Course 214

si
es
7FA Gas Turbine Major Inspections

of
Pr
n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in
any form or by any means, including photocopying, recording, or other electronic or mechanical

s
methods, without the prior written permission of the publisher, except in the case of brief
quotations embodied in critical reviews and certain other noncommercial uses permitted by

al
copyright law. For permission requests, write to the publisher, addressed “Attention: Permissions
Coordinator,” at the address below.

on
Technical Training Professionals
9401 Indian Creek Parkway Suite 1170

si
Overland Park, KS 66210
www.tectrapro.com.com

es
Ordering Information:

of
Quantity sales. Special discounts are available on quantity purchases by corporations,
associations, and others. For details, contact the publisher at the address above.
Orders by U.S. trade bookstores and wholesalers. Please contact Technical Training

Pr
Professionals: Tel: (913) 338-1143; Fax: (316) 462-5649 or visit www.tectrapro.com.

Printed in the United States of America


n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

7FA Gas Turbine Major Inspections Course

Disclaimer:

s
al
The intent of this course is to familiarize the trainee with the steps necessary to
perform a Hot Gas Path inspection on a 7FA Gas Turbine. It is not intended to be used

on
as a field procedure for performing a hot gas path inspection. Please refer to proper
and specific plant procedures.

si
es
of
Pr
n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

7FA Gas Turbine Major Inspections Course


Learning Objectives, Chapter:

s
1.0 Overview
This chapter provides an overview of the hot gas path and major inspections. At the

al
completion of this topic the trainee will be able to identify the different types of
maintenance performed on the gas turbine.

on
2.0 HGP Clearance Measurements
Provides a description of the steps required to measure and record component

si
clearances as part of the Hot Gas Path inspection.

es
3.0 Turbine Casing Removal
Provides a description of the steps required to remove the turbine casing to conduct a
Hot Gas Path inspection.

of
4.0 HGP Concentricity, Rotor Float, & Clearance Checks

Pr
Provides a description of the steps required to measure the concentricity of the first
stage nozzle assembly and take rotor float measurements and internal turbine
clearances.
g
5.0 HGP Component Removal
n
This chapter provides a step for step description of the disassembly of the gas turbine
ni

combustion system for inspection.


ai

6.0 Hot Gas Path Inspection


This chapter provides a description of the steps necessary to inspect the hot gas path
components.
Tr

7.0 HGP Turbine Section Assembly


Provides a description of the reassembly process following a Gas Turbine Hot Gas Path
al

inspection.
c

8.0 HGP Assembly Clearances


ni

Provides a description of the required clearance measurements taken during the Gas
Turbine Hot Gas Path inspection reassembly.
ch

9.0 HGP Combustion Section Assembly


This chapter provides a description of the steps necessary to reassemble the
Te

combustion section following a Gas Turbine Hot Gas Path inspection.

10.0 HGP External Equipment Assembly and Testing


This chapter provides a step by step description of the reassembly of the gas turbine
combustion system following the combustion inspection, including machine retest.

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

214_B5_Ch1 Overview
1. Inspection Scope

s
al
on
si
es
of
Pr
n g
a. The purpose of hot gas path and major inspection is to examine those parts that are
ni

exposed to high temperatures from the combustion process and parts that have been in-
service for a long period of time, such as compressor blades and bearings.
ai

b. The hot gas path inspection includes the full scope inspection of the combustion system
components and a detailed inspection of the turbine nozzles, shrouds, and buckets.
Tr

c. The major inspection includes the full scope inspection of the combustion system
components, the full scope of the hot gas path inspection and a detailed inspection of
the compressor blades, turbine buckets, bearings, rotor, and casing conditions.
d. Good preparation for these outages will include having all of the spare parts and tools on
al

site prior to the start of the inspection.


c
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

s
al
on
si
es
of
Pr
n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

2. Hot Gas Path Inspection

s
al
on
si
es
of
Pr
a. A hot gas path inspection is estimated to take 176 hours or 22 eight hour shifts to
g
perform.
n
b. The hot gas path inspection includes the combustion inspection and a detailed
inspection of the turbine nozzles and shrouds.
ni

c. In order to perform this inspection, the top half of the turbine shell is removed.
d. The nozzles, diaphragms, and shrouds are removed.
ai

e. The turbine buckets will be inspected visually while in place.


Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

3. Major Inspection

s
al
on
si
es
of
Pr
a. A major inspection is estimated to take 368 hours or 46 eight hour shifts to perform.
g
b. The major inspection is a flange-to-flange inspection of gas turbine components which
n
are subject to wear during normal turbine operation.
c. This inspection includes elements of the combustion system inspection and the hot gas
ni

path inspections, plus:


• The upper inlet case, mid, and discharge cases are removed.
ai

• The compressor and inlet cases are inspected for fouling, erosion, corrosion, and
leakage.
Tr

• The rotor and stator compressor blades are checked for tip clearances, rubs, bowing,
cracking, and warping.
• The turbine nozzles and shrouds are checked for clearance, foreign object damage,
cracking, erosion and corrosion.
al

• The seals and hook fits of the nozzles and diaphragms are inspected for rubs,
erosion, fretting or thermal deterioration.
c

• Turbine buckets are removed and the bucket, bucket grooves and dovetails are
inspected foreign object damage, cracking, erosion and corrosion.
ni

• Bearings and seals are inspected for clearance and wear.


• All clearances are checked against their original values.
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

s
al
on
si
es
of
Pr
n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

s
al
on
si
es
of
Pr
n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

Test
1) Scope

s
al
on
si
es
of
Besides the combustion system parts, what additional parts are inspected during a hot

Pr
gas path inspection?

A. Nozzles
B. Shrouds
g
C. Buckets
n
D. All of the above
ni
ai

2) Buckets
Tr
c al
ni
ch
Te

The buckets must be removed to in order to inspect them.

A. True
B. False

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

3) Cases

s
al
on
si
es
of
Which of the following cases are removed for a hot gas path inspection?

A. The upper turbine case

Pr
B. The upper compressor discharge case
g
C. The exhaust frame
n
D. The upper and lower turbine case
ni

4) Equipment
ai
Tr
c al
ni
ch
Te

The major inspection includes bearings and seals.

A. True
B. False

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

5) Compressor

s
al
on
si
es
of
What are the compressor blades inspected for during the major inspection?

A. Rubs
B. Bows Pr
g
C. Cracks
n
D. All of the above
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals


214 - 7FA Gas Turbine Major Inspections

Test Answers

1) D
2) False

s
3) A
4) True

al
5) D

on
si
es
of
Pr
n g
ni
ai
Tr
c al
ni
ch
Te

Copyright © 2018 by Technical Training Professionals