DHA QUETTA

DEVELOPMENT OF DHA QUETTA

SECTOR A-1

BILL OF QUANTITIES

VOLUME-III
DHA QUETTA (SECTOR A-1)
GRAND SUMMARY

S. NO. DESCRIPTION AMOUNT (PKR)

1 ROAD WORK
2 STORM WATER DRAINAGE SYSTEM
3 SEWERAGE SYSTEM
4 WATER SUPPLY
5 UTILITY CROSSING DUCTS
6 EXTERNAL ELECTRIFICATION
TOTAL AMOUNT =
DHA QUETTA (SECTOR- A-1)
SUMMARY (ROAD WORK)

SR. NO DESCRTIPTION AMOUNTS: (PKR)

Bill No. 01 EARTH WORK AND ALLIED ACTIVITIES


Bill No. 02 SUB BASE AND BASE
Bill No. 03 SURFACE COURSES AND PAVEMENT
Bill No. 06 ANCILLARY WORKS
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES & COST
BILL NO. 01 EARTHWORK
Item No Description Unit Quantities Rate Amounts
101 CLEARING AND GRUBBING SM 515,040.00
COMPACTION OF NATURAL
104 SM 515,040.00
GROUND
EXCAVATE UNSUITABLE
106a CM 7,000.00
COMMON MATERIAL
EXCAVATE UNSUITBALE SOFT
106biii CM 1,500.00
ROCK MATERIAL
STRUCTURAL EXCAVATION IN
107a CM 1,200.00
COMMON MATERIAL
107d GRANULAR BACKFILL CM 2,000.00
107 COMMON BACKFILL CM 1,000.00
FORMATION OF EMBANKMENT
108a FROM ROADWAY EXCAVATION IN CM 582,801.31
COMMON MATERIAL
FORMATION OF EMBANKMENT
108c FROM BORROW EXCAVATION IN CM 1,184,692.19
COMMON MATERIAL
SUBGRADE PREPARATION IN
109a SM 128,760.00
EARTH CUT
Sum of Bill No. 01 Carried to Summary (Road Work) =
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES & COST
BILL NO. 02 SUB BASE AND BASE
Item No Description Unit Quantities Rate Amounts
201 GRANULAR SUB-BASE CM 71,391.00
202 AGGREGATE BASE CM 52,380.00
ASPHALTIC BASE COURSE PLANT
203B MIX (CLASS B) CM 11,463.00
Sum of Bill No. 02 Carried to Summary (Road Work) =
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES & COST
BILL NO. 03 SURFACE COURSES AND PAVEMENT
Item No Description Unit Quantities Rate Amounts
CUT-BACK ASPHALT FOR
302a SM 298,584.00
BITUMINOUS PRIME COAT
CUT-BACK ASPHALT FOR
303a SM 180,672.00
BITUMINOUS TACK COAT.
ASPHALTIC CONCRETE FOR
305b WEARING COURSE (CLASS B) CM 14,937.00
Sum of Bill No. 03 Carried to Summary (Road Work) =
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES & COST
BILL NO. 06 ANCILLARY WORKS
Item No Description Unit Quantities Rate Amounts
401f LEAN CONCRETE CM 10,185.00

PRECAST CURB IN CONCRETE


601dii M 74,626.00
CLASS A-1 OF SIZE 450X150 mm
INCL. BEDDING & HAUNCHING
SP CURB GUTTER M 10,691.00
PAVEMENT MARKING IN NON-
608b1 REFLECTIVE CR PAINT FOR LINES M 22,020.00
OF 15 cm WIDTH
PAVEMENT MARKING IN NON-
608c1 REFLECTIVE CR PAINT FOR LINES M 81,305.00
OF 20 cm WIDTH
TRAFFIC ROAD SIGNS CATEGORY
607A EACH 16.00
1
TRAFFIC ROAD SIGNS CATEGORY
607c EACH 1.00
3 (a)

PROVIDING AND LAYING


CEMENT CONCRETE PAVING
STONE 60MM THICK IN NATURAL
COLOUR AS IN FLOORS,
STREETS, PUBLIC PARKING
Mes :12-22 ETC;ANY PATTERN AND SHAPE SM 101,827.00
(HYDRAULICALLY COMPRESSED)
LAID AND JOINTED IN SAND
INCLUDING 50MM THICK SAND
BED AS LAYING COARSE ALL AS
SPECIFIED.
Sum of Bill No. 06 Carried to Summary (Road Work) =
DHA QUETTA (SECTOR A-1)
SUMMARY (DRAINAGE SYSTEM/ STORM WATER)

S. NO. DESCRTIPTION AMOUNT (PKR)

1 DRAINAGE SYSTEM / STORM WATER NETWORK

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


ABSTRACT OF QUANTITIES (A-1)
DRAINAGE SYSTEM/ STORM WATER
RATE
PAY ITEM DESCRIPTION UNIT QUANTITY AMOUNTS (PKR)
(PKR)
Excavation as in hard soil upto 1.5m
depth, in foundation and pipe trenches
upto 1.5 m wide in shafts, wells and
independent holes upto 30 sqm each
MES:'01-02 and throw earth clear of edges of CM 16,307.83
excavation within 10 m. timbering to
be paid extra (trench over 1.5 m width
will be treated as areas).

Providing and laying of cement


concrete Type 'B' using broken or
crushed stone as specified in walls,
sills, copings, channels, drains, steps,
MES:'03-16 string courses, corbels, pier caps, CM 7,657.80
hinge stones, bed plates etc, including
form work and fair faces to exposed
surfaces.

Providing and laying of cement


concrete 1:4:8 using crushed or
MES:03-08 CM 1,191.53
broken stone graded as specified

Burnt brick work in wall over 115 mm


thick laid and jointed in cement mortar
MES:'04-09 1:6 straight or to curve with inner CM 341.25
radius of 6 m and over upto g.f roof
level.
RCC PIPE
Supply and fix reinforced cement
concrete pipes 300mm bore, laid and
MES 21-07 jointed with spigot socket or tongue METER 7,110.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 375mm bore, laid and
MES 21-08 jointed with spigot socket or tongue METER 1,384.00
and groove joint incl rubber ring, as
specified.
supply and fix reinforced cement
concrete pipes 450mm bore, laid and
MES 21-09 jointed with spigot socket or tongue METER 1,267.00
and groove joint incl rubber ring, as
specified.
ABSTRACT OF QUANTITIES (A-1)
DRAINAGE SYSTEM/ STORM WATER
RATE
PAY ITEM DESCRIPTION UNIT QUANTITY AMOUNTS (PKR)
(PKR)
supply and fix reinforced cement
concrete pipes 525mm bore, laid and
MES 21-10 jointed with spigot socket or tongue METER 222.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 600mm bore, laid and
MES 21-11 jointed with spigot socket or tongue METER 199.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 675mm bore, laid and
MES 21-12 jointed with spigot socket or tongue METER 904.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 750mm bore, laid and
MES 21-13 jointed with spigot socket or tongue METER 253.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 825mm bore, laid and
MES 21-14 jointed with spigot socket or tongue METER 862.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 900mm bore, laid and
MES 21-15 jointed with spigot socket or tongue METER 546.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 1050mm bore, laid and
MES 21-16 jointed with spigot socket or tongue METER 809.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 1200mm bore, laid and
MES 21-17 jointed with spigot socket or tongue METER 608.00
and groove joint incl rubber ring, as
specified.
ABSTRACT OF QUANTITIES (A-1)
DRAINAGE SYSTEM/ STORM WATER
RATE
PAY ITEM DESCRIPTION UNIT QUANTITY AMOUNTS (PKR)
(PKR)
Supply and fix reinforced cement
concrete pipes 1650mm bore, laid and
MES 21-17
jointed with spigot socket or tongue METER 46.00
Prorata
and groove joint incl rubber ring, as
specified.
CONCRETE MANHOLE

Supply and fix bars round, using


MES: 09-56 deformed bars grade - 60 including KG 256,015.70
cutting, bending, binding and placing
reinforcement in position.
M.S GRATING ON MANHOLE
Providing & lanying ms. grating as per
SP drawing and design complete in all EACH 484.00
respect.
Providing and laying RCC type B
manhole cover (precast complete with
MES: 21-35 angle iron frame embedded in EACH 484.00
concrete all as per information sheet
No. Svcs-341
Providing of sand cushion in layers as
specified, under concrete roads, hard
MES: '02-91 CM 684.64
standings, landing ground etc.

CEMENT PLASTERING
13mm thick cement plaster 1:3
MES: 13-3 SM 1,669.12
finished as specified.
Total Amount Carried to Grand Summary (DRAINAGE/STORM WATER) (PKR) =
DHA QUETTA (SEC- A-1)
SUMMARY (SEWERAGE SYSTEM)

SR. NO DESCRTIPTION AMOUNTS: (RS.)

1 SEWERAGE NETWORK
2 DWTS

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


DHA QUETTA (SECTOR-A-1)
ABSTRACT OF QUANTITIES
SEWERAGE SYSTEM

Pay Item Item Description Unit Quantity Rate (PKR) Amount (PKR)
Excavation as in Hard Soil upto 1.5m
depth, in foundation and pipe trenches
upto 1.5 m wide in shafts, wells and
independent holes upto 30 Sqm each
MES:'01-02 and throw earth clear of edges of CM 44,405.00
excavation within 10 m. Timbering to
be paid extra (Trench over 1.5 m width
will be treated as areas).

Bottoming/ sub base of any thickness


as specified using Granular Sub Base
Material laid and compacted to 100%
MES:'02-15 CM 37,744.25
modified AASHTO density by
appropriate compacting equipment and
roller.
RCC PIPE
Supply and fix reinforced cement
concrete pipes230mm bore, laid and
MES 21-05 Meter 26,036.00
jointed with spigot socket or collars, as
specified.
Supply and fix reinforced cement
concrete pipes 300mm bore, laid and
MES 21-07 jointed with spigot socket or tongue Meter 2,069.00
and groove joint incl rubber ring, as
specified.
Supply and fix reinforced cement
concrete pipes 375mm bore, laid and
MES 21-08 jointed with spigot socket or tongue Meter 633.00
and groove joint incl rubber ring, as
specified.
CONCRETE MANHOLE
Manhole complete rectangular or
MES: 21-31 circular as described, exceeding
Prorata 600mm but not exceeding 1800mm
Cum 1,553.92
(200mm deep with iron steps (in angles 380mm
wall) centers),230 mm thick poured concerte
walls.
DHA QUETTA (SECTOR-A-1)
ABSTRACT OF QUANTITIES
SEWERAGE SYSTEM

Pay Item Item Description Unit Quantity Rate (PKR) Amount (PKR)

MANHOLE COVER
Providing and laying RCC type B
manhole cover (precast complete with
angle iron frame embedded in
MES: 21-35 Each 1,121.00
concrete all as per information sheet
No. Svcs-341 dated 10-11-99.

HOUSE CHAMBER
Manholes complete rectangular or
circular as described n.exceeding
600mm deep form inverted to surface
MES: 21-28 Each 245.00
of cover, including main channel set in
CM 1:1, 150 mm thick RCC walls.

Total Amount Carried to Summary (Sewerage System) (PKR) =


DWTS
MAIN SUMMARY
SR.
DESCRIPTION AMOUNT (PKR)
No.
1 ANAEROBIC BAFFLED REACTOR

2 ANAEROBIC FILTERS

3 EFFLUENT TANK

4 SETTLER TANK

5 CHAMBER

TOTAL AMOUNT IN (Rs)


ANAEROBIC BAFFLED REACTOR
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 371.75
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth, in
foundation and pipe trenches upto 1.5 m wide in
shafts, wells and independent holes upto 30 Sqm
each and throw earth clear of edges of excavation
2.1
within 10 m. Timbering to be paid extra (Trench
over 1.5 m width will be treated as areas).

Cum 5,631.45
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL), with
spoil obtained from excavation in trenches/over
areas within 10m including watering and
compaction in 150mm layer and dressing to
required profile and shape.
Cum 1,779.73
Compaction of Natural ground upto 95% modified
2.3
ASHTO density all as spd. Sqm 1,255.82
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 126.25
ANAEROBIC BAFFLED REACTOR
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using crushed
stone and clean sand, conform to ASTM
with minimum cylindrical strength of 3000 psi at 28
days with RCC Type- '8' as under including water
tight shuttering fixing and removing etc, but
excluding the cost of reinforcing steel including the
3.2
cost of extra labour for fixing of pipes, opening and
making of drip course mould etc, complete in all
respects at any floor and any height, as per
specifications, drawings and all to the approval of
the Engineer lncharge.

a. Footings and raft foundation using ordinary


3.3 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI. Cum 595.37
b. Beams, lintels, Slab & stair etc using ord
3.4 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 173.95
a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL to
3.5
footing). Cum 370.39
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and fixing
in position Deformed bar steel conforming to
ASTM A-615 and made of best quality billets
and having minimum yield strength of 60,000 PSI
including cost of binding wire of 14SWG
including wastage, spd/ unspd laps, steel chairs
3.6 rolling margin etc, at any floor and any height
complete in all respects as per drawings and all
to the approval of the Engineer lncharge any
floor and any height over laps and chairs not to be
paid (incl steelchairs).

Kg 110,000.0
ANAEROBIC BAFFLED REACTOR
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
4 PLASTER WORK
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects as
per drawings, specifications, and as directed by
the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal walls


4.1
etc. and add Pudlo Plaster. Sqm 4,387.36
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where mention
Sqm 957.62
5 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with washers,
ladders, railings, brackets, pipe supports, tie rods
and balusters, chimny bars, chains, rings shackles,
5.1 hinges and type, grating or gullies, etc. including
forging, letting in to stone or brick work etc:
complete, by welding in lieu of riveting/bolting etc.

Kg 640.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF as
6.1 per drawings.
Mtr 8.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame exceeding
6.2 7.5Kg but not exceeding 10 Kg/Each set in Cm
and handing in concrete as spd.
Each 168.00
Providing and fixing of PVC water stopper 190 mm
6.3 Mtr 858.27
wide
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) = -
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 669.14
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth, in
foundation and pipe trenches upto 1.5 m wide in
shafts, wells and independent holes upto 30 Sqm
each and throw earth clear of edges of excavation
2.1
within 10 m. Timbering to be paid extra (Trench
over 1.5 m width will be treated as areas).

Cum 7,781.17
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including watering
and compaction in 150mm layer and dressing to
required profile and shape.
Cum 1,887.86
Compaction of Natural ground upto 95% modified
2.3
ASHTO density all as spd. Sqm 1,701.94
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 171.10
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using crushed
stone and clean sand, conform to ASTM
with minimum cylindrical strength of 3000 psi at
28 days with RCC Type- '8' as under including
water tight shuttering fixing and removing etc, but
excluding the cost of reinforcing steel including
3.2
the cost of extra labour for fixing of pipes, opening
and making of drip course mould etc, complete in
all respects at any floor and any height, as per
specifications, drawings and all to the approval of
the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not leaner
than 3000 PSI. Cum 799.86
b. Beams, lintels, Slab & stair etc using ord
3.3 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 245.07
3.4 a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 560.76
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and fixing
in position Deformed bar steel conforming to
ASTM A-615 and made of best quality billets
and having minimum yield strength of 60,000 PSI
including cost of binding wire of 14SWG
including wastage, spd/ unspd laps, steel
3.5 chairs rolling margin etc, at any floor and any
height complete in all respects as per drawings
and all to the approval of the Engineer
lncharge any floor and any height over laps and
chairs not to be paid (incl steelchairs).

Kg 156,000.00
4 Brick Work (Ground Floor)
ENGINEER ESTIMATE FOR DHA QUETTA
ANAEROBIC FILTERS
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Burnt brick work in wall over 115 mm thick laid
and jointed in cement mortar 1:6 straight or to
4.1
curve with inner radius of 6 m and over upto G.F
roof level. Cum 326.16
5 PLASTER WORK
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects as
per drawings, specifications, and as directed by
the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


5.1
walls etc. and add Pudlo Plaster. Sqm 4,855.76
b. 13mm thick cement plaster (1:4) on ceilings
5.2 surfaces and external walls.etc where mention
Sqm 1,217.84
6 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with washers,
ladders, railings, brackets, pipe supports, tie rods
and balusters, chimny bars, chains, rings
6.1 shackles, hinges and type, grating or gullies, etc.
including forging, letting in to stone or brick work
etc: complete, by welding in lieu of riveting/bolting
etc.
Kg 160.00
7 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF as
7.1 per drawings.
Mtr 8.00
Providing and fixing of PVC water stopper 190
7.2
mm wide Mtr 916.79
Providing & laying PVC Pipe 15 mm dia fill in
7.3 tank 3 feet according to Drawing complete in all
respect. Mtr 169,140.00
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
EFFLUENT TANK
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 520.45
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 1,782.98
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 609.05
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 317.96
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 31.97
EFFLUENT TANK
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 119.21
b. Beams, lintels, Slab & stair etc using ord
3.3 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 42.49
3.4 a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 117.78
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/ unspd
3.5 laps, steel chairs rolling margin etc, at any
floor and any height complete in all respects
as per drawings and all to the approval of the
Engineer lncharge any floor and any height
over laps and chairs not to be paid (incl
steelchairs).
Kg 31,200.00
4 PLASTER WORK
EFFLUENT TANK
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


4.1
walls etc. and add Pudlo Plaster. Sqm 594.80
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 515.11
5 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 80.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
6.1 as per drawings.
Mtr 8.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 8.00
Providing and fixing of PVC water stopper 190
6.3 Mtr 131.67
mm wide
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
SETTLER
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 1,022.30
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 3,605.49
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 1,057.32
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 1,470.53
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 93.29
SETTLER
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 380.06
b. Beams, lintels, Slab & stair etc using ord
3.4 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 141.35
a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 274.36
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/ unspd
3.5 laps, steel chairs rolling margin etc, at any
floor and any height complete in all respects
as per drawings and all to the approval of the
Engineer lncharge any floor and any height
over laps and chairs not to be paid (incl
steelchairs).
Kg 78,000.00
4 PLASTER WORK
SETTLER
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


4.1
walls etc. and add Pudlo Plaster. Sqm 2,103.35
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 785.43
5 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 240.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
6.1 as per drawings.
Mtr 8.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 36.00
Providing and fixing of PVC water stopper 190
6.3 Mtr 405.95
mm wide
TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =
ENGINEER ESTIMATE FOR DHA QUETTA
CHAMBER
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
1 Clearing and Grubbing
Clearing of site including cutting of Tree Shrubs
1.1 and obstruction according to satisfaction of
engineer. Sqm 1,022.30
2 EXCAVATION
Excavation as in Ordinary Soil upto 1.5m depth,
in foundation and pipe trenches upto 1.5 m wide
in shafts, wells and independent holes upto 30
Sqm each and throw earth clear of edges of
2.1
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).
Cum 257.47
2.2 Back Fill
Earth filling as in Ordinary or hard soil ,filling in
foundation , pipe trenches, shafs, wells,
independent holes, under floors or around plinth
etc, 1.5 M below or above Ground Level (GL),
with spoil obtained from excavation in
trenches/over areas within 10m including
watering and compaction in 150mm layer and
dressing to required profile and shape.
Cum 177.59
Compaction of Natural ground upto 95%
2.3
modified ASHTO density all as spd. Sqm 380.99
3 CONCRETE
Providing, mixing, depositing, curing and
compacting cement concrete using ordinary
cement 1:4:8 in foundation etc, as shown on the
drawing with clean local sand and using crush
3.1
stone graded as spd including formwork where
required etc, complete in all respect and as
directed by Engineer lncharge.
Cum 3.37
ENGINEER ESTIMATE FOR DHA QUETTA
CHAMBER
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing, mixing, depositing, vibrating and
curing, reinforced cement concrete using
crushed stone and clean sand, conform to
ASTM with minimum cylindrical strength of
3000 psi at 28 days with RCC Type- '8' as under
including water tight shuttering fixing and
removing etc, but excluding the cost of
3.2
reinforcing steel including the cost of extra
labour for fixing of pipes, opening and making of
drip course mould etc, complete in all respects
at any floor and any height, as per
specifications, drawings and all to the approval
of the Engineer lncharge.

a. Footings and raft foundation using ordinary


cement as in RCC Type 'B' concrete not
leaner than 3000 PSI. Cum 11.43
b. Beams, lintels, Slab & stair etc using ord
3.4 cement as in RCC Type 'B' concrete not leaner
than 3000 PSI and ratio (1·2:4):-
I. up to 12 Mtr height from G.L. upto 3rd Floor
Cum 3.69
a. Walls & Column :-
I. up to 12 Mtr above from G.L (including GL
to footing). Cum 18.35
STEEL REINFORCEMENT
a. Supplying, cutting, bending, binding and
fixing in position Deformed bar steel
conforming to ASTM A-615 and made of
best quality billets and having minimum yield
strength of 60,000 PSI including cost of binding
wire of 14SWG including wastage, spd/ unspd
3.5 laps, steel chairs rolling margin etc, at any
floor and any height complete in all respects
as per drawings and all to the approval of the
Engineer lncharge any floor and any height
over laps and chairs not to be paid (incl
steelchairs).
Kg 4,000.00
4 PLASTER WORK
ENGINEER ESTIMATE FOR DHA QUETTA
CHAMBER
CIVIL WORKS
Sr.
Description Unit Quantity Rate Amount (PKR)
No.
Providing and applying cement sand plaster 13
mm thick internal and external surfaces of walls
ceiling at any floor and any height to all surfaces
and planes both normal and oblique inclusive of
corners, splays in jamb, curves, recesses,
grooves, moulding, scaffoldings, labour, curing,
cleaning, bomding, etc,complete in all respects
as per drawings, specifications, and as directed
by the Engineer Incharge.

a. 13mm thick cement plaster (1:6) internal


4.1
walls etc. and add Pudlo Plaster. Sqm 84.76
b. 13mm thick cement plaster (1:4) on ceilings
4.2 surfaces and external walls.etc where
mention Sqm 117.99
5 Grill / Ladder
Supply and fix hold fast, guard bars, Straps for
wooden trusses, holding down bolts with
washers, ladders, railings, brackets, pipe
supports, tie rods and balusters, chimny bars,
5.1 chains, rings shackles, hinges and type, grating
or gullies, etc. including forging, letting in to
stone or brick work etc: complete, by welding in
lieu of riveting/bolting etc.
Kg 240.00
6 MISCELLANEOUS
---do--- but 50mm dia UPVC for sleeves of GF
6.1 as per drawings.
Mtr 8.00
Supply and fixing cast iron manhole cover for
overhead water tank 600mm with frame
6.2 exceeding 7.5Kg but not exceeding 10 Kg/Each
set in Cm and handing in concrete as spd.
Each 4.00
Providing and fixing of PVC water stopper 190
6.3
mm wide Mtr 36.57
7 SUBMERSIBLE PUMP
Providing & Laying submersible pump 2 HP
SP complete with all requirement accoring to
design. Nos 8.00

TOTAL AMOUNT CARRIED TO SUMMARY DWTS (PKR) =


DHA QUETTA (SECTOR- A-1)
SUMMARY WATER SUPPLY SYSTEM

SR. NO DESCRTIPTION AMOUNT (PKR)

1 WATER SUPPLY SYSTEM


2 OVER HEAD TANK
3 UNDER GROUND TANK
4 TUBE WELLS
TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =
ABSTRACT OF QUANTITIES
WATER SUPPLY SYSTEM
RATE
PAY ITEM DESCRIPTION UNIT QUANTITY AMOUNTS (PKR)
(PKR)
Excavation as in Hard Soil upto
1.5m depth, in foundation and pipe
trenches upto 1.5 m wide in shafts,
wells and independent holes upto
30 Sqm each and throw earth clear
MES:'01-02 CM 27,961.08
of edges of excavation within 10 m.
Timbering to be paid extra (Trench
over 1.5 m width will be treated as
areas).

Bottoming/ sub base of any


thickness as specified using
Granular Sub Base Material laid
MES:'02-15 and compacted to 100% modified CM 15,951.88
AASHTO density by appropriate
compacting equipment and roller.

PROVIDING OF SAND CUSHION


IN LAYERS AS SPECIFIED,
MES: '02-91 UNDER CONCRETE ROADS, CM 10,543.18
HARD STANDINGS, LANDING
GROUND ETC.
Providing and laying of cement
concrete 1:4:8 using crushed or
MES:03-08 CM 94.12
broken stone graded as specified

Providing and laying reinforced


cement concrete Type B using
shingle or gravel in columns,
beams, stairs, posts, struts, piers,
MES'3-22 CM 906.10
lintols, and the like requiring
shuttering, as specified.
Reinforcement measured and paid
separately
Supply and fix bars round, using
deformed bars grade - 40 including
MES :09-54 cutting, bending, binding and KG 86.08
placing reinforcement in position.
ABSTRACT OF QUANTITIES
WATER SUPPLY SYSTEM
RATE
PAY ITEM DESCRIPTION UNIT QUANTITY AMOUNTS (PKR)
(PKR)
Burnt brick work in wall over 115
mm thick laid and jointed in cement
MES:'04-09 mortar 1:6 straight or to curve with CM 9.08
inner radius of 6 m and over upto g.f
roof level.

One coat of water proofing


MES'10-102 SM 2,247.40
compound using bitumen 10-20
applied hot at 14.68 kg per 10 sqm.
RCC PIPE
Supply and fix high density
polyethlene (hdpe) pipe 66 mm dia,
SP-1 METER 17,705.00
class pn-10 complete in all respect

Supply and fix high density


polyethlene (hdpe) pipe 96.8 mm
SP-2 METER 9,907.00
dia, class pn-10 complete in all
respect
Supply and fix high density
polyethlene (hdpe) pipe 141 mm
SP-3 METER 5,595.00
dia, class pn-10 complete in all
respect
Supply and fix high density
polyethlene (hdpe) pipe 220.4 mm
SP-5 METER 122.00
dia, class pn-10 complete in all
respect
SP-6 CONCRETE MANHOLE
MANHOLE COMPLETE
RECTANGULAR OR CIRCULAR
AS DESCRIBED, EXCEEDING
600MM BUT NOT EXCEEDING
SP-7 METER 1,553.92
1800MM DEEP WITH IRON STEPS
(IN ANGLES 380MM
CENTERS),230 MM THICK
POURED CONCERTE WALLS.
Providiing & laying of gate vale
SP-8 NO 227.00
complete in all respect
Providiing & laying of air relief vale
SP-9 NO 1.00
complete in all respect

SP-11 Providiing & laying of fire hydrant NO 6.00


valve complete in all respect
Post marker gi pipe 100 mm dia
SP-12 NO 178.00
one meter
ABSTRACT OF QUANTITIES
WATER SUPPLY SYSTEM
RATE
PAY ITEM DESCRIPTION UNIT QUANTITY AMOUNTS (PKR)
(PKR)
Brass connection with clamps and
SP -13 gi pipe with elbow fitting complete EACH 1,557.00

MANHOLE COVER
Providing and laying rcc type b
manhole cover (precast complete
with angle iron frame embedded in
MES: 21-35 EACH 234.00
concrete all as per information sheet
no. svcs-341 dated 10-11-99.

CEMENT PLASTERING
13mm thick cement plaster 1:3
MES: 13-3 SM 1,622.64
finished as specified.
Total Amount Carried to Summary (Water Supply) (PKR) =
DHA QUETTA (SECTOR - A-1)
SUMMARY (TUBE WELL) (20 Nos)
SR .
DESCRIPTION AMOUNT (PKR)
NO
1 CIVIL WORKS
2 MECHANICAL & PLUMBING WORKS
3 ELECTRIFICATION WORKS

TOTAL AMOUNT OF TUBE WELLS CARRIED TO SUMMARY (WATER SUPPLY)


(PKR) =
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
CIVIL WORKS
EXCAVATION FOR FOUNDATION
Excavation in foundation of building ,
bridge and other structure including
dagbelling, dressing and refilling around
structure with excavated earth water and
ramming as directed, lead beyond 8
3/ 21 (c)
kilometer and lift upto 5 feet (1.52 m).
Dressing and levelling of earhtwork to
designed section, etc.
In Ordinary soil
%0 Cft 20,151
GRANULAR FILL -
Bottoming/ sub base of any thickness as
specified using Granular Sub Base Material
Mes/ 02- laid and compacted to 100% modified
Cft 7,328
15 AASHTO density by appropriate
compacting equipment and roller.

ANTI TERMITE TREATMENT -


Providing and spraying anti-termite liquid
26/ 42 mixed with water in the ratio of 1:40 (Rate 100 Sft 14,648
for each spray)
P.C.C -
Cement concrete plain including
compacting, finishing and curing
6/ 5(i) -
placing,complete (including screening and
washing of stone aggregate):
i) Under Foundation/Raft P.C.C ( 1:4:8 ) 100 cft 1,209
STEEL REINFORCEMENT
-
(Deformed Grade 60, ASTM A615)
Fabrication of mild steel reinforcement for
cement concret including cutting bending,
laying in position, welding and fastening,
including cost of binding wire and labour
6/ 9 (c), -
charges for binding of steel reinforcement
(also includes removal of rust from the
bars). Deformed bar 60 grade

All Structure Kg 37,625


REINFORCED CEMENT CONCRETE
-
(RAFT)
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
Providing and laying reinforced cement
concrete (including 1) The rate
includes rendering floor prestressed
concrete), using coarse sand and screened
surface smooth, and the plastering graded
and washed aggregate, in required shape
and design, done for making up all surfaces
including forms, moulds, Shuttering, lifting,
compacting, after removing centring. curing,
endering and finishing exposed surface,
complete (but excluding the cost of steel
6/ 6-a
reinforcement, its fabrication 2) Plastering -
ii(3),
done under soffit of and placing in position,
etc.) (a)(ii) Reinforced
cement concrete in slab of rafts / strip
foundation, base slab of column and
retaining walls; etc and other structural
members other than those mentioned in
5(a) (i) above ot requiring form work (i.e.
horizental shuttering) complete in all
respects:-

(3) Type C (nominal mix 1: 2: 4) -


a) Raft Per Cft 2,793
REINFORCED CEMENT CONCRETE -
Providing and laying reinforced cement
concrete (including pre-stressed concrete),
using coarse sand and screened graded
and washed aggregate, in required shape
6/ 6,a(i)1 and design, including forms, moulds,
-
shuttering, lifting, compacting, curing,
rendering and finishing exposed fabrication
and placing in position etc).

Reinforced cement concrete in roof slab,


beams, columns, lintels, girders and other
structural members laid in situ or pre cast
laid in position or prestressed members cast
in situ complete in all respect. Type-A
(Nominal Mix 1:1:2 )

For All Structure Per Cft 10,443


DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
BLOCK MASONRY
Precast cement concrete hollow blocks (1:
2: 4) , including cost of templates and
6/ 11 Cft 9,244
constructing walls thereof.

INTERNAL PLASTER C.S.M. (1:5)


Cement plaster 1:5 upto 20' (6.00 m)
b)½" (13 mm) thick
Extra for lime, mud or cement plaster and
11/ 11(b)
pointing from20' (6.00 m) and above for
each additional 10' (3.00 m)height or part
thereof.
100 Sft 13,900
EXTERNAL WALL PLASTER C.S.M. (1:4)

Cement plaster 1:4 upto 20' (6.00 mm)


b)3/4" (20 mm) thick
Extra for lime, mud or cement plaster and
11/ 9©
pointing from20' (6.00 m) and above for
each additional 10' (3.00 m)height or part
thereof.
100 Sft 27,782
EMULSION PAINTING
preparing of surface and painting with
13/ 31 emulsion paint , complete in all respect.
a,b 39, a) New surface 1+ 2 total 3 coat

ceiling & walls 100Sft 17,092


WEATHER SHIELD
Preparing surface and painting with water
13/ 32A proof coloured cement finish, like duracem,
a ,I, ii, buxcem or other finishes with
39, similar specifications, on walls, etc.

a) New surface 1+ 2 total 3 coat 100 Sft 24,002


MS. WINDOW GRILL
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
P/F MS box section of 16 SWG,having
frames of 2”x1-1/2” leave frame of T- type
box section of 2” x 1” x 1 ” , with½”x1/2”box
section using, Ushaped rubber for fixing
5mm thick glass panesi / cthe cost of fixing
of 24 SWG wire guaze on inner side by
25/54
mean sof ½”x1/8” MS flat patti, MS grill
fitted with in the window frame and screws
including hinges ,brass handles and
painting 3 coats. Complete in all respect.

Sft 1,743
P.C.C ( UNDER FLOOR)
Cement concrete plain including
compacting, finishing and curing
6/ 5(f,i )
placing,complete (including screening and
washing of stone aggregate):
(1:4:8) 100 cft 1,247
(1:2:4) 100 cft 643
P.C.C. FOR PLINTH PROTECTION
Cement concrete plain including placing,
compacting, finishing and curing complete
6/ 5(f,i )
(including screening and washing of stone
aggregate):
(1:4:8) 100 cft 1,809
(1:2:4) 100 cft 932
ALUMINUM WINDOWS, VENTILATORS
,DOORS
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
Providing and fixing all types of glazed
aluminium windows of anodized
champagne colour partly fixed and party
sliding using deluxe section of approved
manufacturer having Frame of size 100mm
x 30mm using frame at bottom, at top and
side leaf leaf frame sections of 60mm x
23mm at top & bottom and size 45mm x
25mm at center and size 45mm x 25mm at
25 /53a sides, Jali leaf frame size 43mm x 13mm i/c
fine quality aluminum jali, 5mm thick
imported tinted glass with rubber gasket
using approved standard latches, wheel,
stopper, brush chennel angle joint and
hardware etc. complete in all respect.
(2 mm thick section)

Door ,windows ,ventilator Sft 1,008


TERRAZO CHIPS -
Providing and laying floor of mosaic marble
chips 1"(25 mm) thick of approved quality
and shade, laid in white cement and
10/ 23 pigment, over ¾"(20 mm) thick bedding of 100Sft 4,133
cement sand mortar 1:2, including finishing
and polishing, complete.

WATER PROOFING (ROOF TREATMENT)


Providing and laying insulation and water
proofing to roof consisting of.
2 coat of with Sika Seal - 105
19 mm cement sand mortor(1:6)
50 m thermopore sheets
75 mm thick Screed(1:2:4) on slabs
1000 gauge sinle layer polythene sheet
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
25 mm thick terrazo tiles laid with 20mm
(1:5) cement sand mortar nominal thickness
pointed flush with cement sand mortar (1:3)
using 1-part of OPC and 3-parts of clean
approved quality sand. Including curing,
mortar fillet 2”x2” all around at corner of slab Sft 7,368
and parapet wall, complete in all respect as
per drawings and specification, or as
directed by the Engineer Incharge.

CHAKWAL STONE -
Providing and laying 3/4" thick (minimum)
natural sand stone fixng with bond around
P.Sft 1,607
the building , complete in all respect.

TOTAL AMOUNT CARRIED TO SUMMARY (TUBE WELLS) (PKR)= -


MECHANICAL & PLUMBING WORKS
BORING
Providing and installation of Submersible
Pump for water bore Complete in all
respect.(bore depth aproximately. 800 ft)

Water bore material and all accesssories


with labour charges Rft. 16,000
30 HP Nos. 20
TOTAL AMOUNT CARRIED TO SUMMARY (TUBE WELLS) (PKR)= -
ELECTRIFICATION WORKS
ZE-03 Raceways, Boxes and Installation Details
Supply and laying of 3″ (75mm) Φ UPVC
pipe Class "D" for electric cables from
manhole outside the building to Distribution
1 Box as specified and as per Ft 2,000
instruction/satisfaction of Engineer in
charge

Supply and laying of 1″ (25mm) Φ PVC pipe


for electric cables from Distribution Box to
Switch board, and upto each point as
2 Ft 6,000
specified and as per instruction/satisfaction
of Engineer in charge
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
Supply, installation, testing and
commissioning of Light/fan point wiring with
02 No. of 2.5 mm² single core PVC
insulated (including green/yellow earth
conductor of 01 No. of 2.5 mm² single core
PVC insulated, stranded copper conductors
(voltage grading 450/750) in already laid
3 Nos. 40
PVC conduit pipes (rigid/flexible), concealed
in structure or under floor, complete with all
accessories from distribution board to
switch board and as per the satisfation of
the Engineer Incharge.

Same as above Sr. No. 3 , but from point to


4 Nos. 120
point
Supply, installation, testing and
commissioning of 3 Pin 16 Amps., Power
Socket, wiring (including circuit wiring) with
02 No. of 4 mm² single core PVC insulated
(including green/yellow earth conductor of
01 No. of 4 mm² single core PVC insulated,
stranded copper conductors (voltage
5 grading 450/750) in already laid PVC Nos. 80
conduit pipes (rigid/flexible), from DB to
Power Socket, concealed in structure or
under floor, complete with all accessories
and as per the satisfation of the Engineer
Incharge.

ZE-04 Fans
Supply, installation, testing, and
commissioning complete with all hardware,
1
wall brackets, cords and other accessories
etc. of:
i. Exhaust Fan 12" dia Nos. 80
ZE-05 Earthing and Bonding
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
Supply, Installation and connecting of 01
Nos. Earth point comprising of earth rod
(copper claded MS rod) 20 mm dia. 10 ft.
length (for double earthing of DB's body)
driven in ground by means of 8 SWG Hard
1 Drawn Bare Copper Conductor. The Job 40
earthing rod shall be complete with fixing
clamps, necessary hardwares etc as per the
satisfaction of The Engineer.

ZE-07 Switchgear and Distribution Board


Supply, installation, testing and
commissioning of wall mounted DB - TW
along with angle iron frame 16 SWG, sheet
steel enclosure having high quality powder
coated paint, color RAL 7032. The panel
shall be complete with incoming and
outgoing MCB's, CU busbars
(20A,415V,TPN+E) Amp./volt. meters,
indication lights, construction with IP 54
protection class, door locking arrangment
etc and all other accessories as required for
1 quality work, incoming from SMDB-04 Near Job 40
Petrol Pump, having
Incoming
20A TP MCCB, 16 KA,
Outgoings (from bottom through cables)
i) 02 x 10 A SP MCB, of 10 kA capacity
ii) 01 x 16 A SP MCB, of 10 kA capacity
iii) 01 x 20A, 30 mA 4P ,RCBO
DHA QUETTA (SECTOR - A-1)
ABSTRACT OF QUANTITIES
PAY AMOUNT
DESCRIPTION UNIT QUANTITY RATE (PKR)
ITEM (PKR)
ZE-08 Interior Lighting
Supply, installation, testing and
commissioning of light fixtures complete
with lamps, starting gears, holders,
including all suspension, mounting and
fixing materials, concrete bases, swivel
1
mounts, brackets, suspension chains and
hooks as specified and to the satisfaction of
Engineer.

i. LED Tube Light (1 X 18W Single Rod)


Nos. 160

TOTAL AMOUNT CARRIED TO SUMMARY (TUBE WELLS) (PKR)= -


DHA QUETTA (SECTOR A-1)
SUMMARY
OVER HEAD WATER TANK
S. No. DESCRIPTION AMOUNT (PKR)

1 OVER HEAD WATER TANK (100,000 GLN)

TOTAL AMOUNT CARRIED TO SUMMARY (WATER SUPPLY) (PKR) =


DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Excavation
01-6 Excavation in over area as in Ordinary soil
upto 1.5 m depth, in foundation / to obtain
earth for filling under floors/areas etc,or for
Cum 832.00
shafts,wells,exc 30 Sqm each clear of
edges of excavation within 10 M

01-6+
1.5 M to 3.0 M. Cum 832.00
01 - 13
01-6+
2 (01 - 13) 3.0 M to 4.5 M. Cum 238.40

Termite
11-1 Termite Proofing of new buildings incl
wood work therein with approved Sqm 974.20
chemicals.
Granular Back Fill
02-07 Roll and compact Granular Soil formation
surface/ embankment upto 150mm layers
by compacting equipment and roller upto
Cum 1,678.00
100% Modified AASHTO density, incl filling
in depression with hard soil.

P.C.C 1:4:8
03-8 Providing and laying of C.C Type' C' using
crushed or broken stone graded as Cum 30.00
specified.
R.C.C
03-36 Providing and laying RCC 28 Mpa (4000
psi) cylinder strength ,as in piers
,foundations etc,incl lead up to 5 km
Cum 348.00
without the use of shuttring .Reinforcement
to be measured and Paid Separately .
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
03-34 Providing and laying RCC 28 Mpa (4000
psi) cylinder strength incl lead up to 5 km ,
using weigh batch ,as in roof ,Slabs,walls
, landings ,plinth beams and bands etc
as specified ,requiring shuttring
.Reinforcement to be measured and Paid
Separately . i) Lift 00' -
40' Cum 156.00
03-34
ii) Lift 40' - 50' Cum 34.00
+03-71
03-34
+ 2 * (03- iii) Lift 50' - 60' Cum 34.00
71)
03-34+
3 * (03-71) iv) Lift 60' - 70' Cum 70.80

03-34
+ 4 * (03- v) Lift 70' - 80' Cum 149.20
71)
03-34
+ 5 * (03- vi) Lift 80' - 90' Cum 76.20
71)
03-35 Providing and laying RCC 28 Mpa (4000
psi) cylinder strength ,as in columns
,beams,stairs,posts ,struts ,piers ,lintels
and the like,incl lead up to 5 km as
specified ,requiring shuttring
.Reinforcement to be measured and Paid
Separately. i) Lift 00' -
40' Cum 11.62
03-35 ii) Lift 40' - 50'
Cum 3.40
+ 03-71
03-35 + iii) Lift 50' - 60'
Cum 2.20
2*(03-71)
10-102 One coat of water proofing compound using
bitumen 10-20 applied hot at 14.68 Kg per Sqm 455.00
10 Sqm.
13-03 13mm thick cement plaster 1:3 finished as
Sqm 1,507.00
specified.
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
13-11 19mm thick cement plaster 1:4 finished as
Sqm 1,238.00
specified.
15-121 Wall finish coat of graffiato wall coating
1.5mm to 3.00mm thick (stright and swirl ) Sqm 1,507.00
in any colour .
15-125 Surface preparation by using putty on
plastered wall or ceiling to form smooth
Sqm 2,745.20
base for distemper, plastic emulsion paint
all as specified.
Sand Cushion
02 91 Providing Sand Cushion in layers as
specified , under concrete roads ,hard
Cum 8.80
standings and landing grounds etc.

12-15 Providing and laying of cement concrete


type B as in floor ,slabs, surface finished
smooth with neat cement and steel trowel, Cum 4.60
using crushed or broken stone.

12-37 Providing and laying 10mm thick Terrazzo


(-) 12-44 floor using marble chips 1:2 with ordinary Sqm 87.60
cement.
Bricks Ballast
12-07 Providing and laying burnt bricks, laid on
edge. in floors, roofs , channels, etc., laid
Sqm 87.60
and jointed in sand or mud.

Marble Patti
12-28 Supply and fix 8-10mm thick and 40mm
wide marble patty as dividing strips in floor Meter 287.40

12-38 Providing and laying 10mm thick Terrazzo


(-) 12-44 in dado,skirting using marble chips 1:3 with
ordinary cement ,incl 10 mm thick cement Sqm 795.60
plaster.
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
18-264 Sluice valve according to BSS-3464,
(Table 18-1-5) flanged and drilled to BS
table 18-1-9, complete with rubber packing Each 2.00
100mm dia, supply and fixing.

18-265 150mm dia. Each 6.00


Manhole Cover
21-35 Providing and laying, R.C.C Type 'B'
manhole cover (precast) complete with
angle iron frame, embedded in concrete, all Each 2.00
as per information sheet # Svcs-341

Water Stopper
3-32 Providing and fixing of PVC water stopper
M 199.00
190 mm wide.
M.S Pipe
18-429 MS pipe,water quality(Medium),100 mm
dia,with all fittings i.e.
sockets,bends,tees,elbows etc where
M 20.00
required,laid complete in trenches, as
specified (excl cost of excavation),supply
and fixing.
18-430 ii) 150mm dia. M 182.80
Vent Pipe
Supply and fix 100mm dia bore cast iron
20-02 soil waste and vent (SWV) Pipes as M 8.00
specified.
Supply and fix bars round, using deformed
bars Grade-60, including cutting, bending,
09-56 Kg 180,000.00
binding and placing reinforcement in
position.
Supply and fix,holds fast, guard Bars,
straps tor wooden trusses, holding down
bolts with washers, ladders, railing,
brackets pipe supports, tie rods and
balusters, chimney bars, chains, rings
09-16 Kg 1,600.00
shackels, Hinges any type, gratings or
gullies, etc, incl, froging, letting into stone or
brick work etc. complete by welding in lieu
of riveting bolting etc.
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
OVERHEAD TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
GAUGE
N.S Providing and fixing guage for masurment
of water level in the tank, guage made of
12" wide M.S sheet 12 guage with painting
in white masurment marks in red along with
masurment arrangment, complete in all Nos. 4.00
respect including pullies, M.S wire, and
fixing arrangements as per instruction of
Engineer Incharge)

N.S M.S Railing


Providing and fixing M.S railing 18 SWG
best quality of approved design and section
in stairs, top rail 1-1/2" dia pipe and vertical
posts 3/4" dia pipe fixed over steps with
3/8" dia rawal bolts, including cost of two
Sqm 119.40
coat of enamal paint over one coat of red
oxide,complete in all respects, as per
drawings, and as per instruction of the
Engineer Incharge.

S/ F of steel door of approved design all as


Sqm 5.20
spd
Supplying of Aluminum sliding window
(Deluxe Model) of Anodized champagne
extruded section upto height of 1524 mm as
specified incl fixing on concrete. Wooden or 6725 18.60
steel frames complete with all necessary
fitting including 5 mm tinted glass.

Total Amount Carried to Summary (OHT) (PKR) = -


DHA QUETTA (SECTOR A-1)
SUMMARY
UNDERGROUND WATER TANK
S. NO. DESCRIPTION AMOUNT (PKR)

1 UNDERGROUND WATER TANK (200,000 GLN)

TOTAL AMOUNT CARRIED TO SUMMARY (WATER SUPPLY) (PKR) =


DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
UNDERGROUND TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
Excavation
01-6 Excavation in over area as in Ordinary soil
upto 1.5 m depth, in foundation / to obtain
earth for filling under floors/areas etc,or for
Cum 1,159
shafts,wells,exc 30 Sqm each clear of edges of
excavation within 10 M

01-6+
1.5 M to 3.0 M. Cum 1,159
01 - 13
01-6+
3.0 M to 4.5 M. Cum 980
2 (01 - 13)
Termite
11-1 Termite Proofing of new buildings incl wood
work therein with approved chemicals. Sqm 1,450

Granular Back Fill


02-07 Roll and compact Granular Soil formation
surface/ embankment upto 150mm layers by
compacting equipment and roller upto 100% Cum 934
Modified AASHTO density, incl filling in
depression with hard soil.
P.C.C 1:4:8
03-8 Providing and laying of C.C Type' C' using
crushed or broken stone graded as specified. Cum 60

R.C.C
03-36 Providing and laying RCC 28 Mpa (4000 psi)
cylinder strength ,as in piers ,foundations
etc,incl lead up to 5 km without the use of
Cum 180
shuttring .Reinforcement to be measured and
Paid Separately .

03-34 Providing and laying RCC 28 Mpa (4000 psi)


cylinder strength incl lead up to 5 km , using
weigh batch ,as in roof ,Slabs,walls , landings
,plinth beams and bands etc as specified
,requiring shuttring .Reinforcement to be Cum 192
measured and Paid Separately .
i) Lift 00' - 40'
DHA QUETTA (SECTOR A-1)
ABSTRACT OF QUANTITIES
UNDERGROUND TANKS

AMOUNT
Pay Item DESCRIPTION UNIT QUANTITY RATE
(PKR)
10-102 One coat of water proofing compound using
bitumen 10-20 applied hot at 14.68 Kg per 10 Sqm 671
Sqm.
13-03 13mm thick cement plaster 1:3 finished as
Sqm 1,222
specified.
13-11 19mm thick cement plaster 1:4 finished as
Sqm 1,227
specified.
Manhole Cover
21-35 Providing and laying, R.C.C Type 'B' manhole
cover (precast) complete with angle iron frame,
embedded in concrete, all as per information Each 4
sheet # Svcs-341

Water Stopper
3-32 Providing and fixing of PVC water stopper 190
M 880
mm wide.
Vent Pipe
Supply and fix 100mm dia bore cast iron soil
20-02 waste and vent (SWV) Pipes as specified. M 8

Supply and fix bars round, using deformed bars


Grade-60, including cutting, bending, binding
09-56 Kg 60,000
and placing reinforcement in position.

GAUGE
Providing and fixing guage for masurment of
water level in the tank, guage made of 12" wide
M.S sheet 12 guage with painting in white
masurment marks in red along with masurment
SP arrangment, complete in all respect including Nos. 4
pullies, M.S wire, and fixing arrangements as
per instruction of Engineer Incharge)

SP BUILDING AREA
Complete area of Building Sft 2,716
Total Amount Carried to Summary (UGT) (PKR) =
ABSTRACT OF QUANTITIES (SEC-A-1)
UTILITY DUCT/SLEAVES NET WORK
Amount
Pay Item Item Description Unit Quantity Rate (PKR)
(PKR)
MES:'01- Excavation as in Hard Soil upto 1.5m depth, in
02 foundation and pipe trenches upto 1.5 m wide in
shafts, wells and independent holes upto 30 Sqm
each and throw earth clear of edges of
CM 1,862.00
excavation within 10 m. Timbering to be paid
extra (Trench over 1.5 m width will be treated as
areas).

MES:'02-
Bottoming/ sub base of any thickness as
15
specified using Granular Sub Base Material laid
and compacted to 100% modified AASHTO CM 1,199.00
density by appropriate compacting equipment
and roller.
Providing of sand cushion in layers as specified,
MES: '02-
under concrete roads, hard standings, landing CM 543.00
91
ground etc.
RCC PIPE

Supply and fix reinforced cement concrete


MES 21-05 pipes230mm bore, laid and jointed with spigot Meter 10,059.00
socket or collars, as specified.
Total Amount Carried to Summary (UTILITY DUCTS/ SLEAVES) (PKR) =
DHA QUETTA (SECTOR-A1)
SUMMARY (EXTERNAL ELECTRIFICATION)
S. No. Description Amount (PKR)
1 ELECTRIFICATION

TOTAL AMOUNT CARRIED TO GRAND SUMMARY (PKR) =


DHA QUETTA (SECTOR - A1)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
Pay
Description Unit Quantity Rate Amount (PKR)
Item

ZE-02 Pad Mounted Distribution Transformer

Supply, installation, testing and


commissioning of following Outdoor type Pad
Mounted Distribution Transformers (11
KV/415V) including Construction of
foundations as per technical specification,
drawings and as per directed by the Engineer.

i 630 KVA Each 216.00


ii 400 KVA Each 8.00
iii 200 KVA Each 86.00
iv 100 KVA Each 33.00
ZE-03 Out Door Pad Mounted Ring Main Unit
1 11KV RMU
Supply, installation, testing and
commissioning of following MV Pad Mounted
switches including Construction of
Foundations as per technical specification,
drawings and as per directed by the Engineer.
i 4 - way RMU Each 40.00
ii 3 - way RMU Each 60.00
ZE-04 HT & LT Cable and Cable Accessories
(a) HT XLPE Cable
Supply, laying, testing and commissioning of
following HT XLPE cables, directly in sand
layer in already excavated trenches or through
RCC Pipes (already installed at road
crossings), including cable binding ties as per
specifications and drawings
i 1-Core 1000MCM 11KV Cable M 271,923.00
ii 3-Core 4/0 AWG 11KV Cable M 20,000.00
DHA QUETTA (SECTOR - A1)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
Pay
Description Unit Quantity Rate Amount (PKR)
Item
(b) LT Cable
Supply, laying, testing and commissioning of
following Aluminum LT cable directly in sand
layer in already excavated trenches or through
the RCC pipe (already installed at road
crossings) as per specifications, drawings and
as dire
i LV Cable 4-Core 37/0.083 M 22,000.00
ii LV Cable 4-Core 37/0.093 M 10,000.00
(c ) HT heat Shrinkable Termination Kits
Supply, installation, earthing and
commissioning of following HT heat shrinkable
termination kits of Raychem / 3-M/Cellpack for
cables laid , including cable glands and
miscellaneous materials and supply,
installation as per requirement
i 1-Core 1000MCM 11KV Cable Sets 180.00
ii 3-Core 4/0 AWG 11KV Cable Each 450.00
(d) LT Heat Shrinkable Termination Kits
Supply, installation, testing and
commissioning of LT heat shrinkable
termination kits of Raychem / 3 - M / Cell pack
for cables laid including cable glands,
miscellaneous materials and supply,
installation as per requirements, specification

i 4- core 120mm2 - 150mm2 PVC / PVC Each 600.00


(e ) Cable Markers
Supply at works and, installation of HT & LT
i cable markers as per specifications, drawings, Each 2,000.00
and as directed by the Engineer.
DHA QUETTA (SECTOR - A1)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
Pay
Description Unit Quantity Rate Amount (PKR)
Item
ZE-06 LT Service Boxes / Feeder Pillars
Supply, installation, testing and
commissioning of 06 way LT Distribution
Boxes (IP54) (Feeder Pillars / Services box)
i Each 434.00
including construction of foundations as per
technical specifications, drawings and as
directed by the Engineer.
ZE-07 Earthing System
Earthing Rod for Transformers, Ring Main
(a)
Units & Feeder Pillars/Distribution Box
i Transformers Nos. 686.00
ii 11 KV HT Pad Mounted Switches / RMU Nos. 200.00
(b) iii Feeder Pillars / Distribution Box Nos. 434.00
iv Earthing Wire Kg 6,600.00
v Fixing of Earthing Wire Job 1,392.00
ZE-08 Raceways, Excavation and Backfilling
Excavation and Backfilling of trench in any
type of soil within the project area for laying of
HT & LT cables including sand, protective
(a)
bricks and excavated earth compaction in
layers not exceeding 9" thick site cleaning etc:
as per drawings, specification
i Excavation CM 86,863.00
ii Sand (Bed and Cover) CM 8,018.00
iii Bricks (Protection Cover) 3" thick Nos. 13,203.00
iv Excavated earth backfilling and compaction CM 74,702.00
v Plinth for Transformer Job 343.00
vi Plinth for RMU Job 100.00
vii Plinth for Feeder Pillar / Distribution Box Job 434.00
(b) PIPES
Providing, excavation, laying, jointing and
compaction of uPVC pipes for road crossing
as per requirements, standards, specifications
and as directed by the Engineer.
i 6" dia (uPVC) M 8,500.00
DHA QUETTA (SECTOR - A1)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
Pay
Description Unit Quantity Rate Amount (PKR)
Item
ii 4" dia (uPVC) M 1,250.00
(c ) PIPE DUCT
Providing, excavation, laying, jointing of uPVC
Pipe duct for Main HT/LT Feeders as per
requirments standards specificaitons and as
directed by the Engineer.
i 2 Way duct M 200.00
ii 4 Way duct M 1,000.00
iii 6 Way duct M 1,000.00
iv 8 Way duct M 400.00
v 12 Way duct M 125.00

Providing, excavation, & preparation of


manholes as per requirments standards
(d) vii Nos. 280.00
specificaitons and as directed by the
Engineer.
ZE-09 SOLAR ROAD LIGHTING

Making of RCC foundation size 600 x 600 x


1830 mm as specified with 1:2:4 including 4
Nos. J-Bolts dia 25 mm each 1220 mm long,
complete with 8 Nos. nuts/bolts, including
back filling of excavated material, as shown in
i Nos. 125.00
drawing and complete to the satisfaction of
Engineer. Contractor shall have to provide the
construction drawings of pole foundation for
the approval of Engineer/Consultant as per
site conditions

Making of RCC foundation size 550 x 550 x


1830 mm as specified with 1:2:4 including 4
Nos. J-Bolts dia 25 mm each 1220 mm long,
complete with 8 Nos. nuts/bolts, including
back filling of excavated material, as shown in
ii Nos. 643.00
drawing and complete to the satisfaction of
Engineer. Contractor shall have to provide the
construction drawings of pole foundation for
the approval of Engineer/Consultant as per
site conditions
DHA QUETTA (SECTOR - A1)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
Pay
Description Unit Quantity Rate Amount (PKR)
Item

Providing, installation and erecting octagonal


shape hot dip galvanized steel pole 225mm
dia bottom 100mm dia top shell thickness
4.5mm. 12 meter high with Double arm of 2.0
meter each (make Munir, Jamal Poles or
iii Nos. 35.00
equivalent). Complete with base plate arm.
Complete with base plate of
470mmx470mmx25mm. electrically welded.
Pole shall be erected with 4x25mm dia
1220mm long anchor bolts.

Providing, installation and erecting octagonal


shape hot dip galvanized steel pole 225mm
dia bottom 100mm dia top shell thickness
4.5mm. 10 meter high with Double arm of 1.5
meter each (make Munir, Jamal Poles or
iv Nos. 90.00
equivalent). Complete with base plate arm.
Complete with base plate of
470mmx470mmx25mm. electrically welded.
Pole shall be erected with 4x25mm dia
1220mm long anchor bolts.

Providing, installation and erecting octagonal


shape hot dip galvanized steel pole 192mm
dia bottom 62mm dia top shell thickness
4.5mm. 8 meter high with Single arm of 1.0
meter each (make Munir, Jamal Poles or
vi Nos. 643.00
equivalent). Complete with base plate arm.
Complete with base plate of
400mmx400mmx25mm. electrically welded.
Pole shall be erected with 4x25mm dia
1220mm long anchor bolts.

140Wp, 36V, 3.9A Solar Cylinder Panel, with


mono crystalline cells, Tempered glass
material, aluminum alloy frame and efficiency
vii of the solar cells should be greater than 20%, Nos. 1,782.00
fully weather proof (IP 65).including all
accessories and as per the satisfaction of the
engineer incharge.
DHA QUETTA (SECTOR - A1)
ABSTRACT OF QUANTITIES
EXTERNAL ELECTRIFICATION
Pay
Description Unit Quantity Rate Amount (PKR)
Item

Solar LED Road lighting of 120W suitable


for the project requirement (make Sunlight,
Unilamp) , fully IP 66 with corrsion resistance
die cost Aluminum Husing, Silicon gas kit,
thermally hardened glass complete with built
in 2100WH, 25.6V Li-ion Battery, 24V
Programable MPPT controller, Automatically
viii control through photo cell or with time Nos. 350.00
controller and color rendring index (CRI)
should be greater than 80 . The contractor
shall furnish and install the Complete LED
Street Light Luminaries as describe in tender
specification. The specific wattages of the
LED lumanireis are to be indicated in
individual luminaries specifications.

Solar LED Road lighting of 90W suitable for


the project requirement (make Sunlight,
Unilamp) , fully IP 66 with corrsion resistance
die cost Aluminum Husing, Silicon gas kit,
thermally hardened glass complete with built
in 1680WH, 25.6V Li-ion Battery, 24V
Programable MPPT controller, Automatically
ix control through photo cell or with time Nos. 641.00
controller and color rendring index (CRI)
should be greater than 80 . The contractor
shall furnish and install the Complete LED
Street Light Luminaries as describe in tender
specification. The specific wattages of the
LED lumanireis are to be indicated in
individual luminaries specifications.

TOTAL AMOUNT CARRIED TO SUMMARY (EXTERNAL ELECTRIFICATION) (PKR) =