Event Card Event Card
Pick up at the end of day Pick up at the end of day
11 12
Event Card Event Card
Pick up at the end of day Pick up at the end of day
13 14
Did you remember to pull to replenish
to WIP limits, and update the Day Ready
on any new stories?
15 16
Event Card Event Card
Pick up at the end of day Pick up at the end of day
17 18
Event Card Event Card
Pick up at the end of day Pick up at the end of day
19 20
Carlos believes that his Testers are not as Hold a quick retrospective.
focused on their work as they should be. Notice that the Ready queue is never fully
He requires that each Tester do their best, depleted. Ask your facilitator to update the
follow the testing process he has defined, and Ready queue WIP limit to 3. Do not remove
aim to roll at least a 5 on their die every day. existing stories from the queue, just
He will be monitoring individual performance. honor the new WIP limit from now on.
What impact do you predict this will
Carlos hasn’t heard of quality guru, have on cycle time?
W. Edwards Deming, have you?
Trackers annotate your charts.
There is nothing to do for this event, but look Financial Analyst: this is the end of a billing
up Deming later if you don’t know about him. cycle, remember to do your financial summary.
21
Clear Tote Bag:
Event cards, sorted: Day 9 - 21
Story cards, cleaned and sorted: Contents
F1-2, I1-3,S1-30, E1
Pink Blocker stickies Green Sleeve:
6 cloths
Game board
Dry-erase markers:
CFD Chart
3 Black 1 Green
Control Chart
2 Brown 1 Red
Financial Summaries
1 Purple 1 Blue
Daily Steps
1 Orange
3 Instruction Sheets
Dice:
2 Red Return to Facilitator:
3 Blue
1 Orange die
2 Orange (return
Ready WIP limit update
one to facilitator)
1. Standup Meeting
PM facilitate: 2. Play Board
Briefly review board and
decide strategy for the day. Team: Declare dice, reduce work,
pull stories, update Day Ready,
Day Deployed, Cycle Time.
6. Event Card
PM: Pick up end of day Event Card,
read aloud, action if necessary,
and place card at back of deck.
Daily 3. Sanity Check
Steps
PM, check that:
• WIP limits are honored
• Day Ready is updated on any
new stories
• Day Deployed and Cycle Time are
(The Project Manager's Guide) updated on any deployed stories.
5. Day Complete /
Financial Summary
Financial Analyst: Tick off day
as complete.
4. Track Charts
If end of a billing cycle, complete
financial summary, gather Trackers: Complete charts -
deployed stories and set aside. Cumulative Flow Diagram,
Notify facilitator of gross profit. Control Chart.
© getKanban.com 2010.
All rights reserved.
We made it! This is the end of the game.
Control Chart Tracker: track an approximate
3-point moving average line through the
data points for Standard stories on
your chart to show any trends over time.
Financial Analyst: please complete
your final financial summary.
Project Manager: divide the story cards among
the team, wipe clean, and sort into order.
(Have a sheet of paper under the cards
when wiping clean to avoid leaving a mess.)
Keep the charts for discussion.
Put the remaining items away in the bags provided.
S1 (Test) Subs: 11 S2 (Test) Subs: 12 S3 (Test) Subs: 11
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 1 = - 1 = - 1 =
S4 (Dev Done) Subs: 10 S5 (Dev Done) Subs: 13 S6 (Dev Doing) Subs: 11
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 2 = - 2 = - 3 =
S7 (Dev Doing) Subs: 12 S8 (Design Done) Subs: 10 S9 (Design Doing) Subs: 12
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 3 = - 3 = - 4 =
S10 (Design Doing) Subs: 11 S11 (Ready) Subs: 13 S12 (Ready) Subs: 10
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 4 = - 5 = - 6 =
S13 (Ready) Subs: 10 S14 (Ready) Subs: 10 S15 (Ready) Subs: 7
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 6 = - 7 = - 8 =
S16 Subs: 6 S17 Subs: 7 S18 Subs: 7
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- = - = - =
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
S19 Subs: 10 S20 Subs: 8 S21 Subs: 7
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- = - = - =
S22 Subs: 9 S23 Subs: 11 S24 Subs: 9
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- = - = - =
S25 Subs: 8 S26 Subs: 11 S27 Subs: 10
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- = - = - =
S28 Subs: 9 S29 Subs: 11 S30 Subs: 7
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- = - = - =
E1 by
Special job
day 21 Cash: $5,000 F1 Sec. Audit
Due day: 15 Fine:$2,200 F2 Trade show
Due day: 20 Subs: 25
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 18 = - = - =
I1 Database Upgrade
(Dev Doing) I2 Refactor
(Ready)
core subsystem
I3 Document legacy code
Design Design Design
Dev Dev Dev
Test Test Test
Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time Day Deployed Day Ready Cycle Time
- 3 = - 8 = - =
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools
consulting coaching training tools consulting coaching training tools consulting coaching training tools