CONTENTS
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 1/37
8/24/2020 VALIDATION MASTER PLAN

Production Head

Engineering Head

IT Department Head

APPROVED BY

DESIGNATION NAME SIGNATURE DATE

Quality Assurance Head

General Manager

AUTHORIZED BY

DESIGNATION NAME SIGNATURE DATE

Vice President

2.0 INTRODUCTION

Pharmaceutical Formulation plant having tablet , capsule,liquid manufacturing facility, which is situated
________________________ India.

The facility was designed in the year ____________________ to meet the national, International,

regulatory and cGMP requirements.

The manufacturing facility is supported by Engineering, Ware house, Quality control and Quality Assurance
department. All these departments are covered under the relevant validation activities.

The Validation Master plan is a dynamic document which provides complete over-view of validation
program.

It describes the overall objective, intention approach for establishing performance adequacy of equipment,
utilities, processes and systems.
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
2.6 It identifies the scope of validation, applicable validation protocols-reports, procedures and frequency of
Cookie settings ACCEPT
validations. 
https://pharmaguidances.com/validation-master-plan/ 4/37
8/24/2020 VALIDATION MASTER PLAN

3.0 VALIDATION POLICY 

3.1 The organisation is committed to the concept of validation and all Processes facilities, equipment’s,
Machines, Instruments, Control Systems, Utilities, and analytical methods are put through appropriate
qualification and validation cycles before being accepted for use. Performance Qualification shall be carried

out for all critical equipment’s used for manufacturing, Engineering and Quality control.

3.2 All systems are subject to ongoing validation to evaluate the impact of changes in process, systems,

environment, equipment directly or indirectly on the product.

Three Validation studies are carried out as per protocol prepared by nominated team members from various

departments.

3.4 For certain equipments/ Instruments, on case –by –case basis the manufacturers qualification documents
shall also be taken as inputs for qualification activities. This includes pre delivery inspection and FAT.

4.0 OBJECTIVE

Validation Master Plan is a document, which describes our company’s intentions and the methods which are
related with validation of the equipments, instruments, systems, utilities, facilities, materials, analytical
methods and processes.

Validation program is designed to demonstrate that the facility for the production up to final stage of
production of different dosage forms is capable of meeting the process parameters in a repeatable and

controllable manner.

Validation Master Plan ensure that validation activities are carried out as per respective protocols and after

completion will determine whether the equipment, system, process and methods,

Meets the specifications of its design.

Suitable for its intended applications.

Confirm to the basic cGMP design criteria.

Will satisfy the regulatory requirements.

Meets safety requirements as applicable.

Is capable
Do Not of consistently
Sell My Personal Informationproducing a product that is fit for use.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
4.4 The critical utilities, equipment & process validation program are established in accordance with the
Cookie settings ACCEPT
methods and procedures maintained by the product requirements which are based on the currently available

https://pharmaguidances.com/validation-master-plan/ 5/37
8/24/2020 VALIDATION MASTER PLAN

product information and the Current Good Manufacturing practices, guidelines and other regulations.

4.6 Validation Master Plan helps :

4.6.1 The management to know and access what the validation programme involves and understand its
necessity.

4.6.2 The validation team members to understand their tasks and responsibilities.

4.6.3 To understand the company’s approach towards validation and the set up of organising validation

related activities.

5.0 SCOPE     

5.1 The scope of this document is to describe the systems and methodology used to execute the various
phases of the validation program .

5.2 It applies to all critical equipments, instruments, procedures, utilities, facilities and other quality
supporting systems used for manufacturing, processing, testing, labelling and packaging which may affect the

quality of product directly or indirectly.

5.3 Validation Master Plan applies methodology of validation program of following,

1. Facilities

2. Equipments / Instruments / System [ Qualification]

3. Utilities (e.g. HVAC, Water system, Pure steam and Compressed Air.)

4. Control systems (e.g. computer hardware and soft ware)

5. Manufacturing processes

6. Cleaning processes

7. Analytical methods

8. Environmental (Physical & Microbiological)

9. Personnel ( e.g. Analysts, checkers on inspection or packing line).

10. Revalidation or Re-qualification. 

Do Not Sell My Personal Information


6.0 VALIDATION
We use cookies on ourRESPONSIBILITIES
website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

6.1  Validation
Cookie settings Team
ACCEPTConstitution   

https://pharmaguidances.com/validation-master-plan/ 6/37
8/24/2020 VALIDATION MASTER PLAN

6.1.1 The over all validation process is co-ordinated by a team, which is a working group comprising of
qualified personnel as required for the specific validation activities.

6.1.2 The validation team is made up of representatives from the following areas:

Quality assurance (Validation)

Production

Engineering

Quality control

6.1.3 Validation team is responsible for :

Preparation of Validation Master Plan.

Determining the equipments, instruments, systems, facilities and utilities to be validated.

Preparation of validation and Qualification protocols.

Execution of the validation and Qualification protocols.

Determining the suitability of the established protocol to qualify a system.

Approving all validation protocols and report for each validation from respective functional department

heads.

Reviewing each protocols and reports content to assure compliance with current regulations and guidelines.

Verifying the adequacy of the tests used for the verification of the system as established by the validation
protocols.

Determine the extent of revalidation necessity in case of changes in a validated system.

Document control.

6.1.4 Other personnel will be utilised, as necessary, by the members of the validation team to assist the
assessment of the special equipment, system, utilities where their area of expertise will facilitate the

development & execution and assure the quality of the validation efforts.

6.1.5 Individual responsibilities of different departments as follows:

1. Production: It is responsible for,


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Describing the production process in collaboration with Quality assurance.
you consent to the use of ALL the cookies.

Preparation
Cookie settings ofACCEPT
the batch records in collaboration with Quality assurance.

https://pharmaguidances.com/validation-master-plan/ 7/37
8/24/2020 VALIDATION MASTER PLAN

Transferring the processes to the production facility, in collaboration with Quality assurance.

Providing all current and approved standard operating procedures to be used as part of manufacturing

process.

Providing personnel and materials as required for the execution of validation protocols, equipment trials and
process trials.

Training of all manufacturing personnel in technical, validation and GMP aspects.

Sampling and execution of process controls.

Preparing reports on any deviation from occurs during process.

Participating in preparation of draft validation protocols.

Executing DQ, IQ, OQ & PQ with validation team members as per validation protocols.

Tracking for validation requirements.

Operating & maintaining plant, facilities, equipment, support systems and the specific manufacturing
processes within its design limits.

2. Engineering: It is responsible for,

1. Building and room drawings

2. Calculations

3. Instrument list

4. Maintenance requirements

5. Spare part list

6. Calibration requirements and procedures

7. Equipment design, installation and system construction procedures.

8. Operational recommendations

Co-ordination of calibration activities for all critical instruments as defined by the validation team

Participating in preparation of draft validation protocols.

Executing DQ, IQ and OQ tasks and assisting in the execution of

Preparing and maintaining calibration records for all critical instruments.

Executing
Do Not Sell Mythe installation
Personal and
Information maintenance of production facilities and laboratories.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Training
you ofthe
consent to alluse
engineering personnel in technical, validation and GMP/ GEP aspects.
of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 8/37
8/24/2020 VALIDATION MASTER PLAN

Download
Continue to download

Donwload Now
bb.archimegasuper.com

‫ﻓﺗﺢ‬

SR. NO. CONTENTS PAGE NO.

1 APPROVAL

2 INTRODUCTION

3 VALIDATION POLICY

4 OBJECTIVE

5 SCOPE

6 VALIDATION RESPONSIBILITIES

6.1 Validation Team Constitution

7 FACILITY DESCRIPTIONS AND DESIGN

7.1 General Description and Design Concept

7.2 Description of Products

7.3 Description of Process

7.4 Description of Equipments

8 VALIDATION PROGRAM AND SUPPORTING SYSTEMS

8.1 Fundamentals of Validation Program

8.2 Supporting systems for validation program


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
9 VALIDATION CONCEPT AND TYPES
you consent to the use of ALL the cookies.

Cookie settings ACCEPT


10 ACCEPTANCE CRITERIA  

https://pharmaguidances.com/validation-master-plan/ 2/37
8/24/2020 VALIDATION MASTER PLAN

11 RISK MANAGEMENT STRATEGY

12 STANDARD OPERATING PROCEDURES

13 CHANGES AND MODIFICATIONS

13.1 Changes and modification to the validation systems

13.2 Changes and modification to the validated systems

14 VALIDATION SCHEDULE

15 ANNEXURE

16 GLOSSARY

APPROVAL

The Validation Master Plan has been initiated, checked, approved and authorized for implementation by the
undersigned.

INITIATED BY

Download
Continue to download

Donwload Now
bb.archimegasuper.com

‫ﻓﺗﺢ‬

DESIGNATION NAME SIGNATURE DATE

Quality Assurance Executive

[Validation]

CHECKED BY

DESIGNATION
Do Not Sell My Personal Information NAME SIGNATURE DATE
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Quality Control Head
Cookie settings ACCEPT

https://pharmaguidances.com/validation-master-plan/ 3/37
8/24/2020 VALIDATION MASTER PLAN

NOTE: Critical instruments are those which have direct impact on the product   quality, i.e. Instruments which

measure, monitor, or control manufacturing,processing and testing parameters. 

3. Quality Control: It is responsible for,

Participating in preparation of draft validation protocols.

Training of all Quality control personnel in technical, validation and GMP/ GLP aspects.

Testing of validation sample as per validation protocols and specifications.

Preparing laboratory reports by collecting data and verified summaries of findings and conclusions.

Ensuring that the laboratory systems, instruments, devices and equipment to be used in the course of

validation studies have been qualified, validated and calibrated.

4. Quality Assurance: It is responsible for,

Co-ordinating and organising the validation team.

Co-ordinating the preparation of the validation protocols for each Area, system, Facility, Utility, equipment,

Instrument.

Co-ordinating the process validation by monitoring, sampling, testing and challenging the specific

manufacturing processes.

Co-ordinating all change control approvals. Organising the changes required to approved protocols resulting
from specification changes or changes in operating parameters.

Training of personnel involved in validation activities.

Collecting and organising the validation data.

Tracking of all validation requirements based on the review of guidelines or literatures.

Preparing the final validation summaries and certification statements. 

7.0 FACILITY DESCRIPTIONS AND DESIGN 

7.1 General Description and Design Concept of facility as follows:-

7.1.1 Pharmaceutical plant have provide manufacturing facility for different dosage forms as tablets,Liquid &
capsule.
Do Not Sell My Personal Information
The
We use plant
cookiesisonfunctionally divided
our website to give into
you the mostdifferent blocks viz.
relevant experience Change Rooms,
by remembering Administration,
your preferences Quality
and repeat visits. Assurance,
By clicking “Accept”,
you consent to the use of ALL the cookies.
Quality Control, Production, Service Floor, Warehouse, Utility, Engineering Workshop, Canteen and the
Cookie settings ACCEPT

https://pharmaguidances.com/validation-master-plan/ 9/37
8/24/2020 VALIDATION MASTER PLAN

Gate House. Quality Control Laboratory is contagious to production operations, whereas there exists an In-

Process Quality Control Laboratory inside the production area.

The production area has infrastructure to manufacture tablets,liquid & capsule.

The Production and supporting areas have been made in a cluster module with covered interconnecting

corridors and feasibility for modular expansion. The building is made of Reinforced Cement Concrete
(RCC), and designed such, that no beams or columns are visible in the manufacturing and testing areas.

The walls of the plant are constructed of brick and plastered to provide a hard smooth finish, with minimised

recesses. The Production, Quality Assurance, and the interconnecting corridors have quota stone and only
warehouse have hygienic Epoxy flooring.

The return air risers of the HVAC system are concealed within the wall to avoid recesses. The terminal
filters and lighting fixture are recess type, ceiling mounted. All the services to the manufacturing area are

provided from the first floor, (designated as the Service Floor) through Galvanised iron.

Sanitary type drains have been provided in the production and testing areas. Further, concealed drainage

line has supplied to effluent treatment plant. All drainage is treated to bring down the COD and BOD to
predetermined levels. This treated water is then used for gardening.

The Ware house is dust resistant and controlled environment.

The Power Supply system features the facility to control voltage fluctuations and an automatic changeover

system from the state power supply to stand by power generation system in case of power failure.

7.1.9 The building is surrounded on all sides by a fire hydrant loop, maintained at high pressure.                        

 7.2  Description of Products:  As per attached Annexure (Make and attached Product list here)

 7.3   Description of Process ow:As per attached Annexure (Make and attached list here) 

7.4 List of equipments: As per attached Annexure (Make and attached list here)

8.0 VALIDATION PROGRAM AND SUPPORTING SYSTEMS 

8.1 Fundamentals of  Validation Program:-


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
8.1.1 The validation program shall be divided into five phases as follows,
you consent to the use of ALL the cookies.

Cookie settings ACCEPT


Phase I – Preparation and Approval of the Validation Master Plan. 
https://pharmaguidances.com/validation-master-plan/ 10/37
8/24/2020 VALIDATION MASTER PLAN

Phase II – Preparation and Approval of the Validation Protocols.

Phase III – Execution of Validation protocols, tests laid down in Validation Protocols and data collection.

Phase IV – Preparation of Validation Report, Compilation of data collected during Validation, review,

recommendations and Approval of Validation Report. Document shall be kept under custody of the Quality
Assurance.

Phase V – Ongoing evaluation, review, Change Control, Deviations and Revalidation.

8.1.2 The Validation Master Plan (VMP) shall be prepared by the Validation Executive.

8.1.3 The document shall be checked by the heads of all Functional area.

The document shall be approved by the Quality Assurance Manager and General Manager. The document
shall be Authorised by Vice President .

8.1.4 There shall be separate Protocols for DQ, IQ, OQ, PQ (where ever applicable), Environment Control,
Analytical method validation, Facility, Utility, Process Validation, and Cleaning Validation etc. All the protocols

shall be numbered as per SOP for the numbering of protocols and reports.

8.1.5 The Protocols shall consist of the Objective, scope, responsibilities,procedures for conducting the tests

for Validation. The results observed during the validation studies, summary, conclusion and final approval

shall include in the reports.

Validation Executive and Concerned department Executive shall initiate

the Validation Protocols. Concerned HOD and HOD’s of the Production, Engineering shall approve. Quality

Assurance Manager & General Manager shall finally authorize the validation protocols.

8.1.7 The Approved Master copies of protocol shall be kept in the custody of the Quality Assurance Manager.

During execution of validation protocol, validation report shall be prepared as per protocol and attached the

collected data of the same to the reports.

8.1.8 Summary & conclusion Report and Approval

After the execution of the protocols, a validation task report shall be reviewed, summarise, concluded and
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
recommendations made by the team carrying out the validation activity and approved by the involved team
you consent to the use of ALL the cookies.

members.
Cookie settings ACCEPT

https://pharmaguidances.com/validation-master-plan/ 11/37
8/24/2020 VALIDATION MASTER PLAN

8.2 Supporting systems for validation program:

8.2.1 Protocol and documentation system:

The system shall designed to assure that all validation documentation shall prepare accordingly validation
policies establish by a validation team, which shall responsible for the co-ordinating the validation program

and approving all validation activities.

8.2.2 Documentation control system:

This system shall design to manage all documents generated during the validation process, including that

from the change control program. The system will include a numbering system to identify each protocol and

an index to list of all approved protocols. It assures that all documentation shall properly stored and controlled

so as to maintain its integrity.

Protocol execution system:

This system shall assure that all requirements outlined in the approved validation protocol are met and thus

system shall considered to valid. To comply with these requirements this system shall establishes the

procedures to be followed for co-ordination of the validation tasks through the validation team. This system
shall also provides assurance that the information collected is timely, correct and is properly reviewed and

shall approved by the validation team members. 

8.2.4 Change control system:The SOP for Change Control

 9.0  VALIDATION CONCEPT AND TYPES

9.1  De nition:

9.1.1 ‘The collection and evaluation of data, beginning at the process development stage and continuing

through the production phase, which ensures that the facility, equipment, manufacturing process, control

systems, utilities including personnel and materials are capable of achieving the intended results on a
consistent and continuing basis and thus is capable of consistently producing a product that meets the

established products specification’.

9.1.2 Validation is an documented evidence which can confirm predetermined critical parameters.     
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
       9.2  Validation Types:
Cookie settings ACCEPT

https://pharmaguidances.com/validation-master-plan/ 12/37
8/24/2020 VALIDATION MASTER PLAN

1. Facility validation: 

Room no. and location

Purpose of area for use 

Dimension of area:

Height (Meter), Length (Meter), Width(Meter), Area (M2 / Ft2) Volume (M3/Ft3 ). 

Area Details:

Walls:

Wall to floor,  wall to false ceiling,  Wall to return air riser, Wall to door frame.

Do Not Sell My Personal Information


Ceiling: Type, Finish, Painting Shade & Jointing.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Door:
Cookie settings ACCEPT

https://pharmaguidances.com/validation-master-plan/ 13/37
8/24/2020 VALIDATION MASTER PLAN

Type, Dimension (W X H meter), No of doors, Location, Painting, No and type of door closer, No and type of

handle, Size of glass view panel, Door interlocking.

Windows:

     Type & No of windows, Dimensions (W x H meter), Jointing.

Drainage:

     Type of trap, No and location, Material of construction.

Electrical work:

Wiring type, no. of light fittings and type arrangement for emergency light. No. of telephone points, no. of

computer points, no. of Power sockets, no. of single phase sockets & type, no. of three phase sockets &

type, no. of lighting switch box & type Illumination level in Lux. 

Building management system:

Indication box, Size, Location Indication, pressure Indication, temperature Indication, humidity and Door

status. 

Other facilities:

Fly killer, Air curtain, PVC strip door, SS corner angle, SS fenders, Fan Safety, Pass box.  

1. Analytical Method validation: 

This type of validation shall be done at Analytical Research Development department.

1. Vendor Quali cation : 

Vendor Qualification shall be carried out for all vendors of Raw and Packing Materials, to ensure that the

components of the product, consistently meet predetermined specifications.

Vendor evaluation shall be done on the basis of questionnaire, pre-shipment samples, machine trials and/or

a vendor audit .

Do Not Sell My Personal Information


The supplied materials shall be checked / analysed with respect to in- house specifications.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Control
1.Cookie system
settings
validation: 
ACCEPT

https://pharmaguidances.com/validation-master-plan/ 14/37
8/24/2020 VALIDATION MASTER PLAN

Computer software and hardware Validation.

The objective of the computer system validation is to demonstrate that the computer system performs

(Create, modify, archive, and retrieve) as it is supposed to.

This shall be based on following:

Specification for hardware and software depending on intended use.

Computer and manual modes of data validation giving similar results.

Accessibility, durability and accuracy of stored data.

Levels of authority for data entry and change.

Accuracy and reliability of data entered.

Security system to ensure any alteration or pilferage of data.

v Quali cation (DQ/ IQ/ OQ/ PQ) of  Computer Hardware and software:

To control the equipment/ instrument/ system, computer hardware and software systems used as a part of

equipment or instrument or system must be validated. Design qualification, Installation qualification and

operational qualification shall be executed prior to performance qualification of associated equipment/

instrument/ system.

To expedite the process of validation, the computer system validation shall be done as a part of equipment/

instrument/ system validation.

The following are the contents for computer hardware and software validation: 

1. Detail description of control system

Control panel

Power supplies

Temperature sensor (Wherever applicable)

Humidity sensors (Wherever applicable)

Smoke detectors (Wherever applicable)

CPU

Do Not Sell My Personal Information


Location
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Manufacturer
Cookie settings ACCEPT
Model 
https://pharmaguidances.com/validation-master-plan/ 15/37
8/24/2020 VALIDATION MASTER PLAN

Processor

Capacity

Disk type

Floppy disk drive

Hard disk drive

Ports

Monitor

Manufacturer

Model

Type

Size

Software

Operating system version

Application program version

Password control

Input devices

RAM

CDROM

2. Computer Hardware

Manufacturer

Model No.

Serial No.

CPU board Model No.

CPU board Serial No.

Communication processor

Printers
Do Not Sell My Personal Information
Screens
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Floppy disk drives
Cookie settings ACCEPT
Hard disk drives 
https://pharmaguidances.com/validation-master-plan/ 16/37
8/24/2020 VALIDATION MASTER PLAN

Computer operating environment:-

Temperature

Humidity

Electromagnetic field

Calibration – List of all calibrated instruments for the computer control systems and make this list as a part

of validation document.

Electrical – Verification of the control system and/ or control wiring has been installed as per manufacturer’s

drawing and specifications and confirm correct identification of wires or air control lines in the control panel

and the control panel / computer system are properly grounded.

3. Computer Software

Software

Verification that software prevents unintentional access.

Verify back up procedures.

Verification of restart of software procedures after system failure.

Verification of software change control procedures.

Verification whether the controller operates as a stand alone device or as part of a distributed system. If the

controller operates as part of a distributed system, verify that the program is written to prevent unauthorised

access between the system.

Verification that the following phases of software life cycle have taken place ,

Requirements

Design phase

Installation and check out phase

Operation and maintenance phase

Performance phase

Verification that supplier has provide the following

Logic
Do Not Sellflow diagram
My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you Operating
consent to themanual
use of ALL the cookies.

Cookie settings ACCEPT


Software description 
https://pharmaguidances.com/validation-master-plan/ 17/37
8/24/2020 VALIDATION MASTER PLAN

Where does memory reside ( RAM, Tape Disk)

4. Controlled devices:

Verification that the controlled devices for the system as per approved drawings, specifications and
authorised change orders.

Verification that all the controlled devices have been installed and tagged as per ,

Manufacturer

Model

Location

Description

Function

Calibration date

ID number

Verification that all the wiring done as per specifications. Execution of point to point verification between the
control panel. Confirm the correct identification of wires and / or air control lines.

Evaluate the controlled functions for their potential effect on the quality strength, purity and safety of the

final product.

1. Equipment validation (Quali cation):

2. Design Qualification

3. Installation Qualification

4. Operational Qualification

5. Performance Qualification

1. Design Quali cation (DQ)

The following sections are to be included in design qualification:

User requirement specification (U.R.S.)

User requirement speci cation (U.R.S.):


Do Not Sell My Personal Information
The
We use following sections
cookies on our website toare
giveto betheincluded
you in User
most relevant Requirement
experience Specification:
by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Cookie
1.0 settings
Introduction ACCEPT

https://pharmaguidances.com/validation-master-plan/ 18/37
8/24/2020 VALIDATION MASTER PLAN

2.0 Overview

3.0 Operational Requirements

3.1 Capacity

3.2 Specifications

3.3 Functional Requirements

3.4 Environment

3.5 Maintenance

4.0 Life Cycle

4.1Prefered vender list

4.2Development

4.3Testing

4.4 Delivery

4.5 Support

5.0 Glossary

6.0 References

7.0 Approval

Note: Numbering system as per SOP of User requirement specification

Functional Requirement speci cation ( FRS):

Specification provided by the supplier end is to be attached to the report.

Factory acceptance test procedure (F.A.T.):

Remark of team of selector on F.A.T.


Do Not Sell My Personal Information
We Approval
use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Installation
2.Cookie settings Quali cation (IQ)
ACCEPT

https://pharmaguidances.com/validation-master-plan/ 19/37
8/24/2020 VALIDATION MASTER PLAN

Installation Qualification is documented check that all key aspects of the installation adhere to appropriate

codes, approved design intentions and that manufacturer’s recommendations are suitably considered.

To qualify, the specifications of the new equipment received, must match with the URS . Any exceptions to

the original Purchase order or Functional specification shall be documented and justified. Attribute

inspection of the equipment/ Instrument/ System shall be carried out, documented and proper installation

shall be verified.

All modifications in existing equipments shall be properly documented through a change control procedure.

It may not be possible to inspect and verify every feature associated with a piece of equipment. In such

cases, a

certificate of conformance shall be consider, obtained from the equipment manufacturer.

The following sections are to be included in Protocol of Installation Qualification protocol:

Approval

Objective

Scope

Responsibility

Procedure

Re-qualification criteria

Abbreviations

Reference

3. Operational Quali cation (OQ)

1. OQ demonstrates that the equipment/ Instrument/ System can operate throughout it’s dynamic range of

operation, within limits and tolerances as per specified in the operating manual or instructions.

This demonstration of equipment’s basic operation shall involve all control parameters of the equipment.

OQ shall be carried out for equipment/ Instrument/ System that will be used routinely in manufacturing,

testing or in critical utilities.


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
The following sections are to be included in Operational Qualification protocol:
Cookie settings ACCEPT
Approval 
https://pharmaguidances.com/validation-master-plan/ 20/37
8/24/2020 VALIDATION MASTER PLAN

Objective

Scope

Responsibility

Procedure

Re-qualification criteria

Abbreviations

Reference

4. Performance Quali cation (PQ)     

Performance qualification is documented verification of performance of equipment/ Instrument/ System as

intended for the process under specified operating ranges.

All critical equipment / Instrument/ System are qualified for performance verification.

The study shall involve the challenging of the system to simulated worst case situations, and establishment
of operating variables.

The following sections are to be included in performance qualification protocol:

Approval

Objective

Scope

Responsibility

Procedure

Acceptance criteria

Re-qualification criteria

Abbreviations

Reference

NOTE: All equipment, Instrument and system shall have required separate qualification protocol and report.

1. Process validation:
Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to
Process the use of ALL
validation the cookies.
is established documented evidence which provides a high degree of assurance that a
Cookie settings
specific process will
ACCEPT consistently produce a product , meeting its predetermined specifications and quality

https://pharmaguidances.com/validation-master-plan/ 21/37
8/24/2020 VALIDATION MASTER PLAN

characteristics.

If a new product is duplicasy of the existing product then its validation shall be bracketed with the existing

product. 

The purpose of process validation is to demonstrate the reliability and reproducibility of manufacturing

process, within established parameters and to assure batch uniformity and integrity of drug products. A

process validation program shall establish a documented evidence of three full-scale production batches. 

The validation protocol shall be a written document that defines and gives the detail of critical steps of
manufacturing process. It shall state, how the validation program will be conducted and lists acceptance

criteria for successful validation.

The process validation batches shall be taken for packing after completion of 30 days hold time study for the

initial batches manufactured, Provided the product meets the Finished product / release specification/ upon re

analysis.

There are four types of the process validation.

Prospective validation

Concurrent validation

Retrospective validation

Revalidation 

1. Prospective validation:

Prospective Validation shall be carried out on the small scale or R & D batches during development stage.

These validations were carried out to identify the processing steps, equipment settings and process timings,

which can prove to be critical in overall impact of product quality. All these steps, equipment setting and

process timing are evaluated to finalise the setting parameter. Limits of all critical parameters shall put

tentatively.

This draft form of study can lead towards the finalisation of Batch Manufacturing Record / Batch Packing

Record for large scale batches.


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
The prospective validation shall take care of following:
you consent to the use of ALL the cookies.

Cookie settings ACCEPT


1. Process description 
https://pharmaguidances.com/validation-master-plan/ 22/37
8/24/2020 VALIDATION MASTER PLAN

2. Investigation summary of critical processing steps

3. Finished product release specification

4. Calibration of equipment

5. Appropriate analytical methods

6. Proposed in process control with acceptance criteria

7. Sampling plan

8. Method for recording and evaluating results and responsibilities. 

2. Concurrent validation:

1. This validation comprises of determination and evaluation of process parameters applicable from scale up

to large scale batches.

Process validation for establishing the predetermined limits of all critical parameters by conducting three

consecutive commercial or large scale batches.

Validation carried out during routine production or products manufacturing for sale.

The tests are finalised based on evaluation of the results of these batches. These batches were monitored

for stability and quality trends.

Matrix approach can be applied to process validation. The matrix approach means that a plan to conduct

process validation on different strength of same product, manufactured by the same process and similar

type of equipment. e.g. validation on one strength (preferably smallest) as a representative amongst the

multiple strength of the same product. This approach should be in accordance with cGMP and should

demonstrate that the process is consistent for all the strength. 

Note: The batches will not be dispatched unless and until the analysis of the validation sample is completed. 

3. Retrospective validation:

Historical trending of all critical parameters obtained from analytical results and / or IPQC results observed

after testing of physical, chemical and microbiological parameters of product manufactured by same

process. To ensure that all the parameters shall be in the limit and in uniform range.
Do Not Sell My Personal Information
Retrospective
We validation
use cookies on our shall
website to give youdone yearly
the most ofexperience
relevant productsbyor batches your
remembering manufactured inrepeat
preferences and previous year.
visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 23/37
8/24/2020 VALIDATION MASTER PLAN

Minimum first 20 batches shall consider for retrospective validation. If less than 20 batches were

manufactured in one year then batches of previous years were consider for trending.

4.   Revalidation:

Periodic revalidation: This type of revalidation shall be done on periodic basis as per specified frequency.

The revalidation shall be governed by the Change Control procedure.

Revalidation after any change : All validated equipment, systems, processes, products etc. shall be

continuously monitored for any change, to be considered for revalidation of the same. 

Revalidation / Requalification [Verification of validation] shall be considered in the case of :

Equipment / Instruments / System:

1) Substitution of existing equipment with a new equipment /instrument/System.

2) Change of site /location of the equipment / instrument / System from qualified existing place to other place.

3) Any major modification in the existing equipment / instrument /System since purchase which can have an

adverse effect on the quality and efficacy of the finished product. 

Manufacturing Process:

A change in the validated manufacturing process that has an effect on the quality and efficacy of the finished

product, which includes a change in the following :

1) Master formula or manufacturing process.

2) Raw Materials

3) Equipment

4) Batch Size

5) Change in manufacturing site or location.

1. Cleaning validation: 
Do Not Sell My Personal Information
De nition:
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
· Validation of the process by which the equipments are cleaned is called as cleaning validation.
Cookie settings ACCEPT

Objective: 
https://pharmaguidances.com/validation-master-plan/ 24/37
8/24/2020 VALIDATION MASTER PLAN

Cleaning validation is an important mechanism to protect the pharmaceutical products from cross

contamination. A pharmaceutical product can be contaminated by previous product residues, traces of

cleaning agent, micro-organisms or any foreign particle as borne particles, dust, raw materials etc.

This should be performed to provide a documented evidence that the procedure being followed for cleaning
of equipment and accessories is effective and removes residues of previous batch / product up to a

predetermined acceptance level, using a well defined protocol and acceptance criteria.

For equipments which are not product specific, cleaning procedure for such equipment should be able to

ensure that it can consistently remove residues to the predetermined level.

Procedure:

There are two methods employed for sampling during cleaning validation. These are Rinse and Swab

method. Rinse method will be applicable when swabs are not practically possible.

Cleaning procedures for products and processes, which are very similar are do not need to be individually
validated. Representative of similar range can be selected to justify the validation programme, which

addresses the critical issues relating to selected products and processes.

A single validation study under consideration of the “worst case” can be carried out on the basis of the

maximum strength, potency, solubility and LD50. The cleaning validation can be evaluated,

1. For highest strength product in multi strength products or all products.

2. For highest potency product in all products.

3. For least solubility in common cleaning solvent i.e. Water.

This “worst case” term can also be referred as “bracketing”. And such approach is called as matrix approach.

Three cleaning validations exercise shall be performed and shown to be successful in order to prove that

the method is validated.

The documentation of cleaning validation shall include validation protocol, cleaning procedures,

sampling plans, surface area calculations, testing procedures and executed record of the cleaning event, a

record of the sampling and testing events and a validation report which contains clear conclusions against
Do Not Sell My Personal Information
acceptance criteria.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 25/37
8/24/2020 VALIDATION MASTER PLAN

This validation shall covers sanitation, microbiology as well as removal of external agents like detergents,
using sampling techniques capable of detecting and measuring to very low levels wherever applicable.

There are two criteria’s for the cleaning validation, one is dose criteria and second is 10 PPM criteria.

Validated analytical methods used for cleaning validation shall have sensitivity to detect residues or

contaminant of previous product . The detection limit for each analytical method should be sufficiently

sensitive to detect the established acceptance level of residues or the contaminant.

Equipment surface area calculation:

1. The product contact surface area for each equipment shall be calculated by theoretically breaking down the

equipment in to basic geometric shapes [cylindrical, cubical, cone, rectangle etc.] and then apply to relevant
area calculation formulae.

2. Amount of contaminant, mix from previous product to next product, depend on the common surface area of

equipment used for both previous and next product.

Responsibility:

Quality Assurance:

Generation of validation protocol

Sampling during validation

Review and compilation of validation data & certification

Production:

            Ensuring cleaning of equipment

1. Utilities Validation: 

Equipments / Machineries used for plant utility as,

1.Do
HVAC system
Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
2.you
Water system
consent to the use of ALL the cookies.

3.Cookie
Pure settings
steam generator
ACCEPT

https://pharmaguidances.com/validation-master-plan/ 26/37
8/24/2020 VALIDATION MASTER PLAN

4. Compressed air system

1. HVAC system:- 

Air Handling Unit system, ventilation system, and evaporating system are the part of HVAC system which is

one of the utility have directly or indirectly impact on products.

Total ____ number of independent air handling units, _____ number of ventilation systems with supply and

exhaust duct have been provided in the facility. Each critical operational area has a dedicated air-handling
unit (AHU) and has temperature and humidity controls. Each room is provided with terminally filtered air, as

per the requirement of operation, to be carried out in the room. Total ___ number of evaporating units in

service floor are provided.

The core corridors are provided with controlled environment. Pressure balancing of each room has been
done to avoid any cross contamination, by any ingress of air / drug product from adjacent areas.

There is provision to automatically control and record temperature and percentage relative humidity &

monitor and record the pressure differential across Rooms, by means of a computer interface.

This system is qualified initially, monitored at regular intervals and revalidated once in a year in oral dosage

form area.

Initially Temperature control test, Humidity control test, Air velocity & number of air changes test, Differential

Pressure Control test, Air borne Particle Count test, Microbial count test, Air flow direction test shall be

conduct to perform the system.

Limits for each test shall mentioned in the validation protocol as acceptance criteria.

2. Water system:- 

Water system is one of the utility which have directly or indirectly impact on products. There are mainly

three types of water system as follows,

Raw water system [Potable water]

DM water system [Deionised water]


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Purified water system
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 27/37
8/24/2020 VALIDATION MASTER PLAN

New water system shall be established and use for regular purpose after one year validation study includes

the results of chemical and microbiological quality of the water.

For qualifying the DM water system & purified water system, Chemical and Microbiological Test shall be

conduct mentioned as follows.

Temperature, PH, Conductivity, Colour, Total hardness, Total dissolved solids, Turbidity, Alkalinity and
presence of ions or minerals, Microbial counts, pyrogens and endotoxins. Test method for each tests shall

be mentioned in the protocol.

Location of sampling points shall be done as per specified in Validation protocol or as per SOP.

Frequency for all above mentioned tests shall be mentioned in the individual validation protocol.

Validation of water system shall divide in to three different phases as follows. Frequency of sampling,

number of samples taken and no. of sampling locations are reduces from phase I level to next phase

level.

Phase – I –

Phase – II –

Phase – III –

Following acceptance criteria:

1. Raw water circulation and its storage shall be requalified if microbial load is if,more than 500 CFU / ml and

chemical water quality shall confirms to In-house standards.

2. Demineralised water circulation and its storage shall be qualified if microbial load is if, more than 100 CFU /

ml and chemical water quality shall confirms to In-house standards.

3. Purified water circulation and its storage shall be qualified if microbial load is if,more than 10 CFU / ml and

chemical water quality shall confirms to In-house standards.

4. For acceptance criteria of chemical and microbiological tests of purified water,USP – 41 [NF – 36] shall be

refer.

Sanitization of purified water system shall be done after 15 days


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Water
you system
consent shall
to the use betherevalidate
of ALL cookies. if there is any major change, replacement or modification in existing

system.
Cookie It shall
settings be periodically
ACCEPT revalidate or verified once in a year on the basis of monthly, weekly or daily

https://pharmaguidances.com/validation-master-plan/ 28/37
8/24/2020 VALIDATION MASTER PLAN

testing data as per scheduled trend.  

3. Pure steam generator:-

Pure steam is one of the utility which have directly or indirectly impact on the quality of the product.

Conductivity, PH, Total organic carbon, Bacterial endotoxin and Microbial count test of pure steam

condensate shall be carried out during validation.

Frequency for sampling and testing shall be mentioned in the protocol.

Sampling locations of pure steam shall be carried out from pure steam generator as per specified in the
validation protocol.

Data of chemical and microbiological analysis of all months shall be reviewed and trend shall be prepared

for year.

Based on the trend data of the year summary report shall be prepared and shall be approved at unit levels.

Limits or Acceptance criteria for each tests shall defined in the validation protocol.

Pure steam generator shall be revalidate if there is any major change, replacement or modification in

existing system. It shall be periodically revalidate or verified once in a year on the basis of monthly, weekly

or daily testing data as per scheduled trend.

4. Compressed air system:-

Compressed air system is one of the utility which have directly or indirectly impact on the quality of the
product.

Sampling locations shall be mentioned in the validation protocol. Sampling method of Compressed Air shall

be carried out as per respective Standard Operating Procedure.

Following test shall conduct to qualify compressed air system. Limits or Acceptance criteria for each tests

shall defined in the validation protocol.


Do Not Sell My Personal Information
1.We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Water vapour: Dew point and moisture content in air shall identify.
you consent to the use of ALL the cookies.

Cookie settings ACCEPT


1.1 Pressure Dew point : 0 to + 3° c. 
https://pharmaguidances.com/validation-master-plan/ 29/37
8/24/2020 VALIDATION MASTER PLAN

1.2 Atmospheric Dew point : – 15 to – 20° c.

2. Compressed Air must be oil free so during the course of generation it

does not comes in contact with Oil.

3. Hydrocarbons should be less than 5 mg / m3.

4. Micro organisms should be less than 3 CFU/ m3.

5. Particulate matter such as fibres and metal particles should be NMT 100 particles of 0.5 mper cubic feet of

air.

6. Compressed air system should meet the class 100 requirement.

Frequency of different tests of different frequency should be specify in to the validation protocol.

Data of chemical and microbiological analysis collected monthly or quarterly shall be reviewed and trend

shall be prepared for year.

Based on the trend data of the year summary report shall be prepared and shall be approved at unit levels.

Compressed Air System shall be revalidate if there is any major change, replacement or modification in

existing system. It shall be periodically revalidate or verified once in a year on the basis of monthly and

yearly testing data as per scheduled trend.

Note: During validation program of above described utilities some tests were conducted by external party and

some tests were in-house, specified in validation protocol.

10.0   ACCEPTANCE CRITERIA 

10.1 The specific acceptance criteria for the experimentation results, during validation, shall be defined in
detail in the respective validation protocol. Recognised national or international standards shall be cited for

reference.

11.0 RISK MANAGEMENT STRATEGY

11.1 Risk: It is defined as the combination of like hood and consequences of specified hazardous event
Do Not Sell My Personal Information
occurring.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 30/37
8/24/2020 VALIDATION MASTER PLAN

11.2 Hazards: It is defined as the source or situation with potential for harm in terms human injury or ill health,

damage to property, damage to work place, damage to environment, or a combination of these.

11.3 Any aspect of the operation that can affect the quality attributes i.e. Identity, purity,strength, safety of the

product directly or indirectly, obviously that can affect the health of customer, that’s why, assessment of

impact of risk requires.

11.4 This shall be based on the comprehensive understanding of the product, process,system and
components. Where possible this assessment of impact shall be defined in the user requirement specification

& process validation.

11.5 Risk and issue management strategy:-

Sources of risks: Risk sources are broadly categorized into,

New project

Introduction of new equipments in to the existing facility

Changes in the existing facility or utility or equipments

Introduction of new product

Change in the approved vendor.

11.6 Method of Risk identification and Evaluation:

Impact assessment : The risk is identified and categorized in to impact and no impact.

Identify the system

Develop system boundaries

Does the system have an direct impact on product quality

Is it linked with direct Direct impact

impact system

No impact system Indirect Impact Develop supporting rational


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
11.7 Based on the findings, if the impact of the risk is direct or indirect one, then the extent of validation is
you consent to the use of ALL the cookies.

decided i.e. whether


Cookie settings ACCEPT
it requires a process, equipment, analytical method, cleaning process or vendor

https://pharmaguidances.com/validation-master-plan/ 31/37
8/24/2020 VALIDATION MASTER PLAN

qualification.

11.8 Risk categorization, validation priorities, schedule preparation, depth of validation including timelines
shall be determined by the functional team members from the production, QA, QC and Engineering.

11.9 When a new product is introduced in to the existing system, the risk is assessed by using matrix vs.

does form which is evaluated in the product development plan for the process validation and cleaning

validation.

11.10 Impact assessment: The applicability of any thing of the following criteria was taken as an indication

that the system has direct impact or indirect impact on the product. Systems such provides Utility which has

direct contact with the product are compressed air, purified water, Pure stem and HVAC system

Name of System / Equipment / Direct Indirect


Description Remark
Instrument impact impact

Area — Y — —

HVAC System Y — —

Compressed air Y — —

Utilities Purified water Y — —

Potable water N Y —

Pure steam Y Y —

All equipments used in the


Y — —
manufacturing processes
Equipments
All equipments or machineries used
N Y —
for storage

12.0   STANDARD OPERATING PROCEDURES 


Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
12.1   ThetoStandard
you consent Operating
the use of ALL the cookies.Procedures relevant to the equipment, process,and analytical methods shall

available at individual
Cookie settings ACCEPT site.

https://pharmaguidances.com/validation-master-plan/ 32/37
8/24/2020 VALIDATION MASTER PLAN

13.0 CHANGES AND MODIFICATIONS: 

13.1 Changes and modi cation to the validation systems:

Any changes or modifications to the validation protocol, test reporting formats and other related documents

must be approved by the validation team prior to becoming effective through a ‘Change Control’ system.

13.2 Changes and modi cation to the validated systems:

All changes or modifications to a validated systems must be evaluated and

approved by following ‘Change control system’. A supplement to be attached to the revised protocol to reflect

the approved changes as it may be deleted part or additional part in the validation protocol. 

14.0  VALIDATION SCHEDULE

14.1 The Validation for equipment, instruments, systems and processes which requires to be periodically
revalidated at defined frequency as per individual validation protocol within ± 1 month of the due date.

15.0 ANNEXURE (To be prepared and attached)

1. Annexure – I Product list

2. Annexure – II Equipment list

3. Annexure – III Process flow

4. Annexure – IV Equipment validation schedule

5. Annexure – V Process validation schedule 

16.0  GLOSSARY

1. Acceptance criteria:

The product, equipment, and /or process specifications and limits, such as acceptable quality level and
unacceptable quality level, that is necessary for making a decision to accept or reject.

Calibration:
2.Do Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
Demonstrating that a measuring device produces results within specified limits of those produced by a
Cookie settings ACCEPT
reference standard device over an appropriate range of measurements. This process results in corrections 

https://pharmaguidances.com/validation-master-plan/ 33/37
8/24/2020 VALIDATION MASTER PLAN

that may be applied if maximum accuracy is required.

3. Change control:

A formal system by which qualified representatives of appropriate discipline reviewed proposed or actual

changes that might affect a validated status. The intent is to determine the need for action that would ensure

and document that the system is maintained in the validated status.

4. Certi cation:

Documented testimony by qualified authorities that a system qualification, calibration, validation or

revalidation has been performed appropriately and that the results are acceptable.

5. Critical variable study:

A study that serves to measure variables or parameters , critical to the satisfactory operation of a piece of

equipment or plant and to assure their operation within monitored and controlled limits. Examples of variables

are pressure, Temperature, Flow rates , Time etc.

6. Limit of detection:

The lowest amount of analyse in a sample which can be detected but not quantitiated as an exact value. The

limit of detection is mostly a parameter of the limit test.

7. Limit of Quantitation:

The lowest amount of analyse in a sample which can be quantitatively determined with defined precision and

accuracy under the stated experimental condition. The limit of detection is mostly a parameter of the limit

test.                       

8. Inspection:

The process of measuring, testing or otherwise comparing the item to requirement.

9. Installation Quali cation:

Documented verification that all key aspects of the installation adhere to appropriate codes and approved
Do Not Sell My Personal Information
design intentions and that manufacturer’s recommendations are suitably considered.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

10. Operational Quali cation:


Cookie settings
ACCEPT

https://pharmaguidances.com/validation-master-plan/ 34/37
8/24/2020 VALIDATION MASTER PLAN

Documented verification that the system or subsystem performs as intended throughout all anticipated
operating ranges.

11. Performance quali cation:

Documented verification that the equipment performs as intended for the process,as specified by operating

ranges .

12. Process optimisation:

To optimise the process for maximum efficiency while maintaining quality standards.

13. Process validation :

Establishing documented evidence that a process does what it purports to do. It is an documented verification

that the integrated system functions as intended in its normal operating environment. The term performance

qualification may also be used.

14. Pre determined acceptance criteria:

The criteria assigned before undertaking testing to allow evaluation of test results to demonstrates

compliance with test phase of delivery requirement.

15. Protocol:

A document that gives a direction or guideline for any process as what , where, when, who, why and how to
do.

16. Proven acceptable range:

All values of a given control parameter that fall between proven high and low worst case conditions.

17. Quali cation:

The performance of tests to determine if a component of a manufacturing process possesses the attributes

required to obtain a specified quality of a product.

Quality
18.Do assurance:
Not Sell My Personal Information
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.
The activity of providing , to all concerned , the evidence needed to establish confidence that the quality
Cookie settings ACCEPT
function is being performed adequately . 
https://pharmaguidances.com/validation-master-plan/ 35/37
8/24/2020 VALIDATION MASTER PLAN

19. Quality control:

The regulatory process through which industry measures actual quality performance , compares it with

standards and acts on the difference .

20. Quality function:

The entire collection of activities from which industry achieves fitness for use, no matter where these activities

are performed .

21. Revalidation:

Repetition for verification of the validation and qualification process or a specific portion of it.

22. SOP: Standard Operating Procedure.

23. State of control:

A condition in which all operating variables that can affect performance remain within such ranges that the

system or process performs consistently and as intended .

24. Validation change control:

A formal monitoring system by which qualified representatives of appropriate disciplines review proposed or

actual changes that might affect validated status and cause corrective action to be taken that will ensure that

the system retains its validated state of control .

25. Validation task report:

A scientific report of the results derived from executing a validation protocol A brief summary of

conclusions from a specific task conclusions report, usually indicating validation success and designating

proven acceptable ranges that have resulted. The conclusions are formally approved .

26. Validation Master Plan:

A document providing information on the company’s validation activities. It should be define details of and

time scales for the validation works to be performed. Responsibilities relating to the plan should be stated.
Do Not Sell My Personal Information
27.We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
Worst case:
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 36/37
8/24/2020 VALIDATION MASTER PLAN

A condition or set of conditions encompassing upper and lower processing limits and circumstances within

standard operating procedure, which pose the greatest chance of product or process failure when compared

to ideal conditions. Such conditions do not necessarily induce product or process failure.

28. Critical Part:

Part of an equipment which can affect the quality of product directly is known as critical part.

For more Pharma updates- Please click the Link – https://pharmaguidances.com

Pharmaceutical Guidanace
Mr. Shiv Kumar is the Author and founder of pharmaceutical guidance, he is a pharmaceutical Professional from India having more than 14 years of
rich experience in pharmaceutical field.
During his career, he work in quality assurance department with multinational company’s i.e Zydus Cadila Ltd, Unichem Laboratories Ltd, Indoco
remedies Ltd, Panacea Biotec Ltd, Nectar life Science Ltd. During his experience, he face may regulatory Audit i.e. USFDA, MHRA, ANVISA, MCC,
TGA, EU –GMP, WHO –Geneva, ISO 9001-2008 and many ROW Regularities Audit i.e.Uganda,Kenya, Tanzania, Zimbabwe. He is currently leading
a regulatory pharmaceutical company as a head Quality. You can join him by Email, Facebook, Google+, Twitter and YouTube

Do Not Sell My Personal Information


We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept”,
you consent to the use of ALL the cookies.

Cookie settings ACCEPT



https://pharmaguidances.com/validation-master-plan/ 37/37

You might also like