PROJECT SUMMARY
Executive Summary
BABATNGON, LEYTE
Jovannie T. Lumaniog
Gilbert V. Villafranca
Engineering District.
volcanic eruption and landslides. This has been an unsolved problem around the
globe since most of the natural disaster are beyond human control and cannot
mass failure and sub aerial erosion. The sub aerial erosion, which occurs
uniformly along the riverbank and recurs every year, contributes to progressive
deepening of a notch developed above the water level as both preparatory and
the onset of riverbank instability have been made. Recently, Osman and Thorne
humans and their livelihood around the world (UNISDR, 2014). A more
disastrous type of flooding is called flash flood. The Nation Weather Service
(NWS) defines a flashflood event as a flood which occurs within six hours or less
44.9 feet about mean sea level. The scouring of the riverbank and devastating
flood during rainy season and typhoon is one of the greatest problem of the
residents in Brgy. Bagong Silang especially the farmers and the people residing
near the Bagahupi River. It is expected that after a heavy rainfall or a typhoon
properties and agricultures will be destroyed by the water from Baghupi River.
Huge quantity of water flow during heavy rain coming from the upper
catchments making its way towards the Bagahupi River in Barangay Bagong
Silang.
water running through the Bagahupi River. The current flow of water is so strong
that it flows faster and causes erosion. When Typhoon Yolanda struck Region 8,
Barangay Bagong Silang for instance, where the flood reaches to approximately
3 feet. Some of the houses near the river was in danger because the soil in the
banks of the river was scouring and in the further future it could reach to the
houses.
In addition, large number of people residing near the river which makes
the settlers susceptible to hazard brought by the water in the river and the risk
of flooding during and the properties due to scouring during rainy season and
Typhoon months.
Objective of the study
Leyte and protect the lives and properties from the risk brought by the strong
current of water in the river during heavy rainfall and typhoons. Specifically, this
study aims:
during calamities.
Market Feasibility
one hundred two) The beneficiary of the project is almost all the residents in
Barangay Bagong Silang, specifically the houses near the River, School and the
rice field in the area. To proposed construction of river protection would be the
Silang, Babatngon, Leyte. The river protection would be a good significant to this
study not only to the residents but to the community as well. It protects the
properties of the people from soil erosion and to protect the lives or the
Technical Feasibility
plan will cover a period of time starting with the site investigation, once the
Financial Feasibility
Management Feasibility
Project monitoring and evaluation during the entire duration of the project
office. Likewise, the whole project operation will be monitored by the same office
with the cooperation of DPWH with its working force under the general services
detail calculated in the project estimates and specification where the proponents
will take change as the project consultant. The Project Manager will be manned
Manager will be the Municipal Engineer accompanied with the Municipal Engineer
Assistant as the Material Engineer in the Region. The main function of the project
will be to oversee the overall conduct of the different phases of the project; take
charge of all project financial needs and make progress report of the different
phases of the work to the Local Chief Executive in the Municipality of Babatngon.
The Project Engineer shall be responsible in the monitoring of the structural and
the physical durability of the project, adheres to the project specification and
standards, and responsible in the flow of construction method and its place
the flow of materials and supplies as well as to ensure the quality of materials
durability. Other skilled and component workers within the Municipality shall also
laborer force.
Socio-Economic Aspect.
community that will affect the project. In return, this will also appraise the
barangays.
Environmental Aspect.
construction and operation of the proposed project. The result of the actual
construction of the said proposed project must address all direct impact on the
impacts on water quality, and noise impacts due to construction and operation
activities. This will not be avoided during operation of construction, but if this
proposed project flood control program will be established, an efficient and long-
term flood mitigated the measure and design of flood control structures.