You are on page 1of 4
HIMACHAL PRADESIL PUBLIC WORKS DEPARTMENT. Office Order The Interstellar Testing Center Pi, Ltd 86, Industrial Area, Phase. Ponghkike '5409( Tatyana (e-mail customersupport@itelabs.com) has falilled the eonditinns hyd danny vide government leuer bearing no: PBW(B)F(R)I/2012. dated: 29.5,2017 for empanelmeny in HPPWD as. private material testing laboratory for the NABL aceredited tests The tise et NABL(National Accreditation Board for Laboratoies) accredited tess was provided by the {ie The follow complianees have heen made by the ational Soil Testing & Research laboratories: '- NABL accreditation of the tests provided is up t0 08.06.2019 40 04.06.2021 suie it Metall OF the fist is given further, The aeereditition ofthe lub can alse be seer on the Nebsite of NABL av the link given: hntp:/Avww.nablindi re/nabldindes.phipe- search 2. ‘The test house deposited the application fee & empanelment few amounting tots. Sud. Rs. 5000/- (Payment receipt No-1382822 dated: Nil) in the government treasi's 4. The fest house has agreed to terms & eonditions, and io charge rate oF tests as per the approved HPPWD rates vide its letter dated: 10.02.2020. ‘he test house is hereby empanelied subjeet to following terms and conditions 4) This empaneiment is valid up t0 04.06.2021 as per your NAL i ational Aecieditation Board for Laboratories) accreditation, tt will be extended Upto 3 years on submission NABL(National Accreditation Board for Laboratories) acereditation eertiticate b) All tests of terials in the field shall be conducted in the presence of comes weil Assistant Enginteer/ Junior Engineer in ehanye of work ©) The firm shall keep complete documentation. supported with Photographs! videogrph and tests be eonducted showing the presence of field staf or HPPW 4) The payment for tests conducted by the frm shall be made by the converned I seeusis En ineer afier completing all codal formalities and all statutory deductions ance of the firm, the empangiment is fable to he ©) In case of unsatisfactory perfor withdrawn by the department (HPPWD), f) All the-test results shall be submitted fo concem Executive Engineer in tiplicae dans with one set of test results to this office addressed to Engineer-in-Chiel (Projec:) Shia ‘on the same date. ' ‘The empanelment is for the tests as mentioned below for which NABI. seeredittion los been obtained by Test House. fh) The rate of tests approved by the HPPWD shall be inclusive ofall ses anal iy vst ho the following tests accredited by the NABL only (National Accreditation loan! Kev Laboratories) upto 04.06.2021 ~ “Approved Ries ~niwords ‘Rupees lve re we _|, 800.00 | united city 3 Flakiness index of agaregate IS. 2886 (Partt)~ 00.00. | (RuPces lve _{ 1997 | £00.00 | hundred only Aa Le ian Index of aggregate 1S: 2386 (Part-I | go 99 | (Runees ve 1 _|_ 1800.00" | hunter any We Gravity of aggregate 1S: 2386 (Par-3)— eo0 00 | (Rupees five | funded ony “Water Absorption of aggregate 1S: 2386 ( (Rupees five \ L nundrect oniy \ | Sieve Analysis of sand 1S 389-1870 (Rupees tive « ee hen gees. ‘hunted only Fineness Modulus of Sand iS: 963-1970 (Rupees tive Cos OE ak -| huncred only ) Sli Cantent of Sand 1S. 383-1970 (Rupees four hundied ony (Rupoas thr [hundred oni |-ga] Bulk density of sand 1S:2886 (Parts) 1997 (Rupees ten (Rupes ive funeral ony {Rupees one userid | set of three cube: T Core eulting up toa depih of 30cm the concrete | iBitumen with core dia 100mm & 150MM | 1900.00 “(Flues fs | tundted on 500.00 500,00: sects hundred only ~T | (Rupees tive 1950.00 | hundred tity L oni) F “22765 ra Densily of Wood As per latest relevant 18 Cous Stone: ~ Crashing Code ig Strength Of Stone As per lalest relevant IS ‘500,00. | (Rupees five ‘Cement:- ia & final saing of time IS" 4037 TPa 5) 1088 Water absorption of Stone Aé per latest relavant IS | rated (Rupes tur SON edocs T tips five | $50.00 | huncrect fifty s-o0ly) "| Soundnass test o Code ‘cement As per latest relevant IS Fineness test of cement As perlaiest relevant iS eee sf: G-4 “| Compressive sirenath of Content As par latest LIS Code fement method), ‘500.00 00.00 (Rupees five hundred oniy (Rupees five fungied only (Rupees five 1289800 T runes! only ion eae tne [Per M | hunciod only 00.00 | (Rupees five icked only v2 J3 | ar nism Sage of Binder Content As per lalaal relevant I@ 700,00 | (Rupves seven Sate NO eo ncreeh sal ost > 1) Penetration teat 1S. 1203- 1976 ro | (Rupees five eel ee | hunded only (2) Ductity test 1S: 1208" 1078 (Rupsas tive ey el OS i eraser "Softening point As par latest relevant TS Code ‘500.00 | (Rupoes five ef fungi only Viscosity test 1S: 1205: 1978 | (Rupoas ve nie 500.00 | hunred only Fire end flash point (S: 1209. 1978 S000 | ures tve = irene BURT Tas eee = ce ny Marshalls Stabilly lest As per latest relevant IS (Ruposs one | Code 1800.00: | theussnit five sees fs | hutidred any Stripping Value of aggre (Rupes five IS Code oa 20000 uiiared ony | Core cutting up to a depth of 30em the concrese 1000.00 | (Rupees onc with core LL thowssind oni Standard Penet including interpretation of eerie Bearing capacity .00 dynamic Cone Penetration $000.00) ores {Fests per latest relevant! Code Pa ace | hs Plate load Test IS: 1888-1982 a (Rupees fifleon oe iSanict OF ly) | Mik Design of Granuiar Sub Base Ag por ‘lest (Rupees six relevant IS Code Sas CBR of soil iS 2720 (Part-16)1985 | | Sieve Analysis of 2720(Part-d) 1935 "Atterbergs Limits of Soi 1S, 2720(Pari-B) 198 No.PW, E-in-C(QC&D) Lab. E Copy forwarded 1. The Principal $ 10, hundred only (Rupess seven hundred fifty {only} ‘(Rupeds five _{ hundred only: (Rupees two co seine | hundred only ‘A EngingeFin-Chiek Project HPPWD, Nirman Bhawan shinkr panclment2019- 456 P—/b4SF Duel 23/87/9223 ‘erstary (PW) 10 the Govt. of Himachal Pradesh Shimla-2 for inlormeivn please. The Engincer-in-Chief, HPPWD. Nirman Bhawan Shimla-2, for information ple: All the Zonal Chief Engineer, HPPWD, Shimla Zone, Mandi Zone, Hamigour Jace ail Kangra Zone at Dharamshala for information and necessary action please The Chief Engineer (PMGSY) HPPWD, Nirman Bhawan Shimla-2, lor infurniation please. he Chief Engineer, State Roads Project. HPRIDC. Nirman Bhawan Shimla? for information pleas the Chief Engineer (NH) HPPWD, Nirman Bhawan Shimla, for information plese All Superintending Engineers, HPPWD, through e-mail, for information dnd necessuss action, AI! the Executive Engineers, HPPWD, through e-mail,-for information and necessary action. Nodal Officer (1) HPPAVD, Nirman Bhawan Shinla-2. for information upkustiny: thy same on HPPWD website, The Interstellar Testing Ceiter Pvt. Ltd., 86. Industrial Area, Phase-l, Panchhula 134109(Haryana) for information. HPPWD, Sing Shima

You might also like