Pier deSIGN PDF
Pier deSIGN PDF
Pier Design(Sketch)
A C
1.475
1 PC1
2.5 2.5 2
1.53
4.5
PC2
BPL 571.59
HFL 572.09
7.5
5.59
SBL 568
1.5 1.5
FBL 566.5
10.4 7.4
This preliminary section is defined by considering by considering hydrological analysis and geotechnical recommendation
Bearing stopper
2.5
A2
2.25
1.25
4.5 2.95
bearing
1.475
A1
0.775
Bearing Pad
7.5
1. Bridge data
Span of bridge 35 m
Type Of Bridge PSC
width of superstrcture 7.5 m
Nos of Longitudinal
Girder 2
2. Material Data
Unit weight of
materials
3
Concrete (ϒc) 25 KN/m
3
macadam (ϒas) 22 KN/m
3
water (ϒw) 10 KN/m
3
soil (ϒs) 18 KN/m
Submerged soil
3
density(ϒ') 10 KN/m
Grade of Concrete
Stem M25
Grade of steel Fe500
Geotechnical Data
Bearing capacity of
2
soil - KN/m
angle of repose(φ) 29 degree 0.506145483 radian
Surcharge angle(β) 0 degree 0 radian
Angle of back of
abutment(α) 90 degree 1.570796327 radian
angle of friction
between soil and
wall(δ) 16 degree 0.27925268 radian
Coefficient of friction 0.5
2 Material Properties
Live Load
Calculation for
bearings(A1 and A2 )
Live load with impact
IRC Loadings Critical value Impact factor
factor
70R_track Load 667.4171271 0.1 734.16
70R_wheel Load 810.1022099 0.105 895.07
Class A Load 845.5966851 0.110 938.41
Lateral reinforcement
ptovided 0.5*0.15% of
2
sectional area 12900 mm
Provide,bar dia 25 mm
number 27 Nos
Spacing required 285 mm
spacing provided 250 mm
2
Provided area 15021 mm OK
for An
reinforcement,provide
8 legged shear bars
Nos of leg provided 8.00 Nos
bar dia 16 mm
2
Area provided 12867.96 mm OK
Spacing of An bars
with in 2/3 of depth of
corbel 220.00 mm
Provide spacing 180.00 mm OK
Skin reinforcement @
0.1% of gross
2
sectional area ofcorbel 9000 mm
2
on each side 4500.00 mm
Provide
bar dia 25 mm
Nos required on each
side 10 Nos
Spacing required 211 mm
Spacing required
provided 200 mm
Provided area on each
2
side 5154.18 mm OK
Check for punching
shear
Distance of bearing
from the face of stem 1.40 m
effective depth at the
section of bearing 1471.70 mm
Allowable punching
pressure,
2
τp=0.16*sqrt(fck) 0.80 N/mm
Total punching stress
developed,τ_punch 2721438.96 N
2
Punching area 14550373.80 mm
Punching stress
2
developed 0.19 N/mm Ok
PCC4
16 mm dia. @ 200 mm c/c
Total
Forces on the Pier at Total Load CG of load
Load(Absolute
point from Impact factor A B C Including from pier
without
superstructure Impact,KN centre,m
impact),KN
Babai River Bridge
Combination V : Dry Case ,Non Seismic,Full Live Load (One span collapse condition)
Moment
Horizontal load Moment along
Horizontal load along across
Particular Load Coefficient Vertical load ,P KN across traffic(x- traffic(y-
traffic(y-y),KN traffic(x-x)
x),KN y)KNm
KNm
Dead Load(Total) 1 5210.54 5307.52
Live Load 1 659.51 663.02 691.3432018
Total Horizontal force 1 154.74 865.02
Total 5870.05 154.74 0.00 6835.57 691.34
Maximum Loads/Moments
2
Sectional Area of stem,Ag 3801327.11 mm
Provide main reinforcement (% of sectional area) 1.00 %
Total area of reinforcement 38013.27 mm2
provide, dia. Of main bars 32 mm
number of bars 48 nos
cover provided 75 mm
spacing of bars required 135 mm
Spacing of main bar provided 130 mm
Area of reinforcement provided 40647 mm2 OK
% of reinforcement therfore provided 1.07 %
dia of transverse reinforcement 12 mm
diameter upto the line of reinforcement,Dc 2006.00 mm
2
So area of steel provided,As 38603.89 mm
2
so Area of concrete,Ac 3762723.22 mm
check for the section capacity of stem
section,
2
Ae=Ac+(1.5m-1)*As 4303177.69 mm
area of the section,
Ie=pi()*D^4/64+(m- 1324662826904.91 mm4
3
Ze=2*Ie/D 1204238933.55 mm
Stress Check
2
Maximum Stress in N/mm
Condition: Non-Seismic Seismic One span Collapse
σcc=P/Ae 2.33 2.57 1.36
σcb=M/Ze 2.13 6.94 5.68
σcc/σacc+σcb/σacb 0.63 0.83 0.90
Result OK OK OK
32dia.@135mmc/c_Spacing
P1
2
12 PS2 36 3.770 135.717 0.889 120.637
100
3
2100 16 PS3 9 2.3 20.700 1.580 32.711
100 Total 2890.273
2 4400
600 25 PCC2 31 5.6 173.600 3.858 669.753
2704
2100
6 10 LEGGED
1400 12 PCC6 30 18.4 552 0.889 490.667
Varries
7
co
Babai River Bridge
co
8 LEGGED 16 PCC7 11 61.86 680.48 1.580 1075.325
co 7400
Varries
8 co 8 LEGGED
co 4400 16 PCC8 11 37.86 416.48 1.580 658.140
100 mm pitch
1500
Total 7227.174
BAR BENDING SCHEDULE OF STOPPER BLOCK
Bar Total Unit Total
dia. Bar
SN Sketch Nos length length weight(k Weight
(mm) mark
(m) (m) g/m) (Kg)
1 500
16 AST1 10 2.225 22.25 1.580 35.16
1725
2 500
12 AST2 10 2.46 24.60 0.889 21.87
1960
200
900
3 900 12 ACP3 3 1.9 5.70 0.889 5.07
100 hook
800
In one
pedestal 129.16
Total in 2 pedestal 258.31
Babai River Bridge
A C
1.475
B
0.5 TPL 573.59
1
2.5 2.5 2
4.5
1.25 BPL 571.59
HFL 572.09
7.5
5.59
2.65 2.2
2.2
1.5 1.5
FBL 566.50
10.4 7.4
0.2
0.2 MSL 566.00
13
PBL 553.50
7.4
1. Bridge data
Span of bridge 35 m
Type Of Bridge Prestressed Concrete
width of superstrcture 11 m
Pile diameter 1 m
Nos of piles along traffic direction(L-
direction) 4 Nos
Nos of piles perpendicular to traffic
direction(T-direction) 3 Nos
Total Nos of piles(n) 12
Pile spacing along traffic direction (L-
direction) 3 m
Pile spacing perpendicular to traffic
direction (T-direction) 3 m
Pile cap length along traffic
direction(L-direction) 10.4 m
Pile cap length perpendicular to
traffic direction(T-direction) 7.4 m
offset in L-direction 0.2 m
offset in T-direction 0.2 m
Length of column between two
restraints 3.59 m
Effective length as per code 4.308 m
diameter of pier 2.2 m
2. Material Data
Unit weight of materials
3
Concrete (ϒc) 25 KN/m
3
macadam (ϒas) 22 KN/m
3
water (ϒw) 10 KN/m
3
soil (ϒs) 18 KN/m
3
Submerged soil density(ϒ') 10 KN/m
Grade of Concrete
Pile M35
Pile cap M35
Grade of steel Fe500
2
Permissible stress in steel 240 N/mm
Geotechnical Data
Bearing capacity of soil
angle of repose(φ) 28 degree 0.488692191 radian
Surcharge angle(β) 0 degree 0 radian
Angle of back of abutment(α) 90 degree 1.570796327 radian
angle of friction between soil and wall(δ) 16 degree 0.27925268 radian
Coefficient of friction 0.5
Calculations:
Ah 0.18
Av 0.12
Horizontal seismic forces
calculation:
Particulars Forces (KN) Lever arm (m)Moment(KNm)
Superstructure 626.40 6.09 3814.776
Pier Cap 250.09 4.73 1183.676625
Pier Stem 61.41 1.795 110.2317389
Total along traffic 937.90 5108.68
Total across the traffic 937.90
Vertical Seismic Forces
Particulars
Superstructure 835.20
Pier Cap 166.73
Pier Stem 40.94
Total 1042.87 KN
Loads and Moment Calculation
Case I : Dry Case , Non
Sesimic,Full Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 1311.53 1514.82 1934.51
Braking force/Tractive force 1 209.48 752.02
Total 12888.07 209.48 0.00 2266.84 1934.51
Case II: Flooded Case, Non
Seismic, Full Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 1311.53 1514.82 1934.51
Braking force/Tractive force 1 209.48 752.02
Buoyancy 1 -1309.87
Water current force 1 2.64 7.71 7.19 21.02
Total 11578.20 212.11 7.71 2274.03 1955.53
Case III: Dry case , Non Seismic,
No Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 0
Braking force/Tractive force 1 209.48 752.02
Total 11576.54 209.48 0.00 752.02 0.00
Case IV: Flooded case , Non
Seismic, No Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 0
Braking force/Tractive force 1 209.48 752.02
Buoyancy 1 -1309.87
Water current force 1 2.64 7.71 7.19 21.02
Total 10266.67 212.11 7.71 759.21 21.02
Case V: Dry case , Seismic, Full
Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 1311.53 1514.82 1934.51
Braking force/Tractive force 1 2185.27 8937.77
Seismic forces 1 1042.87 2185.27 937.90 5108.68 5108.68
Total 13930.94 4370.55 937.90 15561.27 7043.19
Case VI: Flooded case , Seismic,
Full Live Load
Babai River Bridge
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 1311.53 1514.82
Braking force/Tractive force 1 2185.27 8937.77
Buoyancy 1 -1309.87
Water current force 1 2.64 7.71 7.19 21.02
Seismic forces 1 1042.87 2185.27 937.90 5108.68 5108.68
Total 12621.06 4373.18 945.61 15568.46 5129.70
Case VII: Dry case , Seismic, No
Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 0
Braking force/Tractive force 1 2185.27 8937.77
Seismic forces 1 1042.87 2185.27 937.90 5108.68 5108.68
Total 12619.41 4370.55 937.90 14046.45 5108.68
Case VIII: Flooded case , Seismic,
No Live Load
horizontal
horizontal load Moment Moment across
load along
Particulars Load coefficient Vertical load,PKN aacross traffic along traffic traffic (X-X)
traffic (Y-Y)
(X-X)KN (Y-Y) KNm KNm
KN
Dead Load 1 11576.54
Live Load 1 0
Braking force/Tractive force 1 2185.27 8937.77
frictional force 0
Buoyancy 1 -1309.87
Water current force 1 2.64 7.71 7.19 21.02
Seismic forces 1 1042.87 2185.27 937.90 5108.68 5108.68
Total 11309.54 4373.18 945.61 14053.64 5129.70
Summary of Load
Horizontal Horizontal Moment
load along load aacross Moment along across
Cases Vertical load,P Remarks
traffic (Y- traffic (X- traffic (Y-Y) traffic (X-
Y) X) X)
Case I : Dry Case , Non Sesimic,Full 12888.07 209.48 0.00 2266.84 1934.51
Case II: Flooded Case, Non Seismic,
e
as
Full Live Load 11578.20 212.11 7.71 2274.03 1955.53
C
Case III: Dry case , Non Seismic, No ic
ism
Live Load 11576.54 209.48 0.00 752.02 0.00
Se
on
∑ = 2
180 m
∑ = 2
72 m
Critical pile distance from Y-axis
from CG line,Xc 4.5 m
Critical pile distance from X-axis
from CG line,Yc 3m
Summary of Loads
Cases Vmax (KN) Vmin(KN) Hmax
Case I : Dry Case , Non Sesimic,Full
17.46
Live Load 1211.28 936.73 Ok
Case II: Flooded Case, Non Seismic,
17.68
Full Live Load 1103.18 826.52 Ok
Case III: Dry case , Non Seismic, No
17.46
Live Load 897.96 729.81 Ok
Case IV: Flooded case , Non
17.68
Seismic, No Live Load 875.41 835.70 Ok
Case V: Dry case , Seismic, Full Live 1843.41 478.41 364.21 Ok
Case VI: Flooded case , Seismic, Full
364.43
Live Load 1654.70 448.81 Ok
Case VII: Dry case , Seismic, No
364.21
Live Load 1615.64 487.59 Ok
Case VIII: Flooded case , Seismic,
No Live Load 364.43
1507.54 377.38 Ok
From Geotechnical Report Pile
Capacity 1647.75 KN for 13.5 m pile length below scour
Design of Pile Cap
Bending moment at the face of
column 4809.74 KNm
Minimum effective depth required
deff ,sqrt(M/(R*b)) 580.36 mm
Provided overall depth of cap 1500 mm Mimimum should be at least 600mm or 1.5* pile dia. As per code.
Effective cover 75 mm
deff Provided 1425 mm
Area of reinforcement required at
2
bottom, Ast=M/(Z*deff*σst) 15784.03009 mm
Provide,
bar dia 25 mm
number required 50 Nos
spacing required 150 mm
2
Hence reinforcementrequired 24543.69 mm
Actual provided reinforcement
bar dia 32 mm
spacing 120 mm
number 63 Nos
2
Actual provided reinforcement 50667.61 mm OK
2
Top bar (0.12%) bothways 13320 mm
provide,
bar dia 20 mm
number 43 Nos
spacing Required 240 mm
Sapcing Provided 200 mm
Check shear
shear force at deff distance from the
face of abutment 3633.84 KN
2
shear stress developed 0.23 N/mm
reinforcement provided 0.32 %
2
permissible shear stress 0.25 N/mm OK
Check for punching shear stress
Effective depth of section provided 1425 mm
Total vertical load 12888.07 KN
2
punching shear stress 0.200374271 N/mm
permissible punching shear
2
stress,0.16*sqrt(fck) 0.95 N/mm Ok
25dia.@175mm_spacing P1
12 mm @ 100 mm c/c for depth upto 3m and 150mm c/c for rest
P2
3 10250
900 20 PP3 38 12.05 457.9 2.469 1130.62
4 7250
900 20 PP4 53 12.05 638.65 2.469 1576.91
Total 11597.16
Total 1123.88