Section-1 Introduction to Technical proposal

1.1 Background

Proposal is a plan or suggestion especially a formal or written one, put forward for consideration
by other.
Proposal is a request for support of sponsored or to get acknowledge by who is the owner of the
projects.
A proposal is not promise or commitment but if accepted by the other party, its proposer is
expected to follow through and negotiate for the creation of a binding contract. If submitted in
response to a request for proposal (RFP), it normally constitutes a bid.
In procurement of goods or services, the bid and proposal are often in official use of these two
terms “bid” suppose the limits two terms or scope of work is similar and usually the lowest bid is
awarded work.
Proposal mean the entity is fully aware the detail and scope of work may vary and the work is
awarded to the best plan. Quality and quantity are more of a consideration when proposal are
seriously as opposed to the lowest bid.

1.2 technical proposal structures


The entire Technical proposal should be no more than 12 pages.

Components of the Form of Technical Proposal.

 Cover Page
• Title of the Proposal.
• Duration of the Project in months
• Location of the Project (Sub Location, Location, Constituency and County).
• Amount Requested in ETHIOPIAN BIRR
• Level of Support (County, Grass root)
• Priority Area Covered by the proposal.

Executive Summary Page (Should not exceed one page). A good proposal should have an
executive summary, which gives a brief of the proposal indicating the problem, methods,
activities and expected outcomes.

Main Proposal

The main body of the proposal should contain the following:

INTRODUCTION AND BACKGROUND: This section should give detailed information on the
proposing organization and its activities, relevant previous and current activities. It should also
cover the management capacity, human resource capacity, organizational structure as well as the
collaborators and networks indicating the activities they supported.
PROBLEM STATEMENT AND JUSTIFICATION: This section should cover Current situation,
Problem statement and justification. The organization has to narrow down to the specific
problem faced by the local/target community and justify why this should be funded.

PROJECT DESIGN AND IMPLEMENTATION: This section should cover the methodology
and the approach to be applied and describe the geographical area, target population and /or
project beneficiaries, procedures and strategies of implementation. It should also have the goal,
objectives, activities, expected outputs and outcomes. The section should cover 2 -3 objectives of
the proposal. The objectives should be specific, Measurable, Attainable, Realistic and Time
bound.

Section-2 Company overview


2.1 General
As further described below, Technical Proposals shall address the technical elements of then
design and construction of the Project. The Proposer’s Technical Proposal shall be developed
using narratives, tables, charts, plots, drawings and sketches as appropriate. The purpose of the
Technical Proposal is to document the Proposer's understanding of the Project, demonstrate the
team’s capabilities to complete the Project, document the selection of appropriate design criteria,
and state an approach and schedule for completing all design and construction activities.
2.2 Vision
Vision of the UNITED construction company is:
 Committed to be the center of excellence for the local construction industry.

Our mission
 Have an extra ordinary role in supporting the economic development endeavor of the
nation.
 Provide efficient and effective construction services and meet customers’ expectation to
higher level.
 Ensure sustainable profitability and wealth growth of the company.

OUR Quality Policy


 UNITED Construction P.L.C. in line with its vision and mission is strongly
committed to execute infrastructure and development construction projects both in
the government and private sectors with highest quality standard developed to
exceed our customers’ expectations and to meet all the statutory and regulatory
requirements
 It is our constant endeavor to maintain and continually improve effectiveness of our
performance based on the principles of Quality Management System encouraging an
attitude of “Do it right first” by communicating throughout our company.
 The management is dedicated to review for continual suitability of the systems and
create conditions which will allow the achievement of quality objectives and also to
provide safe and healthy working environment.

Company Motto
“Committed to great undertakings and build them to last”.

2.3 company scope of services


Our company has the following company scope of service when the project is in a process.
The Work shall include but is not limited to:

 Design Services – completion of construction plans.


 Permitting, Utility Relocation and Construction, and Right of Way Acquisition – all to
the Extent Denoted in the RFP (Volume II).
 Construction Services – construct and ensure workmanship of the designed facility.
 Toll Facilities - design and construction of support structures for toll technology
components (to be installed by others).
 Construction Engineering Inspection - provide qualified technical personnel, in
appropriate numbers and at the proper times, such that all contract administration
responsibilities are effectively carried out.

Section-3 Statement of qualification

Our company (UNITED Construction Company) is qualified by the government of the


countries. Our company is qualified all over the required measurements by the governments
which is our company is full fill of all necessary equipment’s, materials and also required
equipment’s that is required for the projects.

3.1 legal statuses


Our company is established since 2002 E.C with having grade 6 and it is with having initial
capital of 2,000,000(two million) for the construction way. When our company is established the
government of Ethiopia is giving the legal status of the contractors.
The government of Ethiopia is giving the license for the contractors with regards to Ethiopian
constitutions what it orders for the contractors.
3.1.1 Constitution or legal status of company
Our company is full of legal regarding of the constitution of Ethiopia because our company is
paying the correct tax yearly and also it is possible to see our legal license and our company is
registered for VAT.
Our company is responsible for paying the required tax for the government not only this
company is responsible for paying VAT Tax monthly.
It is also responsible for renewed of the license with the yearly with the required [payment for
the renewed of license.
United Construction Company has renewed license until present time, it is o ready attached in to
our bid response
Our company is responsible for any constitutional aspects or that is required by the constitution
of the Ethiopian governments.
3.2 power of Attorney of signatory of bid
1. The mode of execution of the Power of Attorney should be in accordance with the procedure,
if any, laid down by the applicable law and the charter documents of the executant(s) and when it
is so required the same should be under common seal affixed in accordance with the required
procedure.
2. Also, where required, the executants(s) should submit for verification the extract of the charter
documents and documents such as a resolution / power of attorney in favor of the Person
executing this Power of Attorney for the delegation of power hereunder on behalf of the Firm.
3. In case the Proposal is signed by an authorized Director of the Firm, a certified copy of the
appropriate resolution / document conveying such authority may be enclosed in lieu of the Power
of Attorney.
 To be executed by the single Applicant or the Lead Member in case of a Consortium.
 The mode of execution of Power of Attorney should be in accordance with the procedure,
if any, laid down by the applicable law and the charter documents of the executant(s) and
when it is so required the same should be under common seal affixed in accordance with
the required procedure.
 Also, wherever required, the executant(s) should submit for verification the extract of the
charter documents and documents such as a resolution / Power of attorney in favor of the
Person executing this Power of Attorney for the delegation of power hereunder on behalf
of the executant(s).
Section-4 General experience of the company
United Construction P.L.C is established in 2002EC with an initial capital of Birr 2 million as a
G6 Contractor -

Since its establishment, united has accomplished more than 5 building projects and 3 road
projects and also carry out water utility construction as well as construction of waste disposal
systems in different cities of the country. The total worth of those projects to date is more than
Birr 80,000,000 Million with vast experience in building projects.

Moreover, united is also the owner of about 10 heavy & light duty construction machinery and
plants with over 50 permanent and contract employees and about 150 daily laborers.

United has its own three story head office building in Addis Ababa and a modern workshop and
training center at the branch office in Mikelle.

Currently, united is executing 2 project worth of around Birr 15 million and has achieved an
annual turnover of more than Birr 1 million.

4.1 Completed projects


Our company has achieved more than 5 building projects and more than five (2) road projects.
The following projects are following in the bellow table
A Completed building project
S no Project name employer Duration Budget IN BIRR
1 Machew technical school Tigray bureau of 2 year 10,00000E/BIRR
education
2 Mekelle nursing school Tigray healthy bureau 2 year 12,000000BIRR

3 Axum health assistance Tigray healthy bureau 1 year 6,347,017.00


school
4 Mekelle university class Ministry of education 1 year 7,234,345.00
room
5 Mekelle business college Ministry of education 1 year 9,546,000.00

B) Road projects
no Project name employer duration budget

1 Gonder cobblestone Gonder city 1year 5000000


pavement120km administration
2 Adigrat 200km Adigrat city 1year 5000000
cobblestone pavement administration
3 Hawassa light weight 5km Hawassa transport 5month 10000000
asphalt pavement authority

C) Water utility and sanitary disposals systems


no Project name employer duration budget
1 Adigrat university waste Adigrat university 2 year 10,000,000
disposals system
2 Work city water supply Work city 2 year 5000,000
system administration
3 Silte zone water reservoir Silte zone water and 3 year 7,000,000
construction sanitary authority

B) Projects at hand
There are few projects are in our hand or we have more than three projects are in a process or
that are ongoing. Those are as follow:
S Project name Employers Types of Start Finish
no name work date(E.C) date(E.C)

1 Mekelle university MEKKELE Building Nove 2009 JULY


dormitory UNIVERSITY 2010E.C

2 Residential building ATO BACHA Building SEP 2008 AUGUST


house 2010

Sectio-5 Declaration of site visit & understanding the work


Our company is declared for the site visit to execute the work as a whole so that it is easily
understandable for executing of the works that’s why UNITED Construction Company is declare
for site visit at any time.
5.1 understanding of the project
Since our company is declared for the site visit for the execution of the work. UNITED
Construction Company has good attitudes towards of the project. That’s why our company
knows of all activities of the project which means it is easily understandable by our company to
execute the whole projects. So that we are responsible for any risk that comes from the project
because we declare that site and also we are understood the activities on the project.
5.2 mobilizing of the contractor & work methodology
Mobilization

Upon award of the Contract and authorization to proceed, mobilization activities will commence.

Mobilization will consist of the following:

1. Mobilization of necessary labor, materials, equipment, tools, and supervision to commence


work on the project.

2. Continued processing of the required submittals which includes administrative and procedural
requirements for submitting project work plans, product data, samples and any other submittals
required in the Project Specifications.

3. Performance of pre-construction activities, previously detailed, on a continual basis, to ensure


that as one phase of remediation is completed the next phase of remediation can commence.

4. The Contractor personnel, taking part in the active remediation activities, will receive the
required medical surveillance (initial entrance physicals) prior to any hazardous or intrusive site
work being performed. Also during the mobilization phase, the construction and set-up of the
primary support/staging area for the Project will take place. If approved by the Town of Hamden,
Mill Rock Park will be utilized as the primary support/staging area.
Besides our company is follow for our work methodology for execution of the whole project as
you give full responsibilities for the execution of the project and we are the responsible one for
following the whole work methodology until the activities going to be finished.
As we express our vision and mission of the company we are very responsible for any risk that
comes from the project.
5.3 ORGINIZATINAL CHART
UNITED Construction Company has proposed key personnel in the project which is both key
personnel in skilled person and non-skilled persons those are seeing in the bellow

 Our company has the following key personnel proposed those are as we see in the bellow
table:

S no Man power No

1 Senior management 2

2 Assistance manager 5

3 Project manager 2

4 Construction heads 2

5 Office engineering heads 3

6 Material engineers 1

7 Chief surveyor 1

8 Engineers(others) 10

9 Surveys 1

10 Lab technicians 1

11 Construction professionals 4

12 Machine operator 2

13 Construction mechanics 2

As we see from the above table we are o ready mentioned the required man proposed in our
projects. When we generalized we have around 40 skilled persons and also we have more than
100 daily labors.
UNITED Construction Company has different key personnel’s in the company for managing
different activities those are as we see below:
 Site manager
 Project manager
 Material engineers
 Supervisors
Name: DANIEL FASIL
Position: site engineer
Project participates: Mekelle university dormitory purpose
When he is in the project he was good in performing and regarding the help for the workers
technically.
As we see his performance he is very excellent and he is welling for the helping of the
construction way and managing all activities.

2 Experience of the key personnel’s


Name: KIBROM KIROS
Position: PROJECT MANAGER
Project participants:
.
When mister KIBROM is staying on the project of BAHIRDAR ROAD PROJECT purpose
he was very good by managing the projects. That’s why the owners are recognized or the owner
is appreciated by his management system not only this our company is reward him because he is
already managed well the projects.

Curriculum Vitae
Proposed Position on the Project:
Name of Firm: UNITED CONSTRUCTION COMPANY
Name of Personnel: AYALEW DEMAMU
Profession/Position: COT’M ENGINEERING
Date of Birth
Years with the date: 23/4/79 E.C Nationality: ETHIOPIA
Proposed Duration on Site: 6Years
Key Qualifications and Relevant Experience
Mr. AYALEW has working with other construction company with having project manager at the
other construction company.
Expected Role in UNITED Construction Company
Mr. AYALEW expected role in UNITED Construction Company is to be a project manager in
all activities that is performed in all projects.
Education
Mr. AYALEW. Have a BSc in construction technology and management in Addis Ababa
University.

A earth moving equipment


S no Description

1 Dozer
2 Loader

3 Excavator

4 Vibratory compactor

C hauling equipment

S no description

1 Tractor trailers

2 Trucks

D concreting equipment

S no Description

1 Batching plants

2 Mixers

3 Concrete pumps

4 Concrete placers

UNITED Construction Company contains the above major equipment’s in the whole company.
Even though it contains the above major equipment’s it also contains un limited equipment’s to
execute the project and also it contains more than enough in number also.

Section-8 financial status


Financial status is a status that is a capability of the contractors for performing of the projects not
only that it is the capability of financial capability of the contactor.
Generally, it is the worth of the contractors towards his company

8.1 financial statuses


Our company has the following financial status:

Our company has a financial status in two ways. Those are as follow

 Cash in hand
 Cash in bank as such as CPO method
UNITED construction company has a financial capacity from our company is more than
1500000(fifteen million) not only that our company has a capacity of financial lend from the
bank around 10,000,000 million.

Generally, our company has more than 20,000000 (twenty million Ethiopian birr in a bank as
CPO way)

UNITED Construction Company has the following average annual construction turnover for the
past 5 years from the present time.

Year: 2005 2006 2007 2008 2009

Volume 2900000 3100000 34000000 3600000 3900000


: