Main Block Government of Nepal 1/9

Office of Rainas Municipality


Lamjung
Loose Measurement Sheet-2
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung
Job:- Main Building
S.n. Description of Work No Length T.Length Breadth Height Quantity Unit Remarks
A. Civil Construction Work
Earthworks
4 STONE WORK: Dry stone / boulder soling work in
foundation bed using
(available at good condition at site)

Floor soling for Block A 8 3.670 29.360 3.070 0.200 18.027


2 3.670 7.340 4.270 0.200 6.268
Floor soling for Block B 4 3.670 14.680 3.970 0.200 11.656
6 4.270 25.620 3.970 0.200 20.342
Total= 56.294 cum
7 BRICK WORK: Providing, laying
and curing first class brick masonry
works in cement, sand mortar (1:4) in
ground floor finished in perfect lines
& level as per specification, drawings
& instructions of the site engineer.

First floor beam


Grid 1-1 1 7.000 7.000 0.230 2.900 4.669
Grid 2-2 1 5.800 5.800 0.230 2.900 3.869
Grid 3-3 1 5.490 5.490 0.230 2.900 3.662
Grid 4-4 1 5.490 5.490 0.230 2.900 3.662
Grid 5-5 1 7.190 7.190 0.230 2.900 4.796
Grid 6-6 1 5.200 5.200 0.230 2.900 3.468
Grid 7-7 1 3.500 3.500 0.230 2.900 2.335
Grid 8-8 1 18.140 18.140 0.230 2.900 12.099
Grid 9-9 1 22.040 22.040 0.230 2.900 14.701
Grid A-A 1 7.600 7.600 0.230 2.900 5.069
Grid B-B 1 6.140 6.140 0.230 2.900 4.095
Grid C-C 1 3.800 3.800 0.230 2.900 2.535
Grid D-D 1 6.380 6.380 0.230 2.900 4.255
Grid E-E 1 3.800 3.800 0.230 2.900 2.535
Grid E-E 1 3.300 3.300 0.230 2.900 2.201
Grid F-F 1 7.600 7.600 0.230 2.900 5.069
Grid F-F 1 13.290 13.290 0.230 2.900 8.864
Secondary beam 1 3.900 3.900 0.230 2.900 2.601
Deduction Door Windows
W1 13 1.500 19.500 0.230 1.750 -7.849
W3 3 0.900 2.700 0.230 1.750 -1.087
W2 3 1.200 3.600 0.230 1.750 -1.449
D3 1 0.900 0.900 0.230 2.500 -0.518
D2 1 1.000 1.000 0.230 2.500 -0.575
Total= 79.008 cum
11 PCC & RCC: Providing and Laying Plain Cement
Concrete ( P.C.C.) in 1: 2:4 with cement, sand and
crosser aggregate including mixing, laying, finishing
to approved level, line and dimensions and curing all
complete as per specification and instruction of site
Engineer.

Floor soling for Block A 8 3.670 29.360 3.070 0.100 9.014


2 3.670 7.340 4.270 0.100 3.134
Floor soling for Block B 4 3.670 14.680 3.970 0.100 5.828
Total= 17.976 cum

Prepared By:- Checked By:- Forwarded By:- Approved By:-


Main Block Government of Nepal 2/9
Office of Rainas Municipality
Lamjung
Loose Measurement Sheet-2
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung
Job:- Main Building
S.n. Description of Work No Length T.Length Breadth Height Quantity Unit Remarks
12

Providing and laying PCC (1:1.5:3) M20 for RCC


work in foundation, column, beam, slab, lintel
etc. withcement sand and crosser aggregate of
required size including mixing with concrete
mixture, compacting the concrete with vibrator
machine, laying, finishing to approved level, lines
and dimension and curing all complete work as
per specification and instruction of site Engineer.

Plinth beam
Grid 1-1 2 8.660 17.320 0.230 0.300 1.195
Grid 2-2 2 8.660 17.320 0.230 0.300 1.195
Grid 3-3
2 7.000 14.000 0.230 0.300 0.966
Grid 4-4 2 7.000 14.000 0.230 0.300 0.966
Grid 5-5 2 8.660 17.320 0.230 0.300 1.195
Grid 6-6 2 8.660 17.320 0.230 0.300 1.195
Grid 7-7 3 19.300 57.900 0.230 0.300 3.995
Grid 8-8 3 19.300 57.900 0.230 0.300 3.995
Grid 9-9 3 19.300 57.900 0.230 0.300 3.995
Grid A-A 3 7.600 22.800 0.230 0.300 1.573
Grid B-B 3 7.600 22.800 0.230 0.300 1.573
Grid C-C 3 7.600 22.800 0.230 0.300 1.573
Grid D-D 2 17.020 34.040 0.230 0.300 2.349
Grid D-D 3 7.600 22.800 0.230 0.300 1.573
Grid E-E 2 15.700 31.400 0.230 0.300 2.167
Grid E-E 3 7.600 22.800 0.230 0.300 1.573
Grid F-F 2 15.700 31.400 0.230 0.300 2.167
Grid F-F 3 7.600 22.800 0.230 0.300 1.573
First floor beam
Grid 1-1 2 8.660 17.320 0.230 0.300 1.195
Grid 2-2 2 8.660 17.320 0.230 0.300 1.195
Grid 3-3
2 7.000 14.000 0.230 0.300 0.966
Grid 4-4 2 7.000 14.000 0.230 0.300 0.966
Grid 5-5 2 8.660 17.320 0.230 0.300 1.195
Grid 6-6 2 8.660 17.320 0.230 0.300 1.195
Grid 7-7 3 19.300 57.900 0.230 0.300 3.995
Grid 8-8 3 19.300 57.900 0.230 0.300 3.995
Grid 9-9 3 19.300 57.900 0.230 0.300 3.995
Grid A-A 3 7.600 22.800 0.230 0.300 1.573
Grid B-B 3 7.600 22.800 0.230 0.300 1.573
Grid C-C 3 7.600 22.800 0.230 0.300 1.573
Grid D-D 2 17.020 34.040 0.230 0.300 2.349
Grid D-D 3 7.600 22.800 0.230 0.300 1.573
Grid E-E 2 15.700 31.400 0.230 0.300 2.167
Grid E-E 3 7.600 22.800 0.230 0.300 1.573
Grid F-F 2 15.700 31.400 0.230 0.300 2.167
Grid F-F 3 7.600 22.800 0.230 0.300 1.573
Secondary beam 2 3.300 6.600 0.230 0.300 0.455
Column upto First floor level
for Block A
C1 12 0.400 4.800 0.400 3.300 6.336
C2 3 0.400 1.200 0.400 3.300 1.584
for Block B 0.000
C1 2 0.400 0.800 0.400 3.300 1.056
C2 8 0.400 3.200 0.400 3.300 4.224
C2 11 0.400 4.400 0.400 3.300 5.808
First floor Slab Block A 1 18.560 18.560 9.700 0.125 22.504

Prepared By:- Checked By:- Forwarded By:- Approved By:-


Main Block Government of Nepal 3/9
Office of Rainas Municipality
Lamjung
Loose Measurement Sheet-2
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung
Job:- Main Building
S.n. Description of Work No Length T.Length Breadth Height Quantity Unit Remarks
First floor Slab Block B 1 23.200 23.200 10.300 0.125 29.870
Sill band & Lintel band
Grid 1-1 2 7.000 14.000 0.230 0.150 0.483
Grid 2-2 2 5.800 11.600 0.230 0.150 0.400
Grid 3-3 2 5.490 10.980 0.230 0.150 0.379
Grid 4-4 2 5.490 10.980 0.230 0.150 0.379
Grid 5-5 2 7.190 14.380 0.230 0.150 0.496
Grid 6-6 2 5.200 10.400 0.230 0.150 0.359
Grid 7-7 2 3.500 7.000 0.230 0.150 0.242
Grid 8-8 2 18.140 36.280 0.230 0.150 1.252
Grid 9-9 2 22.040 44.080 0.230 0.150 1.521
Grid A-A 2 7.600 15.200 0.230 0.150 0.524
Grid B-B 2 6.140 12.280 0.230 0.150 0.424
Grid C-C 2 3.800 7.600 0.230 0.150 0.262
Grid D-D 2 6.380 12.760 0.230 0.150 0.440
Grid E-E 2 3.800 7.600 0.230 0.150 0.262
Grid E-E 2 3.300 6.600 0.230 0.150 0.228
Grid F-F 2 7.600 15.200 0.230 0.150 0.524
Grid F-F 2 13.290 26.580 0.230 0.150 0.917
Secondary beam 2 3.900 7.800 0.230 0.150 0.269
150.836 Cum
13 REINFORCEMENT: Providing Reinforcement bars
(Grade Fe 415 or above) work including straightening,
cleaning, cutting, bending, binding with 20 SWG
annealed wire & fixingin position as per design
drawing, barbending schedule for raft
foundationcolumn, beam, wall, stair, slab in all RCC
works as per specification,drawing & instruction of
siteEngineer. Approved brand : Himal Iron,
Panchakanya or Equivalent.
Plinth beam For A block
Grid 1-1 16mm dia bar 2 9.460 18.920 0.890 16.839
Grid 1-1 12mm dia bar 4 9.460 37.840 1.580 59.787
Grid 2-2 16mm dia bar 2 9.460 18.920 0.890 16.839
Grid 2-2 12mm dia bar 4 9.460 37.840 1.580 59.787
Grid 3-3 16 mm dia bar 2 7.800 15.600 0.890 13.884
grid 3-3 12 mm dia bar 4 7.800 31.200 1.580 49.296
Grid 4-4 16 mm dia bar 2 7.800 15.600 0.890 13.884
Grid 4-4 12 mm dia bar 4 7.800 31.200 0.890 27.768
Grid 5-5 16 mm dia bar 2 9.460 18.920 0.890 16.839
Grid 5-5 12 mm dia bar 4 9.460 37.840 1.890 71.518
Grid 6-6 16 mm dia bar 2 9.460 18.920 0.890 16.839
Grid 6-6 12 mm dia bar 4 9.460 37.840 0.890 33.678
Grid D-D 16 mm dia bar 2 19.020 38.040 0.890 33.856
Grid D-D 12 mm dia bar 4 19.020 76.080 0.890 67.711
Grid E-E 16 mm dia bar 2 8.400 16.800 0.890 14.952
Grid E-E 12 mm dia bar 4 8.400 33.600 0.890 29.904
Grid F-F 16 mm dia bar 2 8.400 16.800 0.890 14.952
Grid F-F 12 mm dia bar 4 8.400 33.600 0.890 29.904
lapping 16mm dia bar 18 5.400 97.200 1.580 153.576
12mm dia bar 21 4.500 94.500 0.890 84.105
Stirupus 570 0.960 547.200 0.390 213.408
Plinth beam For B block All 16 mm dia bar
Grid 6-6 6 9.460 56.760 1.580 89.681
Grid 7-7 12 21.300 255.600 1.580 403.848
Grid 8-8 12 21.300 255.600 1.580 403.848
Grid 9-9 12 21.300 255.600 1.580 403.848
Grid A-A 12 8.400 100.800 1.580 159.264
Grid B-B 12 8.400 100.800 1.580 159.264
Grid C-C 12 8.400 100.800 1.580 159.264
Grid D-D 6 19.020 114.120 1.580 180.310
Grid D-D 12 8.400 100.800 1.580 159.264

Prepared By:- Checked By:- Forwarded By:- Approved By:-


Main Block Government of Nepal 4/9
Office of Rainas Municipality
Lamjung
Loose Measurement Sheet-2
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung
Job:- Main Building
S.n. Description of Work No Length T.Length Breadth Height Quantity Unit Remarks
Grid E-E 6 17.700 106.200 1.580 167.796
Grid E-E 12 8.400 100.800 1.580 159.264
Grid F-F 6 17.700 106.200 1.580 167.796
Grid F-F 12 8.400 100.800 1.580 159.264
lapping 32 4.800 153.600 1.580 242.688
Stirupus 585 0.960 561.600 0.390 219.024
First floor beam For A block
Grid 1-1 16mm dia bar 6 9.460 56.760 1.580 89.681
Grid 1-116mm dia exta bar 2 6.200 6.200 1.580 9.796
Grid 2-2 16mm dia bar 6 9.460 56.760 1.580 89.681
Grid 2-2 16mm dia ext bar 2 6.200 12.400 1.580 19.592
Grid 3-3 16 mm dia bar 6 7.800 46.800 1.580 73.944
grid 3-3 16 mm dia ext bar 2 7.600 15.200 1.580 24.016
Grid 4-4 16 mm dia bar 6 7.800 46.800 1.580 73.944
Grid 4-4 16 mm dia ext bar 2 7.600 15.200 1.580 24.016
Grid 5-5 16 mm dia bar 6 9.460 56.760 1.580 89.681
Grid 5-5 16 mm dia ext bar 4 6.200 24.800 1.580 39.184
Grid 6-6 16 mm dia bar 6 9.460 56.760 1.580 89.681
Grid 6-6 16 mm dia ext bar 4 7.600 30.400 1.580 48.032
Grid D-D 16 mm dia bar 6 19.020 114.120 1.580 180.310
Grid D-D 16 mm dia ext bar 4 6.200 24.800 1.580 39.184
Grid E-E 16 mm dia bar 6 8.400 50.400 1.580 79.632
Grid E-E 16 mm dia ext bar 4 6.200 24.800 1.580 39.184
Grid F-F 16 mm dia bar 6 8.400 50.400 1.580 79.632
Grid F-F 16 mm diaext bar 4 7.800 31.200 1.580 49.296
lapping 16mm dia bar 28 5.400 151.200 1.580 238.896
Stirupus 620 0.960 595.200 0.390 232.128
First floor beam For B block All 16 mm dia bar
Grid 6-6 6 9.460 56.760 1.580 89.681
extra bar 4 6.200 24.800 1.580 39.184
Grid 7-7 6 21.300 127.800 1.580 201.924
extra bar 2 13.500 27.000 1.580 42.660
Grid 8-8 6 21.300 127.800 1.580 201.924
extra bar 2 13.800 27.600 1.580 43.608
Grid 9-9 6 21.300 127.800 1.580 201.924
extra bar 2 13.650 27.300 1.580 43.134
Grid A-A 6 8.400 50.400 1.580 79.632
extra bar 2 6.400 12.800 1.580 20.224
Grid B-B 6 8.400 50.400 1.580 79.632
extra bar 2 6.100 12.200 1.580 19.276
Grid C-C 6 8.400 50.400 1.580 79.632
extra bar 2 6.100 12.200 1.580 19.276
Grid D-D 6 19.020 114.120 1.580 180.310
extra bar 4 12.600 50.400 1.580 79.632
Grid D-D 6 8.400 50.400 1.580 79.632
extra bar 4 5.500 22.000 1.580 34.760
Grid E-E 6 17.700 106.200 1.580 167.796
extra bar 4 8.900 35.600 1.580 56.248
Grid E-E 6 8.400 50.400 1.580 79.632
Grid F-F 6 17.700 106.200 1.580 167.796
extra bar 4 13.400 53.600 1.580 84.688
Grid F-F 6 8.400 50.400 1.580 79.632
lapping 32 4.800 153.600 1.580 242.688
Stirupus 645 0.960 619.200 0.390 241.488
Column upto Ground floor
for Block A
C1 12 mm dia bar 48 3.300 158.400 0.890 140.976
C1 16 mm dia bar 96 3.300 316.800 1.580 500.622
C2 16 mm dia bar 36 3.300 118.800 1.580 187.733
for Block B 0.000
C1 12 mm dia bar 8 3.300 26.400 0.890 23.496

Prepared By:- Checked By:- Forwarded By:- Approved By:-


Main Block Government of Nepal 5/9
Office of Rainas Municipality
Lamjung
Loose Measurement Sheet-2
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung
Job:- Main Building
S.n. Description of Work No Length T.Length Breadth Height Quantity Unit Remarks
C1 16 mm dia bar 16 3.300 52.800 1.580 83.437
C2 16 mm dia bar 8 3.300 26.400 1.580 41.712
C3 20mm dia bar 88 3.300 290.400 2.470 717.288
C3 16mm dia bar 44 3.300 145.200 1.580 229.416
Stirupus
for Block A 465.0 1.425 662.625 0.390 258.424
930.0 1.025 953.250 0.390 371.768
for Block B 800 1.425 1139.288 0.390 444.322
931.0 1.025 954.275 0.390 372.167
Slab Reinorcment for Block A
8 mm Dia Bottom bar 149.0 9.750 1452.750 0.390 566.573
79.0 18.600 1469.400 0.390 573.066
8mm dia top bar 79.0 18.860 1489.940 0.390 581.077
149.0 4.200 625.800 0.390 244.062
lapping 52.0 0.750 39.000 0.390 15.210
Slab Reinorcment for Block B
8 mm Dia Bottom bar 187.0 10.300 1926.100 0.390 751.179
84.0 23.200 1948.800 0.390 760.032
8mm dia top bar 84.0 23.200 1948.800 0.390 760.032
149.0 4.500 670.500 0.390 261.495
Staircase portion 16.0 10.770 172.320 0.890 153.365
38.0 1.200 45.600 0.890 40.584
lapping 58.0 0.750 43.500 0.390 16.965
Sill band & Lintel band
Grid 1-1 4 7.000 28.000 0.890 24.920
Grid 2-2 4 5.800 23.200 0.890 20.648
Grid 3-3 4 5.490 21.960 0.890 19.544
Grid 4-4 4 5.490 21.960 0.890 19.544
Grid 5-5 4 7.190 28.760 0.890 25.596
Grid 6-6 4 5.200 20.800 0.890 18.512
Grid 7-7 4 3.500 14.000 0.890 12.460
Grid 8-8 4 18.140 72.560 0.890 64.578
Grid 9-9 4 22.040 88.160 0.890 78.462
Grid A-A 4 7.600 30.400 0.890 27.056
Grid B-B 4 6.140 24.560 0.890 21.858
Grid C-C 4 3.800 15.200 0.890 13.528
Grid D-D 4 6.380 25.520 0.890 22.713
Grid E-E 4 3.800 15.200 0.890 13.528
Grid E-E 4 3.300 13.200 0.890 11.748
Grid F-F 4 7.600 30.400 0.890 27.056
Grid F-F 4 13.290 53.160 0.890 47.312
Secondary beam 4 3.900 15.600 0.890 13.884
Total= 17117.218
14 Form Work : 19mm ply wood &Steel props for all
kinds of RCC workwith necessary wood, nails,
proping,scaffolding, stagging, supportinclusive of
wedging and cuttingholes for utilization work till
thesupport is fullunyielding nett
forColumn/Beam/Slab etc. Completeworks.
Plinth beam
Grid 1-1 2 8.660 17.320 0.300 5.196
Grid 2-2 2 8.660 17.320 0.300 5.196
Grid 3-3
2 7.000 14.000 0.300 4.200
Grid 4-4 2 7.000 14.000 0.300 4.200
Grid 5-5 2 8.660 17.320 0.300 5.196
Grid 6-6 2 8.660 17.320 0.300 5.196
Grid 7-7 3 19.300 57.900 0.300 17.370
Grid 8-8 3 19.300 57.900 0.300 17.370
Grid 9-9 3 19.300 57.900 0.300 17.370
Grid A-A 3 7.600 22.800 0.300 6.840

Prepared By:- Checked By:- Forwarded By:- Approved By:-


Main Block Government of Nepal 6/9
Office of Rainas Municipality
Lamjung
Loose Measurement Sheet-2
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung
Job:- Main Building
S.n. Description of Work No Length T.Length Breadth Height Quantity Unit Remarks
Grid B-B 3 7.600 22.800 0.300 6.840
Grid C-C 3 7.600 22.800 0.300 6.840
Grid D-D 2 17.020 34.040 0.300 10.212
Grid D-D 3 7.600 22.800 0.300 6.840
Grid E-E 2 15.700 31.400 0.300 9.420
Grid E-E 3 7.600 22.800 0.300 6.840
Grid F-F 2 15.700 31.400 0.300 9.420
Grid F-F 3 7.600 22.800 0.300 6.840
First floor beam 0.000
Grid 1-1 2 8.660 17.320 0.300 5.196
Grid 2-2 2 8.660 17.320 0.300 5.196
Grid 3-3
2 7.000 14.000 0.300 4.200
Grid 4-4 2 7.000 14.000 0.300 4.200
Grid 5-5 2 8.660 17.320 0.300 5.196
Grid 6-6 2 8.660 17.320 0.300 5.196
Grid 7-7 3 19.300 57.900 0.300 17.370
Grid 8-8 3 19.300 57.900 0.300 17.370
Grid 9-9 3 19.300 57.900 0.300 17.370
Grid A-A 3 7.600 22.800 0.300 6.840
Grid B-B 3 7.600 22.800 0.300 6.840
Grid C-C 3 7.600 22.800 0.300 6.840
Grid D-D 2 17.020 34.040 0.300 10.212
Grid D-D 3 7.600 22.800 0.300 6.840
Grid E-E 2 15.700 31.400 0.300 9.420
Grid E-E 3 7.600 22.800 0.300 6.840
Grid F-F 2 15.700 31.400 0.300 9.420
Grid F-F 3 7.600 22.800 0.300 6.840
Secondary beam 2 3.300 6.600 0.300 1.980
First floor Slab Block A 1 18.560 18.560 9.700 180.032
side bar 1 56.520 56.520 0.125 7.065
First floor Slab Block B 1 23.200 23.200 10.300 238.960
side bar 1 67.000 67.000 0.125 8.375
Column upto First floor level
for Block A
C1 48 0.400 19.200 3.300 63.360
C2 12 0.400 4.800 3.300 15.840
for Block B 0.000
C1 8 0.400 3.200 3.300 10.560
C2 32 0.400 12.800 3.300 42.240
C2 44 0.400 17.600 3.300 58.080
Sill band & Lintel band
Grid 1-1 4 7.000 28.000 0.150 4.200
Grid 2-2 4 5.800 23.200 0.150 3.480
Grid 3-3 4 5.490 21.960 0.150 3.294
Grid 4-4 4 5.490 21.960 0.150 3.294
Grid 5-5 4 7.190 28.760 0.150 4.314
Grid 6-6 4 5.200 20.800 0.150 3.120
Grid 7-7 4 3.500 14.000 0.150 2.100
Grid 8-8 4 18.140 72.560 0.150 10.884
Grid 9-9 4 22.040 88.160 0.150 13.224
Grid A-A 4 7.600 30.400 0.150 4.560
Grid B-B 4 6.140 24.560 0.150 3.684
Grid C-C 4 3.800 15.200 0.150 2.280
Grid D-D 4 6.380 25.520 0.150 3.828
Grid E-E 4 3.800 15.200 0.150 2.280
Grid E-E 4 3.300 13.200 0.150 1.980
Grid F-F 4 7.600 30.400 0.150 4.560
Grid F-F 4 13.290 53.160 0.150 7.974
Secondary beam 4 3.900 15.600 0.150 2.340
Total= 1010.660

Prepared By:- Checked By:- Forwarded By:- Approved By:-


Page 7 of 9
Government of Nepal
Office of Rainas Municipality
Lamjung
Summary Of Cost
Project Name :- Construction of Rainas municipality Administrative office Building
Site :- Rainas, Lamjung

A. Neta Main Building Qty


S. N. Work Description Remarks

STONE WORK: Dry stone / boulder soling work in Unit BOQ Qty Main Block Rate (Nrs.) Amount (Nrs.)
A Civil Works:-
foundation bed using
(available at good condition at site)

4.00 cum 159.96 56.294 2,000.00 112,587.20

BRICK WORK: Providing, laying


and curing first class brick masonry
works in cement, sand mortar (1:4) in
7.00 cum 353.75 79.008 13,000.00 1,027,106.86
ground floor finished in perfect lines
PCC & RCC: Providing
& level as perand Laying Plain
specification, Cement Concrete
drawings
( P.C.C.) in 1:
& 2:4 with cement,
instructions of thesand and crosser aggregate
site engineer.
including mixing, laying, finishing to approved level, line
and dimensions and curing all complete as per specification
11.00 and instruction of site Engineer. cum 223.69 17.976 11,000.00 197,732.26

Providing and laying PCC (1:1.5:3) M20 for RCC work in


foundation, column, beam, slab, lintel etc. withcement sand
and crosser aggregate of required size including mixing
12.00 with concrete mixture, compacting the concrete with Cum 403.92 150.836 15,000.00 2,262,532.50
vibrator machine, laying, finishing to approved level, lines
and dimension and curing all complete work as per
specification and instruction of site Engineer.

REINFORCEMENT: Providing Reinforcement bars (Grade


Fe 415 or above) work including straightening, cleaning,
cutting, bending, binding with 20 SWG annealed wire &
fixingin position as per design drawing, barbending
13.00 kg 69,765.05 17,117.218 100.00 1,711,721.79
schedule for raft foundationcolumn, beam, wall, stair, slab
in all RCC works as per specification,drawing &
instruction of siteEngineer. Approved brand : Himal Iron,
Panchakanya or Equivalent.

Form Work : 19mm ply wood &Steel props for all kinds of
RCC workwith necessary wood, nails, proping,scaffolding,
14.00 stagging, supportinclusive of wedging and cuttingholes for sqm 2,526.64 1,010.660 800.00 808,528.00
utilization work till thesupport is fullunyielding nett
forColumn/Beam/Slab etc. Completeworks.

Total 6,120,208.61
5% Contingency + Supervision Charge 306,010.43
Subtotal 2 6,426,219.04
Value Added Tax (13 % of subtotal 1) 835,408.48
Total=(VII+VIII) 7,261,627.52

Estimated By :- Checked By :- Recommended by:- Approved By:-


d=n]=k=kmf=g+= !^*
g]kfn ;/sf/
/fOgf; g=kf
sfof{no ndh'ª
7]Ssf ;DaGwL lan .
ljn g++ Name
Project M—2nd Running Billof Rainas municipality Administrative office
:- Construction 7]Ssf k§fsf] ;+Vof M e'QmfgL ef}r/ g+=M—
Building STONE WORK: Dry stone / boulder soling cl3NNff] e'QmfgL lansf] s|d ;+Vof M— ldlt M—
sfof{b]z ldlt M— work in foundation bed using ,, ,, ,, ef}r/ g+= M— gfkL lstfj k[=g+=M— —
(available
sfo{ ;DkGg ug'{kg]{ at good condition at site)
ldlt M— sfo{ ;DkGg ldlt M— cf=j= M—
7]s]bf/sf] gfd M—
Oli6d]6 sfdsf] ljj/0f O{sfO cßfjlw sfd ePsf] cl3Nnf] ljndf r9]sf] xfn ePsf] s}lkmot
cf=g+= kl/df0f b/ hDdf d"No kl/df0f hDdf d"N kl/df0f hDdf d"No

4.00 cum 56.29 2,000.00 112,587.20 - 56.29 112,587.20

BRICK WORK: Providing, laying


and curing first class brick masonry
7.00 works in cement, sand mortar (1:4) in cum 79.01 13,000.00 1,027,106.86 - 79.01 1,027,106.86
PCCground
& RCC: Providing
floor finishedand Layinglines
in perfect Plain
Cement Concrete
& level ( P.C.C.) in 1:drawings
as per specification, 2:4 with
cement, sand and crosser
& instructions aggregate
of the site engineer.
including mixing, laying, finishing to
approved level, line and dimensions and
curing all complete as per specification
and instruction of site Engineer.
11.00 cum 17.98 11,000.00 197,732.26 - 17.98 197,732.26

Providing and laying PCC (1:1.5:3) M20


for RCC work in foundation, column,
beam, slab, lintel etc. withcement sand
and crosser aggregate of required size
12.00 including mixing with concrete mixture, Cum 150.84 15,000.00 2,262,532.50 - 150.84 2,262,532.50
compacting the concrete with vibrator
machine, laying, finishing to approved
level, lines and dimension and curing all
complete work as per specification and
instruction of site Engineer.

REINFORCEMENT: Providing
Reinforcement bars (Grade Fe 415 or
above) work including straightening,
cleaning, cutting, bending, binding with 20
13.00 SWG annealed wire & fixingin position as kg 17,117.22 100.00 1,711,721.79 - 17117.22 1,711,721.79
per design drawing, barbending schedule
for raft foundationcolumn, beam, wall,
stair, slab in all RCC works as per
specification,drawing & instruction of
siteEngineer. Approved brand : Himal Iron,
Panchakanya or Equivalent.
Form Work : 19mm ply wood &Steel props
for all kinds of RCC workwith necessary
wood, nails, proping,scaffolding, stagging,
14.00 supportinclusive of wedging and sqm 1,010.66 800.00 808,528.00 - 1010.66 808,528.00
cuttingholes for utilization work till
thesupport is fullunyielding nett
forColumn/Beam/Slab etc.
Completeworks.
hDdf - 6,120,208.61 0.00 6,120,208.61
b) Insurance Job - - -
Eof6 !#Ü 795,627.12 795,627.12
s"n hDdf 6,915,835.73 6,915,835.73

lg=Aoj=sf] ;xL

of] adf]lhd hDdf ? M— 6,915,835.73 cl3NNff] ljnjf6 e'QmfgL ePsf ? M— - afFsL lbg'k 6,915,835.73
s§f ug"{kg]{ ? M — s= k]ZsL ? M— v= dfn;fdfgsf] df]n ? M—
u= d]zLg cf}h/sf] axfn M— 3=cfos/ ? M— 91,803.13 ª= w/f}6L ? M— 306,010.43
v'b lbg'kg]{ ? M— 6,518,022.17
k]z ug]{sf] ;xL hfFr ug]{sf] ;xL :jLs[t ug}{sf] ;xL
bhf{ bhf{ bhf{
hDdf ? cIf/?kL sf] r]=g+=