You are on page 1of 26
X-SERIES VOYAGE DATA RECORDER COMMISSIONING REPORT © This Commissioning Report and the information contained therein ig the property of ‘AMI Marine (UK) Ltd Itmust not be reproduced or otherwise disclosed without prior consent in writing from ‘AMI Marine (UK) Lid Commercial in Confidence when completed) ‘This Page Intentionally Blank Page 2 of 26 X-VDR Commissioning Report Iss01 Rev01.docx Commercial in Confidence (when completed) OTT Modification Ni Document ; Date | Modification Number (where applicabie) | | Issue__i Brief. of Cl Fwd 28.10.14 | Original Issue NOTE: All alterations must be verified by re-authorisation and approval of the complete document. AMI Marine (UK) Ltd Unit 9 Crosshouse Centre TelNo: +44 (0) 23 8048 0450 Crosshouse Road FaxNo; +44 (0) 23 8048 0451 Southampton $014 5GZ Email: technical@amimarine.ne United Kingdom Web: www.amimarine.net Page 3 of 26 X-VDR Commissioning Report Iss01 Rev01.docx ; Commercial in Confidence (when completed) This Page Intentionally Olank Page 4 of 26 X-VDR Commissioning Report tss01 Rev01.docx. Commercial in Confidence (when completed) IMPORTANT WARNINGS DANGER: HIGH VOLTAGE! RISK OF ELECTRICAL SHOCK! This unit has a high voltage source inside. Disconnect from the power before removing protective covers. ‘DO NOT remove the covers while the unitis switched on. 24 Volt DC electrical power on interfaces and capsule. NOTICE Compass safe distance is 1 meter. NOTICE No user serviceable parts inside, servicing only by properly qualified and certified technical staff. NOTICE ‘This manual is for informational use only, and may be changed without notice. This manual should not be construed as a commitment of AMi Marine Ltd. Under no circumstances does ‘AMI Marine Ltd assume any responsibilty or liablity for any errors or inaccurac ‘appear in this document. The equipment should only be used for the purposes the manufacturer; any deviation from this will void the warranty of the product. Page 5 of 26 X-VOR Commissioning Report 1ss01 RevO docx | ‘Commercial in Gonfidonce (when completed) ‘This Page Intentionally Blank Page 6 of 26 X-VDR Commissioning Report ss01 Rev01.docx Commercial in Confidence (when completed) FAVCAN ‘918682 ‘SIG DE TENERIFE KOREAN REGISTER 39/06/1995 | 3964 jAmze6s4 42/12/2016 ‘System to that 24V de (Nominal) power supplies ere available, + XVOR UPS [27 Apernaral equipment onesie and spre [ 5 oe aes “The following equipment is recommended for an effective and complete ins KW907-Beacon Tester Digital Multimeter ‘USB Mouse & Keyboard x | Laptop Gomputar x | NuRIA3 NMEA Reader - x x x X-VDRTSM (@riage Conte Pane’) Foe Gapsule 350-19000-00-0268 |. BATTERY INST Fixed Capsule Sonar Beacan qe71700-36972 | 12/1272016 dallary X-VORUPS (Uinerurete Power So) ze0se 12/12120;66anoves Float Free Capsule Dao-osoonasa | sanaraniare Float Free Capsule HRU NA 1222016) 4 Page 7 of 26 X-VDR Commissioning Report Iss01 Revit docx ‘Commercial in Confidonce (when compiated) This Page Intentionally Blank Page 8 of 26 X-VOR Commissioning Report tss01 Rev01.docx Commercial in Confidence (when © | After instaling all hardware, confirm that each unit is secure ang all cables and | connectors are in place and secured. hack there are no loose items within the enclosure such as scrows of washors. ‘Check that ail internal system cabiing is secure and fied back. fiVSIGALWSBECTION &8 «To avoid system re-boots during the set-up procedure, set the system to ‘Service Mode’ by maving SW’? on the Terminal PCB to ‘Service’ Aller successful set-up position retumn this switch to the ‘Operate’ position 7 On the front of the Main Electronics Unit (MEU) set the Key-switah fo the OFF position anc follow the below steps UNINTERRUPTED POWER SUPPLY + Conf thatthe battery is connected and ine UPS swatch isin tho OFF position ‘Switch on the ship's breaker to supply the X-VDR with 110/220v AC x © Turn the UPS switch to the ON position and canfitm the ‘DG ON" tight fon the DRA300 iluminates ‘ter few seconds the system will BEEP and iho SYS remain steady vB 1 Panel wih show th software vo3tng up | | Perit to 06 1706 BAT 0 2H 2X nd ACOKTEDS | illuminated on the Terminal PCS __ | [On complain ofthe Boot sequonce the XAVDR desktop wl ba played on th Bridge Control Panel [Tun the DR Enoincerng Salup sofware and rofor fo annex AIO | configure the XVOR a9 of 26 X-VOR Commissioning Report Iss01 Rov docx ‘Commercial in Confidence (when completed) ‘This Page Intentionally Blank Page 10 of 26 X-VOR Commissioning Report Iss01 Rev01.docx jal in Confidence {whon compote Comme: “POWER UB SEQUENCE continued BRIDGE CONTROL PANEL J Select the VIDEO tab and contin that the video image is displayed from the COIS units Select the AUDIO tab and confirm thatthe microphones correspond to those 2” Seloct the NMEA tab and confi that al NMEA data that is expected wit listed and has a green indication ‘Selec! the CAPSULE tab and conim that ho FIXED CAPSULE has 0 = indication Conf that the HYDROSTATIC RELEASE installation & + Gontinm that the LTRW (Long Term Recording Medium) has @ green Indication [72> select the POWER tab and cont tal the MAINS POWER indication ip not date is conect | in a Caution state | {Conti thatthe UPS Indiation is notin a Caution state + Conf that the BATTERIES indalion ts not in a Coution stele 7” pross and hold the SYSTEM TEST pad und te Yok tums green — this Hill start a full system test ‘Select the EVENT LOG tab and ensure that no Caution indications are shown in the event fog within the text highlighted BLUE, Page 11 of 26 X-VDR Commissioning Report tss01 Revot.docx: Commercial in Confidence (wien completed) This Page Intentionally Blank Page 12 of 26 X-VDR Commissioning Report Iss01 Rev01.docx 7 Bosse the VIDEO lab and cant that no “Cautions! are presont and tnt active video capture screens _limagas ean be seen on each of —Femove the physical eonnection between one Rader and the XVDR, insite the MEU + Confirm that the corresponding video box displays NO VIDEO DETECTED \d tums amber confirm that a Caution indication flashes at the top of the screen Contr thatthe status indleator lashes amver next 10 the VIDEO tab Solact any other tab and then select the VIDEO tab and confirm thal the Cautions remain but stop flasring 7 Ronlace the physical conneetion ofthe Radar to the XVDR MEU and conf thal the Caution indications ne longer romain and that the status indication returns to green ‘AUDIO + Select Ihe AUDIO tab and remove one of the physiea! microphone connections inside the ‘Gonfim thatthe eovresponding mrophone displays a yelow Caution” indication [Conti thal an amber “Caution incleaton flashes in the top panel of the screen ~ Geonfim hat athe status tab nex! to the AUDIO tab asnes amber —Belet any other tab and then sect Ihe AUDIO fab and conti that a | “Caution indications romain but atop lasing _ 7 "Replace the physical microphane connection and confi that te Caution indication clears and al indleations return toa green staus [NMEA y Solocl the NMEA tab and observe a green indication next to each Ni input label + Remove the physical data input con’ tion on channel 1 ofthe terminal | PCB = Confirm that an amber bar cov Select any other tab and then seiect the Ni ‘Caution’ indications remain but stop flashing Page 13 of 26 XVDR Commissioning Report iss01 Rev0t docx ‘Commercial in Confidence (when completed) “This Page Intentionally Blank Page 14 of 26 X-VOR Commissioning Report Iss01 Rev01.dook | CAPSULES + Cont POWER Conf thatthe NMEA input abel bar returns othe orginal sale but that the individual status indicator remains amber 7°" Repiace the physical data Input connection and confirm that a status Indicators return green = Contem thal the ‘Cauterindeation clears Confirm that the box labelled Fixed Capsule _the top left corner ‘Confur thatthe box lsboled Float Free Capsule’ displays @ greon status LED in the top left corner Selec tho POWER lab ane confi Inat ne amor Caution inicatrs are suet 7 Confirm thatthe BATTERIES indicator depinys an y amber ‘Caution Gontirm that the Caution incicationf lashes athe top of + Confirm thet the status incicator flashes amber ne +” Select any othor lab and then select ihe POWER tab and confi that the Cautions remain but stop flashing Reconnect the batteries in the X-VOR UPS and contirm that all Cautios indications are reset Confirm that the BATTERIES INSTALLED cate is set correctly “Switch off the AC supply to the X-VDR UPS end confirm that the AC jays an amber ‘Caution “Record the time im that the Caution indication lashes st ho top ofthe seven _ thal the status indleator lashos amber noxt tothe POWER ‘eb ‘Select any other tab and then selec! the POWER tab an confi tha the Cautions remain but stop Hashing Page 15 X-VDR Commissioning Report Commercial in Confidence {when complated) ‘This Page Intentionally Blank Page 16 of 26 X-VOR Commissioning Report 18801 Rev01.dock Commercial in Caniidence fwhen complatedt ‘EVENT LOG + Confirm thatthe evant log fiers are set to Date’ = (Currant) resentin the og Gf hal th ches wai oul above a a | Cant ha te SYSTEM TEST rons ar present in thalog~ these wl be jae ted in ight blue 7 Gonfim that a markers present inthe log eae sane “has been adjusted to ‘around %4 turn clockwise from the minimum setting (fully anticlockwise) 0 sive the optimum audio lave! [Ensure an audio source is outpuling ata good volume within range or each microphone + Gomes asa of headphones to he frst microphone input aniston othe ceived by the microphone ‘microphone gain POT 1 ne tne ie auc love, confirming good Sy + Adu: and clear audio + Repeat for miorophone 2 (i - [x] | x Repeat zat for microphone a ‘epplicabie) | Repeat for microphone 6 (if applicable) | } | 2 Repeat for microphane 7 (if applicable) Pago 17 of 26 X-VDR Commissioning Report 15301 RevOt docx. Commercial in Confidence (when completed) This Page Intentionally Blank ge 18 of 26 X-VDR Commissioning Report iss01 RevO1.docx Commercial in Confidence {when compicted) and receive audio [s good and clear onrecl the headphones tothe second VHF input and confm tat tne transmit and receive audio is good and clear (if applicable) T Cont thal the inage recorded lea good representa ofthe source image tt further calibration is required, enter Engineering Setup mode as follows: Hold the vessel image for 10 seconds then tao the AMI logo 5 fimes. Enler usemame anc passiierd to access tne XVDR deskton ‘Wait for five minules and dawnload a section of images and conti save image s goad and coat | Rou ae + Shipdata in (i ‘epplicabie) Ratan a copy of he + ane Layout wisn’ aE 7 Gemecin dg «etalon Report oe Page 19 of 26 X-VOR Commissioning Reno {5507 Rev doce Commercfal in Confidence (when completed) ‘This Page Intentionally Blank. Page 20 of 26 X-VDR Commissioning Report Iss01 Rev01 docx SIGNATURE PAGE a “This post instalation test was condueted in accordance with (SO 224i es Fire for tho aaue ofthe Insataion Performance Tes! Cercle ands rea emTiPtGATE fortis vesee wich Now dv for rv aatin on nn | :72:2008 and forms part of he | ied tothe SAFETY | Eee § REPORT 18 NOT. AN ANNUAL PERFOMANG Se eS ir aecordance wih he principals ofermorisaton of carication iwi roman valle untl the next annual re-validation of thet certificate, subject to the equipment being maintained ree Approval Certificat 13882-14 in aopropriate To be forwarded to AM) Marine (UK) Ltd fer review. Page 21 of 26 X-VDR Commissioning Report iss01 Rev0' docx: ‘Commorcial In Confidonce (when completed) ‘This Page Intentionally Blank Page 22 of 26 X-VDR Commissioning Report Iss01 Rev01.docx [MANUFACTURERS ANAL | this performance test was conducted in accordance with SOLAS regulation V/18.8 and forms part of | the procedure forthe issue of the Installation Performance Test Cerificate | -The results, information and any comments should be relayed to the manufacturer in accordance with the instructions contained within tne Operation Manual, ‘Subject to satisfactory results, an Installation Performance Certificate will then be issued. ‘AMI Marine (UK) will complete a review, record any changes and issue the completed lest report and the Annual Certificate within 45 days. To accommodate partarmance chacks to align with the ppropriale survey under the Harmonized System of Survey and Certification (SSC) the enna performance check may be carried oul upto 3 mantns sefore the due date fora Hassenger ship and - Je 3 months of the due date for a cargo ship, | Confirmation that all data [Confirm that a 20 minute section of data, including the listed configuration files will be forwarded to AMI Marine (UK) for analysis. Confirm that copies of the Sorvica report and instalation Report will be forwarded to ‘AMI Marine (UK's analysis of the downloaded data and in accordance with (IEC) 61996-2 Maritime rravigation and radio communication equipment and systems ~ Shipbome Voyage Data Recorder {YDR) and (S-VOR.— Performance requitements ~ Mathods of testing and requifed test results ception 4 6 Data ilams to be recorded (rasolution A.B6 1 (20), section 5.4). is to be altached to complete this report, ‘This confirms the endorsomont by the manufacturor of the tosts and that the master database thas hoon created Page 23 of 26 XCVOR Commissioning Report Iss1 Rev0 1.deck Commercial in Confidence (whon completed) ‘This Page Intentionally Blank Page 24 of 26 XCVDR Commissioning Report Iss01 Rev01.docx ‘Commercial in Gonfidance (when complotarl) AMI Marine (UK) Warranty; avirevatet, vrs | “The Waranty Period is +2 months relum to bese, parts and labour Kom date of purcase unless an allernaive pescs hos bean tiernise aged in ating. ‘This wety shal oly ago¥ where the REGISTRATION CARO supplied wit the gocds has been plapey completed and feturd to Atl wth the esiad of 21 days fom station. | “Te rgistaonfown en sto bo dowloaded fom tne Ara Narre wobsila uo mimaine -Rowurns Proceduro: Senior emt RE: REQUEST FOR RETURN AUTHORISATION lo tchnica‘@amimarie oct Please do NOT cond tems back 1 AU! Vestine unl afer yew hove recoued Returs Authorsaton fanponse Ema nstutig youtodos0. | Documents to bo includod | Peepers engl INSTALLATION REPORT, and apt tof your RETURN WATERIAL AUTHORISATION INEORMATION EVAL, and enclose bot ine rtirn packane be sure to pac te ranening producl securely and acearng to cara natrustons. Camiage incur dirog retum shinning Rea ae tenon wi reno he tom mole of eur, copa. oF exchange under the Warrany Teri, ems Mot fecelved by ANd Marina, wil pa be credited. MOST authored reluins should bo rolucned one aderass below -owover here ara seme axcaplions, so 00 NOT 30 MOST a eS Sueur your RETURN AUTHORISATION NFORUATION EMAIL for applicable return inststons: in (KU Cin Fees nus Esta | Tove Lano Essien foe Soa0 on ie ‘A full explanation of AM Mating (UK) Lie warranty conditions can bo found on our we sie oF vee vn ema + Terms of Service and Polis ave subject to change vthext tin. ee eee ease complete and return to AME Marne ether by ost othe above address or by ema 0 tehncalbamimarioe. net Reston Foro Pago 28 of 26 | X@VDR Commissioning Report iss01 Rev0% docx Commercial In Confidence (when completed) This Page {ntentionally Blank Page 26 of 26 X-VOR Commissioning Report iss01 Rev01.dock

You might also like