305-04 305 Construction of subgrade from cum 88,100

road way cut material, complete


and as directed by the Engineer
305-05 305 Construction of subgrade with cum 187,170
approved materials from borrow
pits, complete and as directed by
the Engineer
305-06 305 Backfill behind abutment, cum 4,572
wing walls, return walls for
bridges, complete and as directed
by the Engineer
307-01 307 Turfing side slope of roads and sqm 57,127
islands at major junctions with
grass sods, complete and as
directed by the Engineer
308-01 308 Seeding and Mulching, sqm 500
complete and as directed by the
Engineer
Total Bill No.3 carried to
Summary