Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

CONTENTS

1. DOCUMENT AIMS AND APPLICATION AREA ........................................................................................ 2

2. DOCUMENT VERSION MANAGEMENT .................................................................................................. 2

UNITS IN CHARGE OF THE DOCUMENT ............................................................................................... 2

REFERENCES ........................................................................................................................................... 3

ORGANIZATIONAL PROCESS POSITION IN THE PROCESS TAXONOMY ......................................... 3

DEFINITIONS AND ACRONYMS .............................................................................................................. 3

PROCESS DESCRIPTION ........................................................................................................................ 5

MOVEMENT CRITERIA FOR MV AND HV CIRCUIT BREAKERS .......................................................... 6


8.1 Criteria for maneuvering MV circuit - breakers................................................................................... 6
8.2 Criteria for maneuvering of HV circuit – breakers .............................................................................. 6
8.3 List of circuit – breakers to be maneuvered ....................................................................................... 6

PROGRAMMING AND IMPLEMENTATION OF MANEUVERING ACTIVITIES ....................................... 7

KPIS MONITORING FOR ACTIVITY OF MANEUVERING OF HV/MV CIRCUIT BREAKERS ............ 8

RELATED ORGANIZATIONAL DOCUMENTS TO BE IMPLEMENTED AT COUNTRY LEVEL ......... 9

12. ANNEXS ..................................................................................................................................................... 10

THE HEAD OF GLOBAL OPERATION AND MAINTENANCE


Francesco Amadei

1/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

1. DOCUMENT AIMS AND APPLICATION AREA


This document define tems and operative modalities for opening and closing tests for MV and HV circuit
breaker of Primary Substations.
Long-lasting periods of not activity of circuit breakers could increase the probability of malfunction when
needed.
Firmly remaining the possibility of periodic preventive maintenance, with the simple handling of circuit breakers
with a long time of inacticity, it is possible to periodically verify the efficiency of the chain of command, to reduce
mechanical problems related to not activity and to highlight eventual anomalies. In particular, the handling
reduce the intervention of recovery circuit breakers due to a not opening of circuit breakers downstream for
the intervention of protection. This action permit to reduce the impact of the interruption to the customers and
then over power quality indexes.
Therefore, are described:
• the procedures for programming the opening-closing tests for HV and MV circuit-breakers to be implemented
through the applications present;
• the flow for the activation of the operating structures for the implementation of opening-closing tests and the
possible activation of the necessary maintenance actions;
• KPI's for monitoring the process and the effectiveness of maintenance actions.
This Operating Instruction shall be implemented and applied to the extent possible within the Global
Infrastructure and Networks Business Line and in compliance with any applicable laws, regulations and
governance rules, including any stock exchange and unbundling-relevant provisions, which in any case prevail
over the provisions contained in this document.

2. DOCUMENT VERSION MANAGEMENT

Version Data Main changes description


Issuing of “Global Infrastructure and Networks - Predictive techniques for on condition
1 05/12/2018
maintenance of HV and MV circuit-breakers through the movement of the same”

UNITS IN CHARGE OF THE DOCUMENT


Responsible for the preparation, interpretation and updating of the document:

 Global Infrastructure and Networks: Operation and Maintenance / Network Operations and
Maintenance

Responsible for document authorization:

2/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

 Global Infrastructure and Networks: Head of Quality and Process Transformation Unit

 Global Infrastructure and Networks: Head of People and Organization Unit

REFERENCES

 Enel Group's Code of Ethics

 Zero Tolerance Plan for Corruption (ZTC) of the Enel Group

 Organization and management model pursuant to Legislative Decree n. 231/2001 or equivalent


documents adopted in the countries

 Enel Global Compliance Program (EGCP)

 Enel Human Right Policy

 RACI manual for Global Infrastructure and Networks

 RACI manual for AFC

 Policy 67 “Global Infrastructure and Networks Network Maintenance Program definition and management
guidelines”

ORGANIZATIONAL PROCESS POSITION IN THE PROCESS TAXONOMY


Value Chain/Process Area: Networks Management
Macro Process: Operation and Maintenance
Process: Maintenance

DEFINITIONS AND ACRONYMS


Acronyms and Key Terms Descriptions
Of a component or system is defined as an abnormal operating condition
that impairs the functioning in the short, medium or long-term, and that
Anomaly
the need for a time-dependent resolution of the gravity and the possible
direct effects on the safety of personnel and/or third parties.

Periodic maintenance of the facilities to keep the plants under normal


Periodic maintenance operating conditions (without changing the power) and prevent
performance degradation and consequent failure or inefficiency. This

3/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

maintenance is performed cyclically through specific programs


developed based on standardized criteria and standards

Maintenance carried out following a periodic or visual inspection, which


“On Condition” Maintenance is not deferrable over time and is not included in the program of
interventions.

Key Performance Indicators: a set of quantifiable measures that a


KPI’s Company uses to gauge or compare performances in terms of the
meeting of the strategic and operational goals

System Average Interruption Duration Index: average outage duration


SAIDI
for each customer served (LV or MV).

High Voltage: system with 230kV to 35kV nominal operative voltage


HV
between the phases.

Medium voltage; electrical system with a rated voltage between phases


MV higher than 1 kV in AC power or 1.5 kV in DC power up to and including
35 kV in either AC or DC systems.

CO/CC Operations Center / Control Center for operation of the network

Theresold DD not maneuvered Limit in days, within the circuit breaker has not moved

UO Operative unit

MARE AT Application used in Enel to planning/monitoring maintenance for HV

Installation that modifies the voltage, current and interconnection


parameters to facilitate the transmission and distribution of energy.
Primary Substation (PS)
According to the voltage levels, they are classified into HV/HV, HV/MV,
and MV/MV.

This category includes anomalies, related to electromechanical fault or


civil works, which require a resolution as quickly as possible, to decrease
Level 1 anomalies
the risk of failure on the network; are classified in this category also the
critical issues that involve the timely restoration of security conditions;

List of maneuvers Automatic list of maneuvers generated by the remote control system

ODM Maneuvering equiment (circuit –breaker or disconnectors)

STUx/STM Standard for Remote control system for HV and MV

Development of the line starting from the PS circuit breaker along the
Dorsal
main branches up to the disconnectors of power supply

4/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

PROCESS DESCRIPTION

HV/MV circuit Breaker

Beyond not NO
maneuvere
d threshold?

YES Implementation of
Test Maneuver
List of circuit- breakers YES
to be maneuvered
(month n-1)
NO
Successf
ull? On Condition
Planning
Maintenance
Maneuvers test for
month n
NO

re- energized NO Programming the


Progra YES
by remore activity with Implementation of
mmed?
control system? territorial units and Test Maneuver
CO
YES

Fig1: Flux diagram for maneuvers management of circuit breaker

On the basis of the list of HV/MV circuit - breakers, every CO, once a month, draws up the list of circuit breakers
that have not undergone any movement within the threshold period, the value of which is established in the
following paragraphs.

The CO performs the movement, carried out by remote control, in conditions of re-energizing the line upright,
in the shortest possible time and in full autonomy. If the operating needs do not allow it (non-power supply line,
unavailability due to breakdown or work in progress along the unavailable routes or OdMs, manual counter-
maneuvering operation), the CO must reprogram and plan the movement involving the competent operating
structures, such as the assigned unit network maneuvers and the maintenance unit.

The Operating Centers that perform the manouvers immediately notify the opening / closing tests with a
negative result to the technicians of the maintenance unit, who perform the necessary intervention in relation
to the anomaly. The anomaly detected must be recorded on the maintenance application of the MARE HV
plants or equivalent, as level 1 criticalities. If the CO does not have the application, it is allowed to use a list,
which allows to record and have at least of the following minimum information:

 Progressive number of the anomaly;

 Date of anomaly detection

 Primary Substation

 HV and MV circuit -breakers

5/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

 Type of criticality

 Maintenance unit alerted

 Note

MOVEMENT CRITERIA FOR MV AND HV CIRCUIT BREAKERS


Following is described the common criteria for all the Country for the identification of circuit – breakers on
which it’s necessary to perform the opening / closing test.
Each Country must implement, according to its own remote control system, its own methods and IT systems
to support the subsequent indications; if the STUx / STM system is present, Annex A indicates an automatic
method for managing the alarms.

8.1 Criteria for maneuvering MV circuit - breakers

Must carried out by remote control system an opening/closing test of all MV circuit-breakers which in the last
period, at least three months, not be moved to ensure that the period of absence of movement is still less than
six months. It is established that all countries will normally have to ensure a maximum period of non-movement
of the MV circuit-breakers chosen within the limits indicated above and on the basis of maintenance frequency,
age and their strategic importance in network management.

For auxiliary service switches, a movement must be performed on each efficiency check of the energy station
or on-site maintenance personnel.

8.2 Criteria for maneuvering of HV circuit – breakers

Must carried out by remote control system an opening/closing test of all HV circuit-breakers which in the last
period, at least five months, not be moved to ensure that the period of absence of movement is still less than
one year. It is established that all countries will normally have to ensure a maximum period of non-movement
of the HV circuit-breakers chosen within the limits indicated above and on the basis of maintenance frequency,
age and their strategic importance in network management.

8.3 List of circuit – breakers to be maneuvered

Every month the list of circuit - breakers that have not been moved during the defined deadlines must be
extracted. The list of circuit - breakers must be extracted by the CO and must be obtained by considering the
data of all the circuit - breakers in operation and the list of the maneuvers performed.

6/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

On the basis of this list the CO programs and plans the maneuvers ensuring that the movement is performed
within the maximum time set for 6 months for the MV circuit-breakers and 12 months for the HV circuit-
breakers.
If the CO is equipped with the STUx / STM system, a possible procedure for extracting the required list is
described in Annex B.
Based on the results of the planning and the tests carried out, the CO will complete the extracted monthly list
(as an example shown as Annex C) integrating it with the following information:

 Type of circuit - breaker ( if is an HV or MV circuit – breaker, or of a secondary or primary winding of


power transformer or a conjuntor..etc)

 Reliability information;

 Movement result;

 Reason for failure to move;

 Ticket issuance

 Note;

PROGRAMMING AND IMPLEMENTATION OF MANEUVERING ACTIVITIES


The CO, with reference to the extracted list, programs the movements requested in the following ways, in case
of:
 MV and HV lines that can be re-feeded by using remotely controlled system: manouvers can be carried
out as soon as possible, even at night and / or on holidays. The presence of personnel in the Primary
Substation is not necessary. In this case it is advisable to carry out the movement test of circuit –
breakers of re-feeding - line. If several negative result are found during a test session, the CO is
allowed to end the test session, to avoid further negative outcomes preventing the regular operation
of the network and involving the maintenance unit in order to solve, during the working time, the critical
issues emerged.
 MV and HV lines that can be re-feeded by using manual manouvers: manouvers are carried out as
soon as possible after programming in agreement with the unit network deputy during working hours.
In this case it is advisable to carry out the movement test of circuit – breakers of re-feeding - line.
 Circuit breakers of HV / MV Power Transformer and MV conjuntors in systems with at least two
transformers and each able to supply all the load: during working hours, with notice to the competent
maintenance unit. The presence of operating personnel in the system is not necessary.

7/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

 Switches of AT / MT Transformer and MV connectors in systems with at least two transformers but
which are not able to supply all the load: evaluate the measure of the counter-supply, eventually lighten
the load with MT counter-power from other primary plants. During working hours, the presence of
operating personnel in the primary plant is necessary.
 AT / MT Transformer circuit-breakers in systems with a single transformer and in any case fully re-
energizing only with recourse from neighboring CPs through the MV network: during working hours,
in agreement with the units involved in network maneuvers and maintenance. The presence of
operating personnel in the primary plant is necessary.
 MT and AT lines that can not be re-moved: as a rule, their movement is scheduled by making the
announcement and the presence of the maintenance unit personnel is required and, if necessary, the
availability of a spare switch.
 MT or AT users on the antenna: given the difficulty in having the upright availability within a month, it
is necessary to take advantage of the availability on request by the same customer, or for other
reasons such as line maintenance, or interference, ensuring a check of the amount to service the
customer at least once every two years.
In cases where the presence of maintenance personnel is required in the primary system, it is advisable to
carry out the remote control operations of all the MV circuit-breakers.

KPIS MONITORING FOR ACTIVITY OF MANEUVERING OF HV/MV CIRCUIT BREAKERS


The Operational Center and Operation & Maintenance Country unit will monitor the movement of the circuit-
breakers constantly. Each month, the Operations Center will compile a statistical report on the movements
according to, by way of example, the one shown in Annex D. It shows the values of the number of switches by
type:

a. LINMT: number of MV circuit breakers (excluding auxiliary services);

b. SECN : number of MV circuit breakers for secondary winding of power transformer;

c. PRIM : number of HV circuit breakers for primary winding of power transformer;

d. CGMT: number of MV couplers;

e. LINAT: number of circuit breakers for HV lines;

Based on the results of the movements carried out, the CO will calculate the following indicators for the
previous month:

1. LINMT0 : Number of MV circuit breakers not maneuvered in the period of one month;

8/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

2. LINMT_non_rial: number of circuit breakers that can not be re- energized, therefore, can not be moved from
the CO (unless an interruption has been programmed with the customers).

3. LINMT1: Number of MV circuit breakers moved by the CO;

4. LINMTX: Number of MV manouvers with anomaly detected;

It is then appropriate, for each type of circuit breaker, to evaluate the following indices:

Index of immobility Ko, represents the ratio between the number of circuit breakers not manouvered in the
month and the total number of the consistency:
𝐿𝐼𝑁𝑀𝑇0
𝐾𝑜 =
𝐿𝐼𝑁𝑀𝑇

Index of application of the movement, K1, which represents the ratio between the number of circuit breakers
manouvered and the number of circuit breakers of re-energized lines:

𝐿𝐼𝑁𝑀𝑇1
𝐾1 =
𝐿𝐼𝑁𝑀𝑇0 − 𝐿𝐼𝑁𝑀𝑇_𝑛𝑜𝑛_𝑟𝑖𝑎𝑙

It should be noted that there may be circuit-breakers that it’s possible to re-energize in standard configuration
of the grid, but which can not be manouvered for various reasons such as temporary changes in the structure,
work in progress, maintenance on circuit-breakers.

Movement anomaly index, Kx, ratio between the number of movements with anomaly and the number of
movements performed by the CO.

𝐿𝐼𝑁𝑀𝑇𝑋
𝐾𝑥 =
𝐿𝐼𝑁𝑀𝑇1

Indicators 1, 2, 3, 4 and their indices are calculated for all types of circuit-breakers SECN, PRIM, CGMT,
LINAT.

RELATED ORGANIZATIONAL DOCUMENTS TO BE IMPLEMENTED AT COUNTRY LEVEL


According to the provisions of this document and within the corresponding geographical perimeter, each I&N
Country shall issue, under the supervision of Global Operation and Maintenance, detailed operating
instructions.

9/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

12. ANNEXS

ANNEX A - MANAGEMENT OF ALARMS OF STUx / STM IN CASE OF NOT MANOUVERED CIRCUIT


BREAKERS

The STUx / STM System allows the automatic generation of alarms that indicate the exceeding of the time
thresholds beyond which the circuit breaker must be moved. The non-handling limit values can only be
configured for the HV and MV type at the general PS level and it is not possible to differentiate them by type
of circuit-breaker. Once the configured limit is exceeded, the alarms are highlighted:

1 ^ THRESHOLD DD NOT MANEUVERED XXX

2 ^ THRESHOLD DD NOT MANOUVERED XXX

Normally, the 1st threshold represents an alert for the operator and therefore must be activated to program its
movement and the 2nd threshold represents the maximum non-movement limit. At the end of every midnight,
STUx / STM generates a list of the circuit breakers on the maneuver list that have exceeded the thresholds on
the same day and it’s necessary to be moved.

The alarm persists in STM, visible in the alarms list and status changes, until there is a subsequent movement
(automatic, remote control or manual). If in the following days there is a movement of a circuit breaker, STM
resets the alarm with the acronym "RETURN THRESHOLD DD NOT MANOUVERED " and reset to zero the
count of days for the next alarm.

The list updated in real time of the switches to be moved can be displayed on STUx / STM using the "Alarm
list and status changes" function.

Fig. 2: time sequence of generation of alarms '' THRESHOLD DD NOT MANOUVERED '' and '' "RETURN THRESHOLD DD NOT
MANOUVERED " following circuit breaker maneuver.

10/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

Annex B – LIST OF CIRCUIT BREAKERS TO BE MOVE FROM STM


The list updated in real time of circuit breakers to be moved can be displayed on STUx / STM via the "Alarm
list and status changes" function.
One of the procedures for exporting a printout from STM is as follows:
You activate the STM Logon with your serial number, and activate the function PRINTS ON REQUEST

When the ALARMS list is activated, a screen appears where you have to highlight with the yellow flags the HV
and MV network ALARMS option and evaluate the fields with the start and end month observation dates and
times. Then click on the file button. This command creates a file in a directory.

11/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

Annex C – EXAMPLES OF STM LIST OF CIRCUIT BREAKERS MANEUVERED

EXITO TEST PRUEBA INTERRUPTORES


DÍAS ULTIMO Por division
Fecha
N FECHA SE INTERRUPTORES MOV Ente Dias red Exito Motivo Note Hora

1 16/04/2017 015-PATRICIOS 015-2-25 150 LINMT


020-
2 16/04/2017 INDEPENDENCIA 020-2-25 150 LINMT
020-
3 16/04/2017 INDEPENDENCIA 020-2-26 104 LINMT
020-
4 16/04/2017 INDEPENDENCIA 020-4-44 121 LINMT
SIN CABLE
5 16/04/2017 021-AZCUENAGA 021-1-17 100 LINMT NO SALIENTE 19/04/2017
SIN CABLE
6 16/04/2017 022-RIVADAVIA 022-1-08 111 LINMT NO SALIENTE 19/04/2017

7 16/04/2017 022-RIVADAVIA 022-1-15 151 LINMT NO SIN INTERRUPTOR 19/04/2017

8 16/04/2017 022-RIVADAVIA 022-2-01 151 LINMT

9 16/04/2017 022-RIVADAVIA 022-2-02 151 LINMT

10 16/04/2017 022-RIVADAVIA 022-2-03 151 LINMT

12/13
INTERNAL USE
Operating Instruction no. 1798
Version no. 1 dated 05/12/2018

Subject: Global Infrastructure and Networks - Predictive techniques for on condition


maintenance of HV and MV circuit-breakers through the movement of the
same
Application Areas
Perimeter: Global
Staff Function: -
Service Function: -
Business Line: Infrastructure and Networks

ANNEX D – EXAMPLE OF STATISTIC MONTLY REPORT FOR MV/HV CIRCUIT BREAKERS


MANEUVERED

OPENING – CLOSING TESTS FOR MV AND HV CIRCUIT BREAKERS FOR CO ……..

MONTH OF REFERENCE ……..

Description LINMT SECN PRIM CGMT LNAT TOTAL

Consistency 800 0 0 0 0 0

Circuit breaker maneuvered montly 26

Circuit breaker not re-energized 8

Circuit breaker maneuvered by CO 16

Circuit breaker maneuvered with anomaly 3

Ko - Index of immobility Ko 26/800

K1 - Index of application of the movement 16/(26-8)

Kx - Movement anomaly index 3/16

13/13