Project :Mantri Arena Mall

Basement Exhaust air Louvered area requirements


As per design As per Architect
Capacity in Total Capaity in
SL No Location Exhaust cutout area Area in Sqm No of Fans Louvered area inputs - Louvered Remarks
CFM CFM
required area available
1.5 Sq.m. cut out reduced
B1E-1 6.96 1.0 60,000 60,000 7.4 7.5 which architect Provided
1 earlier
Louvered area founds to be in
B1E-2
2 6.96 1.0 60,000 60,000 7.4 7.5 order

1.0 60,000 60,000 4.0 Sq.m. cut out reduced


B1E-3 11.30 28.5 26.0 which architect provided
3 earlier
4 Basement-1 2.0 85,000 170,000
5 1.0 60,000 60,000 4.0 Sq.m. cut out reduced
B1E-4 11.30 28.5 26.0 which architect provided
2.0 85,000 170,000 earlier
6
7 3.0 65,000 195,000 Louvered area founds to be in
B1E-5 33.10 45.2 45.6
8 2.0 85,000 170,000 order

1.0 70,000 70,000 8.7 As per discussion cutout &


9 B1E-6 10.00 -
louvered area requested
10 2.0 85,000 170,000 21.1

1 1.0 60,000 60,000 Louvered area founds to be in


B2E-1 11.30 18.0 17.9
2 1.0 85,000 85,000 order
3 2.0 60,000 120,000 Louvered area founds to be in
B2E-2 18.70 25.4 26.0
4 1.0 85,000 85,000 order
5 2.0 60,000 120,000 3.0 Sq.m. cut out reduced
B2E-3 11.00 21.1 21.0 which architect provided
6 1.0 50,000 50,000 earlier
B2E-4 4.13 2.0 65,000 130,000 16.1 Louvered area founds to be in
7 Basement-2 16 order
As per discussion we have
B2E-5 13.40 - - - - - requested slab cutout at
8 lowerbasement only
B2E-6 9.80 2.0 80,000 160,000 19.8 Louvered area founds to be in
9 20.5 order
60,000 60,000 Louvered area founds to be in
10 B2E-7 12.80 1 17.3 17.5
order
11 1 80,000 80,000
Project :Mantri Arena Mall
Basement Fresh air Louvered area requirements
As per design As per Architect
Capacity in Total Capaity in
SL No Location Fresh Air cutout area Area in Sqm No of Fans Louvered area inputs - Louvered Remarks
CFM CFM
required area available
Louvered area founds to be in
B1F-1 5.70 1.0 35,000 35,000 4.3 4.15
1 order
Louvered area founds to be in
B1F-2 45,000 16.7 16.75
2 20.40 3.0 135,000 order
Basement-1
Louvered area founds to be in
B1F-3 23.40 4.0 43,000 172,000 21.3 21.4
order
3
Louvered area founds to be in
4 B1F-4 22.80 3.0 67,000 201,000 24.9 25.0
order

Louvered area founds to be in


B2F-1 10.90 2.0 50,000 100,000 12.4 12.3
1 order
Louvered area founds to be in
B2F-2 21.20 62,000 186,000 23.0 23.0
2 3.0 order
Basement-2
Louvered area founds to be in
B2F-3 9.30 70,000 70,000 8.7 8.8
3 1.0 order
Shaft required up to
B2F-4 5.30 1.0 85,000 85,000 10.5 11.5
4 basement-2 ceiling