interference: Providing bedding for a four-lane underground urban motorway
Vibration-related internal construction
measures for a 247-m high-rise complex with tunnelling below Decoupling of a Four-Lane Urban Motorway and a 247-m Tall Tower Standing above it
Project description The Getzner solution
In the centre of Tokyo, on a site Full-surface bedding of a four-lane borne noise from spreading through covering a total area of about 6,000 urban motorway the building. The building is thus m2, a prestigious multi-function area effectively protected against he irst implementation phase unwanted vibrations. was built; the centrepiece of this development is the Toranomon Hills Mori Tower, a high-rise around 247 T of the project involved applying a resilient bedding to the 200 m m in height with 52 loors, which is underground length of motorway. set to become the tallest building in The full width of this section was Tokyo. bedded on the high-tech Sylomer®. This has the effect of providing the irectly beneath this structure structure erected above the road D the planners designed a four- lane underground urban motorway – with effective and long-term protection against vibration. The a new main trafic artery for getting solution directly addresses the across Tokyo. To enable this impres- cause of the vibration, as the four- sive skyscraper to be built to the lane urban motorway, which is the required usage standards, a solution source of the disturbing structure- had to be found for the vibration borne noise, has now been isolated. produced by the urban motorway, The elastic bedding decouples the which runs through a tunnel for some source of disturbance from its 200 m. The Tokyo Metropolitan surroundings, and thus also from Government selected the Japanese the structure erected over it. property company Mori Building as its partner for this major public- Protecting outstanding private sector project. Mori in turn architecture engaged Getzner as its specialist partner for vibration isolation. In the second implementation phase of the project, a variety of internal Getzner has developed vibration vibration-damping construction protection for two signiicant measures for decoupling the hotel subprojects: an elastic solution for that occupies the upper loors of the the hotel on the uppermost loors tower are being carried out. In order The project goal, which was to of the high-rise complex and a to protect this sensitive area in the provide the maximum quality solution for the urban motorway best possible way against vibrations, of life and work by reducing running directly underneath the Getzner is bedding the hotel loors, vibration and noise, has been building. the pool areas and the itness and achieved. machinery rooms of the hotel on Sylomer®. This prevents structure- Feedback Vibration experts on site The advantages of the What do our clients have to say Getzner solution about the project? Getzner also assumed responsibility for overseeing the installation pro- — Sylomer® performs extremely well nstalling Sylomer® mats has the cess. „On a project of this magnitude it is not only very important to work in the long term — Expert, well-informed contacts I effect of reducing noise and vibration. The material has been closely with our Japanese partners, on site employed successfully for decades – one really needs to be on site oneself, — Material is easy to handle and Getzner has demonstrated this on as only then can we constantly to install numerous occasions in the rail monitor the quality of the work and — Getzner‘s experience spans sector. Another important criterion ensure that our materials protect this decades and has been gained for future-oriented urban planning superb architecture in the long term. across all sectors is that the material should be easy For Getzner, this order is a valuable — Overseeing construction and quick to install. reference for future projects all over — Comprehensive documentation the world“, is how Werner Ebster, — Excellent price/performance ratio Toru Tsuchihashi, project manager at Getzner, Deputy General Manager, underlines the importance of this Mori Building major project. Facts and igures at a glance Project Toranomon Hills Mori Tower in Tokyo (JP)
Key facts: Tallest building in Tokyo (247 m, 52 loors)
Location: Loop Road No. 2 (trunk road from Shimbashi to Toranomon) Project coordination in Japan: Nihon Getzner K.K. und Getzner Werkstoffe Bürs Owner: Mori Building Carriageway solution: Full-width elastic bedding of a four-lane carriageway Hotel solution: Hotel loors, pool complexes plus itness suites and machinery rooms underlaid with Sylomer® bedding Elastic bedding: Getzner Werkstoffe GmbH Execution: 2014
Getzner Werkstoffe GmbH Construction references (extract from Japan)
Foundation: 1969 (as a subsidiary of Getzner, — National Training Center, Tokio (JP) Mutter & Cie) — Palace Hotel, Tokio (JP) Chief Executive Oficer: Ing. Jürgen Rainalter — The Peninsula Hotel, Tokio (JP) Employees: 340 — The St. Regis Hotel, Osaka (JP) 2015 turnover: EUR 77.9 million — Pacifico Yokohama, Business areas: Railway, construction, industry Conference Center (JP) Headquarter: Bürs (AT) — Tokyo American Club, Sports Center (JP) Locations: Berlin (DE), Munich (DE), Stuttgart (DE), — Kabukiza, Tokio (JP) Lyon (FR), Amman (JO), Tokyo (JP), — QVC Studio, Chiba (JP) Pune (IN), Beijing (CN), Kunshan (CN), — Toppan Rotary Printing Press, Osaka (JP) Charlotte (US) Ratio of exports: 85 %