Plinth beam
Grid 1-1 2 8.660 17.320 0.230 0.300 1.195
Grid 2-2 2 8.660 17.320 0.230 0.300 1.195
Grid 3-3
2 7.000 14.000 0.230 0.300 0.966
Grid 4-4 2 7.000 14.000 0.230 0.300 0.966
Grid 5-5 2 8.660 17.320 0.230 0.300 1.195
Grid 6-6 2 8.660 17.320 0.230 0.300 1.195
Grid 7-7 3 19.300 57.900 0.230 0.300 3.995
Grid 8-8 3 19.300 57.900 0.230 0.300 3.995
Grid 9-9 3 19.300 57.900 0.230 0.300 3.995
Grid A-A 3 7.600 22.800 0.230 0.300 1.573
Grid B-B 3 7.600 22.800 0.230 0.300 1.573
Grid C-C 3 7.600 22.800 0.230 0.300 1.573
Grid D-D 2 17.020 34.040 0.230 0.300 2.349
Grid D-D 3 7.600 22.800 0.230 0.300 1.573
Grid E-E 2 15.700 31.400 0.230 0.300 2.167
Grid E-E 3 7.600 22.800 0.230 0.300 1.573
Grid F-F 2 15.700 31.400 0.230 0.300 2.167
Grid F-F 3 7.600 22.800 0.230 0.300 1.573
First floor beam
Grid 1-1 2 8.660 17.320 0.230 0.300 1.195
Grid 2-2 2 8.660 17.320 0.230 0.300 1.195
Grid 3-3
2 7.000 14.000 0.230 0.300 0.966
Grid 4-4 2 7.000 14.000 0.230 0.300 0.966
Grid 5-5 2 8.660 17.320 0.230 0.300 1.195
Grid 6-6 2 8.660 17.320 0.230 0.300 1.195
Grid 7-7 3 19.300 57.900 0.230 0.300 3.995
Grid 8-8 3 19.300 57.900 0.230 0.300 3.995
Grid 9-9 3 19.300 57.900 0.230 0.300 3.995
Grid A-A 3 7.600 22.800 0.230 0.300 1.573
Grid B-B 3 7.600 22.800 0.230 0.300 1.573
Grid C-C 3 7.600 22.800 0.230 0.300 1.573
Grid D-D 2 17.020 34.040 0.230 0.300 2.349
Grid D-D 3 7.600 22.800 0.230 0.300 1.573
Grid E-E 2 15.700 31.400 0.230 0.300 2.167
Grid E-E 3 7.600 22.800 0.230 0.300 1.573
Grid F-F 2 15.700 31.400 0.230 0.300 2.167
Grid F-F 3 7.600 22.800 0.230 0.300 1.573
Secondary beam 2 3.300 6.600 0.230 0.300 0.455
Column upto First floor level
for Block A
C1 12 0.400 4.800 0.400 3.300 6.336
C2 3 0.400 1.200 0.400 3.300 1.584
for Block B 0.000
C1 2 0.400 0.800 0.400 3.300 1.056
C2 8 0.400 3.200 0.400 3.300 4.224
C2 11 0.400 4.400 0.400 3.300 5.808
First floor Slab Block A 1 18.560 18.560 9.700 0.125 22.504
STONE WORK: Dry stone / boulder soling work in Unit BOQ Qty Main Block Rate (Nrs.) Amount (Nrs.)
A Civil Works:-
foundation bed using
(available at good condition at site)
Form Work : 19mm ply wood &Steel props for all kinds of
RCC workwith necessary wood, nails, proping,scaffolding,
14.00 stagging, supportinclusive of wedging and cuttingholes for sqm 2,526.64 1,010.660 800.00 808,528.00
utilization work till thesupport is fullunyielding nett
forColumn/Beam/Slab etc. Completeworks.
Total 6,120,208.61
5% Contingency + Supervision Charge 306,010.43
Subtotal 2 6,426,219.04
Value Added Tax (13 % of subtotal 1) 835,408.48
Total=(VII+VIII) 7,261,627.52
REINFORCEMENT: Providing
Reinforcement bars (Grade Fe 415 or
above) work including straightening,
cleaning, cutting, bending, binding with 20
13.00 SWG annealed wire & fixingin position as kg 17,117.22 100.00 1,711,721.79 - 17117.22 1,711,721.79
per design drawing, barbending schedule
for raft foundationcolumn, beam, wall,
stair, slab in all RCC works as per
specification,drawing & instruction of
siteEngineer. Approved brand : Himal Iron,
Panchakanya or Equivalent.
Form Work : 19mm ply wood &Steel props
for all kinds of RCC workwith necessary
wood, nails, proping,scaffolding, stagging,
14.00 supportinclusive of wedging and sqm 1,010.66 800.00 808,528.00 - 1010.66 808,528.00
cuttingholes for utilization work till
thesupport is fullunyielding nett
forColumn/Beam/Slab etc.
Completeworks.
hDdf - 6,120,208.61 0.00 6,120,208.61
b) Insurance Job - - -
Eof6 !#Ü 795,627.12 795,627.12
s"n hDdf 6,915,835.73 6,915,835.73
lg=Aoj=sf] ;xL
of] adf]lhd hDdf ? M— 6,915,835.73 cl3NNff] ljnjf6 e'QmfgL ePsf ? M— - afFsL lbg'k 6,915,835.73
s§f ug"{kg]{ ? M — s= k]ZsL ? M— v= dfn;fdfgsf] df]n ? M—
u= d]zLg cf}h/sf] axfn M— 3=cfos/ ? M— 91,803.13 ª= w/f}6L ? M— 306,010.43
v'b lbg'kg]{ ? M— 6,518,022.17
k]z ug]{sf] ;xL hfFr ug]{sf] ;xL :jLs[t ug}{sf] ;xL
bhf{ bhf{ bhf{
hDdf ? cIf/?kL sf] r]=g+=