305-04 305 Construction of subgrade from cum 88,100
road way cut material, complete
and as directed by the Engineer 305-05 305 Construction of subgrade with cum 187,170 approved materials from borrow pits, complete and as directed by the Engineer 305-06 305 Backfill behind abutment, cum 4,572 wing walls, return walls for bridges, complete and as directed by the Engineer 307-01 307 Turfing side slope of roads and sqm 57,127 islands at major junctions with grass sods, complete and as directed by the Engineer 308-01 308 Seeding and Mulching, sqm 500 complete and as directed by the Engineer Total Bill No.3 carried to Summary