You are on page 1of 1

NOTE

DRAWING REFERENCE

DRAWING NO. REV

REVISION

REV TGL DESKRIPSI BY CHK APPD

PROJECT

EKSPANSI LINE WB SARI ROTI


PLANT MAKASSAR

OWNER

PT NIPPON INDOSARI CORPINDO Tbk.

Harry Darmawan
Project Manager
CONSULTING ENGINEERS

Architects - Engineers & Planners

Site Manager
CONTRACTOR

PT. SWADAYA GRAHA


YOUR REALIBLE PARTNER IN CONSTRUCTION

Ervan Ari
Project Manager
KEYPLAN

LOKASI

FAUCET: TX-126-LE

TYC-322W
HD
SD1

-0.07
KORIDOR CUCI LOYANG/CRATE
Cover Box Steel

Plate 1,2 mm

FD FD

ELEVASI CT-2 DIMENSI CT-1 & CT-1A TITLE

NO TITIK A B C NO TITIK A B (MM) C (MM) D (MM) STEEL BANGUNAN PRODUKSI

1 A2-10 +8.069 +7.730 +7.381 1 A2-3 +7.730 1668 330 400 CANTILEVER (CT-1 & CT-2)
2 A2-12 +8.069 +7.730 +7.381 2 A1-3 +8.318 1040 368 190 & DETAIL
3 A2-16 +8.069 +7.730 +7.381 3 A'-3 +8.738 622 367 610
DATE
4 A1-16 +8.707 +8.368 +8.019 4 B1-3 +9.158 203 365 1028 19/03/2020

5 A-16 +9.381 +9042 +8.693 5 B-3 +8.738 622 367 610 SCALE (A3 FORMAT) REVISION

1 : 10/5
6 C1-3 +8.318 1039 370 190
DRAWING NUMBER :

S3-07/ABD/SWG-SRM/03/2020