SURFACE WATER DRAINAGE Bill No.

3E

JKR JOHOR PREVIOUS CURRENT TOTAL


ITEM DESCRIPTION UNIT QUANTITY
RATE (RM) AMOUNT (RM) QUANTITY (RM) QUANTITY (RM) QUANTITY (RM) %

(ALL PROVISIONAL)

300MM DIAMETER HALF ROUND DRAIN

A 300mm half round precast concrete drain laid to fall


complete with half brickwall, concrete base, thick
mass concrete, including all necessary excavation,
brc, formwork, hardcore, lean concrete and all
necessary works all as per Engineer's detail drawing M 181 50.00 9,050.00 - - - - - - 0%

GRANITE COVER GRATING FOR 300MM HALF


ROUND DRAIN

B Supply and install 600mm x 400mm wide x 75mm thick


granite grating or other approved equivalent and fix into
position to manufacturer's detail and architect's approval
all as per Architect's drawing M 181 85.00 15,385.00 - - 0 0 0 0 0%

REINFORCED CULVERT PIPE

Supply material and labour to lay precast concrete pipe


('SIRIM' Approved Class 'Z' pipes or other equal and
approved) with 50mm Thick lean concrete, hardcore,
concrete base grade 25 with a layer of BRC A8, 50mm
Thick concrete sorround, or concrete haunching,
concrete collar complete with all necessary formwork,
excavation, backfilling and disposal of surplus earth out
of the site and including all necessary for the works, all in
accordance to the engineer's drawing and S.O approval

C 450mm diameter pipe culvert M 125 250.00 31,250.00 - - - - - - -

Brick Sump

D Construct and complete brick sump including all


excavation, backfilling and remove surplus excavated
materials from site, 230mm brickwall, 20mm thick
plastering, base, slab, lean concrete, a layer of mesh
fabric BRC A7, cement rendering , zink galvanised steel
grating at 5000m centre to centre, and disposal of
surplus excavated material from site all as shown in as
per Engineer's Drawing No 16 1,600.00 25,600.00 - - - - - - -

(END OF ALL PROVISIONAL)

B3/E/1 TO COLLECTION 81,285.00 0 - -


Bill No. 3E
Surface Water Drainage

JKR JOHOR PREVIOUS CURRENT TOTAL


ITEM DESCRIPTION UNIT QUANTITY
AMOUNT
RATE (RM) QUANTITY (RM) QUANTITY (RM) QUANTITY (RM) %
(RM)

COLLECTION

PAGE B3/E/1 . . 81,285.00 0 0 0 - - 0%

BILL NO. 3E - SURFACE WATER DRAINAGE


TOTAL CARRIED TO BILL SUMMARY 81,285.00 0 0 0 - 0 - 0%