Letter No. AA/MABD/NH-365/MM-10.3/806 Date : 13.02.2016 To ‘The Project Manager, Dilip Buildcon Limited, Muthojipet Village, Narsampet Mandal, Warangal District : 506132 Sub: Rehabilitation and Up-gradation of existing NH-365 from km. 154.000 to km. 187.000 (Mangalvarpet to Mallampally section) to two lane with paved shoulder in the state of Telangana under NHPD ~ IV through Engineering Procurement & Construction (EPC) Basis - Reg: Review of Repairing Methodology of Pavement Quality Concrete (PQC) Ref: Your Letter No: DBL/AP-PROJECTS/MM/PKG-03/409 dated 12.02.2016 Dear Sir, With reference to the letter cited above, your submission of working methodology for repairing of Pavement Quality Concrete has been reviewed and found that the methodology is not in line with IRC:SP:83-2008 based on the following observations, 1. Mapping of cracks for the entire Toll Plaza location shall be marked 2. The depth of cracks shall be assessed by taking cores at different severe places where cracks has been observed 3. Based on the depth of crack, the degree of severity shall be assessed as per Table 4.5 of IRC:SP:83-2008. 4. As per the assessment, rating the repair of action may be proposed. 5. Accordingly the methodology for repair action shall be submitted as per IRC:SP:83-2008. Hence, your submission is not acceptable and advised to resubmit as per IRC:SP:83-2008 by considering the above observations for review, We assure you of our full cooperation all the times. Thanking you, With best regards, for Aarvee Associates Architects Engineers and Consultants Pvt. Ltd., (P. Rathi) Team Leader CC to: 1) The Superintending Engineer, R&B, National Highviays, Hyderabad. 2) The Executive Engineer, R&B, National Highways, Warangal. 3) The Authority's Engineer, Aarvee Associates Architects Engineers and Consultants Pvt. Lid., Hyd.

You might also like