You are on page 1of 6

P a g e |1

PROJECT : REROOFING OF ADMINISTRATION BUILDING


OWNER : PHINMA-ARAULLO UNIVERSITY
LOCATION : BRGY.BITAS, CABANATUAN CITY, NUEVA ECIJA

SUBJECT : STRUCTURAL COMPUTATION AND DESIGN ANALYSIS FOR RECTIFICATION OF


ROOF FRAMING AT ARAULLO UNIVERSITY ADMINISTRATION BUILDING

DATE : July 28, 2017

1. GENERAL NOTES AND SPECIFICATIONS


1.1 General Data:
1.1.1 Span = 16.00 mts
1.1.2 Pitch = 11/160
1.1.3 Bay Length = 3.50mts center to center
1.1.4 Support = Simply supported ( Roller and Fixed )
1.2 All dimensions shown in these drawings are purely structural requirements and do not
include architectural finishes
2. STANDARDS AND INFERENCES
2.1 National Structural Code of the Philippines (NSCP) Buildings, Towers and other vertical
structures 6TH edition, 2010

3. BASIC DESIGN LOADS

3.1 DEAD LOADS (DL)


3.1.1 Metal Roofing
Using 0.60mm PPGI Roof Panel
w/ P.Urethane Insulation 7850kg/m3 – Steel
45kg/m3 - Insulation

3.1.2 Truss and Bracing self weight or as compute


3.1.3 Ceiling and Ceiling Joist 50 Pa
(Acoustical Fiber Board)

3.2 LIVE LOADS (LL)


Trusses and Purlins 1200 Pa
3.3 WIND LOADS (WL)
Zone 2 210 Kph

3.4 SEISMIC LOADS


3.4.1 Conforming to the requirements of the National Structural Code of the Philippines
(NSCP)

Structural Analysis – Admin Bldg Phinma AU union galvasteel corporation – project services group
P a g e |2

LOAD ANALYSIS

USING MAXWELL STRESS DIAGRAM

Structural Analysis – Admin Bldg Phinma AU union galvasteel corporation – project services group
P a g e |3

ON TOP CHORD Pn=2606.23(2sin7.83)/(1+sin27.83)


TARS 1 = 2.80m x BL Pn=697.18 Pa
TARS 1 = 2.80m x 3.50m COMPUTATION OF JOINT LOAD
TARS 1 = 9.80 m2
DEAD LOAD ON TOP CHORD
TARS 2 = 2.42m x BL ON PANEL POINTS A & J
TARS 2 = 2.42m x 3.50m DL ON TOP CHORD=(50+630)(5.65) + ½(224.35)
TARS 2 = 8.47 m2 (11.20)
DL ON TOP CHORD=4,670.18N SAY 4.80 KN/pp

TAHS 1 = 3.20m x BL ON PANEL POINTS B & I


TAHS 1 = 3.20m x 3.50m DL ON TOP CHORD=(50+630)(9.80) + ½(224.35)
TAHS 1 = 11.20 m2 (9.71)
DL ON TOP CHORD=7,753.22N SAY 8.00 KN/pp
TAHS 2 = 2.35m x BL
TAHS 2 = 2.35m x 3.50m ON PANEL POINTS D & G
TAHS 2 = 8.23 m2 DL ON TOP CHORD=(50+630)(8.47) + ½(224.35)
(8.40)
DL ON TOP CHORD=6,701.87N SAY 6.80 KN/pp
TAHS 3 = 2.45m x BL
TAHS 3 = 2.45m x 3.50m ON PANEL POINT F
TAHS 3 = 8.58 m2 DL ON TOP CHORD=(50+630)(8.65) + ½(224.35)
(8.58)
ON BOTTOM CHORD DL ON TOP CHORD=6,844.46N SAY 7.00 KN/pp

TAHS 1 = 4.00m x BL
TAHS 1 = 4.00m x 3.50m DEAD LOAD ON BOTTOM CHORD
TAHS 1 = 14.00 m2 ON PANEL POINTS C & H
DL ON BOTTOM CHORD=(5O+ ½(224.35))(14)
TAHS 2 = 2.45m x BL DL ON BOTTOM CHORD=2,270.45N SAY
TAHS 2 = 2.45m x 3.50m 2.30KN/pp
TAHS 2 = 8.58 m2
ON PANEL POINT E
WEIGHT OF TRUSS ( M.A.HOWE FORMULA ) DL ON BOTTOM CHORD=(5O+ ½(224.35))(8.58)
WT= 35.9 ( 1+ L/3.048 ) ; L=16.00 m. DL ON BOTTOM CHORD=1,391.46N SAY
WT= 35.9 ( 1+ 16/3.048 ) 1.40KN/pp
WT= 224.35 Pa
LIVE LOAD ON TOP CHORD
WIND LOADS ( v=210 kph ) ON PANEL POINTS A & J
P=0.766v2 ; v=210kph=58.33m/s LL ON TOP CHORD=(1200)(5.60)
P=0.766(58.33)2 LL ON TOP CHORD=6,720N SAY 7.00KN/pp
P=2606.23 Pa
ON PANEL POINTS B & I
NORMAL PRESSURE ON AN INCLINED SURFACE LL ON TOP CHORD=(1200)(9.71)
(Pn) BY DUCHEMIN’S FORMULA LL ON TOP CHORD=11,655N SAY 14.00KN/pp
Pn=P(2sinθ)/(1+sin2θ)
Structural Analysis – Admin Bldg Phinma AU union galvasteel corporation – project services group
P a g e |4

ON PANEL POINTS D & G


LL ON TOP CHORD=(1200)(8.30)
LL ON TOP CHORD=9,960N SAY 10.00KN/pp

ON PANEL POINT F
LL ON TOP CHORD=(1200)(8.58)
LL ON TOP CHORD=10,296N SAY 10.50KN/pp

WIND LOAD (LEFT)

ON PANEL POINT A
WL=(697.18)(5.65)
WL=3,839.07N SAY 4.00KN/pp

ON PANEL POINT B
WL=(697.18)(9.80)
WL=6,832.36N SAY 7.00KN/pp

ON PANEL POINT D
WL=(697.18)(8.47)
WL=5,905.11N SAY 6.00KN/pp

ON PANEL POINT F
WL=(697.18)(4.32)
WL=3,011.82N SAY 3.50KN/pp

WIND LOAD (RIGHT)

ON PANEL POINT J
WL=(697.18)(5.65)
WL=3,839.07N SAY 4.00KN/pp

ON PANEL POINT I
WL=(697.18)(9.80)
WL=6,832.36N SAY 7.00KN/pp

ON PANEL POINT G
WL=(697.18)(8.47)
WL=5,905.11N SAY 6.00KN/pp

ON PANEL POINT F
WL=(697.18)(4.32)
WL=3,011.82N SAY 3.50KN/pp

Structural Analysis – Admin Bldg Phinma AU union galvasteel corporation – project services group
P a g e |5

Structural Analysis – Admin Bldg Phinma AU union galvasteel corporation – project services group
P a g e |6

TAKE MEMBER CD, EF AND GH

STRESS ON MEMBER CD AND EF = 15.10 KN


(COMPRESSION)

STRESS ON MEMBER EF = 45.60 KN


(COMPRESSION)

Structural Analysis – Admin Bldg Phinma AU union galvasteel corporation – project services group

You might also like