You are on page 1of 1

UNIT UNIT

RATE RATE
AMOUN
PAY ITEM NO. SPEC. DESCRIPTION UNIT QUANTITY IN IN
T
FIGUR WORD
E (RS.) S (RS.)
309-01(a) 309 PCC M15 bed concrete for cum 210
covered rectangular drain,
complete
309-01(b) 309 PCC M20 concrete for bottom cum 118
and side wall of covered
rectangular drain, complete
309-01(d) 309 RCC M20 concrete for Drain, cum 4,291
excluding reinforcement, for the
covered rectangular drains,
complete

309-02(a) 309 PCC M15 bed concrete for cum 325


Edge strip, complete
309-02(b) 309 PCC M20 concrete for Edge cum 418
strip, complete

309-03 309 Providing Concrete retaining cum 1,798


wall of M15, complete
704.2-01 704.2 Providing Gabian retaining cum 43,046
wall, complete.
701.3-01 701.3 Providing geotextile filter sqm 8,176
membrane behind RCC retaining
wall