Professional Documents
Culture Documents
4 of CEP-FIP 1990
s( t, ts ) = csos ( t-ts )
Where:
cso=sx (fcm) x RH
= [160 + 10 x 8 (9 - )] x 10-6
= 400 x 10-6
Where,
fcmo= 10MPa
RH0 = 100%
Where,
sRH = 1- (RH/RH0)3
= 1- (50/100)3
= 0.875
Therefore,
RH = -1.55 s RH
= -1.55 x 0.875
=-1.36
= 0.000544
0.5
s( t-ts ) =
0.5
=
= 0.7632
Where:
ho = 100mm
t1 = 1 day
ts = Age of concrete at the time of shrinkage beginning measured in days i.e 1 day
= 0.76 x 0.000544
= 0.000415
o= RH X (fcm) x (t0)
fcmo= 10MPa
t1 = 1day
t = 36500 days
RH0 = 100%
=1+
= 1.5299
(fcm) = (from equation 2.1-67 of CEB-FIP 1990 code book)
= 2.1637
= 0.63
= 2.100
Creep coefficient:
0.3
s( t-t0) =
0.3
=
= 0.987
H = 150 { 1 + ( 1.2 x RH/RH0 ) 18 } h/h0 + 250 <= 1500 as per clause 2.1 -70
= 1501
= 2.1 x 0.987
= 2.058