You are on page 1of 4

>>

TO NH >

HOUSE

SHOP & H
OUSE

HOU
SE
KKRI

TEM
ANSO TI

PLE
<<< TO M

HOU
SE
CENTRE LINE
PROPOSED CARRIAGE WAY
CLIENT: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/HW/DWG/003
NEW CONSTRUCTION LINK ROAD JAWAR TO NARI PLAN & PROFILE MAIN CARRIAGEWAY
HIMACHAL PRADESH PUBLIC FROM DESIGN CH KM 0+000 TO KM1+065 DATE : JUNE-2019 REV:D
WORK DEPARTMENT CHECKED APPROVED
DESIGNED DRAWN

REV DATE DESCRIPTION A B C D


CIVILMANTRA INFRACON PVT LTD.
SCALE : AS SHOWN PAPER SIZE : A3
REV
DATE
Vertical

Chainage
Horizontal
LZ00 LEVELS
MC00 LEVELS

DESCRIPTION
388
390
392
394
396
398
400
402
404
406
408
410
412
414
418

Level Datum =486.000


0.000 -999.000 497.721 Chainage=0.000m

A
Level=497.721m

L
G
10.000 497.275 497.759

B
R
Chainage=19.483m
20.000 497.397 497.797 Level=497.795m

C
L L R
30.000 497.695 497.883

D
L

R
L
40.000 -999.000 498.056

L
R
Chainage=49.483m

CLIENT:
50.000 498.144 498.315 Level=498.300m

L
G
60.000 498.325 498.614

L
R
70.000 498.742 498.913 Chainage=73.845m

L
Level=499.028m
80.000 499.080 499.190

WORK DEPARTMENT
HIMACHAL PRADESH PUBLIC
90.000 499.236 499.361

L
R
Chainage=99.874m
100.000 499.487 499.417 Level=499.417m
110.000 499.375 499.358

L=70.000m
120.000 498.961 499.184

DESIGN CONSULTANT :
R=-870.899m
130.000 498.719 498.896

L
R
140.000 498.425 498.493 Chainage=143.845m

CIVILMANTRA INFRACON PVT LTD.


Level=498.307m

L
150.000 497.846 497.996

L
R
160.000 497.296 497.491

L
170.000 496.775 496.986

G=-5.049
L=69.205m
180.000 496.195 496.481

L
R L
190.000 495.690 495.977
200.000 495.215 495.472

L
R
210.000 494.749 494.967 Chainage=213.050m
Level=494.813m
220.000 494.319 494.451
230.000 493.851 493.890

L
R
240.000 493.589 493.284

L=38.136m
250.000 493.026 492.631 Chainage=253.050m
Level=492.423m

L
G
260.000 491.702 491.943 Chainage=262.030m

L
R
Level=491.803m
270.000 490.499 491.290
280.000 489.535 490.753

L
290.000 489.147 490.335
300.000 489.441 490.034

L=60.000m
R=845.954m
L
R
310.000 489.846 489.852 Chainage=320.421m
Level=489.788m
320.000 489.827 489.788
Chainage=322.030m
330.000 489.755 489.804 Level=489.789m
L

340.000 489.809 489.823


GROUND LEVEL

G=0.190
L=64.960m

350.000 489.697 489.842


L
R
FINISHED ROAD LEVEL

360.000 489.682 489.861


L

370.000 489.651 489.880


380.000 489.606 489.899
Chainage=386.990m
390.000 489.577 489.918 Level=489.913m
Chainage=399.164m
PROJECT :

400.000 489.694 489.924 Level=489.924m


410.000 490.438 489.915
420.000 490.568 489.890
L=80.259m
R=-70.000m

430.000 490.431 489.850


FROM DESIGN CH KM 0+000 TO KM1+065
L=69.656m

NEW CONSTRUCTION LINK ROAD JAWAR TO NARI


R=-6400.005m

440.000 490.237 489.794


450.000 489.663 489.722
Chainage=456.646m
460.000 489.450 489.636 Level=489.666m
SCALE : AS SHOWN
DRAWING TITLE :

470.000 489.267 489.546


L
R

480.000 489.149 489.456


490.000 489.142 489.366
L

G=-0.898

PAPER SIZE : A3

500.000 489.013 489.277


L=105.095m

PLAN & PROFILE MAIN CARRIAGEWAY

DESIGNED
DRAWN
DATE : JUNE-2019
DRG. NO. CIPL/HW/DWG/003

CHECKED
REV:D
APPROVED
TE M
PLE

HOU
SE

H OU SE

ET
IL
TO
E
US
HO

CENTRE LINE
PROPOSED CARRIAGE WAY
CLIENT: DESIGN CONSULTANT : PROJECT : DRAWING TITLE :
DRG. NO. CIPL/HW/DWG/003
NEW CONSTRUCTION LINK ROAD JAWAR TO NARI PLAN & PROFILE MAIN CARRIAGEWAY
HIMACHAL PRADESH PUBLIC FROM DESIGN CH KM 0+000 TO KM1+065 DATE : JUNE-2019 REV:D
WORK DEPARTMENT CHECKED APPROVED
DESIGNED DRAWN

REV DATE DESCRIPTION A B C D


CIVILMANTRA INFRACON PVT LTD.
SCALE : AS SHOWN PAPER SIZE : A3
REV
DATE
Vertical

Chainage
Horizontal
LZ00 LEVELS
MC00 LEVELS

DESCRIPTION
388
390
392
394
396
398
400
402
404
406
408
410
412
414
418

Level Datum =486.000

8
0.000
500.000 -999.000
489.013 497.721
489.277

5m

A
510.000 488.893 489.187

B
C
520.000 488.793 489.097

D
530.000 488.769 489.007
540.000 488.692 488.917

CLIENT:
550.000 488.537 488.828

L=87.627m
R=150.000m
560.000 488.499 488.738 Chainage=561.741m
Level=488.722m
570.000 488.446 488.651

WORK DEPARTMENT
580.000 488.322 488.572

HIMACHAL PRADESH PUBLIC


590.000 488.290 488.502

R
L L
R
600.000 488.244 488.440

L=60.000m
610.000 488.240 488.387

DESIGN CONSULTANT :
620.000 488.225 488.343 Chainage=621.741m
Level=488.336m

L
R
630.000 488.175 488.303

CIVILMANTRA INFRACON PVT LTD.


640.000 488.109 488.264
650.000 488.042 488.225
660.000 487.967 488.186

G=-0.390
670.000 487.915 488.147

L=143.355m
L=57.142m
R=-200.000m
680.000 487.920 488.108
690.000 487.884 488.069
700.000 487.791 488.030
710.000 487.717 487.991
720.000 487.645 487.952
GROUND LEVEL

L=42.883m
730.000 487.670 487.913

R=200.000m
FINISHED ROAD LEVEL

740.000 487.565 487.874


750.000 487.435 487.835
760.000 487.454 487.796 Chainage=765.096m
Level=487.776m
770.000 487.083 487.761
Chainage=777.249m
780.000 486.738 487.754 Level=487.752m

R
790.000 486.428 487.778

L=89.490m
800.000 486.733 487.835

L=50.000m
810.000 486.529 487.925 Chainage=815.096m
Level=487.982m
820.000 487.772 488.042
830.000 488.175 488.164
L
R

G=1.216

840.000 488.043 488.285


L=54.857m
L

850.000 -999.000 488.407


L
R

860.000 488.089 488.528


Chainage=869.953m
870.000 -999.000 488.650 Level=488.649m
880.000 -999.000 488.797
L
R

890.000 488.645 488.995


L=45.299m

PROJECT :

Chainage=899.953m
900.000 488.879 489.245 Level=489.243m
910.000 489.114 489.519
L
R

920.000 489.620 489.794


G=2.746

FROM DESIGN CH KM 0+000 TO KM1+065


L=61.384m

930.000 489.970 490.069


NEW CONSTRUCTION LINK ROAD JAWAR TO NARI
L

940.000 490.242 490.343


950.000 490.480 490.618
960.000 490.892 490.892 Chainage=961.337m
SCALE : AS SHOWN
DRAWING TITLE :

Level=490.929m
970.000 491.064 491.183
L=49.664m
R=110.000m

980.000 491.255 491.517


990.000 491.440 491.895
PAPER SIZE : A3

1000.000 491.917 492.316


L

PLAN & PROFILE MAIN CARRIAGEWAY

1010.000 492.162 492.780


1020.000 492.530 493.288
L
R

L=100.000m
R=2300.246m

1030.000 492.965 493.840


DESIGNED

1040.000 493.098 494.434


R

DRAWN
DATE : JUNE-2019

1050.000 494.414 495.073 Chainage=1061.337m


R

Level=495.849m
1060.000 495.329 495.755
L LL L L

Chainage=1065.627m
G

DRG. NO. CIPL/HW/DWG/003

496.144 496.153
CHECKED

1065.627 Level=496.153m
REV:D
APPROVED

You might also like