Professional Documents
Culture Documents
COLUMN
SCHEDULE
CLIENT : INDEPENDENT ENGINEER : CONCESSIONAIRE / SPV CONTRACTOR : DESIGN CONSULTANT : JOB No. : PROJECT:
EPC CONTRACTOR: Balance Four Laning Work of Package-4 from Km 315.000 (Near Nandura) to
. .
Km 360.000 (Near Chikhli) section of Amravati - Chikhli NH-6 in the state of
Maharashtra to be executed as Hybrid Annuity Project under NHDP Phase IV
TITLE : AMRA ATI CHI HLI
NATIONAL HIGHWAYS Kalyan Toll Infrastructure Ltd Kalyan Toll Infrastructure Ltd
AUTHORITY OF INDIA Hyderabad.
NTS DRAWING NO :
C:\Users\Gaurav Sharma\Desktop\01. FOB FOUNDATION_recover.dwg, 26-03-2022 12:18:59, DWG To PDF.pc3
NOTE:
R2
² AND SAME SHOULD BE CHECKED AT SITE PRIOR TO
R2
EXECUTION
BP 200X400MM
400MM ANCHOR
LENGTH
BLOW UP - D
DETAIL - D
BUILDING
CLIENT : INDEPENDENT ENGINEER : CONCESSIONAIRE / SPV CONTRACTOR : DESIGN CONSULTANT : JOB No. : PROJECT:
EPC CONTRACTOR: Balance Four Laning Work of Package-4 from Km 315.000 (Near Nandura) to
. .
Km 360.000 (Near Chikhli) section of Amravati - Chikhli NH-6 in the state of
Maharashtra to be executed as Hybrid Annuity Project under NHDP Phase IV
TITLE : H H
NATIONAL HIGHWAYS Kalyan Toll Infrastructure Ltd Kalyan Toll Infrastructure Ltd
AUTHORITY OF INDIA Hyderabad.
NTS DRAWING NO :
C:\Users\Gaurav Sharma\Desktop\01. FOB FOUNDATION_recover.dwg, 26-03-2022 12:57:16, DWG To PDF.pc3