1.1 Background
Proposal is a plan or suggestion especially a formal or written one, put forward for consideration
by other.
Proposal is a request for support of sponsored or to get acknowledge by who is the owner of the
projects.
A proposal is not promise or commitment but if accepted by the other party, its proposer is
expected to follow through and negotiate for the creation of a binding contract. If submitted in
response to a request for proposal (RFP), it normally constitutes a bid.
In procurement of goods or services, the bid and proposal are often in official use of these two
terms “bid” suppose the limits two terms or scope of work is similar and usually the lowest bid is
awarded work.
Proposal mean the entity is fully aware the detail and scope of work may vary and the work is
awarded to the best plan. Quality and quantity are more of a consideration when proposal are
seriously as opposed to the lowest bid.
Cover Page
• Title of the Proposal.
• Duration of the Project in months
• Location of the Project (Sub Location, Location, Constituency and County).
• Amount Requested in ETHIOPIAN BIRR
• Level of Support (County, Grass root)
• Priority Area Covered by the proposal.
Executive Summary Page (Should not exceed one page). A good proposal should have an
executive summary, which gives a brief of the proposal indicating the problem, methods,
activities and expected outcomes.
Main Proposal
INTRODUCTION AND BACKGROUND: This section should give detailed information on the
proposing organization and its activities, relevant previous and current activities. It should also
cover the management capacity, human resource capacity, organizational structure as well as the
collaborators and networks indicating the activities they supported.
PROBLEM STATEMENT AND JUSTIFICATION: This section should cover Current situation,
Problem statement and justification. The organization has to narrow down to the specific
problem faced by the local/target community and justify why this should be funded.
PROJECT DESIGN AND IMPLEMENTATION: This section should cover the methodology
and the approach to be applied and describe the geographical area, target population and /or
project beneficiaries, procedures and strategies of implementation. It should also have the goal,
objectives, activities, expected outputs and outcomes. The section should cover 2 -3 objectives of
the proposal. The objectives should be specific, Measurable, Attainable, Realistic and Time
bound.
Our mission
Have an extra ordinary role in supporting the economic development endeavor of the
nation.
Provide efficient and effective construction services and meet customers’ expectation to
higher level.
Ensure sustainable profitability and wealth growth of the company.
Company Motto
“Committed to great undertakings and build them to last”.
Since its establishment, united has accomplished more than 5 building projects and 3 road
projects and also carry out water utility construction as well as construction of waste disposal
systems in different cities of the country. The total worth of those projects to date is more than
Birr 80,000,000 Million with vast experience in building projects.
Moreover, united is also the owner of about 10 heavy & light duty construction machinery and
plants with over 50 permanent and contract employees and about 150 daily laborers.
United has its own three story head office building in Addis Ababa and a modern workshop and
training center at the branch office in Mikelle.
Currently, united is executing 2 project worth of around Birr 15 million and has achieved an
annual turnover of more than Birr 1 million.
B) Road projects
no Project name employer duration budget
B) Projects at hand
There are few projects are in our hand or we have more than three projects are in a process or
that are ongoing. Those are as follow:
S Project name Employers Types of Start Finish
no name work date(E.C) date(E.C)
Upon award of the Contract and authorization to proceed, mobilization activities will commence.
2. Continued processing of the required submittals which includes administrative and procedural
requirements for submitting project work plans, product data, samples and any other submittals
required in the Project Specifications.
4. The Contractor personnel, taking part in the active remediation activities, will receive the
required medical surveillance (initial entrance physicals) prior to any hazardous or intrusive site
work being performed. Also during the mobilization phase, the construction and set-up of the
primary support/staging area for the Project will take place. If approved by the Town of Hamden,
Mill Rock Park will be utilized as the primary support/staging area.
Besides our company is follow for our work methodology for execution of the whole project as
you give full responsibilities for the execution of the project and we are the responsible one for
following the whole work methodology until the activities going to be finished.
As we express our vision and mission of the company we are very responsible for any risk that
comes from the project.
5.3 ORGINIZATINAL CHART
UNITED Construction Company has proposed key personnel in the project which is both key
personnel in skilled person and non-skilled persons those are seeing in the bellow
Our company has the following key personnel proposed those are as we see in the bellow
table:
S no Man power No
1 Senior management 2
2 Assistance manager 5
3 Project manager 2
4 Construction heads 2
6 Material engineers 1
7 Chief surveyor 1
8 Engineers(others) 10
9 Surveys 1
10 Lab technicians 1
11 Construction professionals 4
12 Machine operator 2
13 Construction mechanics 2
As we see from the above table we are o ready mentioned the required man proposed in our
projects. When we generalized we have around 40 skilled persons and also we have more than
100 daily labors.
UNITED Construction Company has different key personnel’s in the company for managing
different activities those are as we see below:
Site manager
Project manager
Material engineers
Supervisors
Name: DANIEL FASIL
Position: site engineer
Project participates: Mekelle university dormitory purpose
When he is in the project he was good in performing and regarding the help for the workers
technically.
As we see his performance he is very excellent and he is welling for the helping of the
construction way and managing all activities.
Curriculum Vitae
Proposed Position on the Project:
Name of Firm: UNITED CONSTRUCTION COMPANY
Name of Personnel: AYALEW DEMAMU
Profession/Position: COT’M ENGINEERING
Date of Birth
Years with the date: 23/4/79 E.C Nationality: ETHIOPIA
Proposed Duration on Site: 6Years
Key Qualifications and Relevant Experience
Mr. AYALEW has working with other construction company with having project manager at the
other construction company.
Expected Role in UNITED Construction Company
Mr. AYALEW expected role in UNITED Construction Company is to be a project manager in
all activities that is performed in all projects.
Education
Mr. AYALEW. Have a BSc in construction technology and management in Addis Ababa
University.
1 Dozer
2 Loader
3 Excavator
4 Vibratory compactor
C hauling equipment
S no description
1 Tractor trailers
2 Trucks
D concreting equipment
S no Description
1 Batching plants
2 Mixers
3 Concrete pumps
4 Concrete placers
UNITED Construction Company contains the above major equipment’s in the whole company.
Even though it contains the above major equipment’s it also contains un limited equipment’s to
execute the project and also it contains more than enough in number also.
Our company has a financial status in two ways. Those are as follow
Cash in hand
Cash in bank as such as CPO method
UNITED construction company has a financial capacity from our company is more than
1500000(fifteen million) not only that our company has a capacity of financial lend from the
bank around 10,000,000 million.
Generally, our company has more than 20,000000 (twenty million Ethiopian birr in a bank as
CPO way)
UNITED Construction Company has the following average annual construction turnover for the
past 5 years from the present time.