You are on page 1of 74

वितरण सच

ू ी
Distribution List

1 सचचि, के.वि.नि.आ. तीसरा एिं चौथा तल, चंद्रलोक भिि, 36, जिपथ, िई दिल्ली – 110001
Secretary, CERC, 3rd & 4th Floor, Chanderlok Building,36,Janpath,New Delhi-110001

2 मुख्य अभभयंता (जी एम), के.वि.प्रा., सेिा भिि, आर. के. पुरम, िई दिल्ली – 110066
Chief Engineer (GM), CEA,Sewa Bhavan, R.K.Puram , New Delhi-110066

3 सिस्य सचचि, उ. क्षे. वि. स., 18/ए, शहीि जीत भसंह सिसििाल मार्ग, िई दिल्ली – 110016
Member Secretary, NRPC,18/A,SJSS Marg, Katwaria Sarai, New Delhi-110016

4 सिस्य सचचि, प. क्षे. वि. स., एफ-3, एम आई डी सी क्षेत्र, अंधेरी(पूि)ग , मुंबई – 400093
Member Secretary, WRPC, F-3,MIDC Area, Andheri (East),Mumbai-400093

5 सिस्य सचचि, ि. क्षे. वि. स., 29, रे स कोसग क्रॉस रोड, बंर्लूरु – 560009
Member Secretary, SRPC, 29,Race Course Cross Road,Bangalore-560009

6 सिस्य सचचि, प.ू क्षे. वि. स., 14, र्ोल्फ क्लब रोड, कोलकाता – 700033
Member Secretary, ERPC, 14,Golf Club Road , Kolkata-700033

सिस्य सचचि,उ. पू. क्षे. वि. स.,मेघालय राज्य आिासीय वित्त सहकारी सभमनत भलभमटे ड भिि, िोंचिम
7 दहल्स, भशलोंर् – 793003
Member Secretary, NERPC, Meghalaya State Housing Finance Cooperative Society Ltd.
Building, Nongrim Hills , Shillong -793003

मुख्य अभभयंता, राष्ट्रीय विद्युत सभमनत, एिआरपीसी भिि, तत


ृ ीय तल, 18/ए, शहीि जीत भसंह
8 सिसििाल मार्ग, िई दिल्ली – 110016
Chief Engineer, National Power Committee, NRPC Building, 3rd floor, 18/A,SJSS Marg,
Katwaria Sarai, New Delhi-110016

9 कायगपालक नििे शक, प.ू क्षे. भा. प्रे. के., 14, र्ोल्फ क्लब रोड, कोलकाता – 700033
Executive Director, ERLDC,14, Golf Club Road , Kolkata-700033

10 कायगपालक नििे शक, प. क्षे. भा. प्रे. के., एफ-3, एम आई डी सी क्षेत्र, अंधेरी(पूि)ग , मुंबई – 400093
Executive Director, WRLDC,F-3,MIDC Area, Andheri (East),Mumbai-400093

11 महाप्रबंधक, उ.क्षे.भा.प्रे.के, 18/ए, शहीि जीत भसंह सिसििाल मार्ग, िई दिल्ली – 110016
General Manager, NRLDC,18/A,SJSS Marg, Katwaria Sarai, New Delhi-110016

12 महाप्रबंधक, ि. क्षे. भा. प्रे. के, 29, रे स कोसग क्रॉस रोड, बंर्लरु
ू – 560009
General Manager, SRLDC, 29,Race Course Cross Road,Bangalore-560009

13 कायगपालक नििे शक, प.ू क्षे. भा. प्रे. के., डोंर्नतएह, लोअर िोंिह, लापलंर्, भशलोंर्- 793006
Executive Director, NERLDC, Dongtieh, Lower Nongrah, Laplang, Shillong-793006
POWER SYSTEM OPERATION CORPORATION LIMITED
पॉवर सिस्टम ऑपरे शन कारपोरे शन सिसमटे ड

NATIONAL LOAD DESPATCH CENTRE –राष्ट्रीय भार प्रेषण केन्द्र

Monthly
मासिक ऑपरे शन ररपोटट Operation Report

जून
2020
पावर सिस्टम ऑपरे शन कापोरे शन सिसमटे ड
राष्ट्रीय भार प्रेषण केंद्र, नई सिल्ली

POWER SYSTEM OPERATION CORPORATION LTD


NATIONAL LOAD DESPATCH CENTRE, NEW DELHI

माह जू न-2020 के सिए प्रचािन सनष्पािन ररपोटट


OPERATIONAL PERFORMANCE REPORT FOR THE
MONTH OF JUNE-2020
पृ ष्ठसूची CONTENTS

1 माह जून-2020 की साराां श ररपोर्ट 1-5

Summary of report for the month of JUNE-2020


2 क्षे त्रवार स्थापपत पवद् यु त क्षमता 6
Region wise Installed Capacity
3 राष्ट्रीय स्तर पर साांध्यकालीन पशखर माां गपूपतट 7-8
Peak demand met at National level

4 राष्ट्रीय स्तर पर पवद् यु त ऊजाट खपत 9-10


Energy consumption at National level

5 पिक्वेंसी रूपरे खा 11-12


Frequency profile

6 राष्ट्रीय स्तर पर जल पवद् यु त ऊजाट उत्पादन 13-14


Hydro generation at National level

7 राष्ट्रीय स्तर पर पवन ऊजाट उत्पादन 15


Wind generation at National level

8 राष्ट्रीय स्तर पर सौर ऊजाट उत्पादन 16


Solar generation at National level

9 राष्ट्रीय स्तर पर दै पनक अपिकतम पवद् यु त माांग पूपतट 17


Daily maximum demand met at National level

10 23 जून के मााँ ग एवां उत्पादन प्लॉर् (अपिकतम माां ग पूपतट ) व मााँग का डार्ा (15 पमनर् अां तराल)
Demand and generation plots for 23- JUNE (Max Demand Met) and Demand data 18-22
(15-minute)

11 ऊजाट आपूपतट की वास्तपवक स्स्थपत 23


Actual power supply position

12 ऊजाट आवश्यकता एवां आपू पतट की पपछले वर्ट माह जून -2019 से तुलना 24
Energy requirement and met comparison with JUNE -2019

13 पशखर माां ग आवश्यकता एवां आपू पतट की पपछले वर्ट माह जून -2019 से तुलना 25
Peak demand requirement and met comparison with JUNE -2019

14 क्षेत्रीय स्तर पर पशड्यूल एवां डर ावल 26


Schedule & drawal at regional level
15 अां तर क्षेत्रीय पवपनमय 27-34
Inter-regional exchanges

16 अां तर राष्ट्रीय पवद् यु त पवपनमय 35-37


Inter-national exchanges

17 एसर्ीओए (पिपक्षीय एवां सामूपहक)एवां यू आइ का ब्यौरा 38


Bilateral and collective short-term open access & UI details

18 पावर माकेर् की सूचना 39-42


Power market information

19 अक्षय ऊजाट प्रमाण पत्र प्रपिया 43-45


Renewable energy certificate mechanism

20 मुख्य घर्नाएाँ एवां पडस्टर्बें स 46-53


Important events/disturbances

21 नए कमीशांड पारे र्ण तत्व 54


New elements commissioned

22 पवभव रूपरे खा 55
Voltage profile

23 जून -2020 के दौरान रा.भा.प्रे.के.िारा पनगरानी में तत्वोां के आउर्े ज की सूची 56-65
List of outage of elements monitored by NLDC for the month of JUNE -2020

24
24 अर्ब तक उच्चतम (माां ग व ऊजाट ) आाँ कड़े : माह जून -2020 तक 66
All Time Highest (Demand & Energy) figures : Till JUNE-2020

25 जून-2020 के पलए पसस्टम ररलाइपर्बपलर्ी सूचकाांक 67


System Reliability Indices for JUNE -2020
1. SUMMARY OF REPORT FOR THE MONTH OF JUNE 2020

1
2
3
4
5
2. ALL INDIA REGIONWISE INSTALLED CAPACITY

As on 30.06.2020
(All figures are in MW)

THERMAL RES @ GRAND


S No Region NUCLEAR HYDRO
COAL LIGNITE GAS DIESEL TOTAL MNRE TOTAL
1 NR 53440 1580 5781 0 60801 1620 20086 17049 99556
2 WR 72935 1540 10806 0 85282 1840 7623 26232 120976
3 SR 44365 3490 6492 434 54780 3320 11775 42501 112376
4 ER 27285 0 100 0 27385 0 4639 1503 33527
5 NER 770 0 1812 36 2618 0 1577 365 4560
6 ISLANDS 0 0 0 40 40 0 0 18 58
ALL INDIA 198795 6610 24992 510 230906 6780 45699 87668 371053
Remarks: Data from CEA website

6
3. र ष्ट्रीय स्तर पर सांध्य क लीन दिखर दर्वि् युत म ां ग पू दति
EVENING PEAK HOUR DEMAND MET AT NATIONAL LEVEL
म ह: जून 2020 MONTH:- JUNE 2020
सभी आां कड़े मेग र्व ट मे All figures in MW
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पू र्वी क्षे. पू र्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
1-Jun-20 43257 40809 35541 17237 2486 139330
2-Jun-20 44705 38432 35759 18165 2398 139459
3-Jun-20 45272 33616 35499 19682 2398 136467
4-Jun-20 42146 36681 36690 18379 2312 136208
5-Jun-20 42370 37593 36543 18619 2437 137562
6-Jun-20 44830 38807 35351 20261 2459 141708
7-Jun-20 43152 37554 33990 19555 2495 136746
8-Jun-20 47690 39734 36975 20438 2715 147552
9-Jun-20 52433 40472 37011 20438 2741 153095
10-Jun-20 51439 40111 34519 21017 2816 149902
11-Jun-20 51691 39849 34756 20956 2721 149973
12-Jun-20 56139 39031 35294 20077 2575 153116
13-Jun-20 54843 39433 35547 19896 2603 152322
14-Jun-20 55474 38091 33856 18987 2455 148863
15-Jun-20 58023 39065 37686 18703 2737 156214
16-Jun-20 58141 40488 36885 19575 2807 157896
17-Jun-20 59720 39605 36829 20129 2576 158859
18-Jun-20 60897 40169 37354 19869 2520 160809
19-Jun-20 56475 40565 37857 21310 2695 158902
20-Jun-20 57311 40973 37706 20591 2823 159404
21-Jun-20 53929 39211 34679 19987 2688 150494
22-Jun-20 57128 40537 36830 20046 2777 157318
23-Jun-20 56929 40689 37302 20902 2767 158589
24-Jun-20 55544 42004 36910 21526 2717 158701
25-Jun-20 55390 43095 36873 19133 2551 157042
26-Jun-20 56521 41917 37026 19563 2483 157510
27-Jun-20 58209 41995 36513 19492 2411 158620
28-Jun-20 59188 40910 34713 19372 2485 156668
29-Jun-20 56119 41942 36159 20570 2690 157480
30-Jun-20 60547 41820 36668 20999 2762 162796
उच्चतम MAXIMUM 60897 43095 37857 21526 2823 162796

दनम्नतम MINIMUM 42146 33616 33856 17237 2312 136208

औसत AVERAGE 53184 39840 36177 19849 2603 151654

अब तक क उच्चतम
62627 54589 50436 23016 2944 176381
All Time Max.

दिन ांक Date 03.07.19 15.10.18 24.02.20 31.08.19 29.08.19 29.05.19


नोट : सभी आां कड़े 2000 बजे की म ांगपू दति पर आध ररत है ।
Note: The above figures correspond to value at 2000 Hrs
7
EVENING PEAK HOUR DEMAND MET DURING THE MONTH OF JUNE 2020
NR WR SR ER NER INDIA
180

160

140
EVENING PEAK HOUR DMD (GW) -->

120

100
NR - Max: 60897 MW Min: 42146 MW Avg : 53184 MW WR - Max: 43095 MW Min: 33616 MW Avg : 39840 MW
SR - Max: 37857 MW Min: 33856 MW Avg : 36177 MW ER - Max: 21526 MW Min: 17237 MW Avg : 19849 MW
80
ALL INDIA - Max: 162796 MW Min: 136208 MW Avg : 151654 MW NER - Max: 2823 MW Min: 2312 MW Avg : 2603 MW

60

40

20

0
10-Jun-20

11-Jun-20

12-Jun-20

13-Jun-20

14-Jun-20

15-Jun-20

16-Jun-20

17-Jun-20

18-Jun-20

19-Jun-20

20-Jun-20

21-Jun-20

22-Jun-20

23-Jun-20

24-Jun-20

25-Jun-20

26-Jun-20

27-Jun-20

28-Jun-20

29-Jun-20

30-Jun-20
9-Jun-20
1-Jun-20

2-Jun-20

3-Jun-20

4-Jun-20

5-Jun-20

6-Jun-20

7-Jun-20

8-Jun-20

DATE -->

8
4. र ष्ट्रीय स्तर पर दर्वि् युत ऊर् ा आपूदता ENERGY MET AT NATIONAL LEVEL
म ह: र्ून 2020 MONTH:- JUNE 2020
सभी आां कड़े दमदलयन यूदनट मे All figures in MU
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-Jun-20 945 1026 861 374 42 3246
02-Jun-20 996 986 847 389 42 3260
03-Jun-20 1029 885 845 410 41 3210
04-Jun-20 1009 841 877 415 41 3183
05-Jun-20 941 890 904 387 43 3164
06-Jun-20 982 911 887 427 41 3248
07-Jun-20 985 914 848 428 45 3220
08-Jun-20 1095 957 906 437 47 3441
09-Jun-20 1188 997 931 452 51 3618
10-Jun-20 1260 1011 899 461 52 3683
11-Jun-20 1291 983 821 451 51 3597
12-Jun-20 1322 968 804 429 49 3572
13-Jun-20 1304 940 835 420 50 3548
14-Jun-20 1285 909 823 408 49 3474
15-Jun-20 1359 931 891 408 50 3640
16-Jun-20 1388 951 891 406 52 3687
17-Jun-20 1412 936 882 413 50 3694
18-Jun-20 1438 950 881 415 47 3731
19-Jun-20 1425 964 895 432 51 3767
20-Jun-20 1358 977 901 432 52 3719
21-Jun-20 1270 949 861 418 50 3549
22-Jun-20 1294 980 881 419 52 3625
23-Jun-20 1351 995 901 436 51 3734
24-Jun-20 1314 1015 907 455 50 3740
25-Jun-20 1282 1042 895 438 46 3703
26-Jun-20 1310 1012 883 420 45 3670
27-Jun-20 1350 1007 883 424 43 3707
28-Jun-20 1377 994 826 397 44 3637
29-Jun-20 1351 1017 857 416 47 3689
30-Jun-20 1407 995 844 444 50 3741
कुल TOTAL 37317 28932 26166 12661 1424 106499
उच्चतम MAXIMUM 1438 1042 931 461 52 3767
दनम्नतम MINIMUM 941 841 804 374 41 3164
औसत AVERAGE 1244 964 872 422 47 3550
सांचयी 2020-21
89430 88887 79205 33339 3626 294486
Cumulative 2020-21
अब तक क उच्चतम
1493 1293 1157 496 58 4145
All Time Max.
दिन ांक Date 01.07.19 16.10.18 18.03.20 25.06.19 22.08.19 30.05.19

9
ENERGY MET DURING THE MONTH OF JUNE' 2020
NR WR SR ER NER ALL INDIA
4000

3500

3000

2500
ENERGY (MU) -->

NR - Max: 1438 MU Min: 941 MU Avg : 1244 MU WR - Max: 1042 MU Min: 841 MU Avg : 964 MU
SR - Max: 931 MU Min: 804 MU Avg : 872 MU ER - Max: 461 MU Min: 374 MU Avg : 422 MU
2000
ALL INDIA - Max: 3767 MU Min: 3164 MU Avg : 3550 MU NER - Max: 52 MU Min: 41 MU Avg : 47 MU

1500

1000

500

0
10-Jun-20

11-Jun-20

12-Jun-20

13-Jun-20

14-Jun-20

15-Jun-20

16-Jun-20

17-Jun-20

18-Jun-20

19-Jun-20

20-Jun-20

21-Jun-20

22-Jun-20

23-Jun-20

24-Jun-20

25-Jun-20

26-Jun-20

27-Jun-20

28-Jun-20

29-Jun-20

30-Jun-20
1-Jun-20

2-Jun-20

3-Jun-20

4-Jun-20

5-Jun-20

6-Jun-20

7-Jun-20

8-Jun-20

9-Jun-20

DATE -->

10
5. वर्ष 2020-21 के फ्रिए आवृफ्रत रूपरे खा FREQUENCY PROFILE FOR YEAR 2020-21

राष्ट्रीय फ्रिड NATIONAL GRID


उच्चतम फ्रिम्नतम औसत
फ्रिक्वेंसी रूपरे खा (Hz) <49.9 49.9-50.05 >50.05
फ्रिक्वेंसी फ्रिक्वेंसी फ्रिक्वेंसी

Apr-20 All India Grid 5.10 75.13 19.77 50.30 49.61 50.01

May-20 All India Grid 4.23 76.68 19.10 50.29 49.57 50.01

% समय
Jun-20 All India Grid 4.51 76.91 18.58 50.31 49.63 50.01

2020-21
All India Grid 4.61 76.24 19.15 50.31 49.57 50.01
(upto June)

11
5.1 जूि 2020 के फ्रिए आवृफ्रत रूपरे खा FREQUENCY PROFILE FOR JUNE 2020

उच्चतम फ्रिम्नतम औसत


फ्रिक्वेंसी रूपरे खा (Hz) <49.9 49.9-50.05 >50.05 एफ़.वी.आई.
फ्रिक्वेंसी फ्रिक्वेंसी फ्रिक्वेंसी

01-Jun-20 3.07 68.78 28.15 50.22 49.81 50.02 0.03


02-Jun-20 6.50 73.84 19.65 50.19 49.76 50.00 0.04
03-Jun-20 6.24 75.15 18.61 50.25 49.80 50.00 2.93
04-Jun-20 2.69 82.84 14.48 50.19 49.82 50.00 0.03
05-Jun-20 2.13 67.35 30.52 50.27 49.81 50.02 0.04
06-Jun-20 3.63 74.85 21.52 50.19 49.82 50.01 0.04
07-Jun-20 1.31 65.54 33.15 50.22 49.83 50.03 0.04
08-Jun-20 13.07 77.69 9.25 50.18 49.74 49.97 0.05
09-Jun-20 13.90 77.66 8.44 50.16 49.63 49.97 0.06
10-Jun-20 5.30 78.33 16.37 50.22 49.78 50.00 0.03
11-Jun-20 1.47 79.22 19.31 50.20 49.81 50.02 0.02
12-Jun-20 3.43 81.55 15.02 50.16 49.75 50.01 0.02
13-Jun-20 1.20 77.37 21.42 50.24 49.85 50.02 0.03
14-Jun-20 0.87 63.77 35.36 50.20 49.83 50.03 0.03
% 15-Jun-20 3.11 77.67 19.21 50.17 49.78 50.01 0.03
समय 16-Jun-20 2.33 82.96 14.71 50.15 49.83 50.00 0.02
17-Jun-20 3.29 82.28 14.43 50.19 49.81 50.00 0.02
18-Jun-20 1.61 77.48 20.91 50.17 49.86 50.01 0.02
19-Jun-20 2.93 78.76 18.31 50.21 49.76 50.01 0.03
20-Jun-20 4.13 70.71 25.16 50.23 49.79 50.02 0.04
21-Jun-20 0.75 55.96 43.29 50.31 49.85 50.05 0.07
22-Jun-20 7.14 83.24 9.62 50.14 49.79 49.99 0.03
23-Jun-20 10.42 84.11 5.47 50.14 49.81 49.98 0.04
24-Jun-20 12.07 81.32 6.61 50.13 49.79 49.98 0.04
25-Jun-20 2.16 85.41 12.43 50.15 49.81 50.01 0.02
26-Jun-20 0.91 86.41 12.67 50.16 49.79 50.01 0.02
27-Jun-20 3.76 77.19 19.05 50.16 49.82 50.01 0.03
28-Jun-20 3.14 75.00 21.86 50.16 49.84 50.01 0.03
29-Jun-20 6.68 80.80 12.52 50.19 49.77 49.99 0.03
30-Jun-20 5.97 84.02 10.01 50.12 49.79 49.99 0.03

12
6.र ष्ट्रीय स्तर पर जल दर्वि् युत उत्प िन
HYDRO GENERATION AT NATIONAL LEVEL
म ह: जून 2020 MONTH:- JUNE 2020

सभी आां कड़े दमदलयन यूदनट मे All figures in MU


दिन ांक ऊत्तरी क्षे . पदिमी क्षे . िदक्षणी क्षे . पूर्वी क्षे . पूर्वोत्तर क्षे . कुल
Date NR WR SR ER NER TOTAL
01-Jun-20 290 41 76 102 17 526
02-Jun-20 280 42 58 102 16 498
03-Jun-20 279 38 58 105 16 497
04-Jun-20 279 35 68 103 20 505
05-Jun-20 284 44 65 110 19 523
06-Jun-20 288 44 63 122 21 538
07-Jun-20 286 41 60 119 22 529
08-Jun-20 313 57 78 118 21 587
09-Jun-20 337 68 81 118 19 623
10-Jun-20 340 55 76 121 15 606
11-Jun-20 348 35 61 115 15 575
12-Jun-20 354 39 59 116 17 585
13-Jun-20 357 36 71 124 22 610
14-Jun-20 362 37 56 125 18 598
15-Jun-20 365 43 74 130 17 629
16-Jun-20 364 48 76 130 19 638
17-Jun-20 367 58 80 128 19 651
18-Jun-20 369 52 72 125 23 640
19-Jun-20 366 55 82 129 27 658
20-Jun-20 365 52 75 129 24 644
21-Jun-20 358 55 71 132 22 637
22-Jun-20 367 69 80 143 22 680
23-Jun-20 369 72 85 140 24 691
24-Jun-20 371 84 88 142 27 712
25-Jun-20 373 76 85 137 27 698
26-Jun-20 363 66 73 138 26 666
27-Jun-20 356 65 76 136 27 661
28-Jun-20 358 61 72 138 29 659
29-Jun-20 354 59 82 143 31 669
30-Jun-20 356 62 73 146 30 667
कुल TOTAL 10217 1590 2176 3767 651 18401
उच्चतम MAXIMUM 373 84 88 146 31 712
दनम्नतम MINIMUM 279 35 56 102 15 497
औसत AVERAGE 341 53 73 126 22 613
सांचयी 2020-21
23553 4275 6847 8160 1143 43978
Cumulative 2020-21
अब तक क उच्चतम All
389 167 208 146 37 816
Time Max.
दिन ांक Date 18.08.15 18.12.14 31.08.18 03.06.20 03.07.19 09.09.19

13
HYDRO ENERGY DURING THE MONTH OF JUNE' 2020
NR WR SR ER NER INDIA
800
NR - Max: 373 MU Min: 279 MU Avg : 341 MU
SR - Max: 88 MU Min: 56 MU Avg : 73 MU
700 ALL INDIA - Max: 712 MU Min: 497 MU Avg : 613 MU

600
WR - Max: 84 MU Min: 35 MU Avg : 53 MU
ER - Max: 146 MU Min: 102 MU Avg : 126 MU
HYDRO ENERGY (MU) -->

NER - Max: 31 MU Min: 15 MU Avg : 22 MU


500
ER - Max: 146 MU Min: 102 MU Avg : 126 MU

400

300

200

100

0
8-Jun-20
1-Jun-20

2-Jun-20

3-Jun-20

4-Jun-20

5-Jun-20

6-Jun-20

7-Jun-20

9-Jun-20

24-Jun-20
10-Jun-20

11-Jun-20

12-Jun-20

13-Jun-20

14-Jun-20

15-Jun-20

16-Jun-20

17-Jun-20

18-Jun-20

19-Jun-20

20-Jun-20

21-Jun-20

22-Jun-20

23-Jun-20

25-Jun-20

26-Jun-20

27-Jun-20

28-Jun-20

29-Jun-20

30-Jun-20
DATE -->

14
7. र ष्ट्रीय स्तर पर पर्वन ऊर् ा उत्प िन
WIND GENERATION AT NATIONAL LEVEL
म ह: र्ून 2020 MONTH:- JUNE 2020
सभी आां कड़े दमदलयन यूदनट मे All figures in MU
दिन ांक ऊत्तरी क्षे . पदिमी क्षे . िदक्षणी क्षे . पूर्वी क्षे . पूर्वोत्तर क्षे . कुल
Date NR WR SR ER NER TOTAL
01-Jun-20 18.9 44.5 51.0 ---------- ---------- 114
02-Jun-20 20.0 48.3 77.0 ---------- ---------- 145
03-Jun-20 13.2 61.1 86.9 ---------- ---------- 161
04-Jun-20 3.4 65.8 111.9 ---------- ---------- 181
05-Jun-20 29.7 73.7 109.4 ---------- ---------- 213
06-Jun-20 10.7 82.6 132.3 ---------- ---------- 226
07-Jun-20 20.5 64.9 149.5 ---------- ---------- 235
08-Jun-20 18.8 61.5 154.4 ---------- ---------- 235
09-Jun-20 22.1 54.4 159.3 ---------- ---------- 236
10-Jun-20 27.6 75.1 156.3 ---------- ---------- 259
11-Jun-20 30.8 58.8 167.6 ---------- ---------- 257
12-Jun-20 20.6 44.0 171.8 ---------- ---------- 236
13-Jun-20 21.7 36.8 168.5 ---------- ---------- 227
14-Jun-20 4.2 45.9 186.9 ---------- ---------- 237
15-Jun-20 11.1 62.2 199.0 ---------- ---------- 272
16-Jun-20 31.0 70.6 180.2 ---------- ---------- 282
17-Jun-20 54.9 89.7 166.7 ---------- ---------- 311
18-Jun-20 63.0 103.2 163.5 ---------- ---------- 330
19-Jun-20 64.0 129.3 150.3 ---------- ---------- 344
20-Jun-20 49.4 121.0 159.8 ---------- ---------- 330
21-Jun-20 32.1 103.7 165.7 ---------- ---------- 301
22-Jun-20 19.6 80.4 162.3 ---------- ---------- 262
23-Jun-20 23.4 70.6 126.8 ---------- ---------- 221
24-Jun-20 19.6 40.6 77.4 ---------- ---------- 138
25-Jun-20 36.1 41.9 58.0 ---------- ---------- 136
26-Jun-20 50.5 50.6 69.4 ---------- ---------- 170
27-Jun-20 53.8 61.9 94.9 ---------- ---------- 211
28-Jun-20 60.2 67.4 90.3 ---------- ---------- 218
29-Jun-20 47.8 46.3 72.8 ---------- ---------- 167
30-Jun-20 8.5 22.1 107.4 ---------- ---------- 138
कुल TOTAL 887.2 1978.9 3927.2 ---------- ---------- 6793.3
उच्चतम MAXIMUM 64.0 129.3 199.0 ---------- ---------- 344
दनम्नतम MINIMUM 3.4 22.1 51.0 ---------- ---------- 114
औसत AVERAGE 29.6 66.0 130.9 ---------- ---------- 226
सांचयी 2020-201
2048.0 6187.3 6931.6 ---------- ---------- 15167
Cumulative 2020-21
अब तक क उच्चतम
71.3 199.3 245.5 … … 467
All Time Max.
दिन ांक Date 14.07.19 27.07.19 20.07.18 … … 12.06.18
*Source: As reported by SLDCs. Limited visibility of embedded wind generator data.

15
8. र ष्ट्रीय स्तर पर सौर ऊर् ा उत्प िन
SOLAR GENERATION AT NATIONAL LEVEL
म ह: र्ून 2020 MONTH:- JUNE 2020
सभी आां कड़े दमदलयन यू दनट मे All figures in MU
दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल
Date NR WR SR ER NER TOTAL
01-Jun-20 37 24 71 4.8 0.0 136
02-Jun-20 41 20 78 4.8 0.0 143
03-Jun-20 31 19 73 4.7 0.0 128
04-Jun-20 33 21 71 4.6 0.0 129
05-Jun-20 22 24 80 4.6 0.0 131
06-Jun-20 39 25 78 4.8 0.0 147
07-Jun-20 40 22 71 4.9 0.0 139
08-Jun-20 42 25 79 4.8 0.0 151
09-Jun-20 42 26 79 4.8 0.0 152
10-Jun-20 43 24 62 4.9 0.0 133
11-Jun-20 42 22 38 4.9 0.0 107
12-Jun-20 39 22 51 4.8 0.0 116
13-Jun-20 31 20 62 4.7 0.0 117
14-Jun-20 38 20 67 4.6 0.0 129
15-Jun-20 40 22 69 4.8 0.0 136
16-Jun-20 41 22 61 4.6 0.0 129
17-Jun-20 42 20 58 4.7 0.0 125
18-Jun-20 37 23 63 4.5 0.0 128
19-Jun-20 39 24 68 4.5 0.0 135
20-Jun-20 40 24 73 5.0 0.0 141
21-Jun-20 33 22 60 4.6 0.0 120
22-Jun-20 42 23 62 4.7 0.0 132
23-Jun-20 41 21 74 4.8 0.0 140
24-Jun-20 36 20 80 4.8 0.0 141
25-Jun-20 34 22 78 5.5 0.0 140
26-Jun-20 38 22 76 4.5 0.0 141
27-Jun-20 36 24 72 4.8 0.0 137
28-Jun-20 38 24 65 4.9 0.0 132
29-Jun-20 39 23 72 4.7 0.0 138
30-Jun-20 41 20 65 4.7 0.0 131
कुल TOTAL 1138 665 2057 143 0.7 4003
उच्चतम MAXIMUM 43 26 80 5 0.04 152
दनम्नतम MINIMUM 22 19 38 4 0.01 107
औसत AVERAGE 38 22 69 5 0.02 133
सांचयी 2020-21
3535 2358 7261 429 2.8 13585
Cumulative 2020-21
अब तक क उच्चतम
47 32 104 5 0.24 178
All Time Max.
दिन ांक Date 03.04.20 13.03.20 17.02.20 25.06.20 22.11.19 28.03.20

*Source: RLDCs for solar connected to ISTS; SLDCs for embedded solar. Limited visibility of embedded solar data.

16
9. र ष्ट्रीय स्तर पर िै दनक अदिकतम दर्वि् यु त म ांग पूदता
DAILY MAXIMUM DEMAND MET AT NATIONAL LEVEL
म ह: र्ून 2020 MONTH:- JUNE 2020
सभी आां कड़े मेग र्व ट मे All figures in MW

दिन ांक ऊत्तरी क्षे. पदिमी क्षे. िदक्षणी क्षे. पूर्वी क्षे. पूर्वोत्तर क्षे. कुल दर्वदभन्नत फ़ैक्टर
Date NR WR SR ER NER TOTAL Diversity Factor*
01-Jun-20 46594 47400 39199 17421 2510 144503 1.060
02-Jun-20 48347 43390 39171 18494 2474 144295 1.053
03-Jun-20 49273 39500 38279 20102 2356 142078 1.052
04-Jun-20 47281 35999 40046 19836 2380 138280 1.053
05-Jun-20 45106 39401 42063 19266 2487 139637 1.062
06-Jun-20 48322 40732 39623 21178 2437 146532 1.039
07-Jun-20 47856 38649 37741 20856 2499 143654 1.027
08-Jun-20 52540 41714 41357 20962 2717 153130 1.040
09-Jun-20 56137 44241 44431 21650 2755 158433 1.068
10-Jun-20 57268 44853 41712 21843 2830 161183 1.045
11-Jun-20 61050 43361 39613 21516 2792 163301 1.031
12-Jun-20 62289 46489 36469 20824 2631 158025 1.068
13-Jun-20 60937 41229 37095 20472 2657 157791 1.029
14-Jun-20 61867 38618 35767 19666 2578 156888 1.010
15-Jun-20 63021 40256 40810 19303 2846 162359 1.024
16-Jun-20 64361 41104 40372 19847 2884 163169 1.033
17-Jun-20 64463 39993 40738 20090 2581 162421 1.034
18-Jun-20 65705 40620 39948 20180 2604 163187 1.036
19-Jun-20 64713 41405 40688 21118 2736 164641 1.037
20-Jun-20 62463 41764 40081 21022 2863 162605 1.034
21-Jun-20 60742 40835 38836 20629 2723 157575 1.039
22-Jun-20 62468 44320 40920 20874 2812 162236 1.056
23-Jun-20 62565 43121 41394 21119 2707 164946 1.036
24-Jun-20 60274 44717 42800 21931 2715 163564 1.054
25-Jun-20 60280 46456 42332 21454 2595 162073 1.068
26-Jun-20 61681 44051 42213 20652 2497 163736 1.045
27-Jun-20 63979 44434 41753 20101 2451 164532 1.050
28-Jun-20 63133 42567 38129 19438 2532 160854 1.031
29-Jun-20 63456 44748 41172 20707 2696 163922 1.054
30-Jun-20 64373 43633 38712 21319 2763 164641 1.037
उच्चतम MAXIMUM 65705 47400 44431 21931 2884 164946 1.068

दनम्नतम MINIMUM 45106 35999 35767 17421 2356 138280 1.010

औसत AVERAGE 58418 42320 40115 20462 2637 157140 1.044

अब तक क उच्चतम
66687 59385 53465 23783 3145 182610
All Time Max.

दिन ांक Date 03.07.19 21.02.20 18.03.20 14.06.19 07.09.19 30.05.19


* Diversity factor = (Sum of regional max demands) / All India max demand
नोट : यह आां कड़े एनएलडीसी स्क ड प्रण ली में िर्ा िै दनक अदिकतम म ांगपू दता िर् ा ते हैं ।
Note: The above figures denote daily maximum demand met recorded in NLDC SCADA.

17
10. DEMAND AND GENERATION PLOTS FOR 23 JUNE (MAXIMUM DEMAND MET)

18
19
20
21
23 जून 2020 (अधिकतम म ाँग) की आल इं धिय म ाँग आपूधति
ALL INDIA DEMAND MET FOR 23 JUNE 2020 (MAXIMUM DEMAND*)

Time (hrs) All India Demand (MW) Time (hrs) All India Demand (MW)
00:05 156160 12:05 158506
00:20 155150 12:20 159127
00:35 154755 12:35 159064
00:50 153488 12:50 158998
01:05 152971 13:05 157150
01:20 151919 13:20 158049
01:35 151166 13:35 158407
01:50 150261 13:50 159200
02:05 149433 14:05 158624
02:20 148536 14:20 160004
02:35 147783 14:35 160076
02:50 147254 14:50 160358
03:05 146132 15:05 159468
03:20 145831 15:20 160794
03:35 145349 15:35 160554
03:50 145047 15:50 160015
04:05 144540 16:05 159018
04:20 144563 16:20 158451
04:35 145120 16:35 156979
04:50 145570 16:50 158368
05:05 145152 17:05 157496
05:20 144825 17:20 150716
05:35 145586 17:35 150104
05:50 145739 17:50 149492
06:05 143837 18:05 146086
06:20 145523 18:20 146217
06:35 146059 18:35 148381
06:50 147362 18:50 150906
07:05 147060 19:05 153248
07:20 148104 19:20 156054
07:35 148767 19:35 157654
07:50 148738 19:50 159734
08:05 149527 20:05 159991
08:20 150845 20:20 160965
08:35 151787 20:35 161256
08:50 152607 20:50 161791
09:05 153077 21:05 162169
09:20 155027 21:20 163396
09:35 155888 21:35 163754
09:50 156556 21:50 163849
10:05 156809 22:05 163596
10:20 158246 22:20 164946
10:35 157911 22:35 164247
10:50 157851 22:50 163420
11:05 158575 23:05 162033
11:20 158810 23:20 161228
11:35 158776 23:35 160282
11:50 158801 23:50 158991
Maximum Demand of 164946MW met @ 22:20hrs (from 1 min. interval SCADA DATA)
* 15 minute interval SCADA DATA of instanteneous demand

22
11. ACTUAL POWER SUPPLY POSITION - JUNE 2020

Requirement/Availability in MU/DAY Requirement/Availability in MU Peak Demand/Peak Met in MW


REGION STATE Peak
Energy Surplus(+)/ Requirem Energy Surplus(+)/ % Surplus(+)/ %
Requirement Requirement Demand
met Deficit(-) ent met Deficit(-) Shortage Deficit(-) Shortage
Met
Chandigarh 5 5 0.0 161 161 0 0.0 363 363 0 0.0
Delhi 104 104 0.0 3109 3109 0 0.0 6314 6314 0 0.0
Haryana 172 172 0.0 5158 5158 0 0.0 10308 10308 0 0.0
Himachal Pradesh 27 27 0.0 806 806 0 0.0 1423 1423 0 0.0
J&K(UT) and Ladakh(UT) 52 42 -10.0 1564 1263 -301 -19.3 2834 2267 -567 -20.0
Punjab 224 224 0.0 6733 6733 0 0.0 12719 12719 0 0.0
NR
Rajasthan 240 240 -0.5 7199 7185 -14 -0.2 12755 12755 0 0.0
Uttar Pradesh 392 392 0.0 11769 11769 0 0.0 22110 22110 0 0.0
Uttarakhand 38 38 0.0 1147 1147 0 0.0 1942 1942 0 0.0
NFF/Railway 1 1 0.0 42 42 0 0.0 92 92 0 0.0
TOTAL 1256 1246 -10.5 37688 37373 -315 -0.8 65337 64886 -451 -0.7
Gujarat 298 298 0.0 8955 8955 0 0.0 15924 15924 0 0.0
Madhya Pradesh 180 180 0.0 5391 5389 -1 0.0 9124 9124 0 0.0
Chhattisgarh 77 77 0.0 2318 2318 0 0.0 3677 3676 -1 0.0
Maharashtra 370 370 0.0 11115 11115 0 0.0 19429 19422 -7 0.0
Goa 9 9 0.0 265 265 0 0.0 516 515 -1 -0.2
WR
D&D 5 5 0.0 148 148 0 0.0 255 255 0 0.0
DNH 12 12 0.0 347 347 0 0.0 589 589 0 0.0
AMNSIL* 17 17 0.0 518 518 0 0.0 880 880 0 0.0

TOTAL 969 968 -0.1 29056 29055 -2 0.0 47627 47627 0 0.0

Andhra Pradesh 170 170 0.0 5102 5102 0 0.0 9423 9423 0 0.0
Telangana 154 154 0.0 4610 4611 1 0.0 8739 8723 -16 -0.2
Karnataka 176 176 0.1 5291 5293 2 0.0 10670 10670 0 0.0
Kerala 64 64 0.0 1924 1925 1 0.0 3312 3299 -13 -0.4
SR
Tamil Nadu 300 300 0.1 9000 9003 2 0.0 14855 14814 -42 -0.3
Puducherry 8 8 0.0 232 232 0 0.0 402 401 -1 -0.3
TOTAL 872 872 0.2 26160 26166 6 0.0 43043 43043 0 0.0
Bihar 101 100 -0.3 3019 3011 -8 -0.3 5922 5791 -131 -2.2
Jharkhand 27 26 -0.2 795 790 -5 -0.6 1481 1402 -79 -5.3
DVC 65 65 0.0 1953 1953 0 0.0 2788 2788 0 0.0
ER Odisha 83 83 0.0 2499 2499 0 0.0 4373 4373 0 0.0
West Bengal 159 159 -0.4 4775 4762 -13 -0.3 8233 8221 -12 -0.1
Sikkim 1 1 0.0 39 39 0 0.0 98 98 0 0.0
TOTAL 436 435 -0.9 13080 13054 -26 -0.2 21931 21931 0 0.0
Arunachal Pradesh 2 2 0.0 53 53 0 -0.5 145 119 -26 -18.1
Assam 30 30 -0.8 911 889 -23 -2.5 1798 1798 0 0.0
Manipur 2 2 0.0 73 72 0 -0.6 220 201 -19 -8.6
Meghalaya 6 6 0.0 177 177 0 0.0 335 335 0 0.0
NER Mizoram 2 2 0.0 49 49 0 -0.8 101 101 0 0.0
Nagaland 2 2 0.0 69 69 0 -0.5 151 143 -8 -5.3
Tripura 8 8 0.0 228 228 0 0.0 287 287 0 0.0
TOTAL 52 51 -0.8 1559 1535 -24 -1.5 3037 2984 -53 -1.8

ALL INDIA 3585 3573 -12.0 107543 107182 -361 -0.3 180975 180471 -504 -0.3
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

23
12. ENERGY COMPARISON OF JUNE 2020 vs JUNE 2019
Energy Requirement (MU) Energy Met (MU)
REGION STATE Average Average
Jun-19 Jun-20 Difference % Change MU/day for Jun-19 Jun-20 Difference % Change MU/day for
June-20 June-20
Chandigarh 181 161 -20 -11 5 181 161 -20 -11 5
Delhi 3833 3109 -724 -19 104 3831 3109 -722 -19 104
Haryana 5746 5158 -588 -10 172 5743 5158 -585 -10 172
Himachal Pradesh 889 806 -83 -9 27 888 806 -82 -9 27
J&K(UT) and Ladakh(UT) 1685 1564 -121 -7 52 1365 1263 -102 -7 42
NR Punjab 6801 6733 -68 -1 224 6801 6733 -68 -1 224
Rajasthan 7543 7199 -344 -5 240 7542 7185 -357 -5 240
Uttar Pradesh 12757 11769 -988 -8 392 12725 11769 -955 -8 392
Uttarakhand 1348 1147 -201 -15 38 1348 1147 -201 -15 38
NFF/Railway 74 42 -32 -43 1 74 42 -32 -43 1
TOTAL 40857 37688 -3169 -8 1256 40497 37373 -3124 -8 1246
Gujarat 10662 8955 -1707 -16 298 10658 8955 -1704 -16 298
Madhya Pradesh 6400 5391 -1009 -16 180 6396 5389 -1007 -16 180
Chhattisgarh 2639 2318 -321 -12 77 2639 2318 -321 -12 77
Maharashtra 13860 11115 -2746 -20 370 13860 11115 -2746 -20 370
WR Goa 356 265 -91 -26 9 356 265 -91 -26 9
D&D 219 148 -71 -32 5 219 148 -71 -32 5
DNH 528 347 -181 -34 12 528 347 -181 -34 12
AMNSIL* 174 518 344 197 17 174 518 344 197 17
TOTAL 34838 29056 -5782 -17 969 34831 29055 -5776 -17 968
Andhra Pradesh 5650 5102 -548 -10 170 5642 5102 -540 -10 170
Telangana 4830 4610 -220 -5 154 4827 4611 -216 -4 154
Karnataka 5803 5291 -512 -9 176 5798 5293 -505 -9 176
SR Kerala 2188 1924 -264 -12 64 2186 1925 -261 -12 64
Tamil Nadu 10051 9000 -1051 -10 300 10046 9003 -1043 -10 300
Puducherry 265 232 -33 -12 8 264 232 -32 -12 8
TOTAL 28787 26160 -2627 -9 872 28763 26166 -2597 -9 872
Bihar 3069 3019 -50 -2 101 3061 3011 -50 -2 100
Jharkhand 791 795 4 1 27 782 790 8 1 26
DVC 2155 1953 -202 -9 65 2155 1953 -202 -9 65
ER Odisha 2614 2499 -115 -4 83 2614 2499 -115 -4 83
West Bengal 5602 4775 -827 -15 159 5586 4762 -824 -15 159
Sikkim 39 39 0 -1 1 39 39 0 -1 1
TOTAL 14271 13080 -1191 -8 436 14237 13054 -1183 -8 435
Arunachal Pradesh 67 53 -14 -21 2 66 53 -14 -20 2
Assam 971 911 -59 -6 30 923 889 -35 -4 30
Manipur 73 73 0 0 2 72 72 0 0 2
Meghalaya 169 177 8 5 6 169 177 8 5 6
NER
Mizoram 56 49 -7 -12 2 55 49 -7 -12 2
Nagaland 67 69 2 2 2 67 69 2 3 2
Tripura 159 228 68 43 8 149 228 78 52 8
TOTAL 1562 1559 -2 0 52 1502 1535 33 2 51
ALL INDIA 120315 107543 -12772 -11 3585 119829 107182 -12647 -11 3573
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

24
13. DEMAND COMPARISON OF JUNE 2020 vs JUNE 2019

Peak Requirement (MW) Peak Met (MW)


REGION STATE
Jun-19 Jun-20 Difference % Change Jun-19 Jun-20 Difference % Change
Chandigarh 355 363 8 2.3 355 363 8 2.3
Delhi 6904 6314 -590 -8.5 6904 6314 -590 -8.5
Haryana 10237 10308 71 0.7 10237 10308 71 0.7
Himachal Pradesh 1612 1423 -189 -11.7 1612 1423 -189 -11.7
J&K(UT) and Ladakh(UT) 2842 2834 -8 -0.3 2362 2267 -95 -4.0
NR
Punjab 12876 12719 -157 -1.2 12876 12719 -157 -1.2
Rajasthan 12620 12755 135 1.1 12620 12755 135 1.1
Uttar Pradesh 21407 22110 703 3.3 21407 22110 703 3.3
Uttarakhand 2134 1942 -192 -9.0 2134 1942 -192 -9.0
NFF/Railway 148 92 -56 -38.0 148 92 -56 -38.0
Gujarat 18437 15924 -2513 -14 18424 15924 -2500 -13.6
Madhya Pradesh 10186 9124 -1062 -10 10180 9124 -1056 -10.4
Chhattisgarh 4038 3677 -361 -9 4013 3676 -337 -8.4
Maharashtra 22912 19429 -3483 -15 22912 19422 -3490 -15.2
WR
Goa 622 516 -106 -17 621 515 -106 -17.1
D&D 350 255 -95 -27.1 350 255 -95 -27.1
DNH 824 589 -235 -28.5 824 589 -235 -28.5
AMNSIL* 934 880 -54 -5.8 934 880 -54 -5.8
Andhra Pradesh 7447 9423 1976 26.5 7433 9423 1990 26.8
Telangana 7246 8739 1493 20.6 7242 8723 1481 20.5
Karnataka 8043 10670 2627 32.7 8021 10670 2649 33.0
SR
Kerala 3579 3312 -267 -7.5 3573 3299 -274 -7.7
Tamil Nadu 14419 14855 436 3.0 14411 14814 403 2.8
Puducherry 395 402 7 1.8 393 401 8 2.0
Bihar 5467 5922 454 8.3 5467 5791 323 5.9
Jharkhand 1386 1481 95 6.9 1346 1402 56 4.2
DVC 3160 2788 -372 -11.8 3160 2788 -372 -11.8
ER
Odisha 4800 4373 -427 -8.9 4800 4373 -427 -8.9
West Bengal 9347 8233 -1114 -11.9 9313 8221 -1092 -11.7
Sikkim 97 98 1 1.0 97 98 1 1.0
Arunachal Pradesh 146 145 -1 -0.6 144 119 -25 -17.4
Assam 1846 1798 -48 -2.6 1791 1798 7 0.4
Manipur 188 220 33 17.3 182 201 20 10.7
NER Meghalaya 367 335 -33 -8.9 367 335 -33 -8.9
Mizoram 101 101 0 -0.3 99 101 2 1.7
Nagaland 144 151 7 5.0 140 143 3 2.3
Tripura 320 287 -33 -10.2 311 287 -24 -7.6
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

25
14. SCHEDULE AND DRAWAL OF CONSTITUENTS - JUNE 2020

ACTUAL Over drawal(+)/ ACTUAL Over drawal(+)/


SCHEDULE SCHEDULE
REGION STATE DRAWAL Under Drawal(-) % OD/UD DRAWAL Under Drawal(-)
(MU) (MU/DAY)
(MU) (MU) (MU/DAY) (MU/DAY)

Chandigarh 166.15 166.49 0.33 0.20 5.54 5.55 0.01


Delhi 2623.96 2622.16 -1.80 -0.07 87.47 87.41 -0.06
Haryana 3910.22 3919.58 9.36 0.24 130.34 130.65 0.31
Himachal Pradesh -40.53 -53.27 -12.74 31.43 -1.35 -1.78 -0.42
J&K(UT) and Ladakh(UT) 571.81 538.44 -33.37 -5.84 19.06 17.95 -1.11
NR
Punjab 4045.67 3991.60 -54.07 -1.34 134.86 133.05 -1.80
Rajasthan 2425.87 2469.48 43.61 1.80 80.86 82.32 1.45
Uttar Pradesh 6067.15 6075.33 8.19 0.13 202.24 202.51 0.27
Uttarakhand 536.63 553.04 16.42 3.06 17.89 18.43 0.55
NFF/Railway 39.27 43.65 4.38 11.16 1.31 1.46 0.15
Gujarat 2680.43 2739.77 59.34 2.21 89.35 91.33 1.98
Madhya Pradesh 2890.43 2834.81 -55.62 -1.92 96.35 94.49 -1.85
Chhattisgarh 776.22 731.87 -44.35 -5.71 25.87 24.40 -1.48
Maharashtra 4392.97 4383.82 -9.16 -0.21 146.43 146.13 -0.31
WR
Goa 255.93 251.93 -4.00 -1.56 8.53 8.40 -0.13
D&D 143.08 148.30 5.22 3.65 4.77 4.94 0.17
DNH 346.38 347.04 0.66 0.19 11.55 11.57 0.02
AMNSIL* 133.78 138.60 4.82 3.60 4.46 4.62 0.16
Andhra Pradesh 1733.97 1750.25 16.28 0.94 57.80 58.34 0.54
Telangana 2519.36 2551.71 32.35 1.28 83.98 85.06 1.08
Karnataka 1897.42 1907.44 10.02 0.53 63.25 63.58 0.33
SR Kerala 1350.99 1358.57 7.58 0.56 45.03 45.29 0.25
Tamil Nadu 3919.84 3864.31 -55.53 -1.42 130.66 128.81 -1.85
Puducherry 240.30 232.40 -7.90 -3.29 8.01 7.75 -0.26
Goa (SR) 43.42 42.51 -0.91 -2.09 1.45 1.42 -0.03
Bihar 2848.35 2848.59 0.25 0.01 94.94 94.95 0.01
Jharkhand 562.55 542.28 -20.27 -3.60 18.75 18.08 -0.68
DVC -1040.39 -1028.74 11.65 -1.12 -34.68 -34.29 0.39
ER
Odisha 232.05 215.11 -16.93 -7.30 7.73 7.17 -0.56
West Bengal 1449.82 1517.87 68.06 4.69 48.33 50.60 2.27
Sikkim 40.41 39.02 -1.39 -3.45 1.35 1.30 -0.05
Arunachal Pradesh 56.21 52.71 -3.50 -6.23 1.87 1.76 -0.12
Assam 731.92 756.81 24.89 3.40 24.40 25.23 0.83
Manipur 70.57 72.14 1.57 2.22 2.35 2.40 0.05
NER Meghalaya 15.25 11.39 -3.85 -25.26 0.51 0.38 -0.13
Mizoram 39.06 36.92 -2.14 -5.48 1.30 1.23 -0.07
Nagaland 64.76 61.40 -3.36 -5.19 2.16 2.05 -0.11
Tripura 151.85 147.55 -4.30 -2.83 5.06 4.92 -0.14
* ArcelorMittal Nippon Steel India Ltd. Previously it was ESIL (Essar Steel India Ltd.)

26
15. INTER REGIONAL EXCHANGES 2020-21
(All figures in MU)

Apr'20 May'20 June'20 Fin. Year 2020-21

Name of Line
Import of NR from WR (WR-NR)
WR - NR 765 kV Gwalior - Agra 2xS/C 1065.60 1216.52 1243.66 3525.78
WR-NR 765 kV Gwalior - Phagi 2xS/C 505.05 640.47 614.28 1759.80
WR-NR 765 kV Jabalpur-Orai D/C 627.01 791.13 921.28 2339.42
WR-NR 765 kV Satna-Orai 740.12 847.26 865.05 2452.43
WR-NR 765 kV Gwalior-Orai 0.00 0.00 0.00 0.00
WR - NR HVDC Champa - Kurukshetra 227.60 880.36 1195.53 2303.49
WR - NR HVDC Vindhyachal 7.01 36.91 77.22 121.14
WR - NR 400 kV Zerda Kankroli 0.00 2.21 4.06 6.27
WR - NR 400 kV Zerda Bhinmal 0.00 2.53 5.49 8.02
WR - NR 400 kV RAPP C - Shujalpur D/C 3.27 24.69 94.41 122.37
WR - NR 220 kV Bhanpura - Ranpur 17.04 26.66 40.97 84.67
WR - NR 220 kV Bhanpura - Modak 35.46 36.32 46.94 118.72
WR - NR 220 kV Auraiya - Malanpur/Mehgaon 0.00 0.00 0.00 0.00
WR - NR 400 kV Vindhyachal-Rihand D/C 0.00 0.00 0.00 0.00
WR - NR HVDC Mundra - Mohindergarh 627.43 1013.72 969.13 2610.28
WR-NR 765 kV Banaskata-Chittorgarh D/C 70.14 175.09 271.26 516.49
Total WR - NR 3925.73 5693.87 6349.28 15968.88
Export of NR to WR (NR-WR)
NR - WR 765 kV Gwalior - Agra 2xS/C 0.00 0.00 0.00 0.00
NR - WR 765 kV Gwalior - Phagi 2xS/C 0.00 0.00 0.00 0.00
NR - WR 765 kV Jabalpur-Orai D/C 0.00 0.00 0.00 0.00
NR - WR 765 kV Satna-Orai 0.00 0.00 0.00 0.00
NR - WR 765 kV Gwalior-Orai 297.33 302.13 221.33 820.79
NR - WR HVDC Champa- Kurukshetra 0.00 0.00 0.00 0.00
NR - WR HVDC Vindhyachal 258.29 61.96 57.17 377.42
NR - WR 400 kV Zerda Kankroli 60.84 56.98 18.14 135.96
NR - WR 400 kV Zerda Bhinmal 86.61 74.20 60.47 221.28
NR - WR 400 kV RAPP C - Shujalpur D/C 27.71 37.62 8.88 74.21
NR - WR 220 kV Bhanpura - Ranpur 0.00 1.87 0.00 1.87
NR - WR 220 kV Bhanpura - Modak 0.00 0.00 0.00 0.00
NR - WR 220 kV Auraiya - Malanpur/Mehgaon 55.54 39.06 76.07 170.67
NR-WR 400 kV Rihand-Vindhyachal D/C 654.81 676.77 672.55 2004.13
NR - WR HVDC Mundra - Mohindergarh 0.00 0.00 0.00 0.00
NR - WR 765 kV Banaskata-Chittorgarh D/C 25.63 22.48 4.67 52.78
Total NR - WR 1466.76 1273.07 1119.28 3859.11
Import of NR from ER (ER-NR)
ER - NR 765 kV Sasaram - Fatehpur 14.25 51.47 5.34 71.06
ER - NR 765 kV Gaya - Varanasi 2*S/C 153.62 216.96 172.81 543.39
ER - NR 765 kV Gaya - Balia 134.25 188.23 190.45 512.93
ER - NR HVDC Alipurduar - Agra 0.00 112.75 514.69 627.44
ER-NR 400 kV Patna - Balia 2xD/C 295.70 355.51 451.36 1102.57
ER - NR 400 kV Muzaffarpur - Gorakhpur D/C 226.29 365.87 358.37 950.53
ER - NR 400 kV Biharshariff - Balia D/C 114.58 138.51 146.45 399.54
ER - NR 400 kV Motihari - Gorakhpur D/C 110.76 137.33 148.91 397.00
ER - NR 400 kV Biharshariff - Varanasi D/C 17.49 50.34 20.50 88.33
ER - NR 400 kV Sasaram -Varanasi 149.59 157.19 200.48 507.26
ER - NR 400 kV Sasaram -Allahabad 49.12 54.01 74.36 177.49
ER - NR 220 kV Pusauli - Sahupuri 88.20 91.85 64.81 244.86
ER - NR 132 kV Sahupuri - Karamnasa 11.04 15.44 13.44 39.92
ER - NR 132 kV Rihand - Son Nagar 0.71 1.42 0.00 2.13
ER - NR 132 kV Rihand - Garhwa 0.00 0.00 0.00 0.00
Total ER-NR 1365.60 1936.88 2361.97 5664.45
Import of NR from NER (NER-NR)
NER-NR HVDC Biswanath Chariali - Agra 11.83 195.04 467.34 674.21
Total NER - NR 11.83 195.04 467.34 674.21
Export of NR to ER (NR-ER)
NR - ER 765 kV Sasaram - Fatehpur 9.02 7.14 37.82 53.98
NR - ER 765 kV Gaya - Varanasi 2*S/C 0.00 4.50 0.00 4.50
NR - ER 765 kV Gaya - Balia 0.00 0.00 0.00 0.00
NR - ER HVDC Alipurduar - Agra 0.00 0.00 0.00 0.00
NR - ER 400 kV Patna - Balia 2xD/C 0.00 0.00 0.00 0.00
NR - ER 400 kV Muzaffarpur - Gorakhpur D/C 0.00 0.00 0.00 0.00
NR - ER 400 kV Biharshariff - Balia D/C 0.00 0.00 0.00 0.00
ER - NR 400 kV Motihari - Gorakhpur D/C 0.00 0.00 0.00 0.00
NR - ER 400 kV Biharshariff - Varanasi D/C 14.15 7.93 10.97 33.05
NR - ER 400 kV Sasaram -Varanasi 0.00 0.00 0.00 0.00
NR - ER 400 kV Sasaram -Allahabad 0.00 0.00 0.70 0.70
NR - ER 220 kV Pusauli - Sahupuri 0.00 0.00 0.00 0.00
NR - ER 132 kV Sahupuri - Karamnasa 7.20 8.64 5.28 21.12
NR - ER 132 kV Rihand - Son Nagar 7.66 7.59 4.25 19.50
ER - NR 132 kV Rihand - Garhwa 7.89 8.67 7.33 23.89
Total NR - ER 45.92 44.47 66.35 156.74
Export of NR to NER (NER-NR)
NR-NER HVDC Biswanath Chariali - Agra 236.01 134.73 0.00 370.74
Total NR - NER 236.01 134.73 0.00 370.74

27
Apr'20 May'20 June'20 Fin. Year 2020-21

Name of Line
Export of WR to ER (WR-ER)
WR - ER 765 kV Ranchi - Dharamjaygarh 2xS/C 123.48 234.93 411.24 769.66
WR - ER 765 kV Dharamjaygarh - Jharsuguda 2xD/C 567.02 669.41 567.35 1803.79
WR - ER 765 kV Durg - Jharsuguda D/C 2.45 11.99 28.02 42.46
WR - ER 400 kV Sipat - Ranchi D/C 54.26 112.15 175.99 342.40
WR - ER 400 kV Raigarh - Jharsuguda 2xD/C 2.64 24.85 61.71 89.21
WR - ER 220 kV Korba - Budhipadar D/C 61.68 70.37 88.70 220.76
WR - ER 220 kV Raigarh - Budhipadar 0.00 0.01 0.63 0.64
Total WR - ER 811.54 1123.72 1333.65 3268.92
Import of WR from ER (ER - WR)
ER - WR 765 kV Ranchi - Dharamjaygarh 2xS/C 36.29 16.56 1.23 54.08
ER - WR 765 kV Dharamjaygarh - Jharsuguda 2XD/C 4.18 0.13 0.10 4.41
ER - WR 765 kV Durg - Jharsuguda D/C 81.45 80.11 23.63 185.19
ER - WR 400 kV Sipat - Ranchi D/C 14.28 3.72 0.14 18.14
ER - WR 400 kV Raigarh - Jharsuguda 2xD/C 90.49 28.51 16.33 135.32
ER - WR 220 kV Korba - Budhipadar D/C 0.01 0.11 0.01 0.14
ER - WR 220 kV Raigarh - Budhipadar 65.45 44.92 27.62 137.99
Total ER - WR 292.14 174.07 69.07 535.28
Export of ER to NER (ER - NER)
ER - NER 400 kV Binaguri - Bongaigaon D/C 0.21 36.70 120.97 157.87
ER - NER 400 kV Alipurduar - Bongaigaon D/C 0.19 85.79 151.92 237.91
ER - NER 220 kV Birpara - Salakati D/C 0.14 17.12 42.92 60.17
Total ER - NER 0.53 139.61 315.81 455.95
Import of ER from NER ( NER - ER)
NER - ER 400 kV Binaguri - Bongaigaon D/C 179.31 61.16 1.02 241.49
NER - ER 400 kV Alipurduar - Bongaigaon D/C 217.91 64.39 6.59 288.89
NER - ER 220 kV Birpara - Salakati D/C 44.02 9.92 0.06 53.99
Total NER - ER 441.24 135.47 7.67 584.37
Export of ER to SR (ER - SR)
ER - SR HVDC Gazuwaka 237.04 258.00 247.19 742.23
ER - SR HVDC Talchar - Kolar 1269.79 1349.18 1173.80 3792.76
ER - SR 765 kV Angul- Srikakulam D/C 1714.96 1844.12 1385.97 4945.05
Total ER - SR 3221.78 3451.30 2806.96 9480.04
Import of ER from SR (SR - ER)
SR - ER HVDC Gazuwaka 0.00 0.00 0.00 0.00
SR - ER HVDC Talchar - Kolar 0.00 0.00 0.00 0.00
SR - ER 765 kV Angul- Srikakulam D/C 0.00 0.00 0.00 0.00
Total SR - ER 0.00 0.00 0.00 0.00
Export of WR to SR (WR-SR)
WR - SR HVDC Bhadrawati 542.30 594.23 467.53 1604.06
WR - SR 765 kV Sholapur - Raichur 2xS/C 1001.48 846.15 625.27 2472.90
WR - SR 765 kV Wardha - Nizamabad D/C 1346.36 671.01 1017.01 3034.38
WR - SR 400KV Kolhapur-Kudgi D/C 83.82 26.69 2.24 112.74
Total WR - SR 2973.96 2138.07 2112.05 7224.09
Import of WR from SR (SR - WR)
SR - WR HVDC Bhadrawati 0.00 0.00 2.77 2.77
SR - WR 765 kV Raichur - Sholapur 2xS/C 1.59 6.71 30.49 38.80
SR - WR 765 kV Wardha - Nizamabad D/C 0.00 0.00 0.00 0.00
SR - WR 400KV Kolhapur-Kudgi D/C 34.06 92.45 268.09 394.60
Total SR - WR 35.66 99.17 301.35 436.18
TOTAL ALL INDIA 14829 16539 17311 48679

28
15.1 Import-Export of NR with WR during June 2020

Import of NR from WR (WR-NR)

Date
NR - WR
WR-NR WR-NR WR - NR WR-NR WR - NR 220 WR - NR 220 WR-NR WR - NR
WR - NR 765 kV WR-NR WR-NR WR - NR WR - NR WR - NR 400 WR - NR 220 765 kV
765 kV 765 kV HVDC 400 kV RAPP kV kV Auraiya - 400 KV Rihand HVDC Total
Gwalior - Agra 765 kV 765 kV HVDC 400 kV Zerda- kV Zerda- kV Bhanpura Banaskata -
Gwalior-Phagi Jabalpur- Champa- C - Shujalpur Bhanpura - Malanpur / Vindhyachal Mundra - WR - NR
2xS/C Satna- Orai Gwalior-Orai Vindhyachal Kankroli Bhinmal - Ranpur Chittorgarh
2xS/C Orai D/C Kurukshetra D/C Modak Mehgaon D/C M'garh
D/C

1-Jun-20 25.41 12.68 23.05 18.92 0.00 17.59 4.54 0.00 0.00 0.00 0.73 0.93 0.00 0.00 24.25 0.00 128.10
2-Jun-20 40.79 18.53 27.66 25.95 0.00 17.72 4.51 0.00 0.70 3.04 1.58 1.70 0.00 0.00 24.25 4.12 170.55
3-Jun-20 46.23 21.51 39.16 25.28 0.00 27.36 4.87 0.51 0.00 4.46 1.77 1.81 0.00 0.00 24.25 10.40 207.61
4-Jun-20 44.84 22.59 39.34 25.80 0.00 28.04 4.85 0.46 0.85 5.90 1.82 2.03 0.00 0.00 24.25 10.17 210.94
5-Jun-20 28.01 17.74 26.25 21.01 0.00 27.75 7.75 1.34 0.00 1.85 1.29 1.40 0.00 0.00 24.25 6.22 164.86
6-Jun-20 30.68 21.00 30.44 22.60 0.00 25.29 6.73 0.07 0.00 3.71 1.66 1.81 0.00 0.00 24.25 9.40 177.64
7-Jun-20 34.11 19.34 28.77 23.99 0.00 20.21 3.68 0.00 0.00 2.37 1.25 1.28 0.00 0.00 24.25 8.66 167.91
8-Jun-20 39.10 25.28 35.08 28.04 0.00 38.40 0.00 0.00 0.00 1.89 2.14 0.00 0.00 25.12 9.40 204.45
9-Jun-20 47.75 23.18 37.58 30.75 0.00 23.70 0.00 0.00 0.00 2.73 2.03 2.16 0.00 0.00 43.07 4.69 217.64
10-Jun-20 49.47 25.09 38.45 31.42 0.00 33.48 2.85 0.00 0.00 0.00 1.80 1.89 0.00 0.00 42.76 7.28 234.49
11-Jun-20 48.72 25.28 37.45 33.47 0.00 33.16 6.52 0.00 0.00 4.24 1.68 1.91 0.00 0.00 40.81 5.12 238.36
12-Jun-20 48.76 22.51 34.38 31.45 0.00 61.82 2.47 0.00 0.00 0.00 1.46 1.84 0.00 0.00 40.70 5.12 250.51
13-Jun-20 40.57 19.79 27.78 29.90 0.00 66.47 0.20 0.00 0.00 2.70 0.47 0.97 0.00 0.00 36.32 2.76 227.93
14-Jun-20 44.03 20.08 30.32 28.99 0.00 42.51 3.18 0.00 1.40 4.09 0.48 0.93 0.00 0.00 30.59 11.01 217.61
15-Jun-20 44.33 17.05 27.12 30.31 0.00 57.06 4.17 0.48 1.20 3.23 0.37 0.70 0.00 0.00 29.40 12.40 227.82
16-Jun-20 45.49 20.30 29.65 31.08 0.00 41.00 2.78 0.45 0.00 4.77 1.14 1.37 0.00 0.00 37.21 14.42 229.66
17-Jun-20 48.47 20.30 35.76 30.77 0.00 51.75 2.59 0.55 0.00 4.61 1.73 1.97 0.00 0.00 30.75 17.63 246.88
18-Jun-20 48.02 19.57 33.46 33.50 0.00 65.03 1.65 0.20 0.00 4.46 1.94 2.17 0.00 0.00 25.42 14.83 250.25
19-Jun-20 44.21 15.44 26.03 31.55 0.00 59.08 3.65 0.00 0.00 2.29 1.49 1.76 0.00 0.00 31.56 16.37 233.43
20-Jun-20 43.74 19.83 29.94 29.92 0.00 33.19 1.11 0.00 0.00 4.03 1.33 1.50 0.00 0.00 30.29 14.05 208.93
21-Jun-20 37.15 18.97 29.08 28.13 0.00 35.55 0.00 0.00 0.00 4.59 1.64 1.73 0.00 0.00 27.80 8.67 193.31
22-Jun-20 43.80 20.16 30.96 31.02 0.00 31.92 0.92 0.00 0.00 4.79 1.34 1.53 0.00 0.00 28.78 6.07 201.29
23-Jun-20 39.87 18.90 28.06 30.34 0.00 48.72 2.66 0.00 0.00 3.85 1.10 1.27 0.00 0.00 34.17 7.03 215.97
24-Jun-20 36.67 18.61 25.23 28.85 0.00 43.21 0.37 0.00 0.00 2.50 0.70 0.95 0.00 0.00 32.08 10.97 200.14
25-Jun-20 32.07 17.85 23.03 28.26 0.00 36.66 0.00 0.00 0.00 0.72 0.39 0.69 0.00 0.00 36.31 8.96 184.94
26-Jun-20 40.20 21.19 26.37 29.81 0.00 37.38 0.00 0.00 0.00 1.67 1.24 1.30 0.00 0.00 36.97 10.12 206.25
27-Jun-20 42.37 21.61 28.00 29.82 0.00 39.82 0.00 0.00 0.00 2.87 1.80 2.01 0.00 0.00 45.96 8.90 223.16
28-Jun-20 43.47 21.38 29.85 31.50 0.00 51.25 0.31 0.00 0.00 3.86 2.08 2.14 0.00 0.00 40.45 11.87 238.16
29-Jun-20 40.57 24.02 28.73 29.49 0.00 43.22 2.43 0.00 0.00 4.53 1.46 1.67 0.00 0.00 33.89 7.56 217.57
30-Jun-20 44.76 24.50 34.30 33.13 0.00 57.19 2.43 0.00 1.34 6.55 1.31 1.38 0.00 0.00 38.97 7.06 252.92
Total 1243.66 614.28 921.28 865.05 0.00 1195.53 77.22 4.06 5.49 94.41 40.97 46.94 0.00 0.00 969.13 271.26 6349.28

29
15.1 Import-Export of NR with WR during June 2020

Export of NR to WR (NR- WR)

Date
NR-WR NR - WR
NR - WR NR-WR NR-WR NR - WR 220 NR - WR
NR-WR NR-WR NR - WR HVDC NR - WR NR - WR NR - WR NR-WR WR - NR 220 WR - NR 220 400 kV 765 kV
765 kV 765 kV 765 kV kV Auraiya - HVDC Total
765 kV 765 kV Champa- HVDC 400 kV Zerda- 400 kV Zerda- 400 kV RAPP C kV Bhanpura - kV Bhanpura - Rihand- Banaskata -
Gwalior - Agra Gwalior-Phagi Jabalpur- Orai Malanpur / Mundra - NR - WR
Satna- Orai Gwalior-Orai Kurukshetra Vindhyachal Kankroli Bhinmal - Shujalpur D/C Ranpur Modak Vindhyachal Chittorgarh
2xS/C 2xS/C D/C Mehgaon M'garh
D/C D/C

1-Jun-20 0.00 0.00 0.00 0.00 7.32 0.00 0.78 3.18 1.19 0.49 0.00 0.00 2.31 20.56 0.00 4.67 40.50
2-Jun-20 0.00 0.00 0.00 0.00 4.74 0.00 0.49 1.27 0.00 0.00 0.00 0.00 2.04 22.69 0.00 0.00 31.23
3-Jun-20 0.00 0.00 0.00 0.00 7.32 0.00 0.00 0.00 0.25 0.00 0.00 0.00 2.40 21.13 0.00 0.00 31.10
4-Jun-20 0.00 0.00 0.00 0.00 7.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.23 22.84 0.00 0.00 33.08
5-Jun-20 0.00 0.00 0.00 0.00 6.47 0.00 0.00 1.34 3.75 0.00 0.00 0.00 3.06 22.66 0.00 0.00 37.28
6-Jun-20 0.00 0.00 0.00 0.00 6.51 0.00 0.38 0.00 0.26 0.00 0.00 0.00 2.88 22.36 0.00 0.00 32.39
7-Jun-20 0.00 0.00 0.00 0.00 6.56 0.00 0.00 0.27 1.45 0.00 0.00 0.00 2.04 22.24 0.00 0.00 32.56
8-Jun-20 0.00 0.00 0.00 0.00 7.47 0.00 7.32 0.13 0.95 0.00 0.00 1.15 22.80 0.00 0.00 39.82
9-Jun-20 0.00 0.00 0.00 0.00 9.08 0.00 7.30 0.62 1.86 0.00 0.00 0.00 3.49 22.84 0.00 0.00 45.19
10-Jun-20 0.00 0.00 0.00 0.00 8.04 0.00 3.06 0.71 2.10 4.49 0.00 0.00 3.59 22.89 0.00 0.00 44.88
11-Jun-20 0.00 0.00 0.00 0.00 7.51 0.00 0.00 1.04 2.93 0.00 0.00 0.00 3.46 22.79 0.00 0.00 37.73
12-Jun-20 0.00 0.00 0.00 0.00 9.34 0.00 0.86 0.90 2.02 3.90 0.00 0.00 3.65 22.73 0.00 0.00 43.40
13-Jun-20 0.00 0.00 0.00 0.00 6.12 0.00 1.19 1.72 2.94 0.00 0.00 0.00 3.08 22.60 0.00 0.00 37.65
14-Jun-20 0.00 0.00 0.00 0.00 7.19 0.00 0.00 0.05 0.00 0.00 0.00 0.00 2.50 22.46 0.00 0.00 32.20
15-Jun-20 0.00 0.00 0.00 0.00 7.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.50 21.19 0.00 0.00 31.34
16-Jun-20 0.00 0.00 0.00 0.00 7.07 0.00 0.00 0.00 0.70 0.00 0.00 0.00 2.63 22.18 0.00 0.00 32.58
17-Jun-20 0.00 0.00 0.00 0.00 6.46 0.00 0.00 0.00 3.27 0.00 0.00 0.00 3.70 22.64 0.00 0.00 36.07
18-Jun-20 0.00 0.00 0.00 0.00 8.50 0.00 0.00 0.00 4.09 0.00 0.00 0.00 3.76 22.75 0.00 0.00 39.10
19-Jun-20 0.00 0.00 0.00 0.00 5.14 0.00 0.00 0.03 4.07 0.00 0.00 0.00 3.60 22.71 0.00 0.00 35.55
20-Jun-20 0.00 0.00 0.00 0.00 5.97 0.00 0.84 0.02 2.17 0.00 0.00 0.00 3.51 22.69 0.00 0.00 35.20
21-Jun-20 0.00 0.00 0.00 0.00 7.80 0.00 1.27 0.36 0.93 0.00 0.00 0.00 3.63 20.87 0.00 0.00 34.86
22-Jun-20 0.00 0.00 0.00 0.00 7.84 0.00 1.09 0.77 0.86 0.00 0.00 0.00 3.54 22.75 0.00 0.00 36.85
23-Jun-20 0.00 0.00 0.00 0.00 7.14 0.00 3.47 0.43 0.67 0.00 0.00 0.00 1.67 22.62 0.00 0.00 36.00
24-Jun-20 0.00 0.00 0.00 0.00 6.90 0.00 0.88 0.01 0.10 0.00 0.00 0.00 1.00 22.67 0.00 0.00 31.56
25-Jun-20 0.00 0.00 0.00 0.00 6.99 0.00 1.26 1.52 4.41 0.00 0.00 0.00 1.79 22.69 0.00 0.00 38.66
26-Jun-20 0.00 0.00 0.00 0.00 8.29 0.00 4.38 1.01 4.75 0.00 0.00 0.00 1.31 22.46 0.00 0.00 42.20
27-Jun-20 0.00 0.00 0.00 0.00 8.12 0.00 12.07 1.30 6.17 0.00 0.00 0.00 0.73 22.63 0.00 0.00 51.02
28-Jun-20 0.00 0.00 0.00 0.00 7.30 0.00 10.53 0.63 5.44 0.00 0.00 0.00 1.00 22.70 0.00 0.00 47.60
29-Jun-20 0.00 0.00 0.00 0.00 8.79 0.00 0.00 0.56 3.14 0.00 0.00 0.00 1.53 22.88 0.00 0.00 36.90
30-Jun-20 0.00 0.00 0.00 0.00 10.69 0.00 0.00 0.27 0.00 0.00 0.00 0.00 1.29 22.53 0.00 0.00 34.78
Total 0.00 0.00 0.00 0.00 221.33 0.00 57.17 18.14 60.47 8.88 0.00 0.00 76.07 672.55 0.00 4.67 1119.28

30
15.2 Import-Export of NR with ER & NER during June 2020
Import of NR from NER
Import of NR from ER (ER-NR)
(NER-NR)

Date
ER - NR 400 ER - NR
ER - NR 765 ER - NR ER - NR ER - NR ER-NR ER - NR ER - NR 132 ER - NR NR - ER
ER - NR 765 ER-NR 400 kV kV 400 kV ER-NR 400 NER-NR
kV Gaya - ER - NR 765 HVDC 400 kV 400 kV 400 kV 220 kV kV 132 kV 132 kV Total Total
kV Sasaram - Patna - Balia Muzaffarpur - Motihari - kV Sasaram - HVDC Biswanath
Varanasi kV Gaya Balia Alipurduar - Biharshariff - Biharshariff - Sasaram - Pusauli - Sahupuri - Rihand - Rihand - ER -NR NER-NR
Fatehpur 2xD/C Gorakhpur Gorakhpur Varanasi Chariali - Agra
2*S/C Agra Balia D/C Varanasi D/C Allahabad Sahupuri Karamnasa Son Nagar Garhwa
D/C D/C

1-Jun-20 0.34 4.50 5.83 6.66 13.55 10.94 4.31 4.72 0.58 4.40 1.47 2.81 0.00 0.00 0.00 60.11 14.54 14.54
2-Jun-20 0.00 5.61 6.79 7.17 15.21 11.06 4.12 4.92 0.00 4.13 1.28 3.16 0.96 0.00 0.00 64.41 16.78 16.78
3-Jun-20 0.00 5.56 7.63 7.12 10.12 11.44 4.52 5.14 0.00 4.45 1.49 3.06 0.00 0.00 0.00 60.53 16.76 16.76
4-Jun-20 0.78 9.39 7.15 7.58 13.32 11.95 5.17 4.96 0.00 1.51 0.00 3.17 0.00 0.00 0.00 64.98 17.27 17.27
5-Jun-20 2.44 5.31 4.41 7.45 10.87 11.27 4.65 3.30 0.31 1.00 0.59 1.78 0.00 0.00 0.00 53.38 16.95 16.95
6-Jun-20 0.45 3.60 4.92 7.35 9.88 10.72 3.81 2.81 0.11 4.30 1.48 2.76 0.48 0.00 0.00 52.67 16.67 16.67
7-Jun-20 0.00 3.06 5.13 10.92 10.64 11.05 3.37 3.95 0.00 4.99 1.37 2.95 0.96 0.00 0.00 58.39 15.79 15.79
8-Jun-20 0.00 5.53 7.76 6.01 13.70 12.99 4.57 5.62 3.33 6.64 3.94 3.95 0.96 0.00 0.00 75.00 17.01 17.01
9-Jun-20 0.00 7.19 8.60 12.17 15.17 13.71 5.20 5.96 0.55 6.70 3.09 2.62 0.00 0.00 0.00 80.96 16.91 16.91
10-Jun-20 0.00 6.60 8.29 11.98 12.69 9.93 4.59 5.58 0.00 9.94 2.94 3.42 0.00 0.00 0.00 75.96 14.02 14.02
11-Jun-20 0.00 6.34 8.54 12.08 12.51 9.58 4.42 5.58 0.00 10.24 2.68 3.11 0.00 0.00 0.00 75.08 16.32 16.32
12-Jun-20 0.00 5.54 7.57 11.98 15.59 11.26 5.07 5.86 1.55 6.97 2.58 1.52 1.44 0.00 0.00 76.93 16.78 16.78
13-Jun-20 0.00 5.68 5.16 11.73 17.84 12.91 5.42 5.67 0.00 6.62 2.80 1.49 0.96 0.00 0.00 76.28 15.91 15.91
14-Jun-20 0.00 3.09 6.20 11.58 14.73 11.67 5.60 5.03 0.00 6.97 2.55 1.42 0.96 0.00 0.00 69.80 16.19 16.19
15-Jun-20 0.00 2.67 5.44 17.32 15.97 12.24 4.70 4.40 0.00 10.56 2.43 1.50 0.00 0.00 0.00 77.23 15.09 15.09
16-Jun-20 0.00 4.89 6.06 24.30 17.18 12.53 4.81 4.53 0.00 6.50 2.61 1.59 0.00 0.00 0.00 85.00 18.75 18.75
17-Jun-20 0.00 2.11 5.49 28.11 15.19 9.86 3.81 5.17 0.00 7.21 2.49 1.96 0.00 0.00 0.00 81.40 14.26 14.26
18-Jun-20 0.00 4.72 6.20 24.15 15.98 10.42 4.83 5.12 0.00 10.08 2.66 1.94 0.96 0.00 0.00 87.06 16.71 16.71
19-Jun-20 0.00 2.59 3.24 23.94 18.49 11.30 6.50 4.74 0.00 10.29 2.55 1.87 0.96 0.00 0.00 86.47 16.79 16.79
20-Jun-20 0.00 4.45 4.97 23.86 16.64 10.79 4.36 4.92 0.06 6.63 2.84 1.81 0.96 0.00 0.00 82.29 15.35 15.35
21-Jun-20 0.00 4.71 4.77 24.08 15.57 10.63 3.92 4.55 0.10 6.49 2.91 1.59 0.00 0.00 0.00 79.32 12.24 12.24
22-Jun-20 0.00 4.27 5.69 23.71 17.54 12.16 4.55 5.10 0.47 6.80 2.83 1.54 0.00 0.00 0.00 84.66 10.84 10.84
23-Jun-20 0.00 6.58 4.81 23.57 19.99 13.61 4.88 5.69 1.49 9.82 2.79 1.73 0.00 0.00 0.00 94.96 11.86 11.86
24-Jun-20 0.00 7.34 5.88 23.79 15.86 12.22 5.01 5.33 1.09 6.50 2.77 2.01 1.92 0.00 0.00 89.72 12.95 12.95
25-Jun-20 0.40 6.63 6.27 23.96 16.54 13.27 5.56 5.04 1.86 6.83 3.13 2.08 0.96 0.00 0.00 92.53 14.03 14.03
26-Jun-20 0.16 7.73 7.47 25.10 16.03 13.98 6.04 4.87 1.81 9.43 3.10 1.88 0.00 0.00 0.00 97.60 14.34 14.34
27-Jun-20 0.06 7.93 7.63 23.88 16.42 14.32 6.14 5.27 2.00 6.22 2.94 1.82 0.00 0.00 0.00 94.63 16.09 16.09
28-Jun-20 0.00 6.60 7.21 24.45 15.86 14.05 5.67 4.76 1.89 6.17 3.60 1.39 0.00 0.00 0.00 91.65 17.16 17.16
29-Jun-20 0.71 11.06 7.15 24.06 15.76 13.11 5.59 4.98 1.99 6.35 3.30 1.23 0.00 0.00 0.00 95.29 16.84 16.84
30-Jun-20 0.00 11.53 8.19 24.63 16.52 13.40 5.26 5.34 1.31 5.74 3.15 1.65 0.96 0.00 0.00 97.68 16.14 16.14
Total 5.34 172.81 190.45 514.69 451.36 358.37 146.45 148.91 20.50 200.48 74.36 64.81 13.44 0.00 0.00 2361.97 467.34 467.34

31
15.2 Import-Export of NR with ER & NER during June 2020
Export of NR to NER
Export of NR to ER (NR- ER)
(NR-NER)

Date
NR - ER NR - ER 400 NR - ER
NR - ER NR - ER NR-ER NR - ER NR-ER NR-ER NR - ER NR - ER NR - ER NR-NER
NR - ER 765 NR - ER 765 NR - ER 400 kV 400 kV kV 132 kV
765 kV Gaya HVDC 400 kV 400 kV 400 kV 400 kV 220 kV 132 kV 132 kV Total HVDC Total
kV Sasaram - kV Gaya Muzaffarpur - Motihari - Biharshariff - Rihand -
- Varanasi Alipurduar - Patna - Biharshariff - Sasaram - Sasaram - Pusauli - Sahupuri - Rihand - NR -ER Biswanath NR-NER
Fatehpur Balia Gorakhpur D/C Gorakhpur Varanasi Son
2*S/C Agra Balia 2xD/C Balia D/C Varanasi Allahabad Sahupuri Karamnasa Garhwa Chariali - Agra
D/C D/C Nagar

1-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.30 0.30 0.00 0.00
2-Jun-20 0.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.35 0.00 1.35 0.00 0.00
3-Jun-20 1.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.04 0.00 0.00 0.00 0.00 0.00 0.40 1.83 0.00 0.00
4-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.70 0.00 0.00 0.00 0.34 1.04 0.00 0.00
5-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.46 0.46 0.00 0.00
6-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 0.41 0.00 0.00
7-Jun-20 2.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.43 0.00 0.00 0.00 0.00 0.00 0.48 4.11 0.00 0.00
8-Jun-20 2.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.47 2.55 0.00 0.00
9-Jun-20 0.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 0.50 0.00 1.61 0.00 0.00
10-Jun-20 1.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.61 0.00 0.00 0.00 0.96 0.43 0.00 3.86 0.00 0.00
11-Jun-20 2.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.96 0.37 0.00 4.75 0.00 0.00
12-Jun-20 2.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 0.00 0.00
13-Jun-20 1.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.85 0.00 0.00 0.00 0.00 0.00 0.00 2.48 0.00 0.00
14-Jun-20 2.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 0.00 0.00 0.00 0.00 0.51 0.00 3.84 0.00 0.00
15-Jun-20 2.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.82 0.00 0.00 0.00 0.00 0.00 0.27 5.06 0.00 0.00
16-Jun-20 1.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.48 0.00 0.00 0.00 0.00 0.00 0.36 2.40 0.00 0.00
17-Jun-20 3.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.18 0.00 0.00 0.00 0.00 0.00 0.30 5.67 0.00 0.00
18-Jun-20 1.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.76 0.00 0.00 0.00 0.00 0.00 0.34 3.05 0.00 0.00
19-Jun-20 2.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.10 0.00 0.00 0.00 0.00 0.00 0.39 3.66 0.00 0.00
20-Jun-20 1.45 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.34 1.79 0.00 0.00
21-Jun-20 2.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 0.31 0.00 3.83 0.00 0.00
22-Jun-20 0.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 0.38 0.00 2.22 0.00 0.00
23-Jun-20 0.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.96 0.47 0.00 1.89 0.00 0.00
24-Jun-20 0.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.47 0.00 1.10 0.00 0.00
25-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.26 0.38 0.64 0.00 0.00
26-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.20 0.48 0.68 0.00 0.00
27-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 0.41 0.00 0.00
28-Jun-20 0.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.39 0.54 0.00 0.00
29-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.40 0.40 0.00 0.00
30-Jun-20 1.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.41 2.32 0.00 0.00
Total 37.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.97 0.00 0.70 0.00 5.28 4.25 7.33 66.35 0.00 0.00

32
15.3 Import and Export of ER with WR & NER during June 2020

Export of WR to ER (WR-ER) Import of WR from ER (ER - WR) Export of ER to NER (ER-NER) Import of ER from NER (NER-ER)

Date WR - ER 765 ER-WR


WR - ER WR - ER ER - WR ER-WR ER - WR ER - WR ER - NER ER - NER 400 ER - NER NER - ER NER - ER 400 NER - ER
kV WR - ER 765 WR - ER WR - ER 220 765 kV ER - WR 400 ER - WR
765 kV 400 kV WR - ER 220 765 kV 765 kV 400 kV 220 kV 400 kV kV 220 kV 400 kV kV 220 kV
Dharamjayga kV Durg - 400 kV kV Korba - Total WR - Dharamjayg kV Raigarh - 220 kV Total ER - Total ER - Total NER -
Dharamjayg Raigarh - kV Raigarh - Dharamjayg Durg - Sipat - Korba - Binaguri - Alipurduar - Birpara - Binaguri - Alipurduar - Birpara -
rh - Jharsuguda Sipat - Budhipadar ER arh - Jharsuguda- Raigarh - WR NER ER
arh - Ranchi Jharsuguda- Budhipadar arh - Ranchi Jharsuguda Ranchi Budhipada Bongaigaon Bongaigaon Salakati Bongaigaon Bongaigaon Salakati
Jharsuguda D/C Ranchi D/C D/C Jharsuguda 2xD/C Budhipadar
2xS/C 2xD/C 2xS/C D/C D/C r D/C D/C D/C D/C D/C 2xD/C D/C
Q/C D/C

1-Jun-20 6.8 11.3 0.0 2.4 0.0 1.3 0.0 21.77 0.4 0.0 3.8 0.1 3.7 0.0 1.5 9.50 1.85 4.41 0.98 7.24 0.66 0.01 0.00 0.67
2-Jun-20 17.9 20.4 0.4 6.8 2.5 2.3 0.2 50.44 0.0 0.0 0.9 0.0 0.1 0.0 0.5 1.57 2.74 5.87 1.27 9.88 0.00 0.00 0.00 0.00
3-Jun-20 19.9 16.8 1.2 7.6 4.6 3.2 0.0 53.28 0.0 0.0 0.3 0.0 0.0 0.0 0.9 1.18 2.89 5.79 1.08 9.76 0.00 0.00 0.00 0.00
4-Jun-20 18.2 15.0 0.8 6.9 3.6 3.8 0.0 48.25 0.0 0.0 0.1 0.0 0.1 0.0 0.8 1.07 2.83 5.39 1.03 9.24 0.00 0.00 0.00 0.00
5-Jun-20 7.2 19.5 0.1 3.0 0.6 3.8 0.0 34.20 0.1 0.0 0.5 0.0 0.3 0.0 0.6 1.45 3.66 7.51 1.47 12.63 0.01 0.00 0.00 0.01
6-Jun-20 12.8 17.9 0.2 4.8 1.3 3.6 0.0 40.68 0.0 0.0 0.5 0.0 0.0 0.0 0.6 1.16 1.43 4.17 0.85 6.44 0.05 0.00 0.00 0.05
7-Jun-20 15.7 15.3 0.3 5.5 4.1 4.0 0.2 45.15 0.0 0.0 1.1 0.0 0.1 0.0 0.3 1.45 2.27 4.20 1.23 7.70 0.05 0.02 0.00 0.07
8-Jun-20 15.8 11.6 0.0 5.7 0.5 3.6 0.1 37.30 0.0 0.0 1.2 0.0 0.4 0.0 0.6 2.20 2.91 4.85 1.21 8.97 0.01 0.00 0.00 0.01
9-Jun-20 15.4 10.6 0.0 5.0 0.1 2.9 0.0 33.98 0.0 0.0 2.2 0.0 1.6 0.0 0.5 4.36 5.26 6.99 1.95 14.21 0.00 0.00 0.00 0.00
10-Jun-20 17.5 18.1 0.7 7.3 0.8 1.8 0.0 46.08 0.0 0.0 1.0 0.0 0.5 0.0 0.0 1.57 7.58 10.13 2.56 20.26 0.00 0.00 0.00 0.00
11-Jun-20 19.9 17.4 1.0 8.5 0.9 2.1 0.0 49.83 0.0 0.0 0.3 0.0 1.2 0.0 0.0 1.56 8.72 10.46 2.83 22.01 0.00 0.00 0.00 0.00
12-Jun-20 14.9 12.5 0.9 7.4 1.2 2.8 0.0 39.65 0.0 0.1 0.7 0.0 1.0 0.0 0.1 1.83 5.94 9.49 2.01 17.44 0.00 0.00 0.00 0.00
13-Jun-20 12.1 16.1 1.1 6.9 2.5 3.2 0.0 41.83 0.2 0.0 0.4 0.0 0.0 0.0 1.1 1.70 2.98 5.65 1.52 10.15 0.00 0.00 0.00 0.00
14-Jun-20 17.8 22.4 2.9 8.7 4.0 3.8 0.0 59.52 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.83 4.62 7.75 1.84 14.21 0.00 0.00 0.00 0.00
15-Jun-20 16.3 26.4 3.6 8.2 5.5 4.2 0.0 64.08 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.72 5.84 7.33 1.89 15.06 0.00 0.00 0.00 0.00
16-Jun-20 18.1 26.9 2.5 8.8 4.1 4.1 0.0 64.65 0.0 0.0 0.0 0.0 0.0 0.0 0.4 0.37 5.56 5.03 1.82 12.41 0.00 0.00 0.00 0.00
17-Jun-20 20.6 22.0 3.0 7.0 4.8 3.9 0.0 61.19 0.0 0.0 0.0 0.0 0.0 0.0 0.5 0.48 5.89 4.61 1.52 12.02 0.00 0.03 0.00 0.03
18-Jun-20 16.7 16.0 1.5 8.3 1.5 3.2 0.0 47.26 0.0 0.0 0.1 0.0 0.2 0.0 0.8 1.10 4.05 2.96 1.24 8.25 0.00 0.07 0.00 0.07
19-Jun-20 13.0 21.5 1.6 7.4 3.1 2.8 0.0 49.50 0.2 0.0 0.3 0.0 0.1 0.0 1.4 1.90 4.11 3.19 1.04 8.35 0.00 0.50 0.00 0.50
20-Jun-20 14.3 23.6 1.9 7.0 1.5 2.5 0.0 50.73 0.0 0.0 0.0 0.0 0.2 0.0 1.6 1.81 5.19 3.85 1.41 10.45 0.00 0.03 0.00 0.03
21-Jun-20 12.8 20.6 1.0 6.4 1.7 2.0 0.0 44.43 0.0 0.0 0.1 0.0 0.0 0.0 1.7 1.78 3.04 1.75 1.17 5.96 0.00 0.56 0.00 0.56
22-Jun-20 11.9 18.4 0.3 5.9 2.3 3.2 0.0 41.93 0.0 0.0 0.5 0.0 0.1 0.0 1.2 1.75 3.71 2.62 1.32 7.64 0.00 0.41 0.00 0.42
23-Jun-20 8.4 18.8 0.4 3.9 3.7 3.1 0.0 38.20 0.3 0.0 0.7 0.0 0.0 0.0 1.0 1.95 2.99 1.47 0.99 5.46 0.00 0.46 0.00 0.46
24-Jun-20 9.3 23.4 0.7 4.1 2.0 3.4 0.0 42.89 0.0 0.0 0.5 0.0 0.1 0.0 1.2 1.84 1.64 0.77 0.71 3.11 0.02 1.66 0.04 1.71
25-Jun-20 7.8 26.3 0.4 3.0 0.7 3.3 0.0 41.46 0.0 0.0 1.3 0.0 1.2 0.0 1.3 3.78 1.83 1.39 0.80 4.03 0.07 1.17 0.00 1.25
26-Jun-20 8.7 28.5 0.3 3.7 1.1 2.8 0.0 45.03 0.0 0.0 0.7 0.0 0.3 0.0 1.4 2.39 2.25 1.52 0.80 4.56 0.00 0.53 0.00 0.53
27-Jun-20 9.5 25.5 0.2 4.1 1.6 3.1 0.0 43.87 0.0 0.0 1.4 0.0 0.1 0.0 1.4 2.95 2.16 2.01 0.72 4.89 0.13 0.90 0.01 1.04
28-Jun-20 10.6 20.4 0.2 4.4 1.6 2.7 0.0 39.83 0.0 0.0 0.9 0.0 0.2 0.0 1.4 2.46 4.88 5.92 1.65 12.44 0.00 0.25 0.00 0.26
29-Jun-20 9.6 16.8 0.6 3.3 0.1 1.1 0.0 31.50 0.1 0.0 2.3 0.0 2.4 0.0 1.8 6.62 6.33 7.93 2.09 16.35 0.00 0.00 0.00 0.00
30-Jun-20 11.9 7.7 0.5 4.2 0.0 1.0 0.0 25.15 0.0 0.0 1.6 0.0 2.4 0.0 1.7 5.71 5.83 6.93 1.93 14.68 0.00 0.00 0.00 0.00
Total 411.24 567.35 28.02 175.99 61.71 88.70 0.63 1333.65 1.23 0.10 23.63 0.14 16.33 0.01 27.62 69.07 120.97 151.92 42.92 315.81 1.02 6.59 0.06 7.67

33
15.4 Import and Export of SR with ER & WR during June 2020

Export of ER to SR (ER - SR) Import of ER from SR (SR - ER) Export of WR to SR (WR-SR) Import of WR from SR (SR - WR)
Date
SR-ER WR-SR SR - WR SR-WR
ER-SR SR - ER WR - SR WR-SR SR-WR 400KV
ER - SR HVDC ER - SR HVDC Total SR - ER 765 kV Angul- Total WR - SR 400KV Total SR - WR HVDC 765 kV Raichur 765 kV Total
765 kV Angul- HVDC 765 kV Sholapur 765 kV Wardha - Kolhapur-Kudgi
Gazuwaka Talchar -Kolar ER - SR HVDC Talchar - Srikakulam SR - ER HVDC Bhadrawati Kolhapur-Kudgi WR - SR Bhadrawati - Sholapur Wardha - SR - WR
Srikakulam D/C Gazuwaka - Raichur 2xS/C Nizamabad D/C D/C
D/C D/C 2xS/C Nizamabad D/C

1-Jun-20 8.50 28.40 55.28 92.17 0.00 0.00 0.00 0.00 12.82 26.04 40.46 0.05 79.37 0.00 0.00 0.00 5.36 5.36

2-Jun-20 9.85 47.92 44.76 102.53 0.00 0.00 0.00 0.00 7.34 16.16 32.24 0.00 55.74 0.00 3.48 0.00 9.91 13.40

3-Jun-20 8.39 33.28 47.49 89.17 0.00 0.00 0.00 0.00 6.09 26.73 37.52 0.00 70.34 2.10 0.03 0.00 8.17 10.30

4-Jun-20 6.08 40.71 50.42 97.21 0.00 0.00 0.00 0.00 7.33 22.99 35.87 0.00 66.19 0.67 0.56 0.00 7.81 9.04

5-Jun-20 6.08 45.21 54.71 106.00 0.00 0.00 0.00 0.00 17.92 22.70 37.19 0.00 77.81 0.00 0.26 0.00 7.91 8.16

6-Jun-20 7.54 35.42 51.31 94.27 0.00 0.00 0.00 0.00 19.30 15.92 33.07 0.00 68.30 0.00 2.22 0.00 9.14 11.36

7-Jun-20 7.29 36.09 48.60 91.98 0.00 0.00 0.00 0.00 19.33 13.25 31.15 0.03 63.76 0.00 2.80 0.00 9.02 11.83

8-Jun-20 7.91 45.25 50.43 103.59 0.00 0.00 0.00 0.00 18.09 17.54 34.45 0.00 70.08 0.00 1.58 0.00 8.55 10.13

9-Jun-20 8.69 43.54 47.85 100.08 0.00 0.00 0.00 0.00 18.31 16.88 32.42 0.00 67.62 0.00 1.19 0.00 6.65 7.84

10-Jun-20 9.96 36.07 44.95 90.99 0.00 0.00 0.00 0.00 19.67 19.35 30.54 0.08 69.64 0.00 0.29 0.00 8.57 8.86

11-Jun-20 9.96 36.08 41.90 87.93 0.00 0.00 0.00 0.00 23.24 13.10 25.21 0.00 61.55 0.00 0.58 0.00 15.08 15.66

12-Jun-20 9.82 37.69 38.68 86.19 0.00 0.00 0.00 0.00 14.93 10.77 23.40 0.00 49.10 0.00 3.34 0.00 14.91 18.25

13-Jun-20 8.71 32.34 41.50 82.54 0.00 0.00 0.00 0.00 12.18 13.85 25.10 0.00 51.13 0.00 1.59 0.00 11.76 13.35

14-Jun-20 9.06 33.02 37.78 79.86 0.00 0.00 0.00 0.00 12.13 8.86 23.39 0.00 44.38 0.00 2.95 0.00 12.16 15.10

15-Jun-20 6.70 44.70 43.28 94.68 0.00 0.00 0.00 0.00 14.76 17.23 28.99 0.00 60.97 0.00 2.86 0.00 11.39 14.25

16-Jun-20 7.43 42.36 41.97 91.76 0.00 0.00 0.00 0.00 13.53 19.38 32.28 0.00 65.19 0.00 1.53 0.00 11.15 12.67

17-Jun-20 7.40 45.21 37.19 89.80 0.00 0.00 0.00 0.00 6.83 21.60 32.58 0.00 61.01 0.00 0.34 0.00 9.03 9.37

18-Jun-20 7.38 30.35 40.29 78.02 0.00 0.00 0.00 0.00 12.22 28.02 33.40 0.00 73.64 0.00 0.16 0.00 8.30 8.45

19-Jun-20 8.06 32.91 41.79 82.76 0.00 0.00 0.00 0.00 9.77 29.50 36.25 0.75 76.28 0.00 0.63 0.00 7.73 8.36

20-Jun-20 10.05 30.68 43.77 84.50 0.00 0.00 0.00 0.00 13.31 24.15 35.41 0.00 72.87 0.00 1.25 0.00 8.80 10.05

21-Jun-20 10.05 27.19 40.09 77.33 0.00 0.00 0.00 0.00 17.10 18.62 31.74 0.00 67.45 0.00 0.27 0.00 8.33 8.61

22-Jun-20 9.26 37.32 43.82 90.39 0.00 0.00 0.00 0.00 16.41 20.09 34.39 0.00 70.90 0.00 0.52 0.00 8.65 9.17

23-Jun-20 6.88 43.48 48.31 98.68 0.00 0.00 0.00 0.00 18.69 25.95 36.62 0.43 81.70 0.00 0.00 0.00 5.24 5.24

24-Jun-20 7.77 48.04 52.37 108.18 0.00 0.00 0.00 0.00 16.69 30.85 41.13 0.33 89.00 0.00 0.00 0.00 3.13 3.13

25-Jun-20 8.62 48.04 53.29 109.95 0.00 0.00 0.00 0.00 21.76 28.89 43.27 0.53 94.45 0.00 0.00 0.00 2.93 2.93

26-Jun-20 8.07 48.02 55.06 111.16 0.00 0.00 0.00 0.00 23.77 29.93 48.77 0.02 102.50 0.00 0.00 0.00 4.71 4.71

27-Jun-20 7.42 48.01 51.55 106.99 0.00 0.00 0.00 0.00 23.76 26.21 42.01 0.00 91.98 0.00 0.10 0.00 9.86 9.96

28-Jun-20 8.58 41.72 48.07 98.37 0.00 0.00 0.00 0.00 17.96 20.41 32.75 0.00 71.12 0.00 0.28 0.00 11.53 11.81

29-Jun-20 8.25 41.52 49.30 99.06 0.00 0.00 0.00 0.00 16.17 25.82 37.77 0.00 79.76 0.00 0.04 0.00 9.82 9.86

30-Jun-20 7.44 33.22 40.15 80.82 0.00 0.00 0.00 0.00 16.10 14.47 27.65 0.00 58.22 0.00 1.64 0.00 12.48 14.13

TOTAL 247.19 1173.80 1385.97 2806.96 0.00 0.00 0.00 0.00 467.53 625.27 1017.01 2.24 2112.05 2.77 30.49 0.00 268.09 301.35

34
16. भूटान , नेपाल, बाांग्लादे श एवां म्यान्मार के साथ अांतरराष्ट्रीय ववद् युत वववनमय
INTERNATIONAL EXCHANGE WITH BHUTAN, NEPAL BANGLADESH AND MYANMAR

अप्रैल 2020 से मार्च 2021 April 2020 to March 2021


अांतरराष्ट्रीय विद् यु त विवनमय [भारत से दू सरे दे श को आयात (+) / वनयाात (-) ]
Transnational Exchange (Import=(+ve) /Export =(-ve))

भूटान BHUTAN नेपाल NEPAL बाां ग्लादे श BANGLADESH म्यान्मार MYANMAR


Energy Energy Energy Energy
माह MONTH
Exchange Exchange Exchange Exchange
(In MU) (In MU) (In MU) (In MU)
अप्रैल 2020 APR'20 260.07 -61.15 -408.56 -0.72
मई 2020 MAY'20 838.57 -20.95 -585.83 -0.77
जून 2020 JUN'20 1302.09 -44.41 -748.92 -0.81
कुल Total 2400.73 -126.51 -1743.31 -2.30
* Based on daily operational data

35
16.1 Import from neighbouring countries during June 2020
(All figures in MU)
Import from
Date Import from Bhutan Import from Bangladesh Import from Nepal
Myanmar
400 kV 400 kV
400 kV Tala- 400 kV 220 kV 220 kV 132 kV 132 kV 132 kV 132 kV 220 kV
Jigmeling- Behrampur- From BIHAR 11 kV Moreh-
Binaguri I,II Binaguri- Birpara- Birpara- Rangia- Salakati- Surjyamaninagar- Tanakpur- Muzaffarpur-
Alipurdwar Bheramara Source Tamu
& IV Malbase Chuka D/C Malbase Motanga Gelephu Comilla D/C Mahendranagar Dhalkebar
D/C D/C
1-Jun-20 11.04 3.46 3.84 0.00 14.69 1.14 0.52 0.00 0.00 0.00 0.00 0.00 0.00
2-Jun-20 9.83 3.04 3.63 0.00 12.94 1.14 0.52 0.00 0.00 0.00 0.00 0.00 0.00
3-Jun-20 10.74 3.28 3.68 0.00 12.28 1.24 0.46 0.00 0.00 0.00 0.00 0.00 0.00
4-Jun-20 9.45 2.83 3.19 0.00 11.54 1.39 0.68 0.00 0.00 0.00 0.00 0.00 0.00
5-Jun-20 10.83 3.66 3.78 0.00 13.64 1.37 0.71 0.00 0.00 0.00 0.00 0.00 0.00
6-Jun-20 15.07 4.69 4.20 0.00 14.02 1.19 0.23 0.00 0.00 0.00 0.00 0.00 0.00
7-Jun-20 17.42 5.46 4.84 0.00 14.03 1.34 0.45 0.00 0.00 0.00 0.00 0.00 0.00
8-Jun-20 13.06 4.05 4.13 0.00 14.02 1.45 0.91 0.00 0.00 0.00 0.00 0.00 0.00
9-Jun-20 11.73 3.59 4.07 0.00 13.77 1.40 0.06 0.00 0.00 0.00 0.00 0.00 0.00
10-Jun-20 11.99 3.63 3.98 0.18 14.03 1.24 0.45 0.00 0.00 0.00 0.00 0.00 0.00
11-Jun-20 14.31 0.78 3.30 0.45 14.02 1.15 0.45 0.00 0.00 0.00 0.00 0.00 0.00
12-Jun-20 14.41 0.85 3.49 0.53 13.64 1.44 0.73 0.00 0.00 0.00 0.00 0.00 0.00
13-Jun-20 13.31 4.10 4.26 0.92 13.50 1.36 0.86 0.00 0.00 0.00 0.00 0.00 0.00
14-Jun-20 16.75 5.18 4.25 1.06 13.85 1.40 0.69 0.00 0.00 0.00 0.00 0.00 0.00
15-Jun-20 19.00 5.82 4.01 1.20 14.01 1.24 0.83 0.00 0.00 0.00 0.00 0.00 0.00
16-Jun-20 19.07 5.89 4.59 1.44 14.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
17-Jun-20 19.12 5.87 4.29 1.35 13.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
18-Jun-20 19.13 5.93 4.77 1.47 13.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
19-Jun-20 19.02 5.81 4.78 1.60 13.99 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
20-Jun-20 18.97 5.78 4.71 1.58 12.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
21-Jun-20 19.23 5.94 4.55 1.29 14.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
22-Jun-20 18.70 6.25 4.51 1.36 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23-Jun-20 16.48 7.73 3.82 1.23 14.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24-Jun-20 13.56 10.27 4.42 1.68 14.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
25-Jun-20 16.88 7.83 4.43 1.44 16.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
26-Jun-20 16.89 7.85 4.73 1.65 16.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
27-Jun-20 16.93 7.87 4.83 1.65 18.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28-Jun-20 16.92 7.86 4.74 1.62 17.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
29-Jun-20 17.61 7.16 4.60 1.57 17.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
30-Jun-20 19.17 5.89 4.53 1.45 17.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 466.61 158.35 126.93 26.72 432.50 19.49 8.55 0.00 0.00 0.00 0.00 0.00 0.00
*Based on SEM/Energy meter data for links where available

36
16.2 Export to neighbouring countries during June 2020
(All figures in MU)
Export to
Date Export to Bhutan Export to Bangladesh Export to Nepal
Myanmar
400 kV 400 kV
400 kV Tala- 400 kV 220 kV 220 kV 132 kV 132 kV 132 kV 220 kV
Jigmeling- Behrampur- 132 kV Tanakpur- From BIHAR 11 kV Moreh-
Binaguri I,II Binaguri- Birpara- Birpara- Rangia- Salakati- Surjyamaninagar- Muzaffarpur-
Alipurdwar Bheramara Mahendranagar Source Tamu
& IV Malbase Chuka D/C Malbase Motanga Gelephu Comilla D/C Dhalkebar
D/C D/C
1-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.36 3.43 0.05 0.20 0.08 0.02
2-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.48 3.55 0.15 0.33 0.50 0.02
3-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.52 3.31 0.31 0.29 1.19 0.03
4-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.54 3.15 0.29 0.31 0.68 0.03
5-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.25 2.84 0.10 0.00 0.08 0.03
6-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.84 3.42 0.02 0.01 0.04 0.02
7-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.13 3.40 0.08 0.33 0.14 0.03
8-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.03 3.19 0.05 0.36 0.95 0.02
9-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.90 3.51 0.26 0.31 0.91 0.03
10-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.10 3.44 0.26 0.31 1.67 0.03
11-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.02 3.50 0.32 0.31 1.51 0.03
12-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.53 3.01 0.00 0.80 1.42 0.02
13-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.46 2.86 0.27 0.74 0.17 0.03
14-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.98 3.08 0.35 0.71 1.54 0.03
15-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.98 3.49 0.27 1.37 0.24 0.03
16-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.91 3.45 0.31 1.14 0.08 0.03
17-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.82 3.09 0.17 1.29 0.33 0.03
18-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.74 2.66 0.00 1.43 0.34 0.03
19-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.40 2.86 0.29 1.41 0.25 0.03
20-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.24 3.25 0.29 1.28 0.02 0.03
21-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.07 2.86 0.22 1.19 0.37 0.03
22-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.97 2.72 0.11 1.23 0.22 0.03
23-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21.16 3.45 0.21 1.36 0.19 0.03
24-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.78 3.59 0.35 1.46 0.49 0.02
25-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.71 3.63 0.25 0.90 0.11 0.03
26-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.71 3.02 0.23 1.04 0.22 0.03
27-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.90 2.75 0.00 0.58 0.05 0.03
28-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.78 2.43 0.15 0.71 0.03 0.03
29-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.65 2.59 0.14 1.07 0.02 0.03
30-Jun-20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.55 2.56 0.17 1.09 0.03 0.03
Total 0.00 0.00 0.00 0.00 0.00 0.00 0.00 655.50 94.06 5.67 23.55 13.87 0.81
*Based on SEM/Energy meter data for links where available

37
17. एसटीओए (दिपक्षीय एर्वों सामूदहक) एर्वों डी एस एम दिदलोंग का ब्य रा – माह र्ून 2020
STOA (BILATERAL AND COLLECTIVE) & DSM BILLING DETAILS - JUNE 2020

दिपक्षीय एसटीओए BILATERAL SHORT TERM OPEN ACCESS

र्ून 2020 JUNE' 2020 Apr-Mar'21

लेन – दे न ों की सोंख्या अनुम ददत ऊर्ाा लेन – दे न ों की सोंख्या अनुम ददत ऊर्ाा
क्षे.भा.प्रे .के. का नाम
No. of (दम.यु .) Energy No. of (दम.यु .) Energy
Name of RLDC
Transactions Approved(MU) Transactions Approved (MU)

ऊ. क्षे. NR 645 3078 1553 4398


प.क्षे. WR 76 226 255 1131
द.क्षे. SR 185 596 647 2460
पू .क्षे. ER 103 574 470 2919
पूर्वोत्तर क्षे. NER 11 60 82 228
कुल TOTAL 1020 4534 3007 11136

एसटीओए SHORT TERM OPEN ACCESS

सामूदहक एसटीओए Collective STOA दिपक्षीय एसटीओए Bilateral STOA

क्रेताओों / दर्वक्रेताओों की अनुम ददत ऊर्ाा क्रेताओों / दर्वक्रेताओों की अनुम ददत ऊर्ाा
माह MONTH स. NO. of (दम.यु .) Approved स. NO. of (दम.यु .) Approved
Buyers/Sellers Energy (MU) Buyers/Sellers Energy (MU)

अप्रैल 2020 Apr'20 2458 3692 705 3056


मई 2020 May'20 2922 5596 1282 3546
र्ून 2020 Jun'20 * 2846 4707 1020 4534
कुल TOTAL 8226 13995 3007 11136
* Approved Energy (MU) includes the Real Time Market (RTM) transactions (started from 1st Jun-20) as well, while No. of Buyers/Sellers are excluding RTM.

अनोंदतम आँ कड़े
मादसक डी एस एम दिदलोंग का ब्य रा 2020-21
Provisional data
MONTHLY DSM BILLING DETAILS 2020-21
subject to change

कर ड़ रु. मे (RS. IN CRORES)


पूर्वोत्तर क्षेत्र NORTH
क्षेत्र REGION उत्तरी क्षेत्र NORTH पदिमी क्षेत्र WEST ददक्षणी क्षेत्र SOUTH पूर्वी क्षेत्र EAST
EAST
25.05.20 to 31.05.20 68.16 68.78 15.88 41.84 24.28
01.06.20 to 07.06.20 44.95 47.93 20.31 42.52 25.78
08.06.20 to 14.06.20 56.13 72.80 39.42 68.23 31.09
15.06.20 to 21.06.20 63.65 70.89 17.01 64.21 23.96
22.06.20 to 28.06.20 103.09 97.07 14.96 78.52 28.72

38
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जून 2020
EXCHANGES THROUGH POWER EXCHANGES - JUNE 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
1 पंजाब Punjab 0.00 438.28 0.00 1.40 0.00 439.69
2 हरियाणा Haryana 1.92 158.55 0.00 30.17 1.92 188.71
3 िाजस्थान Rajasthan 14.24 106.14 4.18 42.96 18.42 149.10
4 विल्ली Delhi 92.30 62.69 14.01 11.35 106.31 74.05
5 उत्ति प्रिे श Uttar Pradesh 117.65 96.45 23.92 6.24 141.57 102.69
6 उत्तिाखंड Uttarakhand 28.70 56.88 0.00 1.08 28.70 57.95
7 वहमाचल प्रिे श Himachal Pradesh 269.19 28.09 4.54 0.27 273.73 28.35
8 जम्मू औि कश्मीि J & K 523.70 0.00 93.99 0.00 617.69 0.00
9 केंद्र शावित चंडीगढ़ UT Chandigarh 22.12 2.10 0.39 0.00 22.51 2.10
10 ए डी हाइडरो AD Hydro 74.58 0.00 0.08 0.00 74.66 0.00
11 किचम िांगतू Karcham Wangtoo 46.32 0.00 0.26 0.00 46.59 0.00
12 श्री िीमेंट Shree Cement 0.00 0.00 0.00 0.00 0.00 0.00
13 नाथ्पा झाकिी Nathpa Jhakri 1.81 0.00 0.00 0.00 1.81 0.00
14 बैिािूल Baira Siul HEP(BS0) 0.00 0.00 0.00 0.00 0.00 0.00
15 चमेिा -1 Chamera-I HEP(CM1) 0.00 0.00 0.00 0.00 0.00 0.00
16 चमेिा -2 Chamera-II HEP(CM2) 0.00 0.00 0.00 0.00 0.00 0.00
17 धौलीगंगा Dhauliganga HEP(DG0) 0.00 0.00 0.00 0.00 0.00 0.00
18 िु लहस्ती Dulahasti HEP(DU0) 0.00 0.00 0.00 0.00 0.00 0.00
19 िलाल Salal HEP(SL0) 0.00 0.00 0.00 0.00 0.00 0.00
20 िेिा -2 Sewa-II NHPC(SW2) 0.00 0.00 0.00 0.00 0.00 0.00
21 टनकपुि Tanakpur HEP(TP0) 0.00 0.00 0.00 0.00 0.00 0.00
22 उिी Uri HEP(UR0) 0.00 0.00 0.00 0.00 0.00 0.00
23 लांको बुवधल LANCO Budhil 5.28 0.00 0.00 0.00 5.28 0.00
24 चमेिा-3 chamera 3 0.00 0.00 0.00 0.00 0.00 0.00
25 अिानी एचिीडीिी ADANI HVDC(N0RGU0) 0.00 0.00 0.00 0.00 0.00 0.00
26 मलाना MALANA 0.00 0.00 0.00 0.00 0.00 0.00
27 उिी-II Uri-II HEP(UR2) 0.00 0.00 0.00 0.00 0.00 0.00
28 पाबबवत-III Parbati-III 0.00 0.00 0.00 0.00 0.00 0.00
29 विंगिौली Singrauli उत्तिी क्षेत्र 0.00 0.00 2.19 0.00 2.19 0.00
30 िाििी-I Dadri stage-I NR 0.00 0.00 0.00 0.00 0.00 0.00
31 िाििी-II Dadri stage-II 0.00 0.00 0.00 0.00 0.00 0.00
32 ऊंचाहाि-I Unchahar-I TPS 0.00 0.00 0.00 0.00 0.00 0.00
33 ऊंचाहाि-II Unchahar-II TPS 0.00 0.00 0.00 0.00 0.00 0.00
34 ऊंचाहाि-III Unchahar-III TPS 0.00 0.00 0.00 0.00 0.00 0.00
35 रिहंि-I Rihand STPS-I 0.00 0.00 4.07 0.00 4.07 0.00
36 रिहंि-II Rihand STPS-II 0.00 0.00 2.99 0.00 2.99 0.00
37 रिहंि-III Rihand STPS-III 0.00 0.00 3.74 0.00 3.74 0.00
38 एपीिीपीएल झज्जि APCPL Jhajjar 0.00 0.00 0.00 0.00 0.00 0.00
39 िेंज Sainj HEP 56.81 0.00 0.00 0.00 56.81 0.00
40 िाििी गैि Dadri GPP 0.00 0.00 0.60 0.00 0.60 0.00
41 औिै या गैि NTPC Auraiya 0.00 0.00 0.04 0.00 0.04 0.00
42 वकशनगंगा Kishanganga HEP 0.00 0.00 0.00 0.00 0.00 0.00
43 अंता गैि NTPC Anta 0.00 0.00 0.00 0.00 0.00 0.00
44 िामपुि एचईपी RAMPUR HEP 1.05 0.00 0.00 0.00 1.05 0.00
45 ऊंचाहाि-IV UNCHAHAR-IV 0.00 0.00 0.00 0.00 0.00 0.00
46 एनटीपीिी कोलडाम NTPC KOLDAM 0.00 0.00 0.00 0.00 0.00 0.00
47 कोटे श्वि Koteshwar 0.00 0.00 0.00 0.00 0.00 0.00
48 वकलाज िोलि Kilaj Solar 10.42 0.00 0.00 0.00 10.42 0.00
49 अंता(आि॰एल॰एन॰जी॰ ) Anta_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
50 अंता(िंयुक्त ईंधन) Anta_Comb. RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
51 अंता(द्रि ईंधन) Anta_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
39
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जून 2020
EXCHANGES THROUGH POWER EXCHANGES - JUNE 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
52 औिै या(आि॰एल॰एन॰जी॰ ) Auraiya_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
53 औिै या(िंयुक्त ईंधन) Auraiya_Comb. RLNG Fuel 0.00 0.00 0.01 0.00 0.01 0.00
54 औिै या(द्रि ईंधन) Auraiya_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
55 िाििी(आि॰एल॰एन॰जी॰ ) Dadri_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
56 िाििी(ियुंक्त ईंधन) Dadri_Comb. RLNG Fuel 0.00 0.00 0.01 0.00 0.01 0.00
57 िाििी(द्रि ईंधन) Dadri_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
58 टांडा स्टे ज-२ Tanda Stg-2 0.00 0.00 0.00 0.00 0.00 0.00
59 मध्य प्रिे श MP 124.24 33.18 42.82 0.27 167.06 33.45
60 महािाष्ट्र Maharashtra 14.53 865.43 3.61 85.57 18.14 951.00
61 गुजिात Gujarat 15.98 501.14 1.33 8.94 17.32 510.08
62 छत्तीिगढ़ Chhattisgarh 65.30 19.39 5.09 12.41 70.39 31.79
63 गोिा Goa 40.62 1.16 0.00 0.30 40.62 1.47
64 िमन औि िीि Daman and Diu 0.00 2.37 0.00 0.00 0.00 2.37
65 िाििा औि नगि हिेली Dadra & Nagar Haveli 0.10 21.97 0.00 1.43 0.10 23.41
66 वजंिल Jindal Power 63.40 0.00 0.91 0.00 64.31 0.00
67 लांको अमिकंटक LANCO AMK 0.00 0.00 0.00 0.00 0.00 0.00
68 आयबन कोल ACB India Limited 34.58 0.00 0.55 0.00 35.13 0.00
69 वजंिल स्टील एं ड पािि Jindal Steel and Power Ltd 0.00 0.00 0.00 0.00 0.00 0.00
70 बालको -2 Balco-II 1.60 0.00 0.07 0.00 1.67 0.00
71 स्टिलाइट Sterlite 0.00 0.00 0.00 0.00 0.00 0.00
72 एमको EMCO 0.04 0.00 0.06 0.00 0.10 0.00
73 िन्दना विि् युत VANDANA VIDYUT 0.00 0.00 0.00 0.00 0.00 0.00
74 एस्साि पािि ESSAR POWER 41.12 0.00 2.27 0.00 43.39 0.00
75 एस्साि स्टील ESSAR STEEL 0.00 0.00 0.00 0.00 0.00 0.00
76 के एि के महानिी KSK Mahanadi 0.00 0.00 0.00 0.00 0.00 0.00
77 वजंिल स्टे ज -II Jindal Stg-II 48.32 0.00 2.14 0.00 50.46 0.00
78 कोिबा (प.) Korba(W) Comp. Ltd. / Raigarh EL 73.04 0.00 3.68 0.13 76.71 0.13
79 डी बी पािि D B Power 21.21 0.00 1.75 0.00 22.96 0.00
80 धािीिाल Dhariwal उत्तिी क्षेत्र 0.09 0.00 0.00 0.00 0.09 0.00
81 जे पी वनग्री Jaypee Nigire NR 86.04 0.00 0.00 0.00 86.04 0.00
82 जी एम आि छत्तीिगढ़ GMR Chhattisgarh / REL 0.00 0.00 0.00 0.00 0.00 0.00
83 डी जीईएन मेगा पािि DGEN Mega Power 55.79 0.00 0.95 0.00 56.74 0.00
84 एम बी मेगा पािि MB Power 69.77 0.00 0.46 0.00 70.23 0.00
85 एपीएल मुंद्रा स्टे ज-I APL Mundra Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
86 एपीएल मुंद्रा स्टे ज-II APL Mundra Stg-II 0.00 0.00 0.00 0.00 0.00 0.00
87 एपीएल मुंद्रा स्टे ज-III APL Mundra Stg-III 32.45 0.00 10.23 0.00 42.68 0.00
88 टोिें ट िुगेन Torrent Sugen 7.58 0.00 1.31 0.00 8.88 0.00
89 मारुवत कोल Maruti Coal 26.15 0.00 2.85 0.00 29.00 0.00
90 स्पेक्ट्रम Spectrum 30.72 0.00 0.40 0.00 31.12 0.00
पविमी क्षेत्र
91 झाबुआ पािि Jhabua Power 42.69 0.00 6.42 0.00 49.11 0.00
WR
92 विंध्याचल-I Vindhyachal Stg-I 0.00 0.00 1.38 0.00 1.38 0.00
93 विंध्याचल-II Vindhyachal Stg-II 0.00 0.00 0.50 0.00 0.50 0.00
94 विंध्याचल-III Vindhyachal Stg-III 0.00 0.00 1.10 0.00 1.10 0.00
95 विंध्याचल-IV Vindhyachal Stg-IV 0.00 0.00 0.93 0.00 0.93 0.00
96 विंध्याचल-V Vindhyachal Stg-V 0.00 0.00 0.98 0.00 0.98 0.00
97 मौिा-I Mouda STPS Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
98 िीपत-I Sipat Stg-I 0.00 0.00 1.13 0.00 1.13 0.00
99 िीपत-II Sipat Stg-II 0.00 0.00 0.40 0.00 0.40 0.00
100 िािन Sasan UMPP 0.00 0.00 0.00 0.00 0.00 0.00
101 एनएिपीिीएल NSPCL 0.00 0.00 0.83 0.00 0.83 0.00

40
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जून 2020
EXCHANGES THROUGH POWER EXCHANGES - JUNE 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
102 कोिबा-III Korba-III 15.77 0.00 0.90 0.00 16.67 0.00
103 टीआिएन इनजी TRN Energy 0.00 0.00 0.00 0.00 0.00 0.00
104 गंधाि Gandhar 0.00 0.00 0.05 0.00 0.05 0.00
105 कोिबा I &II Korba Stage I & II 0.00 0.00 2.23 0.00 2.23 0.00
106 आिकेएम पाििजेन RKM Power Gen 0.00 0.00 0.00 0.00 0.00 0.00
107 किाि Kawas 0.00 0.00 0.97 0.00 0.97 0.00
108 मौिा-II Mouda STPS Stg-II 0.00 0.00 0.00 0.00 0.00 0.00
109 एिकेएि पाििजेन SKS Powergen 11.70 0.00 0.01 0.00 11.71 0.00
110 शोलापुि एिटीपीपी Sholapur STPP 0.00 0.00 0.00 0.00 0.00 0.00
111 ित्नावगिी गैि पािि प्राइिेट वलवमटे ड RGPPL 0.00 0.00 0.17 0.00 0.17 0.00
112 गिििाड़ा Gadarwara 0.00 0.00 0.00 0.00 0.00 0.00
113 लािा-II LARA-II 0.00 0.00 0.00 0.00 0.00 0.00
114 िायपुि इनिजेन Raipur Energen 170.77 0.00 11.57 0.18 182.34 0.18
115 आिेलि वमत्तल Arcellor Mittal 0.00 123.36 0.00 6.30 0.00 129.66
116 गंधाि(एन॰ए॰पी॰एम॰) Gandhar_NAPM 0.00 0.00 0.00 0.00 0.00 0.00
117 गंधाि(आि॰एल॰एन॰जी॰ ) Gandhar_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
118 गंधाि(ियुंक्त ईंधन) Gandhar_Comb. RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
119 किाि(एन॰ए॰पी॰एम॰) Kawas_NAPM 0.00 0.00 0.00 0.00 0.00 0.00
120 किाि(आि॰एल॰एन॰जी॰ ) Kawas_RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
121 किाि(ियुंक्त ईंधन) Kawas_Comb. RLNG Fuel 0.00 0.00 0.00 0.00 0.00 0.00
122 किाि(द्रि ईंधन) Kawas_Liquid Fuel 0.00 0.00 0.00 0.00 0.00 0.00
123 खािगोन Khargone STPP 0.00 0.00 0.00 0.00 0.00 0.00
124 आं ध्र प्रिे श Andhra Pradesh 8.08 370.03 0.00 40.38 8.08 410.40
125 कनाबटक Karnataka 38.54 79.13 16.31 3.40 54.85 82.52
126 केिल Kerala 7.13 46.68 2.45 2.54 9.58 49.23
127 तवमलनाडु Tamilnadu 10.38 222.39 0.06 1.21 10.44 223.60
128 पॉण्डिचेिी Pondicherry 0.00 0.00 0.00 0.00 0.00 0.00
129 गोिा Goa 0.00 0.00 0.00 0.00 0.00 0.00
130 लांको कोंडापल्ली LANCO_KONDPLY 0.00 0.00 0.00 0.00 0.00 0.00
131 विमापुिी SIMHAPURI उत्तिी क्षेत्र 0.00 0.00 0.00 0.00 0.00 0.00
132 मीनाक्षी MINAXI NR 0.00 0.00 0.00 0.00 0.00 0.00
133 तेलंगाना TELANGANA 5.03 751.68 0.22 181.15 5.25 932.83
134 थमबल पॉिि टे क Thermal Power Tech 10.37 0.00 1.55 0.00 11.92 0.00
135 कोस्टल इनिजेन Coastal Energen 0.00 0.00 0.00 0.00 0.00 0.00
136 आइ एल & एफ़ एि IL&FS 0.78 0.00 0.00 0.00 0.78 0.00
137 विम्हाद्री-II Simhadri Stg-II 0.05 0.00 0.00 0.00 0.05 0.00
िवक्षणी क्षेत्र
138 एनएलिी-I विस्ताि NLC TPS-I (Exp) 1.56 0.00 14.40 0.00 15.96 0.00
SR
139 एनएलिी-II स्टे ज-I NLC TPS-II Stg-I 2.66 0.00 39.39 0.00 42.06 0.00
140 एनएलिी-II स्टे ज-II NLC TPS-II Stg-II 0.99 0.00 40.02 0.00 41.01 0.00
लांको कोंडापल्ली स्टे ज-III LANCO_KONDPLY STG
141 0.00 0.00 0.00 0.00 0.00 0.00
III
142 िामागुिम-I Ramagundam Stg-I 0.25 0.00 1.93 0.00 2.18 0.00
143 तालचि-II Talcher Stg-II 0.00 0.00 2.94 0.00 2.94 0.00
144 िामागुिम-IIII Ramagundam Stg-III 0.00 0.00 0.26 0.00 0.26 0.00
145 एिजीपीएल Sembcorp Gayatri Pvt. Ltd. 116.55 0.00 18.25 0.00 134.80 0.00
146 एनटीईिीएल िल्लूि NTECL Vallur 0.00 0.00 0.00 0.00 0.00 0.00
147 कुडगी Kudgi 0.24 0.00 0.00 0.00 0.24 0.00
148 विम्हाद्री-I Simhadri Stg-I 0.00 0.00 0.00 0.00 0.00 0.00
149 एनएलिी टीपीएि-II एक्स्प NLC TPS-II EXP 0.51 0.00 8.08 0.00 8.59 0.00
150 एन टी पी एल NTPL 0.00 0.00 0.00 0.00 0.00 0.00
151 एि बी जी क्लीनटे क SBG Cleantech 0.00 0.00 0.00 0.00 0.00 0.00
152 न्यू॰ नैिेली थमबल पािि प्रोजेक्ट् NNTPP 0.00 0.00 9.34 0.00 9.34 0.00
153 पविम बंगाल West Bengal 4.59 21.53 3.03 26.20 7.62 47.73
154 ओवड़शा Odisha 321.07 46.75 32.90 6.29 353.97 53.04
155 वबहाि Bihar 46.10 78.44 5.86 6.31 51.96 84.75
156 झािखंड Jharkhand 30.80 1.15 3.22 1.66 34.02 2.81
157 विण्डिम Sikkim 44.12 0.00 6.45 0.14 50.56 0.14
41
18. पािि माकेट की िूचना ( स्रोत : आई.ई.एक्स. एिं पी.एक्स.आई.एल.)
POWER MARKET INFORMATION ( Source IEX & PXIL)
पािि एक्स्चेंज के माध्यम िे विवनमय – माह जून 2020
EXCHANGES THROUGH POWER EXCHANGES - JUNE 2020
पािि एक्स्चेंज के माध्यम िे ( वम.यु. मे) Through Power Exchange in MU
क्र. ि. S.
क्षेत्रीय इकाई Regional Entity क्षेत्र Region Day Ahead Market (DAM) Real Time Market (RTM) Total (DAM+RTM)
No.
विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase विक्रय Sale क्रय Purchase
158 िामोिि घाटी परियोजना DVC 4.21 0.00 0.08 0.08 4.29 0.08
159 स्टिलाइट STERLITE 0.00 0.00 0.00 0.00 0.00 0.00
160 मैथन पािि वलवमटे ड Maithon P. Ltd 0.00 0.00 0.00 0.00 0.00 0.00
161 आधुवनक पा. वलवमटे ड Adhunik P.Ltd 0.05 0.00 0.00 0.00 0.05 0.00
162 चुजाचेन Chuzachen HEP 9.46 0.00 0.00 0.00 9.46 0.00
163 िं वगत Rangit HEP 0.00 0.00 0.00 0.00 0.00 0.00
164 तीस्ता Teesta HEP 0.00 0.00 0.00 0.00 0.00 0.00
165 जीएमआि कमलंगा GMR Kamalanga 1.58 0.00 0.00 0.00 1.58 0.00
166 वजंिल आई पी टी एल JIPTL 37.10 0.00 0.00 0.00 37.10 0.00
167 जोिथांग Jorethang 56.49 0.00 3.30 0.71 59.79 0.71
पूिी क्षेत्र ER
168 फििा-III Farakka-III 0.86 0.00 0.43 0.00 1.29 0.00
169 बाढ़-II Barh Stage-II 0.00 0.00 0.61 0.00 0.61 0.00
170 कहलगााँि-II Kahalgaon Stage-II 0.43 0.00 3.46 0.00 3.89 0.00
171 फििा Farakka 0.06 0.00 0.00 0.00 0.06 0.00
172 कहलगााँि Kahalgaon 0.16 0.00 1.62 0.00 1.78 0.00
173 तालचि Talcher 0.30 0.00 9.13 0.00 9.43 0.00
174 तीस्ता-III Teesta-III 696.56 0.00 7.76 0.00 704.32 0.00
175 विक्चु Dikchu HEP 71.97 0.00 0.02 0.00 72.00 0.00
176 तावशविं ग Tashiding HEP 53.33 0.00 3.96 0.00 57.28 0.00
177 बीआिबीिीएल BRBCL 0.00 0.00 1.16 0.00 1.16 0.00
178 केबीयूएनएल KBUNL 0.00 0.00 0.00 0.00 0.00 0.00
179 ओपीजीिी यूवनट-IV OPGC UNIT-IV 0.00 0.00 0.00 0.00 0.00 0.00
180 िलीपल्ली Darlipalli 0.00 0.00 1.55 0.00 1.55 0.00
181 एम॰ टी॰ पी॰ एि॰ (स्टे ज-२) MTPS Stg-2 0.00 0.00 0.00 0.00 0.00 0.00
182 नबीनगि NPGC Nabinagar 0.00 0.00 3.36 0.00 3.36 0.00
183 अरुणाचल प्रिे श Arunachal Pradesh 15.70 0.00 0.00 0.00 15.70 0.00
184 अिम Assam 155.12 41.12 5.39 23.42 160.50 64.54
185 मवणपुि Manipur 3.93 4.06 0.00 4.74 3.93 8.80
186 मेघालय Meghalaya 39.14 9.01 0.60 0.91 39.73 9.92
187 वमज़ोिम Mizoram 2.09 0.00 0.00 0.00 2.09 0.00
188 नागालैंड Nagaland 0.57 0.21 0.00 7.63 0.57 7.84
189 वत्रपुिा Tripura 4.56 0.01 0.00 1.56 4.56 1.57
190 अगितला जीटीपीपी Agartala GTPP_AG0 0.00 0.00 0.00 0.00 0.00 0.00
कोवपली KOPILI_KP1
पूउत्तिी
िोत्ति क्षे
क्षेत्र
191 0.00 0.00 0.00 0.00 0.00 0.00
त्र
192 अिम जीबीपीपी Assam GBPP_KT0 NR 0.00 0.00 0.00 0.00 0.00 0.00
NER
193 लोकटक LOKTAK 0.00 0.00 0.00 0.00 0.00 0.00
194 िं गानिी Ranganadi 0.00 0.00 0.00 0.00 0.00 0.00
195 िोयांग Doyang 0.00 0.00 0.00 0.00 0.00 0.00
196 पलाताना Palatana 2.17 0.00 3.02 0.00 5.19 0.00
197 कोवपली-II Kopili-II 0.00 0.00 0.00 0.00 0.00 0.00
198 खंडोंग Khandong 0.00 0.00 0.00 0.00 0.00 0.00
199 बोंगाईगााँि Bongaigaon TPP 0.14 0.00 0.00 0.00 0.14 0.00
200 पािे PARE 0.00 0.00 0.00 0.00 0.00 0.00
201 कामेंग Kameng HEP 23.92 0.00 0.12 0.00 24.04 0.00
4189 4189 517 517 4707 4707

42
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : JUNE 2020

RE Source & Unit wise break up (01.06.2020-30.06.2020)

Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 16 10 6 7
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0

4 Solar PV 69 4 20 3

5 Small Hydro 0 0 0 0

6 Others 0 0 0 0

7 Geothermal 0 0 0 0

8 Biomass 0 0 0 0

9 Bio-fuel cogeneration 8 1 0 0

Total 93 15 26 10

RECs Issued (01.06.2020-30.06.2020)

Sr.No. Non Solar Solar Total

1 288043 108222 396265

Redemption of REC (01.06.2020-30.06.2020)

Sr.No. Non Solar Solar Total

1 262973 89498 352471

43
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : JUNE 2020

RE Source & Unit wise break up (Apr-Mar'21)

Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 20 16 22 15
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0

4 Solar PV 78 9 27 8

5 Small Hydro 0 0 0 0

6 Others 0 0 0 0

7 Geothermal 0 0 0 0

8 Biomass 0 0 0 0

9 Bio-fuel cogeneration 8 1 10 1

Total 106 26 59 24

RECs Issued (Apr-Mar'21)

Sr.No. Non Solar Solar Total


1 882677 222105 1104782

Redemption of REC (Apr- Mar'21)


Sr.No. Non Solar Solar Total
1 787574 141495 929069

44
19. RENEWABLE ENERGY CERTIFICATE MECHANISM
MONTH : JUNE 2020

RE Source & Unit wise break up Since Inception to June'20


Accreditation Registration
Sr.No Source Wise Capacity Capacity
Unit Unit
(MW) (MW)
1 Wind 2718 511 2652 495
Urban or Municipal
2 0 0 0 0
Waste
3 Solar Thermal 0 0 0 0
4 Solar PV 931 382 872 379
5 Small Hydro 274 38 250 37
6 Others 4 2 3 1
7 Geothermal 0 0 0 0
8 Biomass 477 43 420 40

9 Bio-fuel cogeneration 814 89 371 53

Total 5218 1065 4568 1005

RECs Issued since Inception to June'20


Sr.No. Non Solar Solar Total
1 57913781 9805898 67719679

Redemption of REC since Inception to June'20


Sr.No. Non Solar Solar Total
1 52132924 9678083 61811007

REC Closing balance as on 30.06.2020


Sr.No. Non Solar Solar Total
1 5780857 127815 5908672

45
20. IMPORTANT GRID EVENTS / DISTURBANCES
Northern Region-Grid Event Report for June 2020

Outage Revival Category


Generation Load Energy
Name of Elements Affected Event as per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards

1) 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-1


400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-1 & 2 tripped on R-Y fault. At the same time, 400kV Bus 1 along with Uni#2 & U nit#3 at Alaknanda
2) 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-2
1 NR
3) 82.5 MW Alakhanda HEP - UNIT 2
UTTRAKHAND PTCUL, UPPTCL 2-Jun-20 13:08 2-Jun-20 13:45 0:37 also tripped. As per PMU, R-Y fault is observed in the system. In antecedent conditions, 400 KV Alaknanda GVK(UPC)-Srinagar(UK) (UK) Ckt-1 & 2 160 0 GD-1 0
carrying 48MW & 46MW respectively. Unit#2 & Unit#3 generating 82MW each.
4) 82.5 MW Alakhanda HEP - UNIT 3

400 KV Rajwest(RW)-Kankani (RS) Ckt-1 tripped on R-N fault, 1.34 km from Kankani end. At the same time, 400 KV Jodhpur-Kankani (RS) Ckt-2 also
1) 400 KV Rajwest(RW)-Kankani (RS) Ckt-1
2 NR
2) 400 KV Jodhpur-Kankani (RS) Ckt-2
RAJASTHAN RRVPNL 5-Jun-20 11:17 5-Jun-20 13:18 2:01 tripped on R-N fault. As per PMU, R-N fault with delayed clearance is observed in the system. In antecedent conditions, 400 KV Rajwest(RW)-Kankani 0 0 GI-2 0
(RS) Ckt & 400 KV Jodhpur-Kankani (RS) Ckt-2 carrying 122MW & 40MW respectively.

Due to inclement weather at 1902Hrs, 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-1 & 2 tripped on R-N fault. At 1944Hrs, 220 KV
1) 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-1 Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-1 & 2, 220kV Pampore-Mirbazar ckt-1 & 2 also tripped. As per PMU, R-Y fault at 1902Hrs & B-N fault at
3 NR 2) 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-1 J&K PDD JK 6-Jun-20 19:02 6-Jun-20 21:20 2:18 1944Hrs is observed in the system. In antecedent conditions, 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-1 & 2 carrying 97MW each. No 0 0 GI-2 0
3) 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-2 load loss and generation loss is reported by J&K during tripping. However, J&K demand reduced by around 700MW from 1900Hrs to 1945Hrs due to
bad weather.

1) 220 KV Kishenganga(NH)-Wagoora(PG) (UNDEF) Ckt-1


220 KV Kishenganga(NH)-Wagoora(PG) (UNDEF) Ckt-1 & 2, 220KV Kishenganga(NH)-Delina(PDD) (PG) Ckt-1 & 2 tripped from kishenganga end only. As
2) 220 KV Kishenganga(NH)-Wagoora(PG) (UNDEF) Ckt-2
4 NR
3) 220KV Kishenganga(NH)-Delina(PDD) (PG) Ckt-1
J&K POWERGRID/PDD JK 6-Jun-20 19:10 6-Jun-20 19:15 0:05 per PMU, R-Y fault is observed in the system. In antecedent conditions, 220 KV Kishenganga(NH)-Wagoora(PG) (UNDEF) Ckt-1 & 2 carrying 43MW 110 0 GD-1 0
each. Generation loss of around 110 MW occur due to loss of evacuation path.
4) 220KV Kishenganga(NH)-Delina(PDD) (PG) Ckt-2

400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP) & 400/220 kV 315 MVA ICT 3 at Muradnagar_1(UP) tripped on earth fault. As per PMU, B-N fault with
1) 400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP)
5 NR
2) 400/220 kV 315 MVA ICT 3 at Muradnagar_1(UP)
UTTAR PRADESH UPPTCL 7-Jun-20 10:50 7-Jun-20 13:19 2:29 delayed clearance is observed in the system. In antecedent conditions, 400/220 kV 500 MVA ICT 2 at Muradnagar_1(UP) & 400/220 kV 315 MVA ICT 3 0 110 GD-1 0.28
at Muradnagar_1(UP) carrying 73MW & 41MW respectively.

1) 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-2 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-1 & 2 tripped on B-N fault. As per PMU, B-N fault with delayed clearance is observed in the system.
6 NR
2) 220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-1
J&K PDD JK 8-Jun-20 18:14 8-Jun-20 19:06 0:52
220 KV Wagoora(PG)-Pampore(PDD) (PDD JK) Ckt-1 & 2 carrying 46MW & 47MW respectively.
0 0 GI-2 0

400 KV Rajpura-Dhuri (PS) Ckt-1 tripped on B-N,Fault Current 5.34 KA, Fault Distance 54.6 Km from Rajpura end; tower collapse at location 158-162. At
1) 400 KV Rajpura-Dhuri (PS) Ckt-2
7 NR
2) 400 KV Rajpura-Dhuri (PS) Ckt-1
PUNJAB PSTCL 10-Jun-20 12:52 10-Jun-20 18:01 5:09 the same time, 400 KV Rajpura-Dhuri (PS) Ckt-2 tripped R-N,Fault Current 5.30 KA, Fault Distance 56.9 Km from Rajpura end; tower collapse at location 0 0 GI-2 0
158-162. As per PMU, multiple faults are observed in the system. In antecedent conditions, 400 KV Rajpura-Dhuri (PS) Ckt-1 & 2 carrying 156MW each.

400 KV Dadri(NT)-Maharanibagh(PG) (PG) tripped on B-N fault, FLR-Dadri-17.1km/15.28kA. At the same time, 400 KV Ballabhgarh-Maharanibagh (PG)
1) 400 KV Ballabhgarh-Maharanibagh (PG) Ckt-1
8 NR
2) 400 KV Dadri(NT)-Maharanibagh(PG) (PG) Ckt-1
NEW DELHI POWERGRID 10-Jun-20 17:56 10-Jun-20 19:02 1:06 also tripped on B-N fault ,FLR-Balb-26.32km/10.04kA. As per PMU, multiple B-N faults are observed in the system. In antecedent conditions, 400 KV 0 550 GD-1 0.55
Dadri(NT)-Maharanibagh(PG) & 400 KV Ballabhgarh-Maharanibagh (PG) carrying 401MW & 149MW.

Event triggered when R-phase jumper connecting CT to wavetrap broken at Saurya urja (Rajasthan end). Fault in 220kV Bhadla(Ra) – 220kV Saurya Urja
1) 220 KV Bhadla(PG)-Saurya Urja(SU) (UNDEF) Ckt-1
9 NR
2) 220 KV Bhadla(PG)-Saurya Urja(SU) (UNDEF) Ckt-2
RAJASTHAN POWERGRID/ SAURYA 11-Jun-20 11:59 11-Jun-20 12:42 0:43 # 2 line. 220 KV Bhadla(PG)-Saurya Urja(SU) (UNDEF) Ckt-1 & 2 also tripped. As per PMU, Y-N fault is observed in the system. Generation loss of 2100 0 GD-1 0
around 1130MW & 970MW observed in solar connected to Bhadla(PG) & Bhadla(Raj) respectively.

1) 800 KV HVDC Kurukshetra(PG) Pole-1


2) 800 KV HVDC Kurukshetra(PG) Pole-2 Alll four poles of 800 KV HVDC Champa(PG)-Kurukshetra(PG) tripped due to DC line fault.As per PMU, fluctutations in voltage is observed in the
10 NR
3) 800 KV HVDC Kurukshetra(PG) Pole-3
HARYANA POWERGRID 11-Jun-20 12:20 11-Jun-20 16:33 4:13
system. In antecedent condtions, 800 KV HVDC Champa(PG)-Kurukshetra(PG) poles carrying 2000MW.
0 0 GI-2 0
4) 800 KV HVDC Kurukshetra(PG) Pole-4

765kV Meerut-koteshwar line 1 tripped at 14:17 hrs due to operation of R phase reactor buchholz relay at Meerut substation. Due to tripping of this
1) 400 KV Tehri(THDC)-Koteshwar(PG) (PG) Ckt-1
line and loss of evacuation path around 700 MW Generation loss occurred at Tehri Complex. As per PMU, No fault is observed in the system. In
11 NR 2) 765 KV Koteshwar-Meerut (PG) Ckt-1 UTTRAKHAND POWERGRID 13-Jun-20 14:17 13-Jun-20 15:23 1:06
antecedent conditions, 765kV Meerut-koteshwar line 1 carrying 693MW. Generation at Tehri and koteshwar was around 510MW and 180MW
700 0 GD-1 0
3) 400 KV Tehri(THDC)-Koteshwar(PG) (PG) Ckt-2
respectively.

1) 765 KV Bhadla-Bikaner (PG) Ckt-2 765kV Bhadla-Bikaner 2 tripped at 14:51 hrs due to R-N fault. Fault current 3kA and fault distance 65 km from Bhadla. At the same time, 220kV Saurya
12 NR 2) 220 KV Bhadla(PG)-Saurya Urja Solar(SU) (Saurya Urja) Ckt-1 RAJASTHAN POWERGRID 13-Jun-20 14:51 13-Jun-20 15:31 0:40 urja - Bhadla(PG) ckt 1&2 tripped due to SOTF/TOR fault. Around 430 MW Solar Generation loss occurred at Saurya urja. As per PMU, R-N fault with 430 0 GD-1 0
3) 220 KV Bhadla(PG)-Saurya Urja Solar(SU) (Saurya Urja) Ckt-2 unsuccessful autoreclosing is observed in the system.

765kV Lalitpur-Fatehbad line 1 tripped at 18:15 hrs due to R-N fault, Fault current-1.996 KA,FD-271.2km from fatehabad end. Due to tripping of this
1) 765 KV Agra Fatehbad(UP)-Lalitpur(LPG) (UP) Ckt-1 line, Unit #2 and Unit #3 tripped at Lalitpur. Around 935 MW Generation loss occurred at Lalitpur. Unit#1 went on house load (around 65MW). As per
13 NR
2) 660 MW Lalitpur TPS - UNIT 3, 660 MW Lalitpur TPS - UNIT 2
UTTAR PRADESH UPPTCL 13-Jun-20 18:15 13-Jun-20 19:49 1:34
PMU, R-N fault with unsuccessful autoreclosing is observed in the system. In antecedent conditions, Unit#1, Unit#2 & Unit#3 generating around
935 0 GD-1 0
360MW, 355MW & 356MW respectively. 765kV Lalitpur-Fatehbad line 1 carrying 736MW.

765kV Bhadla-Bikaner 2 tripped due to R-N fault, Fault dist.- 65.99Km and FC -3.434KA from Bhadla end. At the same time, 220kV Saurya urja -
1) 765 KV Bhadla-Bikaner (PG) Ckt-2
Bhadla(PG) ckt 1&2 also tripped from Saurya Urja end only. RE-generation loss is 170 MW approx. at Saurya-Urja. As per PMU, R-N fault with
14 NR 2) 220 KV Bhadla(PG)-Saurya Urja Solar(SU) (Saurya Urja) Ckt-1 RAJASTHAN POWERGRID 14-Jun-20 17:27 14-Jun-20 18:05 0:38
unsuccessful autoreclosing is observed in the system. In antecedent conditions, 765kV Bhadla-Bikaner 2 carrying 182MW and 220kV Saurya urja -
170 0 GD-1 0
3) 220 KV Bhadla(PG)-Saurya Urja Solar(SU) (Saurya Urja) Ckt-2
Bhadla(PG) ckt 1&2 carrying 116MW & 66MW respectively.

765kV Bhadla-Bikaner ckt 2 auto-reclose successful at 10:39 hrs on R-N fault, Fault dist.- 63.14Km and FC -5.78KA from Bikaner end. Further 220kV
Saurya urja - Bhadla(PG) ckt 1&2 tripped at 10:39 hrs from Saurya Urja end only due to this transient fault. RE-generation loss is 450 MW is reported by
1) 220 KV Bhadla(PG)-Saurya Urja Solar(SU) (Saurya Urja) Ckt-1 Saurya-Urja(Bhadla). Both 220 kV lines are restored at 11:22 hrs. 765kV Bhadla-Bikaner CKT- 2 finally tripped at 10:59 hrs on R-N fault ,Fault Dist. –
15 NR
2) 220 KV Bhadla(PG)-Saurya Urja Solar(SU) (Saurya Urja) Ckt-2
RAJASTHAN POWERGRID/ SAURYA 16-Jun-20 10:39 16-Jun-20 11:22 0:43
68.46km & FC – 5.8KA from Bikaner end. As per PMU, at 1039Hrs R-N fault with successful autoreclosing is observed in the system. At 1059Hrs, R-N
450 0 GD-1 0
fault with successful autoreclosing again observed and it seems line tripped in reclaim time. In antecedent conditions, 220 KV Bhadla(PG)-Saurya Urja
Solar(SU) (Saurya Urja) Ckt-1 & 2 carrying 281MW & 175MW respectively.

1) 220 KV Meerut(PG)-Gajraula(UP) (UP)


2) 400/220 kV 500 MVA ICT 4 at Meerut(PG) 220 KV bus-II tripped along with ICT-2 & ICT-4 at Meerut substation due to operation of LBB relay on account of fault at 220 kV Meerut Gajraula line of
16 NR 3) 400/220 kV 315 MVA ICT 2 at Meerut(PG) UTTAR PRADESH POWERGRID, UPPTCL 16-Jun-20 10:45 16-Jun-20 11:57 1:12 UPPTCL. As per PMU, R-B fault is observed in the system. In antecedent conditions, 400/220 kV 315 MVA ICT 2 at Meerut(PG) & 400/220 kV 500 MVA 0 0 GI-2 0
4) 220 KV Meerut(PG)-Shatabdinagar(UP) (PG) Ckt-1 ICT 4 at Meerut(PG) carrying 190MW & 280MW respectively.
5) 220KV Bus 2 at Meerut(PG), 220 KV Meerut(PG)-Simbholi(UP) (PG) Ckt-1

1) 800 KV HVDC Kurukshetra(PG) Pole-1 800kV HVDC Champa-Kurukshetra Pole 3 tripped due to CNAP maloperation at Champa end at 22:01 hrs, 800kV HVDC Champa-Kurukshetra Pole 1
2) 800 KV HVDC Kurukshetra(PG) Pole-2 tripped due to Isolation failed for parallel Pole-3 at 22:03 hrs, 800kV HVDC Champa-Kurukshetra Pole 2 tripped due to VBE major failure fault at
17 NR
3) 800 KV HVDC Kurukshetra(PG) Pole-3
HARYANA POWERGRID 16-Jun-20 22:01 16-Jun-20 23:25 1:24
Kurukshetra end at 22:03 hrs, 800kV HVDC Champa-Kurukshetra Pole 4 tripped due to Lane changeover failed at champa at 22:03 hrs. As per PMU,
0 0 GI-2 0
4) 800 KV HVDC Kurukshetra(PG) Pole-4 fluctuations in voltage is observed in the system.

18 NR 1) 220 KV Akal-Amarsagar RAJASTHAN RRVPNL 19-Jun-20 11:05 20-Jun-20 15:12


4628:07 Wind generation loss of 800 MW approx. of Rajasthan occurs after tripping of 220 KV Akal-Amarsagar line on Y-N fault, bus-coupler at Amarsagar also
800 0 GD-1 0
tripped. Generation was revived by 11.15 hrs. As per PMU, fluctuations in phase voltages are observed.
Northern Region-Grid Event Report for June 2020

Outage Revival Category


Generation Load Energy
Name of Elements Affected Event as per CEA
S.No. Region Owner/ Agency Duration Loss Loss Unserved
(Tripped/Manually opened) Area (As reported) Grid
Date Time Date Time (MW) (MW) (in MU)
Standards

400/220 kV 315 MVA ICT 1 & 315 MVA ICT 2 at Suratgarh(RVUN) tripped on overloading. As per PMU, fluctuations in phase voltages are observed in
1) 400/220 kV 315 MVA ICT 2 at Suratgarh(RVUN)
19 NR
2) 400/220 kV 315 MVA ICT 1 at Suratgarh(RVUN)
RAJASTHAN RRVPNL 19-Jun-20 12:07 19-Jun-20 14:01 1:54 the system. Load loss of around 500 MW approx. in Rajasthan is observed as per SCADA data. The load of 220 KV Hanumangarh,Sri Ganga Nagar and 0 500 GD-1 0.55
Bhadra was met through other sources and load was revived by 13.16 hrs.315 MVA ICT-1 & 2 were charged at 14.03 and 14.01 hrs. respectively.

1) 250 MW Nathpa-Jhakri HPS - UNIT 2


2) 68.67 MW Rampur HEP - UNIT 1
Nathpa Jhakri Unit #1,2,3 (250 MW Each) & Rampur HEP Unit#1,3,4 (68.67 MW Each) tripped at 01:32 hrs due to 48V DC failure at Nathpa . Rampur
3) 250 MW Nathpa-Jhakri HPS - UNIT 3 HIMACHAL
20 NR
4) 68.67 MW Rampur HEP - UNIT 4 PRADESH
SJVNL 22-Jun-20 1:31 22-Jun-20 2:26 0:55 units tripped on TOS (in Tandem with NJPS). As per PMU, No fault is observed in the system. In antecedent conditions, Nathpa Jhakri Unit #1,2,3 970 0 GD-1 0
generating 269MW, 244MW & 272MW respectively. Rampur HEP Unit#1,3,4 generating 73MW, 74MW & 72MW respectively.
5) 68.67 MW Rampur HEP - UNIT 3
6) 250 MW Nathpa-Jhakri HPS - UNIT 1

400 KV Suratgarh(RVUN)-Ratangarh(RS) (RS) Ckt-1 tripped on R-Y fault, FD =4.9KM, from Ratangarh end. At the same time, 400 KV Suratgarh(RVUN)-
1) 400 KV Suratgarh(RVUN)-Ratangarh(RS) (RS) Ckt-1
21 NR
2) 400 KV Suratgarh(RVUN)-Ratangarh(RS) (RS) Ckt-2
RAJASTHAN RRVPNL 23-Jun-20 12:12 23-Jun-20 13:59 1:47 Ratangarh(RS) (RS) Ckt-2 tripped on B-N Fault, FD= 37.7KM from Ratangarh end. As per PMU, No fault is observed in the system. In antecedent 0 0 GI-2 0
conditions, 400 KV Suratgarh(RVUN)-Ratangarh(RS) (RS) Ckt-1 & 2 carrying 27MW each.

400 KV Bhadla-Jodhpur (RS) Ckt-1 tripped on Y-N fault. At the same time, 400 KV Jodhpur-Kankani (RS) Ckt-2 also tripped on Y-N fault. As per PMU, Y-N
1) 400 KV Bhadla-Jodhpur (RS) Ckt-1
22 NR
2) 400 KV Jodhpur-Kankani (RS) Ckt-2
RAJASTHAN RRVPNL 24-Jun-20 16:18 24-Jun-20 17:48 1:30 fault is observed in the system. In antecedent conditions, 400 KV Bhadla-Jodhpur (RS) Ckt-1 & 400 KV Jodhpur-Kankani (RS) Ckt-2 carrying 224MW & 0 0 GI-2 0
17MW respectively.

800 KV HVDC Champa(PG)-Kurukshetra(PG) Pole-1 & 2 tripped on CNAP(Common Neutral Area Protection) protection operated at Champa end. As
1) 800 KV HVDC Kurukshetra(PG) Pole-1
23 NR
2) 800 KV HVDC Kurukshetra(PG) Pole-2
HARYANA POWERGRID 24-Jun-20 16:45 24-Jun-20 20:59 4:14 per PMU, Fluctuations in voltage is observed in the system. In antecedent conditions, 800 KV HVDC Champa(PG)-Kurukshetra(PG) Pole-1 & 2 carrying 0 0 GI-2 0
375MW each.

400 KV Khedar(HPG)-Kirori(HV) (HV) Ckt-1 tripped due to snapping R-Phase jumper. At the same time,400/220 kV 315 MVA ICT 2 at Kirori(HV) also
1) 400 KV Khedar(HPG)-Kirori(HV) (HV) Ckt-1
24 NR
2) 400/220 kV 315 MVA ICT 2 at Kirori(HV)
HARYANA HVPNL 27-Jun-20 11:53 27-Jun-20 13:21 1:28 tripped. As per PMU, multiple R-N faults are observed in the system. In antecedent conditions, 400 KV Khedar(HPG)-Kirori(HV) (HV) Ckt-1 & 400/220 0 0 GI-2 0
kV 315 MVA ICT 2 at Kirori(HV) carrying 144MW & 190MW respectively.

1) 68.67 MW Rampur HEP - UNIT 1


2) 250 MW Nathpa-Jhakri HPS - UNIT 6
3) 68.67 MW Rampur HEP - UNIT 5
4) 68.67 MW Rampur HEP - UNIT 2
5) 250 MW Nathpa-Jhakri HPS - UNIT 4 HIMACHAL
25 NR
6) 250 MW Nathpa-Jhakri HPS - UNIT 5 PRADESH
SJVNL 29-Jun-20 4:23 29-Jun-20 6:12 1:49 On DC supply failure, multiple units at Jhakri and Rampur HEP tripped at different successive times. 1000 0 GD-1 0
7) 250 MW Nathpa-Jhakri HPS - UNIT 1
8) 68.67 MW Rampur HEP - UNIT 4
9) 250 MW Nathpa-Jhakri HPS - UNIT 2
10) 250 MW Nathpa-Jhakri HPS - UNIT 3

1) 220 KV Samaypur(BB)-Badshahpur(HV) (HVPNL) Ckt-1


2) 220 KV Ballabhgarh-Samaypur (BB) Ckt-3
3) 220 KV Faridabad(NT)-Samaypur(BB) (PG) Ckt-2 BBMB, HVPNL,
26 NR
4) 220 KV Palwal(HV)-Samaypur(BB) (HVPNL) Ckt-2
HARYANA
POWERGRID
29-Jun-20 9:27 29-Jun-20 10:48 1:21 Bus-1 Bus bar protection operated at Samaypur(BBMB) resulted in tripping of elements connected to bus-1. 0 150 GD-1 0.15
5) 400/220 kV 500 MVA ICT 3 at Ballabhgarh(PG)
6) 220 KV Ballabhgarh-Samaypur (BB) Ckt-1

1) 400 KV Anta(RS)-Kawai SCTPS(APR) (RS) Ckt-2


27 NR 2) 400 KV Anta(RS)-Kawai SCTPS(APR) (RS) Ckt-1 RAJASTHAN RRVPNL 30-Jun-20 0:22 30-Jun-20 2:07 1:45 Multiple faults occurred resulted in tripping of 400kV Anta-Kawai D/C and subsequent tripping of Unit#1 at Kawai TPS. 540 0 GD-1 0
3) 660 MW Kawai TPS - UNIT 1

1) 400 KV Khedar(HPG)-Kirori(HV) (HV) Ckt-1


2) 400/220 kV 315 MVA ICT 2 at Kirori(HV)
3) 400 KV Khedar(HPG)-Kirori(HV) (HV) Ckt-2 Due to flash on 400kV tie bay isolator of Jind Kirori Ckt -2 at kirori end, R-N fault occurred. This resulted in tripping of all 400kV lines emanating from
28 NR
4) 400 KV Jind(PG)-Kirori(HV) (HVPNL) Ckt-2
HARYANA HVPNL 30-Jun-20 1:57 30-Jun-20 4:03 2:06
Kirori.
0 200 GD-1 0.4
5) 400 KV Jind(PG)-Kirori(HV) (HVPNL) Ckt-1
6) 400/220 kV 315 MVA ICT 3 at Kirori(HV)

1) 800 KV HVDC Kurukshetra(PG) Pole-1


29 NR
3) 800 KV HVDC Kurukshetra(PG) Pole-3
HARYANA POWERGRID 30-Jun-20 4:12 30-Jun-20 5:45 1:33 800 KV HVDC Kurukshetra(PG) Pole-1 & 3 tripped due to Neutral bus switch reclose at Champa end. 0 0 GI-2 0

1) 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-1 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-1 tripped on R-N fault with fault current 478amp, fault dist-110.77 km from Ziankot end. ckt-2
30 NR
2) 220 KV Amargarh(NRSS XXIX)-Ziankote(JK) (PDD JK) Ckt-2
J&K PDD JK 30-Jun-20 6:09 30-Jun-20 8:17 2:08
also tripped along with above.
0 50 GD-1 0.1

47
Western Region-Event Report for June 2020
Outage Revival Outage Duration
Category as per CEA Energy Unserved
S.No Region Name of Elements Owner/Agency Event Generation Loss (MW) Load Loss (MW)
standards (MU)
Date Time Date Time Time

Tripping of
1.400 kV Korba(W) Extension-Bhilai At 400 kV korba(W) Extension Power station, while charging 400 kV Korba(W) Extension-Marwa, 400 kV Bus 1 &2 tripped on
2400 kV Korba(W) Extension-Marwa. BB protection operation, followed by the tripping of 400/220 kV 500 MVA Korba(W) ICT. This led to the tripping of 210 MW
1 WR CSPTCL/CSPGCL 1-Jun-20 12:44 1-Jun-20 13:10 0:26 675 Nil GD-1 Nil
3.400/220 kV 500 MVA Korba(W) ICT Korba(W) Units 3&4 and 500 MW Korba(W) Extension Unit 5 due to loss of evacuation path. 400kV Korba(W)-Raita was out
4.210 MW Korba(W) Units 3&4 of service from 29.05.2020 due to tower collapse.
5.500 MW Korba(W) Extension Unit 5

Tripping of
400 kV REL-Durg 1&2 tripped on Y-B fault at 10:48 Hrs and B-E fault at 10:49 Hrs respectively which led to the tripping of
2 WR 1.400 kV REL-Durg 1&2 REL 2-Jun-20 10:49 2-Jun-20 12:18 1:29 310 Nil GD-1 Nil
685MW REL Unit 2 due to loss of evacuation path.
2.685 MW REL Unit 2

Tripping of Due to Nisarga cyclone accompanied with heavy wind and rain,400 kV RGPPL-Nagothane 1&2 tripped on R-E fault and R-Y
1.400 kV RGPPL-Nagothane 1&2 fault at 10:47 Hrs and 09:35 Hrs respectively. 220 kV Nagothane-Wadkhal 1 tripped at 12:58 Hrs due to B phase LA blast at
2.400 kV Nagothane- Padghe 1&2 Nagothane end. 400kV Nagothane- Padghe 1 tripped at 13:16hrs on B-E fault.220kV Nagothane- POSCO line tripped at
3 WR 3.220kV Nagothane- Wadkhal 1 MSETCL 3-Jun-20 14:35 3-Jun-20 16:38 2:03 13:18hrs on Y-E fault. 220kV Nagothane-Wadkhal 2 tripped from Wadkhal end at 13:25Hrs on B-E fault. 220kV Nagothane- Nil 4.5 GD-1 0.0092
4.220 kV Nagothane- POSCO ACCIL(To Apta) tripped at 13:37Hrs on Y-E fault. 220kV Nagothane -MSL line was hand tripped at 14:05hrs due to Rph LA
5.220kV Nagothane-ACCIL blast at MSL end.The last source to the substation 400 kV Nagothane-Padghe 2 tripped on B-E fault at 14:35 Hrs and the
station went blackout.

Tripping of
4 WR PGCIL 11-Jun-20 12:20 11-Jun-20 16:33 4:13 +800 kV HVDC Champa-Kurukshetra Poles 1,2,3&4 tripped on DC Line fault Nil Nil GI-2 Nil
1. +800 kV HVDC Champa-Kurukshetra Poles 1,2,3&4

Tripping of At 765/400 kV Dharamjaygarh substation, due to internal flashover of 765KV Jharsuguda 1 Main Bay B Phase CT, Bus Bar
1.765 kV Dharamjaygarh Bus 4 protection operated and all Main bay CBs connected to Bus 4 tripped. As the fault current in the failed CT still persisted
5 WR PGCIL 11-Jun-20 14:07 11-Jun-20 15:21 1:14 Nil Nil GI-2 Nil
2.765 kV Dharamjaygarh-Jharsuguda 1 through tie bay, internal LBB of Jharsuguda 1 Main Bay operated and resulted into tripping of Jharsuguda 1 feeder. Remote
end tripped on DT received.

Tripping of
1.220 kV Vav- Mota 2
2.220 kV Vav- Kawas 2
At 220 kV Vav substation, 220 kV Vav-Kosamba line tripped on B ph fault from remote end but breaker failed to open at Vav
6 WR 3.220 kV Vav- Kosamba GETCO 11-Jun-20 14:42 11-Jun-20 15:50 1:08 Nil 150 GI-1 0.1700
end which led to tripping of 220 kV Vav Bus-2 and all connected elements on LBB operation.
4.220 kV Vav- Kakrapar 2
5.220 kV Vav- Utran
6.220/66 kV Vav ICT 3,4&5

Tripping of
1.400 kV Bhopal- Damoh 1&2
At 400/220 kV Bhopal substation, 400kV Bina 1 suspension string failed and fell over 400 kV Bus 1 and created Y-B fault. 400
2.400 kV Bhopal- Bina 1&2
kV Bina 1 tripped on Zone 1 distance protection operation. Bus bar protection not operated, all the feeders connected at 400
7 WR 3.400 kV Bhopal- Itarsi 1&2 MPPTCL 11-Jun-20 17:54 11-Jun-20 18:29 0:35 Nil 100.8 GD-1 0.0444
kV side and 220 kV side tripped on Zone 2/Zone 3 distance protection operation. The total station went blackout due to the
4.400 kV Bhopal- Bhopal BDTCL 1&2
event.
5.400/220kV Bhopal ICTs 1,2,3&4
6.220 kV of
Bhopal-Shujalpur 1
Tripping
1.400 kV Dhule(MH)- Dhule 1&2
At 400 kV Dhule(MH) substation, 400 kV Bus 2 B phase CVT blasted and created B-E fault. The BB protection did not operate.
2.400 kV Dhule(MH)- Khandwa 1&2
All the 400 kV lines and 400/220 kV ICTs tripped on backup protection operation. The New ZIV make numerical BB scheme
8 WR 3.400 kV Dhule(MH)- SSP 1 MSETCL 14-Jun-20 18:02 14-Jun-20 19:42 1:40 Nil Nil GI-2 Nil
was in alarm mode and it was in parallel with old RADSS scheme. As reported by MSETCL, the New BB scheme was taken in
4.400 kV Dhule(MH)- Babhleshwar 2
to service after the event.
5.400/220 kV Dhule(MH) ICTs 1,2&3

At 22:01 Hrs, 800 kV HVDC Champa-Kurukshetra Poles 3 blocked due to Common Neutral Area Protection (CNAP)
Tripping of maloperation at Champa end.
9 WR PGCIL 16-Jun-20 22:01 16-Jun-20 23:25 1:24 Nil Nil GI-2 Nil
1.+800 kV HVDC Champa-Kurukshetra Poles 1,2,3&4 At 22:03 Hrs, 800 kV HVDC Champa-Kurukshetra Poles 1,2&4 blocked on CAT B alarm generated at Kurukshetra end, DC
Undercurrent protection operated at Kurukshetra end and Instability Minor Fail Alarm detected at Champa end respectively.

Tripping of
1.220 kV Pithampur Bus 1
2.220 kV Pithampur- Pithampur I/C 1 At 400/220 kV Pithampur substation, R phase PT of 220 kV Bus 1 blasted and resulted in tripping of all the elements
10 WR MPPTCL 23-Jun-20 23:50 24-Jun-20 2:08 2:18 Nil Nil GI-1 Nil
3.220 kV Pithampur-Pithampur Sector1 connected to 220 kV Pithampur Bus 1. 400/220 kV Pithampur ICT 2 connected to 220 kV Bus 2, also tripped during the event.
4.400/220 kV Pithampur ICTs 1&2

Tripping of
1.400 kV Jetpur Bus 2
At 400 kV Jetpur substation, 400 kV Bus 2 and all connected elements tripped on BB protection operation due to B-E phase
11 WR 2.400 kV Jetpur-Amreli 2 GETCO 29-Jun-20 15:02 29-Jun-20 16:59 1:57 Nil Nil GI-2 Nil
fault created by external conductive wire(kite thread) near 400 kV Amreli 1 bay.
3.400 kV CGPL- Jetpur 2
4.400/220 kV Jetpur ICTs 1&2

Tripping of At 400 kV Essar Vadinar station, while test charging 400kV Essar Vadinar-Hadala 2 from Hadala end at 12:58hrs, 400kV Essar
12 WR 1. 400 kV Essar Vadinar- Hadala 1 Essar 30-Jun-20 12:58 30-Jun-20 13:35 0:37 Vadinar- Hadala 1 tripped from Vadinar end. Due to tripping of both the lines, the station got black out. 600MW Essar 485 NIl GD-1 NIl
2.600MW Essar Vadinar Unit 1 Vadinar Unit 1 tripped due to the loss of evacuation path.

Tripping of
1. 220 kV Talegaon(MH) Bus 1
2.220 kV Talegaon(MH)-Talegaon(PG) 1
At 220 kV Talegaon(MH), 220 kV side Y phase CT of 220/22 kV ICT 2 blasted and resulted in tripping of 220 kV Bus 1 and all
13 WR 3.220 kV Talegaon(MH)- Urse 1 MSETCL 30-Jun-20 21:52 30-Jun-20 22:50 0:58 NIl 10 GI-1 0.0097
the connected elements on BB operation.
4.220 kV Talegaon(MH)- GM Motor
5.220/22 kV 50 MVA Talegaon(MH) ICT 2

48
Southern Region-Grid Event Report for June 2020

Outage Revival Outage


Category as per Energy
Sl. Name of Elements Duration Event Generation Load Loss
Region Owner / Agency CEA Grid Unserved
No. (Tripped/Manually opened) (As reported) Loss (MW) (MW)
Standards (MU)
Date Time (Hrs) Date Time (Hrs) Time

i. 230kV Mywadi - Kadamparai line-1& 2


ii. 230kV link-1 and 2.
Complete outage of 230kV Mywadi substation of TANTRANSCO : During antecedent conditions, 230kV
iii. 230kV Mywadi - Ponnapuram line-1 & 2
Mwyadi SS was under single bus operation. Triggering incident was failure of B phase CT of 230kV Mywadi-
iv. 230kV Mywadi - Okmandapam
1 SR TANTRANSCO 22-Jun-20 23:47 23-Jun-20 2:11 2 Hrs 24 mins Ponnapuram line-2 at 230kV Mywadi end. 230 kV Bus-1 bus bar protection operated resulting in the ---- ---- GD-1 ----
v. 230kV Mywadi - Sembatty
tripping of all the connected elements at 230kV Mywadi . 400kV/230kV Udumalpet ICT-1, 2 and 3 also got
vi. 230kV Mywadi - Kurukatthi
tripped during the event.
vii. 230kV Mywadi - Anaikadavu
viii. 400kV/220kV Udumalpet ICT-1 , 2 and 3.

Complete outage of 220/33kV KSPDCL SS-3: Triggering incident was tripping of 220kV Pavagada - KSDPCL3
line due to overvoltage at 220kV Pavagada end. Since the only connected feeder tripped, there was
2 SR i. 220kV Pavagada - KSDPCL3 KSPDCL 25-Jun-20 2:43 25-Jun-20 3:28 45 mins ---- ---- GD-1 ----
complete outage at 220/33kV KSDPCL SS-3. Solar generation was not there since the event happened
during night hours.

Complete outage of 220/33kV KSPDCL SS-5 (Thirumani): Triggering incident was tripping of 220kV
3 SR i. 220kV Pavagada - Thriumani (KSPDCL5) KSPDCL 29-Jun-20 18:01 29-Jun-20 18:55 54 mins Pavagada - Thirumani line due to overvoltage at Thirumani end only. Line did not trip at Pavagada end. This 25 MW ---- GD-1 ----
resulted in complete outage of 220/33kV KSPDCL SS-5 since the only connected feeder tripped.

i. 220kV Nunna - KTPS line


Multiple Tripping in 220kV Nunna SS of APTRANSCO : Triggering incident was failure of B phase LA of 220kV
ii. 220kV Nunna - Gunadala line-2 iii. 220kV
Nunna Gunadala line-2 (connected to 220kV Bus-2) in 220kV Nunna station. Due to breaker problem in
4 SR Nunna Gudivada line-2 iv. 220kV Nunna APTRANSCO 3-Jun-20 14:01 3-Jun-20 14:24 23 mins ---- ---- GI-1 ----
220kV Nunna Gundala line at Nunna end, LBB of Bus-2 operated resulting in tripping of all elements
- Bhimadolu line v.
connected to 220kV Nunna Bus-2. 400/220kV ICT-3 got tripped on operation of backup OC protection.
400kV/220kV Nunna ICT#3

i. HVDC Gazuwaka Pole-1 ii. Tripping of HVDC Gazuwaka Pole-1 and Pole-2: As reported Gazuwaka Pole-1&2 tripped on sustained AC
5 SR -ER PGCIL 15-Jun-20 1:54 15-Jun-20 2:44 50 mins ---- ---- GI-2 ----
HVDC Gazuwaka Pole-2 oscillations/low-voltage in eastern side.

i. 220kV Vemagiri - Peddapuram line-2


Tripping of 220kV Bus-2 at 400/220kV Vemagiri station: Triggering incident was Y-ph to ground fault in
ii. 220kV Vemagiri - Bommuru Line-2
6 SR APTRANSCO 16-Jun-20 2:20 16-Jun-20 6:32 4 Hrs 12 mins 220kV Vemagiri - Bommuru Line-2. As reported, a creeper was fallen on Y-Phase bus-2 Isolator dropper of ---- ---- GI-1 ----
iii. 220kV Vemagiri - Duvva line
the line. Bus bar protection of 220kV Bus-2 operated and all elements connected to the bus tripped.
iv. 400/220kV ICT-2 at Vemagiri

i. 400kV Raichur TPS - Raichur PG line-1


Tripping of 400kV Bus-2 at Raichur TPS: Triggering incident was 400kV Bus-2 R-phase CVT flashover. Bus bar
7 SR ii. 400kV Raichur TPS - BTPS KPCL 16-Jun-20 10:10 16-Jun-20 12:27 2 Hrs 17 mins ---- ---- GI-2 ----
protection of 400kV Bus-2 operated leading to tripping of multiple elements.
iii. 400/220kV ICT-2 at Raichur

i. 400/220kV ICT-1
Tripping of 220kV Bus-1 at 400/220kV Vemagiri station: Triggering incident was B-ph to ground fault in
ii. 400/220kV ICT-3 iii.
220kV Vemagiri - Bommuru Line-2 in 220kV Vemagiri - Vijjeswaram feeder. As reported, an alluminium lead
8 SR 220kV Vemagiri - Bommuru line 1 APTRANSCO 22-Jun-20 6:22 22-Jun-20 6:44 22 mins ---- ---- GI-1 ----
fell on B-Phase Bus-1 isolator dropper connected to 220KV Vijjeswaram feeder. Bus bar protection of 220kV
iv. 220kV Vemagiri - Bheemavaram
Bus-1 operated and all elements connected to the bus tripped.
v. 220kV Vemagiri - Vijjeswaram

49
Eastern Region-Grid Event Report for June 2020

Outage Revival Outage Duration Category as per


Sl. Owner / Generation Loss Load Loss Loss of
Region Name of major elements tripped Event CEA Grid
No. Agency (MW) (MW) Energy(in MU)
Date Time Date Time Time Standards

220 kV Darbhanga (DMTCL)-Darbhanga (Bihar) D/C On 10th June 2020, at 10:54 Hrs, 220 kV Darbhanga (DMTCL)-Darbhanga (BSPTCL) D/C tripped from BSPTCL end. At the same time
1 ER 220 kV Dharbanga-Mushahari-1 BSPTCL 10-Jun-20 10:54 10-Jun-20 11:25 0:31 220 kV Darbhanga (BSPTCL) – Mushahari – 1 and 220 kV Darbhanga (DMTCL) – Motipur – 1 also tripped resulting in load loss at 0 135 GD-1 0.0698
220 kV Darbhanga (DMTCL) – Motipur – 1 Darbhanga, Madhubani and Pandaul.

220 kV New Melli - Jorethang D/C


220 kV New Melli - Jorethang – D/C tripped from Jorethang end only resulting tripping of all running units at Jorethang. 220 kV
2 ER 220 kV Tashiding - New Melli S/C ISTS 11-Jun-20 22:38 12-Jun-20 4:50 6:12 166 0 GD-1 0.0000
Tashiding Rangpo S/C and 220 kV Tashiding New Melli S/C tripped.
220 kV Tashiding - Rangpo S/C

220 kV New Melli - Jorethang D/C


220 kV New Melli - Jorethang – D/C tripped from Jorethang end only resulting tripping of all running units at Jorethang. 220 kV
3 ER 220 kV Tashiding - New Melli S/C ISTS 13-Jun-20 4:54 13-Jun-20 5:04 0:10 175 0 GD-1 0.0000
Tashiding – New Melli S/C tripped from both ends. But both running units at Tashiding tripped on GT O/C protection.
Unit 1 and 2 at Jorethang

220 kV New Melli - Jorethang D/C


220 kV New Melli - Jorethang – D/C tripped from Jorethang end only resulting tripping of all running units at Jorethang. 220 kV
4 ER 220 kV Tashiding - New Melli S/C ISTS 13-Jun-20 7:18 13-Jun-20 7:25 0:07 117 0 GD-1 0.0000
Tashiding Rangpo S/C and 220 kV Tashiding New Melli S/C tripped.
220 kV Tashiding - Rangpo S/C

At 12:54 hrs. gas density high alarm initiated in 400 KV Rangpo-Binaguri Ckt-I at Rangpo and tripping command was sent to 400kV
400 KV Rangpo-Binaguri 1
Main Bus-I at Rangpo. All feeders connected to 400 kV main bus 1 tripped. Due to unavailability of tie bay of 400/132 kV ICT at
400 KV Rangpo-Teesta V-2
Dikchu, both the running units at Dikchu HEP were connected to bus 1 at Dikchu via 400/132 kV ICT. After tripping of 400 kV Dikchu –
400 KV Rangpo-Dikchu
5 ER ISTS 19-Jun-20 12:54 19-Jun-20 13:20 0:26 Rangpo S/C (it was also connected to bus 1 at both Rangpo and Dikchu) due to bus bar operation at Rangpo, both the units tripped 109 0 GI-2 0.0000
400 KV Rangpo-Kishanganj
due to loss of evacuation path.
315 MVA 400/220 KV ICT-3, 4, 5 at Rangpo
Both units 1 and 2 at Dikchu HEP

220 kV Joda – TTPS D/C At 11:41 hrs 220 kV Joda – TTPS D/C tripped on B phase to earth fault. At 11:57 hrs, 220 kV Ramchandrapur – Joda S/C tripped on
6 ER 220 kV Ramchandrapur – Joda S/C OPTCL 23-Jun-20 11:58 23-Jun-20 12:29 0:31 overload. Prior to the tripping, power flow was 160 MW. At same time 220 kV Joda JSPL (Jindal) – Jamshedpur S/C tripped at same 0 160 GD-1 0.0933
220 kV Joda Jindal S/C time from Ramchandrapur and Jamshedpur end respectively in overcurrent protection

220 kV Muzaffarpur Dhalkebar D/C tripped at 18:23 hrs from Muzaffarpur end on R phase directional earth fault. Prior to the tripping
7 ER 220 kV Muzaffarpur - Dhalkebar D/C ISTS 24-Jun-20 18:23 24-Jun-20 19:12 0:49 schedule of Nepal drawal over this link was 74 MW and it would increase to 163 MW w.e.f. 18:30 hrs. There was no generation or 0 0 GI-1 0.0000
load loss reported in Indian grid at the time of the event.

400 kV Alipurduar -Jigmelling D/C tripped at 02:47 Hrs due to R phase to earth fault. At Alipurduar, auto reclose was successful for
400 kV Alipurduar - Jigmelling D/C
8 ER ISTS 25-Jun-20 2:47 25-Jun-20 4:02 1:15 both circuits. But both the circuits tripped from Jigmelling. Around 590 MW generation loss was reported at the time of the event. 0 0 GI-2 0.0000
Unit 1 and 2 at Mangdechu
There was no generation or load loss reported in Indian grid at the time of the event.

400 kV Jigmelling - Alipurduar – 1 along with all four running units (generating around 770 MW) of Mangdechu tripped at 15:40 hrs.
DT signal was received at Alipurduar end of 400 kV Jigmelling Alipurduar – 1 at the time of the tripping. Later, at 15:53 hrs, 400 kV
400 kV Alipurduar - Jigmelling D/C
9 ER ISTS 26-Jun-20 15:40 26-Jun-20 17:07 1:27 Jigmelling - Alipurduar – 2 also tripped due to B phase to earth fault. 400 kV Jigmelling - Alipurduar – 1 was extended from Alipurduar 0 0 GI-2 0.0000
Unit 1 and 2 at Mangdechu
end at 16:24 hrs. But while synchronising at Jigmelling end, it tripped again at 16:49 hrs with DT received at received at Alipurduar.
There was no generation or load loss reported in Indian grid at the time of the event.

GMR unit # 3 was connected to 400/220 kV Meramundali S/S of OPTCL STU network through 400 kV GMR – Meramundali S/C. At
400 kV GMR – Meramundali S/C
10 ER OPTCL 26-Jun-20 18:43 26-Jun-20 20:21 1:38 18:43 hrs, 400 kV GMR Meramundali S/C tripped due to DT received at Meramundali end. This caused total power failure at GMR 180 0 GD-1 0.0000
GMR unit #3
(OPTCL) section and GMR unit #3 tripped. In PMU data, no fault was observed at the time of event

400 kV Rangpo – Kishangunj S/C


At 14:48 hrs 400 kV Rangpo – Kishangunj S/C tripped due to B phase to earth fault. At same time, unit 1 and 2 at Dikchu HEP and unit
11 ER Unit 1 and 2 at Dikchu HEP ISTS 27-Jun-20 14:48 27-Jun-20 15:08 0:20 161 0 GI-2 0.0000
2 at Jorethang tripped due to operation of differential relay.
Unit 1 at JLHEP

400 kV BRBCL – Sasaram – 2 was under break down due to rectification of tower bending. Unit 1 and 2 were in running condition at
400 kV BRBCL – Sasaram – 1
12 ER ISTS 29-Jun-20 21:53 29-Jun-20 22:25 0:32 BRBCL. At 21:53hrs., 400kV Sasaram-BRBCL #1 tripped on R and Y phase fault. Both the units got tripped due to loss of evacuation 422 0 GD-1 0.0000
Unit 1 and 2 at BRBCL
path

50
North Eastern Region-Grid Disturbances Report for June 2020
Generati Load Category as
Sl. Date and Time of Date and Time of Outage Generation Load Loss
Region Name of Element Owner / Agency Event on Loss Loss in per CEA Grid
No. Tripping Revival Duration Loss (MW) (MW)
in MU MU Standards
Khupi area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Balipara-Tenga line.
DoP, Arunachal
1 NER 132 kV Balipara-Tenga line. 01-Jun-20 13:37 01-Jun-20 14:00 0:23:00 At 13:37 Hrs on 01.06.2020, 132 kV Balipara-Tenga line tripped. Due to tripping of this element, Khupi area of Arunachal Pradesh 0 13 0 0.005 GD 1
Pradesh
Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.
Kolasib area of Mizoram Power System were connected with the rest of NER Grid through 132 kV Badarpur-Kolasib line &132 kV
Aizawl - Kolasib line.
132 kV Badarpur-Kolasib line &132 kV Aizawl - POWERGRID &
2 NER 02-Jun-20 06:10 02-Jun-20 06:25 0:15:00 At 06:10 Hrs on 02.06.2020, 132 kV Badarpur-Kolasib line &132 kV Aizawl - Kolasib lines tripped. Due to tripping of these elements, 17 1 0.004 0.0003 GD 1
Kolasib lines DoP Mizoram
Kolasib area of Mizoram Power System was separated from rest of NER Grid and subsequently collapsed due to load generation
mismatch.
Ziro area of Arunachal Pradesh Power System was connected with rest of NER Grid through 132 kV Ranganadi - Ziro line.
POWERGRID &
3 NER 132 kV Ranganadi - Ziro line 02-Jun-20 11:21 02-Jun-20 11:36 0:15:00 At 11:21 Hrs on 02.06.2020, 132 kV Ranganadi - Ziro line tripped. Due to tripping of this element, Ziro area of Arunachal Pradesh 0 12 0 0.0030 GD 1
DOP AP
Power System was separated from rest of NER Grid and subsequently collapsed due to no source in this area.
Kohima area of Nagaland Power System was connected with the rest of NER Grid through 132 kV Dimapur- Kohima line & 132 kV
132 kV Dimapur- Kohima line & 132 kV POWERGRID & Wokha -Kohima line .132 kV Kohima-Karong Line was under planned S/D w.e.f 08:10 Hrs of 02.06.2020.
4 NER 02-Jun-20 13:43 02-Jun-20 13:59 0:16:00 32 15 0.009 0.0040 GD 1
Wokha -Kohima line DoP, Nagaland At 13:43 Hrs on 02.06.2020, 132 kV Dimapur- Kohima line & 132 kV Wokha -Kohima line tripped. Due to tripping of these elements,
Kohima area were separated from the rest of NER Grid and subsequently collapsed due to load generation mismatch in these areas.

Rokhia area of Tripura Power System was connected with the rest of NER Grid through 132 kV Agartala-Rokhia D/C lines & 132 kV
Monarchak -Rokhia line .
132 kV Agartala-Rokhia D/C lines & 132 kV
5 NER TSECL 05-Jun-20 00:36 05-Jun-20 01:41 1:05:00 At 00:36 Hrs on 05.06.2020, 132 kV Agartala-Rokhia D/C lines & 132 kV Monarchak -Rokhia line tripped. Due to tripping of these 50 5 0.54 0.0050 GD 1
Monarchak -Rokhia line .
elements, Rokhia area & Rokhia power station were separated from the rest of NER Grid and subsequently collapsed due to load
generation mismatch in this area.
Imphal and Karong area of Manipur Power System was connected with the rest of NER Grid through 132 kV Karong - Kohima ,132 kV
Imphal(PG) - Imphal(MSPCL) I and II Lines. 132 kV Imphal(PG) - Imphal(MSPCL) III line was under Shutdown. 132 kV Kakching -
POWERGRID,
132 kV Karong - Kohima ,132 kV Imphal(PG) - Kongba line was kept open to avoid over- loading of 132 kV Loktak - Ningthoukhong line.
6 NER MPSCL & DoP, 08-Jun-20 10:36 08-Jun-20 10:47 0:11:00 0 46 0 0.0084 GD 1
Imphal(MSPCL) I and II lines At 10:36 Hrs on 08.06.2020, 132 kV Karong - Kohima ,132 kV Imphal(PG) - Imphal(MSPCL) I and II lines tripped. Due to tripping of
Nagaland
these elements, Imphal and Karong area of Manipur Power System were separated from the rest of NER Grid and subsequently
collapsed due to no source in these areas.
Imphal and Karong area of Manipur Power System was connected with the rest of NER Grid through 132 kV Karong - Kohima line.
132 kV Imphal(PG) - Imphal(MSPCL) I and II Lines tripped at 11:45 Hrs. 132 kV Imphal(PG) - Imphal(MSPCL) III line was under
DoP, Nagaland
7 NER 132 kV Karong - Kohima line 08-Jun-20 11:49 08-Jun-20 11:55 0:06:00 Shutdown. 132 kV Kakching - Kongba line was kept open to avoid over- loading of 132 kV Loktak - Ningthoukhong line. 0 45 0 0.0045 GD 1
and MSPCL
At 11:49 Hrs on 08.06.2020, 132 kV Karong - Kohima line tripped. Due to tripping of this element, Imphal and Karong area of
Manipur Power System were separated from the rest of NER Grid and subsequently collapsed due to no source in these area.
Imphal and Karong area of Manipur Power System were connected with the rest of NER Grid through 132 kV Karong - Kohima ,132
kV Imphal(PG) - Imphal(MSPCL) I and II Lines. 132 kV Imphal(PG) - Imphal(MSPCL) III line was under Shutdown. 132 kV Kakching -
POWERGRID,
132 kV Karong - Kohima ,132 kV Kongba line was kept open to avoid over- loading of 132 kV Loktak - Ningthoukhong line.
8 NER MSPCL & DoP, 08-Jun-20 13:35 08-Jun-20 13:44 0:09:00 0 46 0 0.0070 GD 1
Imhal(MSPCL) I and II lines At 13:35 Hrs on 08.06.2020,132 kV Karong - Kohima ,132 kV Imphal(PG) - Imphal(MSPCL) I and II lines tripped. Due to tripping of
Nagaland
these elements, Imphal and Karong area of Manipur Power System were separated from the rest of NER Grid and subsequently
collapsed due to no source in this area.

Khupi area of Arunachal Pradesh Power System and Dikshi HEP were connected with the rest of NER Grid through 132 kV Balipara-
NEEPCO & DoP,
Tenga line.
9 NER 132 kV Balipara-Tenga Arunachal 08-Jun-20 16:31 08-Jun-20 16:42 0:11:00 0 15 0 0.0020 GD 1
At 16:31 Hrs on 08.06.2020, 132 kV Balipara-Tenga line tripped. Due to tripping of this element, Khupi area of Arunachal Pradesh
Pradesh
Power System and Dikshi HEP were separated from rest of NER Grid and subsequently collapsed due to no source in this area.
AGBPP Power Station and Deomali area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 220
kV AGBPP - Mariani(PG) line, 220 kV AGBPP - Mariani(AS) line, 220 kV AGBPP - Tinsukia D/C.
220 kV AGBPP - Mariani(PG) line, 220 kV POWERGRID,
At 12:51 Hrs on 09.06.2020, 220 kV AGBPP - Mariani(PG) line, 220 kV AGBPP - Mariani(AS) line, 220 kV AGBPP - Tinsukia D/C tripped
10 NER AGBPP - Mariani(AS) line, 220 kV AGBPP - NEEPCO, AEGCL 09-Jun-20 12:51 09-Jun-20 13:22 0:31:00 112 3 0.058 0.0020 GD 1
along with all units in service at AGBPP due to operation of LBB protection of GTG-3 at AGBPP. Due to tripping of these elements,
Tinsukia D/C, AGBPP Unit 1, 2, 3, 4, 5, 7, 8 & 9 & DoP AP
AGBPP Power Station and Deomali area of Arunachal Pradesh Power System were separated from the rest of NER Grid and
subsequently collapsed due to no source in this area.

Rokhia Power Station of Tripura Power System was connected with the rest of NER Grid through 132 kV Rokhia - Agartala 2 line &
132 kV Rokhia - Monarchak line. 132 kV Rokhia - Agartala 1 line was under emergency shutdown w.e.f 11:43 Hrs on 09.06.20.
132 kV Rokhia - Agartala 2 line & 132 kV
11 NER TSECL 09-Jun-20 13:38 09-Jun-20 13:49 0:11:00 At 13:38 Hrs on 09.06.2020, 132 kV Rokhia - Agartala 2 line & 132 kV Rokhia - Monarchak line tripped. Due to tripping of these 25 15 0.005 0.0030 GD 1
Rokhia - Monarchak line
elements, Rokhia Power Station of Tripura Power System was separated from the rest of NER Grid and subsequently collapsed due
to load generation mismatch.

Lekhi area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Lekhi - Pare line 132 kV
Lekhi - Nirjuli line. 132 kV Lekhi - Itanagar line kept open due to CT ratio restriction at Lekhi end.
132 kV Lekhi - Pare line and 132 kV Lekhi - POWERGRID &
12 NER 10-Jun-20 10:49 10-Jun-20 11:30 0:41:00 At 10:49 Hrs on 10.06.2020, 132 kV Lekhi - Pare line 132 kV Lekhi - Nirjuli line tripped. Due to tripping of these elements, Lekhi area 0 17 0 0.0116 GD 1
Nirjuli line. DoP, AP
of Arunachal Pradesh Power System was separated from the rest of NER Grid and subsequently collapsed due to no source in this
area.
Khupi area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV Balipara - Tenga line.
NEEPCO & DoP,
13 NER 132 kV Balipara - Tenga line 10-Jun-20 11:25 10-Jun-20 11:44 0:19:00 At 11:25 Hrs on 10.06.2020, 132 kV Balipara - Tenga line tripped. Due to tripping of this element, Khupi area of Arunachal Pradesh 0 14 0 0.0044 GD 1
AP
Power System was separated from the rest of NER Grid and subsequently collapsed due to no source in this area.
Itanagar (Capital) area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV RHEP- Itanagar
line & 132kV Pare- Itanagar line. 132 kV Lekhi - Itanagar line kept open due to CT ratio restriction at Lekhi end.
132 kV RHEP- Itanagar line & 132 kV Pare- NEEPCO & DoP,
14 NER 10-Jun-20 12:44 10-Jun-20 13:03 0:19:00 At 12:44 Hrs on 10.06.2020, 132 kV RHEP- Itanagar line & 132kV Pare- Itanagar line tripped. Due to tripping of these elements, 0 16 0 0.0051 GD 1
Itanagar line AP
Itanagar (Capital) area of Arunachal Pradesh Power System was separated from the rest of NER Grid and subsequently collapsed due
to no source in this area.
Dimapur area of Nagaland Power System was connected with the rest of NER Grid through 132 kV Dimapur(PG) - Dimapur(DoP,
132 kV Dimapur(PG) - Dimapur(DoP, POWERGRID and Nagaland) I and II Lines. At 17:24 Hrs on 17.06.20, 132 kV Dimapur(PG) - Dimapur(DoP, Nagaland) I and II Lines tripped. Due to
15 NER 17-Jun-20 17:24 17-Jun-20 18:15 0:51:00 0 56 0 0.0480 GD 1
Nagaland) I and II Lines DoP, Nagaland tripping of these elements, Dimapur area was separated from the rest of NER Grid and subsequently collapsed due to no source in
this area.

51
North Eastern Region-Grid Disturbances Report for June 2020
Generati Load Category as
Sl. Date and Time of Date and Time of Outage Generation Load Loss
Region Name of Element Owner / Agency Event on Loss Loss in per CEA Grid
No. Tripping Revival Duration Loss (MW) (MW)
in MU MU Standards
Ningthoukhong area of Manipur Power System was connected with rest of NER Grid through 132 kV Loktak- Ningthoukhong line and
132 kV Imphal - Ningthoukhong line. (132 kV Kakching - Elangkangpokpi & Kakching-Churacnadpur line kept open for over-loading of
132 kV Loktak- Ningthoukhong and 132 kV 132 kV Loktak- Ningthoukhong line.)
16 NER MSPCL 19-Jun-20 11:34 19-Jun-20 11:54 0:20:00 0 17 0 0.0056 GD 1
Imphal - Ningthoukhong lines At 11:34 Hrs on 19.06.20, 132 kV Loktak- Ningthoukhong line and 132 kV Imphal - Ningthoukhong lines tripped. Due to tripping of
these elements, Ningthoukhong area of Manipur Power System was separated from rest of NER Grid and subsequently collapsed
due to no source in this area.
Itanagar (Capital) area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV RHEP- Itanagar
line & 132 kV Pare- Itanagar line. 132 kV Lekhi - Itanagar line kept open due to CT ratio restriction at Lekhi end.
132 kV RHEP- Itanagar line & 132kV Pare- NEEPCO & DoP,
17 NER 19-Jun-20 13:39 19-Jun-20 13:57 0:18:00 At 13:39 Hrs on 19.06.2020, 132 kV RHEP- Itanagar line & 132kV Pare- Itanagar line tripped. Due to tripping of these elements, 0 16 0 0.0048 GD 1
Itanagar line AP
Itanagar (Capital) area of Arunachal Pradesh Power System was separated from the rest of NER Grid and subsequently collapsed due
to no source in this area.
Itanagar (Capital) area of Arunachal Pradesh Power System was connected with the rest of NER Grid through 132 kV RHEP- Itanagar
line & 132 kV Pare- Itanagar line. 132 kV Lekhi - Itanagar line kept open due to CT ratio restriction at Lekhi end.
132 kV RHEP- Itanagar line & 132kV Pare- NEEPCO & DoP,
18 NER 19-Jun-20 17:23 19-Jun-20 17:35 0:12:00 At 17:23 Hrs on 19.06.2020, 132 kV RHEP- Itanagar line & 132kV Pare- Itanagar line tripped. Due to tripping of these elements, 0 15 0 0.0030 GD 1
Itanagar line AP
Itanagar (Capital) area of Arunachal Pradesh Power System was separated from the rest of NER Grid and subsequently collapsed due
to no source in this area.

Kohima (Capital) area of Nagaland Power System was connected with rest of NER Grid through 132 kV Dimapur (PG)-Kohima(DoP,
Nagaland) line and 132 Kohima -Wokha line. 132 kV Karong -Kohima line was under outage since 09:16 Hrs on 20.06.20.
132 kV Dimapur (PG)-Kohima(DoP, Nagaland) POWERGRID &
19 NER 20-Jun-20 11:33 20-Jun-20 11:54 0:21:00 At 11:33 Hrs on 20.06.20, 132 kV Dimapur (PG)-Kohima(DoP, Nagaland) line and 132 Kohima -Wokha line tripped. Due to tripping of 9 13 0.003 0.0046 GD 1
line and 132 Kohima -Wokha line DoP, Nagaland
these elements, Kohima (Capital) area of Nagaland Power System was separated from rest of NER Grid and subsequently collapsed
due to load generation mismatch in this area.

Surjamaninagar Area of Tripura Power System and Comilla Load of Bangladesh Power System were connected with the rest of NER
Grid through 132 kV Palatana-Surajmaninagar line, 132 kV Agartala-Surajmaninagar I & II lines and 132 kV Budhjungnagar-
132 kV Palatana-Surajmaninagar line, 132 kV Surajmaninagar I & II lines.
TSECL , PGCB
20 NER Agartala-Surajmaninagar I line and 132 kV 22-Jun-20 10:23 22-Jun-20 10:38 0:15:00 At 10:23 Hrs on 22.06.2020, 132 kV Palatana-Surajmaninagar line, 132 kV Agartala-Surajmaninagar I line and 132 kV Budhjungnagar- 0 132 0 0.0330 GD 1
POWERGRID
Budhjungnagar-Surajmaninagar I & II lines Surajmaninagar I & II lines tripped. At 10:28 Hrs, 132 kV Agartala-Surajmaninagar II line handtripped from Surjamaninagar. Due to
tripping of these elements, Surjamaninagar Area of Tripura Power System and Comilla Load of Bangladesh Power System were
separated from the rest of NER Grid and subsequently collapsed due to no source in this area.

52
North Eastern Region-Grid Incidences Report for June 2020
Category as
Sl. Owner / Date and Time of Date and Time of Generation Load Loss Generation Loss Load Loss
Region Name of Element Outage Duration Event per CEA Grid
No. Agency Tripping Revival Loss (MW) (MW) in MU in MU
Standards
AGBPP Unit-6 tripped at 15:46 Hrs on 01-06-20 due to low fuel pressure. Revision
1 NER AGBPP Unit-6 NEEPCO 01-Jun-20 15:46 01-Jun-20 16:30 0:44:00 27 0 0.020 0 GI 2
done from Block No.67 on 01-06-20
AGBPP Unit-7 & 8 tripped at 00:16 Hrs on 03-06-20 due to tripping of auxillary
2 NER AGBPP Unit-7 & 8 NEEPCO 03-Jun-20 00:19 03-Jun-20 02:15 1:56:00 55 0 0.110 0 GI 2
supply. Revision done from Block No.10 on 03-06-20
AGTCCPP Unit 2 tripped due to DC charger supply U/V and AGTCCPP Unit 5 tripped
3 NER AGTCCPP Unit-2 & 5 NEEPCO 06-Jun-20 10:03 06-Jun-20 11:30 1:27:00 due to non- availability of HRSG#1 & 2 at 10:03 Hrs on 06-06-20. Revision done from 22 0 0.030 0 GI 1
Block No.47 on 06-06-20
AGBPP Unit-5 and Unit-9 tripped at 04:41 Hrs on 08-06-20 due to tripping of
4 NER AGBPP Unit-5 and Unit-9 NEEPCO 08-Jun-20 04:41 08-Jun-20 07:00 2:19:00 40 0 0.090 0 GI 2
excitation system. Revision done from Block No.29 on 08-06-20
AGBPP Unit-5 tripped due to Differential Relay operated at 20:42 Hrs on 10-06-20.
5 NER AGBPP Unit-5 NEEPCO 10-Jun-20 20:42 10-Jun-20 22:00 1:18:00 22 0 0.030 0 GI 2
Revision done from Block No.89 on 10-06-20
Doyang Unit-2 tripped due to voltage jerk (increase of excitation) at 16:25 Hrs on 15-
6 NER Doyang Unit- 2 NEEPCO 15-Jun-20 16:25 15-Jun-20 18:30 2:05:00 16 0 0.020 0 GI 1
06-20. Revision done from Block No.75 on 15-06-20
AGBPP Unit-3 tripped due to loss of SF6 gas at 07:59 Hrs on 18-06-20. Revision done
7 NER AGBPP Unit-3 NEEPCO 18-Jun-20 07:59 18-Jun-20 09:30 1:31:00
from Block No.39 on 18-06-20
21 0 0.030 0 GI 2

Pare Unit 1 and 2 tripped due to operation of Over current interlock in stage-2 of
8 NER Pare Unit 1 and 2 NEEPCO 22-Jun-20 14:52 22-Jun-20 17:00 2:08:00
21G at 14:52 Hrs on 22-06-20. Revision done from Block No.69 on 22-06-20
118 0 0.030 0 GI 1

DHEP Unit 1 and 2 tripped due to Operation of Negative Phase Sequence Relay at
9 NER DHEP Unit 1 and 2 NEEPCO 23-Jun-20 08:06 23-Jun-20 10:00 1:54:00
08:06 Hrs on 23-06-20. Revision done from Block No.41 on 23-06-20
40 0 0.080 0 GI 1

AGBPP Unit -3 tripped due to Excessive Vibration at 03:16 Hrs on 28-06-20. Revision
10 NER AGBPP Unit -3 NEEPCO 28-Jun-20 03:16 28-Jun-20 05:00 1:44:00 21.7 0 0.040 0 GI 2
done from Block No.21 on 28-06-20
Palatana Unit 1 , 2 , 3 & 4 tripped due to Tripping of Gas compressor ( Gas supply
11 NER Palatana Unit 1 , 2 , 3 & 4 OTPC 28-Jun-20 09:48 28-Jun-20 11:30 1:42:00 pressure fluctuation )at 09:48 Hrs on 28-06-20. Revision done from Block No.47 on 551 0 0.940 0 GI 2
28-06-20

53
21. NEW ELEMENTS COMMISSIONED* IN JUNE 2020
COMMISSIONING OF NEW GENERATING UNITS

REGION S.NO. CONSTITUENT UNIT NAME / LOCATION UNIT NO CAPACITY (MW) DATE

WR 1 SECI GIWEL III(Wind) / Gujarat I 226.8+73.2* 20-06-2020


*COD of added capacity
COMMISSIONING OF NEW ICTs
CAPACITY
REGION S.NO. CONSTITUENT VOLTAGE LEVEL (KVA) SUB-STATION ICT NO DATE
(MVA)
1 UPPTCL 400/220 Sarnath IV 315 11-06-2020
NR
2 PGCIL 765/400 Meerut III 1500 17-06-2020
1 AEGCL 220/132 Samaguri II 160 12-06-2020
NER
2 AEGCL 220/132 Sarusajai II 200 26-06-2020

COMMISSIONING OF NEW TRANSMISSION LINES

LINE NAME VOLTAGE


REGION S.NO. CONSTITUENT CKT NO DATE
(kV)
NR 1 PGCIL 765kV Meerut - Koteshwar D/C** II 765 28-06-2020
SR 1 NTPC-TELANGANA 400 kV Ramagundam NTPC - Telanga STPP D/C I & II 400 24-06-2020
ER 1 PGCIL 400 KV Rajarhat - FSTPP I 400 20-06-2020
** Line was already charged (operational) at 400kV.

LILO OF TRANSMISSION LINES


SL. LINE NAME VOLTAGE
REGION CONSTITUENT LILO AT DATE
NO. (kV)
SR 1 PGCIL-TN-NNTPP 400kV Pugalur - Kalivanthapattu II NNTPS 400 27-06-2020
ER 1 PGCIL 400 kV Gaya - NPGC D/C Chandauti 400 24-06-2020

COMMISSIONING OF BUS/LINE REACTORS


SL. SUB-STATION/ LINE (@SUB-STATION)
REGION CONSTITUENT VOLTAGE LEVEL CAPACITY (MVAR) DATE
NO.
NR 1 PGCIL 765kV Meerut-koteshwar-II (@Meerut) 765 240 28-06-2020
NER 2 PGCIL Misa 400 80 20-06-2020

COMMISSIONING OF FACTS DEVICE/SYSTEM


SL. SUB-STATION/CONSTITUENT VOLTAGE
REGION NAME RATINGS DATE
NO. (kV)
NIL

*Includes first time charging (FTC) as well

54
22. Voltage Profile
कवद् युत कविव रूपरे खा माह - जूि 2020 VOLTAGE PROFILE - June 2020
Date of reporting: 05-Jul-20
Number of hours
Voltage Deviation Index
क्र.स. Sl. VOLTAGE < V(lower)* V(lower) < VOLTAGE < VOLTAGE > V(upper)* voltage was outside उच्चतम (कक.वो.) किम्नतम(कक.वो.) औसत (कक.वो.)
क्षेत्र REGION उपकेंद्र SUBSTATION (%age of time voltage is
No. (V=380,728 kV) V(upper)* (V=420,800 kV) IEGC band during Maximum(kV) Minimum(kV) Average(kV)
outside range)
month
1 अंगुल ANGUL 0% 100% 0% 0% 0 803 756 779
2 गया GAYA 0% 100% 0% 0% 0 790 745 770
पूवी क्षेत्र
3 झारसुगुड़ा JHARSUGUDA 0% 96% 4% 4% 26 806 773 791
ER
4 रांची RANCHI 0% 100% 0% 0% 0 794 759 781
5 सासाराम SASARAM 0% 100% 0% 0% 0 794 737 763
1 आगरा AGRA 0% 100% 0% 0% 0 800 748 778
2 आगरा (फ़तेहाबाद) AGRA (FATEHABAD) 0% 99% 1% 1% 4 805 739 767
3 अिपरा सी ANPARA-C 0% 100% 0% 0% 0 778 752 765
4 अिपरा डी ANPARA-D 0% 100% 0% 0% 0 779 753 766
5 अंता ANTA 0% 100% 0% 0% 0 802 750 777
6 बकलया BALLIA 0% 100% 0% 0% 0 791 744 770
7 किवािी BHIWANI 0% 99% 1% 1% 4 803 749 781
8 बरे ली BAREILLY 0% 99% 1% 1% 5 804 748 777
9 उत्तरी क्षेत्र फ़तेहपुर FATEHPUR 0% 100% 0% 0% 0 793 739 767
10 NR ग्रेटर िोएडा GREATER NOIDA 0% 97% 3% 3% 22 808 753 783
11 झकटकरा JHATIKARA 0% 100% 0% 0% 0 801 745 776
12 कािपुर जीआईएस KANPUR GIS 0% 100% 0% 0% 0 796 751 775
13 लखिऊ LUCKNOW 0% 100% 0% 0% 0 801 747 776
14 लकलतपुर LALITPUR 0% 100% 0% 0% 3 787 721 765
15 मेरठ MEERUT 0% 99% 1% 1% 9 810 751 781
16 मोगा MOGA 0% 100% 0% 0% 1 804 750 777
17 फागी PHAGI 0% 100% 0% 0% 1 802 749 779
18 वाराणसी VARANASI 0% 100% 0% 0% 0 796 754 776
19 उन्नाव UNNAO 0% 100% 0% 0% 0 790 736 764
1 अकोला AKOLA 0% 95% 5% 5% 33 808 758 788
2 औरं गाबाद AURANGABAD 0% 100% 0% 0% 1 801 750 780
3 िोपाल (बीडीटीसीएल) BHOPAL (BDTCL) 0% 100% 0% 0% 0 798 746 771
4 कबलासपुर BILASPUR 0% 100% 0% 0% 0 788 761 774
5 बीिा BINA 0% 100% 0% 0% 0 801 754 779
6 चांपा CHAMPA 0% 100% 0% 0% 0 800 769 786
7 धममजयगढ़ DHARAMJAIGARH 0% 100% 0% 0% 0 788 757 776
8 धुले (बीडीटीसीएल) DHULE (BDTCL) 0% 100% 0% 0% 0 798 741 773
9 एकतुिी EKTUNI 0% 92% 8% 8% 56 808 754 789
10 ग्वाकलयर GWALIOR 0% 100% 0% 0% 2 802 751 780
11 इं दौर INDORE 0% 100% 0% 0% 0 797 748 768
12 जबलपुर JABALPUR 0% 100% 0% 0% 1 803 755 781
13 पकिमी क्षेत्र कोरडी KORADI 0% 100% 0% 0% 0 793 752 775
14 WR पुणे PUNE 0% 100% 0% 0% 0 800 734 778
15 रायगढ़ पूकलंग RAIGARH POOLING 0% 100% 0% 0% 0 798 769 785
16 रायपुर पूकलंग RAIPUR POOLING 0% 100% 0% 0% 0 793 759 777
17 सासि SASAN 0% 100% 0% 0% 0 789 757 771
18 सतिा SATNA 0% 100% 0% 0% 0 795 755 774
19 कसविी SEONI 0% 100% 0% 0% 0 801 760 782
20 सीपत SIPAT 0% 100% 0% 0% 0 789 762 775
21 सोलापुर SOLAPUR 0% 97% 3% 3% 21 807 750 787
22 तामिार TAMNAR 0% 100% 0% 0% 0 798 771 785
23 कतरोड़ा TIRORA 0% 100% 0% 0% 0 785 752 769
24 वड़ोदरा VADODARA 0% 100% 0% 0% 1 802 762 782
25 कवंध्याचल पूकलंग VINDHYACHAL PS 0% 100% 0% 0% 0 788 758 772
26 वधाम WARDHA 0% 100% 0% 0% 2 806 751 782
1 किूमल KURNOOL 0% 99% 1% 1% 5 803 749 781
2 िेल्लूर पूकलंग NELLORE PS 0% 100% 0% 0% 0 800 749 779
3 दकक्षणी क्षे त्र रायचूर RAICHUR 0% 99% 1% 1% 6 803 747 783
4 SR किज़ामाबाद NIZAMABAD 0% 94% 6% 6% 45 812 749 784
5 श्रीकाकुलम SRIKAKULAM 0% 94% 6% 6% 46 813 749 784
6 कतरुवलम THIRUVALEM 0% 99% 1% 1% 6 803 743 779
1 अज़ारा AZARA (400 kV) 0% 100% 0% 0% 0 413 401 407
2 बाकलपारा BALIPARA (400 kV) 0% 100% 0% 0% 0 413 402 406
3 कबस्विाथ चररआकल BISWANATH CHARIALI (400 kV) 0% 100% 0% 0% 0 418 393 407
4 बोंगाईगांव BONGAIGAON (400 kV) 0% 100% 0% 0% 0 418 396 407
5 पू वोत्तर क्षे त्र बोंगाईगांव टीपीएस BONGAIGAON TPS (400 kV) 0% 100% 0% 0% 0 420 399 410
6 NER बकिमहाट BYRNIHAT (400 kV) 0% 100% 0% 0% 0 413 401 407
7 पालाटािा PALATANA (400 kV) 0% 100% 0% 0% 0 420 386 411
8 रं गािदी RANGANADI (400 kV) 0% 96% 4% 4% 25 425 399 413
9 मीसा MISA (400 kV) 0% 100% 0% 0% 2 420 392 407
10 कसलचर SILCHAR (400 kV) 2% 98% 55 0% 2% 14 417 350 404
All listed stations are 765 kV stations unless otherwise mentioned
*Percentage is calculated w.r.t. Time of one month.
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Inter Regional Elements


1 132 kV Bina-Morwa Line NR/WR MO 01-06-2020 00:00 Power not required by Bina(UP) 01-07-2020 00:00 720:00:00 0
For re-arranging following configuration at 132 kv rihand. 1.Two generating units,anpara
2 132 kV Rihand-Garwah 1 Line ER/NR SO 06-06-2020 20:05 double ckt on main bus.2. rest units ,obra(h)rihand,obra(t)-rihand and rest feeders on reserve 06-06-2020 21:42 0
bus 1:37:00
3 132 kV Rihand-Garwah 1 Line ER/NR TL 26-06-2020 05:27 Y-B fault 26-06-2020 07:03 1:36:00 1
4 132 kV Rihand-Garwah 1 Line ER/NR TL 26-06-2020 08:00 Y-B fault 26-06-2020 10:11 2:11:00 2
5 132 kV Rihand-Sone nagar 1 Line ER/NR TL 26-06-2020 08:00 R-B fault 26-06-2020 11:25 3:25:00 1
6 132 kV Rihand-Sone nagar 1 Line ER/NR TL 26-06-2020 11:26 R-B fault 01-07-2020 00:00 108:34:00 2
7 132kV Lalitpur - Rajghat Line WR/NR MO 01-06-2020 00:00 Line hand tripped from Rajghat as requested from UPPTCL. 01-07-2020 00:00 720:00:00 0
For replacement work of damage jumper on location No. 15C Y-Phase and broken disc insulator
8 132kV Ranapratap Sagar-Gandhi Sagar 1 Line WR/NR SO 27-06-2020 11:45 27-06-2020 19:45 0
at location No. 25A 8:00:00
9 220 kV Balimela - U.Sileru Line ER/SR SO 03-06-2020 10:35 Isolator replacement 13-06-2020 19:55 249:20:00 0
10 220 kV Budhipadar-Korba-II Line ER/WR TL 02-06-2020 11:25 Distance protection operated, Zone-I:FL= Y ph-E, FD=13.35KmsIy=9308Amp 02-06-2020 21:38 10:13:00 1
11 220 kV Budhipadar-Korba-II Line ER/WR TL 08-06-2020 13:51 Line tripped on B-E fault 08-06-2020 15:12 1:21:00 2
12 220 kV Budhipadar-Korba-II Line ER/WR TL 09-06-2020 18:45 Earth wire is snapped in between Loc-5 & 6 11-06-2020 16:31 45:46:00 3
13 220 kV Budhipadar-Korba-II Line ER/WR TL 14-06-2020 04:03 Korba east end:Zone-1,Y-ph, 7.18kA,18.91km. 14-06-2020 05:27 1:24:00 4
14 220 kV Budhipadar-Korba-III Line ER/WR SO 23-06-2020 08:30 OPGC diversion work. 23-06-2020 16:20 7:50:00 0
15 220 kV Budhipadar-Korba-III Line ER/WR TL 26-06-2020 13:36 Y-N Fault 26-06-2020 17:27 3:51:00 1
16 220 kV Budhipadar-Raigarh Line ER/WR TL 09-06-2020 19:08 Earth wire is snapped in between Loc-5 & 6 12-06-2020 21:41 74:33:00 1
17 220 kV Mudasangi (Kolhapur)-Chikkodi Line WR/SR SO 15-06-2020 08:30 Half Yearly Maintenance 15-06-2020 18:50 10:20:00 0
18 220kV Ponda-Ambewadi Line WR/SR SO 01-06-2020 00:00 Debunching of 220 kV Ambewadi-Ponda 01-07-2020 00:00 720:00:00 0
19 220kV Xeldom-Ambewadi Line WR/SR TL 05-06-2020 15:23 Line Tripped on Y-B fault 05-06-2020 19:11 3:48:00 1
20 220kV Xeldom-Ambewadi Line WR/SR TL 07-06-2020 14:35 B-N fault Distance - 33.21km, Fault current -876A at Ambewadi end 07-06-2020 15:37 1:02:00 2
21 220kV Xeldom-Ambewadi Line WR/SR SO 11-06-2020 13:55 For attending heavy arcing in R ph line Isolator 11-06-2020 15:27 1:32:00 2
Shutdown for replacement of burnt out R-phase female contact of line isolator at Ambewadi
22 220kV Xeldom-Ambewadi Line WR/SR SO 14-06-2020 11:11 14-06-2020 15:09 2
S/S 3:58:00
23 220kV Xeldom-Ambewadi Line WR/SR TL 15-06-2020 07:58 B-N fault, insulator decaped at loc no 36. 16-06-2020 16:35 32:37:00 3
24 220kV Xeldom-Ambewadi Line WR/SR TL 19-06-2020 11:31 Zone-1,B ph-N.Distance 8.3 km. Fault Current- 4.16 KA/Voltage Regulation 20-06-2020 23:10 35:39:00 4
25 220kV Xeldom-Ambewadi Line WR/SR TL 25-06-2020 09:14 Due to 220KV Bus tripping at Ambewadi 25-06-2020 11:15 2:01:00 5
26 400 kV Alipurduar-Bongaigaon-II Line ER/NER TL 09-06-2020 12:21 R-N Fault, Z1 FC 3.89 kA 60km from Bongaigaon 09-06-2020 13:30 1:09:00 1
27 400 kV Alipurduar-Bongaigaon-II Line ER/NER TL 10-06-2020 10:30 R-N fault 10-06-2020 11:10 0:40:00 2
28 400 kV Alipurduar-Bongaigaon-II Line ER/NER TL 10-06-2020 11:11 R-N fault 10-06-2020 19:25 8:14:00 3
29 400 kV Alipurduar-Bongaigaon-II Line ER/NER TL 11-06-2020 06:35 R-N fault, Z1, 30.3 km from Bongaigaon, FC:5.4kA 11-06-2020 19:34 12:59:00 4
30 400 kV Bhadrawati-Ramagundam-I Line WR/SR SO 17-06-2020 09:23 CVT replacement 17-06-2020 19:38 10:15:00 0
31 400 kV Jeypore-Gazuwaka-II Line ER/SR TS 15-06-2020 14:43 TEED Protection operated 15-06-2020 18:27 3:44:00 1
32 400 kV Jharsuguda-Raigarh-I Line ER/WR TL 14-06-2020 01:50 Y-N Fault 14-06-2020 05:54 4:04:00 1
Replacement of Porcelain insulator by polymer at location nos.
33 400 kV Patna-Balia-I Line ER/NR SO 08-06-2020 10:03 08-06-2020 20:42 0
24,25,28,29,12,47,48,76,77,78,91,92 10:39:00
Replacement of Porcelain insulator by polymer at location nos.
34 400 kV Patna-Balia-I Line ER/NR SO 10-06-2020 09:59 10-06-2020 20:18 0
24,25,28,29,12,47,48,76,77,78,91,92 10:19:00
Replacement of Porcelain insulator by polymer at location nos.
35 400 kV Patna-Balia-I Line ER/NR SO 12-06-2020 08:27 12-06-2020 21:25 0
24,25,28,29,12,47,48,76,77,78,91,92 12:58:00
Replacement of Porcelain insulator by polymer at location nos.
36 400 kV Patna-Balia-I Line ER/NR SO 14-06-2020 08:45 14-06-2020 19:57 0
24,25,28,29,12,47,48,76,77,78,91,92 11:12:00
Replacement of Porcelain insulator by polymer at location nos.
37 400 kV Patna-Balia-I Line ER/NR SO 16-06-2020 09:28 16-06-2020 20:10 0
24,25,28,29,12,47,48,76,77,78,91,92 10:42:00
Replacement of Porcelain insulator by polymer at location nos.
38 400 kV Patna-Balia-I Line ER/NR SO 18-06-2020 10:34 18-06-2020 20:03 0
24,25,28,29,12,47,48,76,77,78,91,92 9:29:00
Replacement of Porcelain insulator by polymer at location nos.
39 400 kV Patna-Balia-II Line ER/NR SO 09-06-2020 09:30 09-06-2020 19:39 0
24,25,28,29,12,47,48,76,77,78,91,92 10:09:00
40 400 kV Patna-Balia-II Line ER/NR SE 09-06-2020 19:54 hand tripped due to isolator problem at ballia end 09-06-2020 21:42 1:48:00 0
Replacement of Porcelain insulator by polymer at location nos.
41 400 kV Patna-Balia-II Line ER/NR SO 11-06-2020 08:37 11-06-2020 21:43 0
24,25,28,29,12,47,48,76,77,78,91,92 13:06:00
Replacement of Porcelain insulator by polymer at location nos.
42 400 kV Patna-Balia-II Line ER/NR SO 13-06-2020 09:27 13-06-2020 20:06 0
24,25,28,29,12,47,48,76,77,78,91,92 10:39:00
Replacement of Porcelain insulator by polymer at location nos.
43 400 kV Patna-Balia-II Line ER/NR SO 17-06-2020 10:04 17-06-2020 20:18 0
24,25,28,29,12,47,48,76,77,78,91,92 10:14:00
Replacement of Porcelain insulator by polymer at location nos.
44 400 kV Patna-Balia-II Line ER/NR SO 19-06-2020 09:46 19-06-2020 20:20 0
24,25,28,29,12,47,48,76,77,78,91,92 10:34:00

56
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
45 400 kV Ranchi-Sipat-I Line ER/WR SO 17-06-2020 09:35 Insulator replacement 18-06-2020 00:06 14:31:00 0
46 400 kV Ranchi-Sipat-I Line ER/WR TL 15-06-2020 07:56 Tripped on B phase fault, 361.2km and 1.5kA from Ranchi end. 15-06-2020 10:24 2:28:00 1
47 400 kV Shujalpur-RAPP-I Line WR/NR SO 18-06-2020 09:52 AMP work 18-06-2020 19:40 9:48:00 0
48 400 kV Shujalpur-RAPP-II Line WR/NR SO 19-06-2020 09:32 AMP work 19-06-2020 19:27 9:55:00 0
49 400 kV Siliguri-Bongaigaon-I Line ER/NER SO 13-06-2020 11:40 To rectify damaged bottom ph jumper at loc 17 13-06-2020 16:58 5:18:00 0
for replacement of Bend cross Arm -reg.Loc. No. 25 (DD +25, B- PHASE TOP) & one earth wire
50 400 kV Varanasi-Biharshariff-I Line ER/NR SO 04-06-2020 07:02 05-06-2020 19:49 0
peak of 400KV al Loc. No. 26 (DD+25) 36:47:00
51 400 kV Varanasi-Biharshariff-I Line ER/NR TL 05-06-2020 20:14 B-E Fault 06-06-2020 00:48 4:34:00 1
for replacement of Bend cross Arm -reg.Loc. No. 25 (DD +25, B- PHASE TOP) & one earth wire
52 400 kV Varanasi-Biharshariff-II Line ER/NR SO 04-06-2020 07:06 05-06-2020 19:50 0
peak of 400KV al Loc. No. 26 (DD+25) 36:44:00
53 400kV Barh-Gorakhpur Ckt-II Line ER/NR SC 01-06-2020 00:00 for the stringing at Gandak river of the LILO section on ERS towers . 01-07-2020 00:00 720:00:00 0
54 400kV Jharsuguda-Raigarh IV Line WR/ER TS 07-06-2020 15:02 Failure of B-ph LA at Raigarh 07-06-2020 23:39 8:37:00 1
55 765 kV Gaya-Balia Line ER/NR SO 13-06-2020 08:23 To attend snapped one jumper out of 04 nos (Quad conductor) bundle at location no. 582 13-06-2020 12:15 0
3:52:00
56 765 kV Gaya-Varanasi-I Line ER/NR SO 01-06-2020 10:21 Tower strengthening work 01-06-2020 20:28 10:07:00 0
57 765 kV Gaya-Varanasi-I Line ER/NR SO 02-06-2020 09:11 Tower strengthening work 02-06-2020 20:11 11:00:00 0
58 765 kV Gaya-Varanasi-I Line ER/NR SO 03-06-2020 08:00 Tower strengthening work 03-06-2020 20:30 12:30:00 0
59 765 kV Gaya-Varanasi-I Line ER/NR SO 06-06-2020 08:58 Tower strengthening work 06-06-2020 19:52 10:54:00 0
60 765 kV Gaya-Varanasi-I Line ER/NR SO 07-06-2020 09:06 Tower strengthening work 07-06-2020 19:48 10:42:00 0
61 765 kV Gaya-Varanasi-I Line ER/NR SO 08-06-2020 09:05 Tower strengthening work 08-06-2020 20:13 11:08:00 0
62 765 kV Gaya-Varanasi-I Line ER/NR SO 09-06-2020 08:13 Tower strengthening work 09-06-2020 20:33 12:20:00 0
63 765 kV Gaya-Varanasi-I Line ER/NR SO 10-06-2020 08:02 Tower strengthening work 10-06-2020 20:28 12:26:00 0
64 765 kV Gaya-Varanasi-I Line ER/NR SO 11-06-2020 08:01 Tower strengthening work 11-06-2020 19:45 11:44:00 0
65 765 kV Gaya-Varanasi-I Line ER/NR SO 12-06-2020 08:06 Tower strengthening work 12-06-2020 19:56 11:50:00 0
66 765 kV Gaya-Varanasi-I Line ER/NR SO 15-06-2020 09:21 Tower strengthening work 15-06-2020 20:10 10:49:00 0
67 765 kV Gaya-Varanasi-I Line ER/NR SO 19-06-2020 08:06 Tower strengthening work 19-06-2020 20:03 11:57:00 0
68 765 kV Gaya-Varanasi-I Line ER/NR SO 20-06-2020 08:08 Tower strengthening work 20-06-2020 19:41 11:33:00 0
69 765 kV Gaya-Varanasi-I Line ER/NR SO 22-06-2020 07:50 Tower strengthening work 22-06-2020 20:47 12:57:00 0
70 765 kV Gaya-Varanasi-I Line ER/NR SO 25-06-2020 08:18 For strengthening of 765 kV delta type suspension tower wind zone-2 25-06-2020 19:35 11:17:00 0
71 765 kV Gaya-Varanasi-I Line ER/NR SO 26-06-2020 09:15 FOR STRENGTHENING OF 765 kVDELTA TYPE SUSPENSION TYPETOWERS (WIND ZONE-2); 26-06-2020 19:29 0
10:14:00
72 765 kV Gaya-Varanasi-I Line ER/NR SO 27-06-2020 07:50 FOR STRENGTHENING OF 765 kVDELTA TYPE SUSPENSION TYPETOWERS (WIND ZONE-2); 27-06-2020 20:49 0
12:59:00
73 765 kV Jharsuguda-Dharmjaygarh-II Line ER/WR TL 14-06-2020 03:53 R-N Fault 14-06-2020 05:18 1:25:00 1
74 765 kV New Ranchi-Dharamjaygarh-I Line ER/WR TS 27-06-2020 12:52 Tripped on DT received at Dharamjaygarh. 27-06-2020 14:00 1:08:00 1
75 765 kV Solapur-Raichur-I Line WR/SR SO 16-06-2020 10:57 For rectifying the damaged conductor. 16-06-2020 18:58 8:01:00 0
76 765kV Chittorgarh-Banaskanta-I Line NR/WR TL 16-06-2020 16:09 Tripped on R-Y fault, 7.3 kA, 58.7 km from Chittorgarh end 16-06-2020 18:58 2:49:00 1
77 765kV Chittorgarh-Banaskanta-I Line NR/WR SO 23-06-2020 09:29 AMP Works 23-06-2020 20:32 11:03:00 1
78 765kV Chittorgarh-Banaskanta-II Line NR/WR SO 24-06-2020 09:31 AMP Works 24-06-2020 21:19 11:48:00 0
79 765kV Durg-Jharsuguda Ckt-I Line WR/ER MO 01-06-2020 00:00 Manually opened due to High Voltage. 05-06-2020 11:09 107:09:00 0
80 765kV Durg-Jharsuguda Ckt-II Line WR/ER MO 05-06-2020 10:17 Manually opened due to High Voltage. 29-06-2020 11:29 577:12:00 0
81 765kV Jharsuguda - Dharamjaigarh-III Line ER/WR TL 14-06-2020 04:03 R-N Fault 14-06-2020 11:34 7:31:00 1
Tripped R-B-N fault, taken under shutdown at 09:52 Hrs (Auto Reclosure of CKt-4 taken in non-
82 765kV Jharsuguda - Dharamjaigarh-III Line ER/WR TL 15-06-2020 02:45 15-06-2020 09:52 2
auto mode) 7:07:00
Tripped R-B-N fault, taken under shutdown at 09:52 Hrs (Auto Reclosure of CKt-4 taken in non-
83 765kV Jharsuguda - Dharamjaigarh-III Line ER/WR SO 15-06-2020 09:52 15-06-2020 19:04 2
auto mode) 9:12:00
84 765kV Wardha-Nizamabad-2 Line WR/SR SE 28-06-2020 07:34 due to SF6 Leakage 28-06-2020 19:26 11:52:00 0
85 Champa-Kurushetra pole-I HVDC WR/NR TL 09-06-2020 05:13 blocked on CLD HV cable operation. 10-06-2020 16:29 35:16:00 1
86 Champa-Kurushetra pole-I HVDC WR/NR TL 11-06-2020 12:20 DC line fault 11-06-2020 16:33 4:13:00 2
87 Champa-Kurushetra pole-I HVDC WR/NR TP 16-06-2020 22:03 CNAP Control mal-operation at champa 16-06-2020 23:25 1:22:00 3
88 Champa-Kurushetra pole-I HVDC WR/NR SO 17-06-2020 00:32 Pole-1 is not operating as per desired mode, so mode reset is required in Pole-1. 17-06-2020 00:49 0:17:00 3
89 Champa-Kurushetra pole-I HVDC WR/NR TS 17-06-2020 00:52 Pole-1 tripped during power balance between Pole-1 & Pole-3 due to control mal-operation 17-06-2020 01:23 4
0:31:00
90 Champa-Kurushetra pole-I HVDC WR/NR TS 24-06-2020 16:46 CNAP(Common Neutral Area Protection) protection operated at Champa end 24-06-2020 20:59 4:13:00 5
91 Champa-Kurushetra pole-I HVDC WR/NR TP 25-06-2020 23:16 Abnormal Firing Angle due to control mal-operation 26-06-2020 01:36 2:20:00 6
92 Champa-Kurushetra pole-I HVDC WR/NR TS 30-06-2020 04:12 NBS Reclose" at Champa end & pole-1 generated Cat B in pole-3 30-06-2020 07:18 3:06:00 7
93 Champa-Kurushetra pole-II HVDC WR/NR SE 06-06-2020 10:29 E/S/D to attend SF6 gas leakage 06-06-2020 13:03 2:34:00 0
94 Champa-Kurushetra pole-II HVDC WR/NR TL 09-06-2020 05:00 CAT B protection protection due to Earth overcurrent in Pole 4 09-06-2020 14:37 9:37:00 1
95 Champa-Kurushetra pole-II HVDC WR/NR MO 10-06-2020 15:25 To facilitate deblocking Pole-1 and pole-3. 10-06-2020 15:47 0:22:00 1
96 Champa-Kurushetra pole-II HVDC WR/NR TS 10-06-2020 22:21 Tripped on CNAP protection 11-06-2020 00:32 2:11:00 2
97 Champa-Kurushetra pole-II HVDC WR/NR TL 11-06-2020 12:20 DC line fault 11-06-2020 17:03 4:43:00 3

57
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
98 Champa-Kurushetra pole-II HVDC WR/NR SE 16-06-2020 06:03 For attending Pole2 HV voltage divider SF6 gas pressure is below alarm level (near to trip level) 16-06-2020 20:46 3
14:43:00
99 Champa-Kurushetra pole-II HVDC WR/NR TS 16-06-2020 22:03 VBE major Fault at Kurukshetra 17-06-2020 03:36 5:33:00 4
100 Champa-Kurushetra pole-II HVDC WR/NR TS 20-06-2020 18:56 Pole 4 failed to de-parallel and issued CAT B Command to Pole2. 20-06-2020 20:05 1:09:00 5
101 Champa-Kurushetra pole-II HVDC WR/NR TS 24-06-2020 16:46 CNAP(Common Neutral Area Protection) protection operated at Champa end 24-06-2020 21:12 4:26:00 6
102 Champa-Kurushetra pole-II HVDC WR/NR TS 25-06-2020 14:23 VBE major fault in Pole-2 25-06-2020 15:45 1:22:00 7
103 Champa-Kurushetra pole-III HVDC WR/NR TL 09-06-2020 05:13 blocked on CLD HV cable operation. 10-06-2020 16:45 35:32:00 1
104 Champa-Kurushetra pole-III HVDC WR/NR TL 11-06-2020 12:20 DC line fault 11-06-2020 17:28 5:08:00 2
105 Champa-Kurushetra pole-III HVDC WR/NR TP 16-06-2020 22:02 CNAP Control mal-operation at champa. 16-06-2020 23:54 1:52:00 3
106 Champa-Kurushetra pole-III HVDC WR/NR TP 24-06-2020 11:37 Lane changeover failure (due to control maloperation) 24-06-2020 14:15 2:38:00 4
107 Champa-Kurushetra pole-III HVDC WR/NR TS 25-06-2020 23:16 Tripped on Abnormal Firing Angle 26-06-2020 01:50 2:34:00 5
108 Champa-Kurushetra pole-III HVDC WR/NR TS 30-06-2020 04:12 NBS Reclose" at Champa end & pole-1 generated Cat B in pole-3 30-06-2020 05:45 1:33:00 6
109 Champa-Kurushetra pole-III HVDC WR/NR MO 01-06-2020 00:00 Pole blocked on High Voltage 05-06-2020 15:28 111:28:00 6
110 Champa-Kurushetra pole-IV HVDC WR/NR TL 09-06-2020 05:00 CAT B protection protection due to Earth overcurrent in Pole 4 09-06-2020 06:26 1:26:00 1
111 Champa-Kurushetra pole-IV HVDC WR/NR TS 09-06-2020 07:01 Tripped while charging pole-1. 09-06-2020 13:07 6:06:00 2
112 Champa-Kurushetra pole-IV HVDC WR/NR MO 10-06-2020 15:25 To facilitate deblocking Pole-1 and pole-3. 10-06-2020 16:12 0:47:00 2
113 Champa-Kurushetra pole-IV HVDC WR/NR TS 10-06-2020 22:21 Tripped on DC under current protection 11-06-2020 00:02 1:41:00 3
114 Champa-Kurushetra pole-IV HVDC WR/NR TL 11-06-2020 12:20 DC line fault 11-06-2020 17:55 5:35:00 4
115 Champa-Kurushetra pole-IV HVDC WR/NR TS 16-06-2020 22:03 Lane change over failed at Champa 17-06-2020 03:06 5:03:00 5
116 Champa-Kurushetra pole-IV HVDC WR/NR TS 20-06-2020 18:55 valve hall fire alarm (VESDA) 20-06-2020 22:43 3:48:00 6
117 Champa-Kurushetra pole-IV HVDC WR/NR TS 25-06-2020 14:23 VBE major fault in Pole-2 and Cat B in pole-4 25-06-2020 16:51 2:28:00 7
118 Gazuwaka Pole-I HVDC ER/SR TS 15-06-2020 01:53 sustained AC oscillations 16-06-2020 18:27 40:34:00 1
119 Gazuwaka Pole-I HVDC ER/SR TS 23-06-2020 14:25 Tripped due to higher harmonics in East side bus 23-06-2020 17:44 3:19:00 2
120 Gazuwaka Pole-I HVDC ER/SR TS 26-06-2020 20:22 Blocked due to oscillations 26-06-2020 21:37 1:15:00 3
121 Gazuwaka Pole-II HVDC ER/SR TS 15-06-2020 01:53 sustained AC oscillations 15-06-2020 02:44 0:51:00 1
122 Gazuwaka Pole-II HVDC ER/SR TS 23-06-2020 14:25 Tripped due to higher harmonics in East side bus 23-06-2020 16:12 1:47:00 2
123 Gazuwaka Pole-II HVDC ER/SR TS 26-06-2020 20:20 Tripped due to oscillations 26-06-2020 21:19 0:59:00 3
124 HVDC Agra-Alipurduar Line-3 HVDC NR/ER MO 01-06-2020 00:00 Pole blocked to facilitate testing 06-06-2020 12:46 132:46:00 0
125 Mundra-Mahendragarh-Pole-I HVDC WR/NR SO 17-06-2020 11:51 For replacement of Primary side HV Line bushing of Pole-1 Y-Phase Converter transformer. 18-06-2020 20:31 0
32:40:00
126 Pusauli B/B HVDC ER/NR TS 02-06-2020 17:12 System alarm failure 02-06-2020 18:22 1:10:00 1
127 Vindhyachal Pole-I HVDC WR/NR TS 06-06-2020 05:32 DC over current protection trip. 06-06-2020 07:15 1:43:00 1

58
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Transnational Elements
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 132 kV Kataiya-Kusaha Line Nepal TL 04-06-2020 13:35 Y-B fault 04-06-2020 16:15 2:40:00 1
2 132 KV Ram Nagar (Bihar) – Gandak (Nepal) Line Nepal SO 01-06-2020 17:55 Line taken under shutdown for maintenance work 01-06-2020 21:10 0
3:15:00
3 132 KV Ram Nagar (Bihar) – Gandak (Nepal) Line Nepal SE 03-06-2020 17:20 Emergecncy shutdown availed by nepal for rectifcation of Isolator sparking. 03-06-2020 18:30 0
1:10:00
4 132 kV Ramnagar - Valmikinagar (surajpur) Line ER/Nepal MO 01-06-2020 00:00 Bihar is drawing power from Bettia and power support from Nepal was not required 01-06-2020 21:10 21:10:00 0
5 132 kV Salakati-Gelephu Line Bhutan TL 08-06-2020 23:50 R-Y-N fault. Dist : 32km From Salakati end. Line tripped from Gelphu end only. 09-06-2020 00:10 0:20:00 1
6 132 kV Salakati-Gelephu Line Bhutan TL 24-06-2020 10:26 Line tripped,Z1, B Phase 3.4 km from Salakati A/R successful at Salakati end 24-06-2020 10:39 0:13:00 2
7 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TL 07-06-2020 13:10 Tripped (Y-B phase fault) 07-06-2020 13:42 0:32:00 1
8 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TS 08-06-2020 11:18 Tripped at Comilla end on pole discrepancy. 08-06-2020 11:26 0:08:00 2
9 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TL 14-06-2020 11:17 Line tripped on R-Y fault from Surajmaninagar end only. 14-06-2020 11:34 0:17:00 3
10 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh SO 21-06-2020 08:28 Protection testing work 21-06-2020 16:00 7:32:00 3
11 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TS 22-06-2020 10:22 LBB operation at Sjmninagar,Line-2 was under Shutdown. 22-06-2020 11:38 1:16:00 4
12 132 kV Surajmani Nagar - Comilla - 1 Line Bangladesh TL 28-06-2020 18:38 Dist. Protection, Z-3, 147.5kM 28-06-2020 19:17 0:39:00 5
13 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TS 04-06-2020 03:20 Line tripped only from comilla end. 04-06-2020 03:42 0:22:00 1
14 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TL 21-06-2020 11:34 Tripped due to R-Y-B fault,Line-1 was under shutdown 21-06-2020 11:55 0:21:00 2
15 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh SO 22-06-2020 08:44 Protection testing work 22-06-2020 12:17 3:33:00 2
16 132 kV Surajmani Nagar - Comilla - 2 Line Bangladesh TL 28-06-2020 18:38 Dist. Protection, Z-3, 147.5kM 28-06-2020 19:25 0:47:00 3
17 132kV Rangia-Motanga S/C Line ER/BHUTAN TS 19-06-2020 11:35 Line tripped from Motanga end on master 86 relay trip. 19-06-2020 11:55 0:20:00 1
18 220 kV Chukha - Birpara - I Line Bhutan TL 04-06-2020 17:21 R-Y fault 04-06-2020 18:18 0:57:00 1
19 220 kV Chukha - Birpara - II Line Bhutan TL 04-06-2020 17:21 Y-N fault 04-06-2020 18:09 0:48:00 1
20 220 kV Malbase - Birpara Line Bhutan SC 01-06-2020 00:00 Tower Diversion work of Loc No. 57 due to course change of Torsa river 10-06-2020 20:03 236:03:00 0
21 220 Kv Muzaffarpur-Dhalkebar-I Line Nepal TS 24-06-2020 17:50 Ckt-1-B Phase-Earth Fault ; Ckt-2 tripped due to DDT. 24-06-2020 19:12 1:22:00 1
22 220 Kv Muzaffarpur-Dhalkebar-II Line Nepal TS 24-06-2020 17:50 Ckt-1-B Phase-Earth Fault ; Ckt-2 tripped due to DDT. 24-06-2020 19:16 1:26:00 1
23 400 kV Malbase - Binaguri - I Line Bhutan TS 11-06-2020 20:25 Tripped only at Malbase end 11-06-2020 21:07 0:42:00 1
24 400 kV Tala - Binaguri - I Line Bhutan SO 05-06-2020 09:45 Tree cutting 05-06-2020 15:08 5:23:00 0
25 400 kV Tala - Binaguri - I Line Bhutan TL 23-06-2020 23:15 Y-N fault (Y phase conductor Snapped between Tower Loc 260-261) 24-06-2020 11:24 12:09:00 1
Y-N fault(Y phase conductor Snapped between Tower Loc 260-261(Still out(At 11:25 Hrs permit
26 400 kV Tala - Binaguri - I Line Bhutan TL 24-06-2020 11:25 24-06-2020 16:14 2
taken for rectification) 4:49:00
R-Y Fault, 136km from Binaguri end, 4.13km from Tala end, FC:3kA Conductor snapped
27 400 kV Tala - Binaguri - II Line Bhutan TL 22-06-2020 19:24 29-06-2020 15:55 1
between Tower Loc TKS-8 and TKS-9 164:31:00
28 400kV Alipurdaur-Jingmeling-I Line ER/BHUTAN TL 25-06-2020 03:17 R-N fault 25-06-2020 06:14 2:57:00 1
29 400kV Alipurdaur-Jingmeling-I Line ER/BHUTAN TS 26-06-2020 15:40 DT received at APD end 26-06-2020 17:07 1:27:00 2
30 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TL 04-06-2020 01:30 R-N Fault, 13.4 km from Alipurduar, FC:1.6kA 04-06-2020 02:33 1:03:00 1
31 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TL 25-06-2020 03:17 R-N fault 25-06-2020 04:02 0:45:00 2
32 400kV Alipurdaur-Jingmeling-II Line ER/BHUTAN TL 26-06-2020 15:53 Line tripped on B-N Fault, Zone-2, 220km 26-06-2020 17:47 1:54:00 3
33 HVDC Behramara Pole-I HVDC Bangladesh TS 11-06-2020 21:06 External Fault Trip 12-06-2020 04:09 7:03:00 1
34 HVDC Behramara Pole-I HVDC Bangladesh SO 19-06-2020 05:40 Works on Valve cooling system and sealing of PRD of converter trf. 19-06-2020 10:50 5:10:00 1
35 HVDC Behramara Pole-I HVDC Bangladesh TS 23-06-2020 10:15 Tripped on external protection operation, triggered from 230 kV side converter transformer. 23-06-2020 13:59 2
3:44:00

59
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Northern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 765kV Bus Reactor-1 at Chittorgarh Bus Reactor NR SO 13-06-2020 09:25 LA Meggering purpose 13-06-2020 12:56 3:31:00 0
2 B/R-I at Anpara D Bus Reactor NR SE 30-06-2020 12:31 To attend oil leakage 30-06-2020 17:36 5:05:00 0
3 B/R-II at Bhiwani Bus Reactor NR SO 08-06-2020 07:56 AMP Work 08-06-2020 13:36 5:40:00 0
4 HVDC Agra Pole-3 HVDC NR SC 01-06-2020 00:00 Pole blocked to facilitate testing 06-06-2020 12:46 132:46:00 0
5 765/400 kV ICT-I at Agra ICT NR SO 29-06-2020 09:46 For enabling Main-2 LBB Function 29-06-2020 16:00 6:14:00 0
6 765/400 kV ICT-I at Bhiwani ICT NR SO 29-06-2020 22:33 Displacement of suspension insulator of 400kV side 29-06-2020 23:20 0:47:00 0
7 765/400 kV ICT-I at G'Noida ICT NR SE 02-06-2020 11:28 Attending oil leakage 02-06-2020 15:03 3:35:00 0
8 765/400 kV ICT-II at Agra ICT NR SO 30-06-2020 10:02 For enabling Main-2 LBB Function 30-06-2020 18:07 8:05:00 0
9 765/400 kV ICT-II at Meerut ICT NR SE 02-06-2020 22:59 Hand tripped due to sparking in 400 kV Transformer Isolator (41689T) R-Phase 03-06-2020 02:55 3:56:00 0
10 765/400 kV ICT-III at Unnao ICT NR SO 16-06-2020 10:06 To attend leakege and HV earth Fault Relay testing 16-06-2020 19:12 9:06:00 0
11 765/400 kV ICT-III at Unnao ICT NR SO 17-06-2020 09:45 To complete pending work like attending leakage and HV Earth Fault Relay Testing 17-06-2020 17:58 8:13:00 0
1500MVA ICT-4 was hand tripped due to heavy spark observed in ICT-4 tie bay isolator, 71789A-
12 765/400 kV ICT-IV at Jhatikara ICT NR SE 16-06-2020 09:54 16-06-2020 13:15 3:21:00 0
R-ph.
13 765/400 kV ICT-IV at Jhatikara ICT NR SO 18-06-2020 09:00 400KV side CSD RPH3 commissioning and 33 KV tertiary transformer commissioning 18-06-2020 19:32 10:32:00 0
14 765/400kV ICT- I at Hapur ICT NR SO 22-06-2020 10:42 Normalisation of ICT after completing Fire wall of line reactor of GTL project 22-06-2020 12:43 2:01:00 0
15 765/400kV ICT- II at Hapur ICT NR SO 25-06-2020 09:36 For Annual Maintenance & Testing work of 765/400KV 1500 MVA ICT-2 25-06-2020 12:42 3:06:00 0
16 765/400kV ICT-I at Bikaner ICT NR SO 25-06-2020 11:35 Switching of spare ICT 25-06-2020 17:46 6:11:00 0
17 765/400kV ICT-III at Koteshwar ICT NR SO 05-06-2020 15:30 Hand-tripped due to smoke in relay panel (w/o code) 05-06-2020 16:33 1:03:00 0
18 765/400kV ICT-III at Meerut ICT NR TS 16-06-2020 17:16 Operation of B phase Bucholz relay 16-06-2020 19:30 2:14:00 1
19 765/400kV ICT-III at Meerut ICT NR SE 27-06-2020 07:36 Spark in Y-phase of 400 kV side (41489T) isolator 27-06-2020 16:58 9:22:00 1
20 765/400kV ICT-IV at Koteshwar ICT NR SO 05-06-2020 15:30 Hand-tripped due to smoke in relay panel (w/o code) 05-06-2020 17:04 1:34:00 0
21 765 kV Moga-Meerut Line NR MO 13-06-2020 16:10 Manually opened due to High Voltage. 13-06-2020 22:49 6:39:00 0
22 765 kV Moga-Meerut Line NR MO 22-06-2020 04:10 Manually opened due to High Voltage. 22-06-2020 08:32 4:22:00 0
23 765 kV Moga-Meerut Line NR MO 01-06-2020 00:00 Manually opened due to High Voltage. 08-06-2020 10:08 178:08:00 0
24 765kV Agra-Jhatikara Line NR SO 05-06-2020 08:23 Tower strenghthening work 06-06-2020 22:35 38:12:00 0
25 765kV Agra-Jhatikara Line NR SO 06-06-2020 08:40 Tower strenghthening work 06-06-2020 22:35 13:55:00 0
26 765kV Agra-Jhatikara Line NR SO 07-06-2020 08:12 Tower strenghthening work 07-06-2020 20:55 12:43:00 0
27 765kV Agra-Jhatikara Line NR SO 08-06-2020 08:32 Tower strenghthening work 08-06-2020 21:51 13:19:00 0
28 765kV Agra-Jhatikara Line NR SO 10-06-2020 08:09 Tower strenghthening work 10-06-2020 20:38 12:29:00 0
29 765kV Agra-Jhatikara Line NR SO 11-06-2020 08:23 Tower strenghthening work 11-06-2020 20:53 12:30:00 0
30 765kV Agra-Jhatikara Line NR SO 20-06-2020 12:23 For removal of Foreign Material(Kite with thread) in the middle of the span. 20-06-2020 16:34 4:11:00 0
31 765kV Ajmer-Bikaner Ckt-I Line NR MO 04-06-2020 18:32 Manually opened due to High Voltage. 06-06-2020 11:54 41:22:00 0
32 765kV Ajmer-Bikaner Ckt-I Line NR SO 18-06-2020 07:32 Summer Maintenance work 18-06-2020 22:18 14:46:00 0
33 765kV Ajmer-Bikaner Ckt-I Line NR SO 19-06-2020 07:59 Summer Maintenance work 19-06-2020 21:53 13:54:00 0
34 765kV Ajmer-Bikaner Ckt-I Line NR SO 20-06-2020 08:00 Summer Maintenance work 20-06-2020 21:12 13:12:00 0
35 765kV Ajmer-Bikaner Ckt-I Line NR MO 21-06-2020 04:15 Manually opened due to High Voltage. 22-06-2020 09:47 29:32:00 0
36 765kV Ajmer-Bikaner Ckt-II Line NR SO 14-06-2020 08:58 Summer maintenance work 14-06-2020 22:12 13:14:00 0
37 765kV Ajmer-Bikaner Ckt-II Line NR SO 15-06-2020 07:38 Summer maintenance work 15-06-2020 22:13 14:35:00 0
38 765kV Ajmer-Bikaner Ckt-II Line NR SO 16-06-2020 07:49 Summer maintenance work 16-06-2020 22:10 14:21:00 0
39 765kV Ajmer-Bikaner Ckt-II Line NR SO 17-06-2020 07:15 Summer Maintenance work 17-06-2020 21:15 14:00:00 0
40 765kV Ajmer-Chittorgarh Ckt-I Line NR MO 21-06-2020 03:57 Manually opened due to High Voltage. 01-07-2020 00:00 236:03:00 0
41 765kV Ajmer-Chittorgarh Ckt-II Line NR MO 14-06-2020 04:05 Manually opened due to High Voltage. 14-06-2020 08:10 4:05:00 0
42 765kV Aligarh-Jhatikara Line NR SO 13-06-2020 08:15 Tower strengthening work. 13-06-2020 21:09 12:54:00 0
43 765kV Aligarh-Jhatikara Line NR SO 14-06-2020 09:11 Tower strengthening work. 14-06-2020 20:27 11:16:00 0
44 765kV Aligarh-Jhatikara Line NR SO 15-06-2020 08:36 Tower strengthening work. 15-06-2020 20:31 11:55:00 0
45 765kV Aligarh-Jhatikara Line NR SO 16-06-2020 08:28 Tower strengthening work. 16-06-2020 20:33 12:05:00 0
46 765kV Aligarh-Jhatikara Line NR SO 25-06-2020 09:25 To rectify conductor/jumper cone in the R Phase of Loc. No. 1141 25-06-2020 15:36 6:11:00 0
47 765kV Aligarh-Jhatikara Line NR TL 26-06-2020 10:20 Y-E fault 26-06-2020 16:37 6:17:00 1
48 765kV Antah-Phagi-II Line NR TL 01-06-2020 00:00 Y-B-N Fault, Tower bend loc:355,356,393,394 01-07-2020 00:00 720:00:00 1
49 765kV Bikaner-Bhadla Ckt-I Line NR SO 02-06-2020 15:20 Summer Maintenance work 02-06-2020 21:29 6:09:00 0
50 765kV Bikaner-Bhadla Ckt-I Line NR SO 03-06-2020 15:24 Summer Maintenance work 03-06-2020 22:46 7:22:00 0
51 765kV Bikaner-Bhadla Ckt-I Line NR SO 07-06-2020 15:04 Summer Maintenance work 07-06-2020 23:38 8:34:00 0
52 765kV Bikaner-Bhadla Ckt-II Line NR SO 04-06-2020 15:50 Summer maintenance work 04-06-2020 22:33 6:43:00 0
53 765kV Bikaner-Bhadla Ckt-II Line NR SO 05-06-2020 15:20 Summer maintenance work 05-06-2020 22:32 7:12:00 0
54 765kV Bikaner-Bhadla Ckt-II Line NR SO 06-06-2020 15:26 Summer maintenance work eg. Tightening of loose condutor VD, Corona ring, arcing horn, 06-06-2020 22:18 6:52:00 0
55 765kV Bikaner-Bhadla Ckt-II Line NR TL 13-06-2020 14:51 R-N Fault 13-06-2020 18:45 3:54:00 1
56 765kV Bikaner-Bhadla Ckt-II Line NR TL 14-06-2020 17:26 R-N fault 14-06-2020 20:44 3:18:00 2
57 765kV Bikaner-Bhadla Ckt-II Line NR TL 16-06-2020 10:59 R-N fault 17-06-2020 12:05 25:06:00 3
58 765kV Bikaner-Bhadla Ckt-II Line NR SO 19-06-2020 15:23 OPGW wire work 20-06-2020 10:34 19:11:00 3
59 765kV Fatehabad-Lalitpur-I Line NR TL 13-06-2020 18:15 R-N Fault 13-06-2020 19:49 1:34:00 1
60 765kV Fatehabad-Lalitpur-II Line NR TL 01-06-2020 00:00 Fatehabad : Fault phase -B(A,B, C) Fault location - 285.40km. Tower damaged at Loc no- 29-06-2020 15:33 687:33:00 1

60
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
61 765kV Fatehpur-Agra-I Line NR MO 17-06-2020 06:10 Manually opened due to High Voltage. 01-07-2020 00:00 329:50:00 0
62 765kV Fatehpur-Agra-I Line NR MO 01-06-2020 00:00 Manually opened due to High Voltage. 08-06-2020 13:22 181:22:00 0
63 765kV Fatehpur-Agra-II Line NR MO 10-06-2020 17:43 Manually opened due to High Voltage. 16-06-2020 20:44 147:01:00 0
64 765kV Jabalpur-Orai -II Line NR SO 02-06-2020 09:36 AMP works 02-06-2020 20:46 11:10:00 0
65 765kV Kanpur-Aligarh Line NR MO 05-06-2020 02:12 Manually opened due to High Voltage. 06-06-2020 21:16 43:04:00 0
66 765kV Kanpur-Aligarh Line NR MO 21-06-2020 09:11 Manually opened due to High Voltage. 22-06-2020 22:15 37:04:00 0
67 765kV Meerut-Bhiwani(PG) Line NR MO 14-06-2020 07:45 Manually opened due to High Voltage. 16-06-2020 16:09 56:24:00 0
68 765kV Meerut-Bhiwani(PG) Line NR SO 17-06-2020 09:03 Tower strengthening work 17-06-2020 19:59 10:56:00 0
69 765kV Meerut-Bhiwani(PG) Line NR SO 18-06-2020 08:25 Tower strengthening work 18-06-2020 20:12 11:47:00 0
70 765kV Meerut-Bhiwani(PG) Line NR SO 19-06-2020 09:39 Tower strengthening work 19-06-2020 20:22 10:43:00 0
71 765kV Meerut-Bhiwani(PG) Line NR MO 20-06-2020 08:15 Manually opened due to High Voltage. 20-06-2020 09:08 0:53:00 0
72 765kV Meerut-Bhiwani(PG) Line NR SO 20-06-2020 09:09 Tower strengthening work 20-06-2020 21:10 12:01:00 0
73 765kV Meerut-Bhiwani(PG) Line NR SO 22-06-2020 08:59 Tower strengthening work 22-06-2020 19:59 11:00:00 0
74 765kV Meerut-Bhiwani(PG) Line NR SO 23-06-2020 10:18 Tower Strengthening work 23-06-2020 21:03 10:45:00 0
75 765kV Meerut-Bhiwani(PG) Line NR SO 24-06-2020 08:00 Tower strengthening work 24-06-2020 19:00 11:00:00 0
76 765kV Meerut-Koteshwar CKt-I Line NR TS 13-06-2020 14:17 Fault in Reactor/Line charged without reactor at Meerut end 13-06-2020 15:23 1:06:00 1
77 765kV Moga-Bhiwani(PG) Line NR SE 13-06-2020 13:09 for rectification work of hanging pilot insulator at Loc no. 131(C+0 13-06-2020 15:47 2:38:00 0
78 765kV Moga-Bhiwani(PG) Line NR SO 21-06-2020 06:53 To attend faulty suspension clamp of Earth Wire 21-06-2020 15:50 8:57:00 0
79 765kV Moga-Bhiwani(PG) Line NR SO 25-06-2020 08:41 Tower strengthening work 25-06-2020 20:25 11:44:00 0
80 765kV Moga-Bhiwani(PG) Line NR SO 26-06-2020 08:41 Tower strengthening work 26-06-2020 19:20 10:39:00 0
81 765kV Moga-Bhiwani(PG) Line NR SO 27-06-2020 08:00 Tower strengthening work 27-06-2020 20:09 12:09:00 0
82 765kV Moga-Bhiwani(PG) Line NR SO 28-06-2020 10:24 Tower strengthening work 28-06-2020 21:24 11:00:00 0
83 765kV Moga-Bhiwani(PG) Line NR SO 29-06-2020 09:23 Tower strengthening work 29-06-2020 20:45 11:22:00 0
84 765kV Moga-Bhiwani(PG) Line NR SO 30-06-2020 08:03 Tower strengthening work 30-06-2020 20:45 12:42:00 0
85 765kV Moga-Bikaner Ckt-I Line NR MO 09-06-2020 00:02 Manually opened due to High Voltage. 10-06-2020 12:20 36:18:00 0
86 765kV Moga-Bikaner Ckt-I Line NR MO 17-06-2020 04:16 Manually opened due to High Voltage. 17-06-2020 12:08 7:52:00 0
87 765kV Moga-Bikaner Ckt-II Line NR MO 12-06-2020 17:07 Manually opened due to High Voltage. 14-06-2020 08:29 39:22:00 0
88 765kV Moga-Bikaner Ckt-II Line NR MO 01-06-2020 00:00 Manually opened due to high voltage. 08-06-2020 12:45 180:45:00 0
89 765kV Phagi-Bhiwani-I Line NR MO 07-06-2020 16:18 Manually opened due to High Voltage. 07-06-2020 21:38 5:20:00 0
90 765kV Phagi-Bhiwani-II Line NR MO 05-06-2020 02:15 Manually opened due to High Voltage. 05-06-2020 12:48 10:33:00 0

61
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Western Region Elements


1 330Mvar Bus Reactor-I at Banaskantha Bus Reactor WR SO 10-06-2020 09:22 Switching with spare Line Reactor 10-06-2020 15:11 0
5:49:00
2 B/R-I at Bhopal Bus Reactor WR TS 19-06-2020 16:02 Tripped on Fire detector alarm 19-06-2020 18:48 1
2:46:00
3 B/R-I at Dharamjaigarh Bus Reactor WR SO 09-06-2020 09:21 AMP Works 09-06-2020 19:50 0
10:29:00
4 B/R-I at Ektuni Bus Reactor WR TS 11-06-2020 09:15 Tripped on PRV operation. 11-06-2020 14:11 1
4:56:00
5 B/R-I at Khandwa(PS) Bus Reactor WR SO 06-06-2020 17:13 Water ingress into the Tank mounted PRV device 06-06-2020 19:02 0
1:49:00
6 B/R-I at Rajnandgaon Bus Reactor WR SE 05-06-2020 16:01 for attending Hotspot on 707-89B R-Phase isolator 05-06-2020 18:25 0
2:24:00
7 765/400 kV ICT - I at Warora ICT WR SO 05-06-2020 09:49 Relay testing work 05-06-2020 17:45 7:56:00 0
8 765/400 kV ICT - II at Parli ICT WR SO 23-06-2020 09:32 AMP Works 23-06-2020 19:35 10:03:00 0
9 765/400 kV ICT-I at Aurangabad(PG) ICT WR SE 23-06-2020 13:09 E/S/D to attend oil leakage 23-06-2020 18:24 5:15:00 0
10 765/400 kV ICT-I at Bilaspur ICT WR SO 08-06-2020 09:03 AMP 08-06-2020 20:13 11:10:00 0
11 765/400 kV ICT-I at Pune ICT WR SO 30-06-2020 11:03 AMP Works 30-06-2020 21:04 10:01:00 0
12 765/400 kV ICT-I at Raigarh-PS(Kotra) ICT WR SO 08-06-2020 09:35 For AMP works 08-06-2020 18:41 9:06:00 0
13 765/400 kV ICT-I at Raipur PS(Durg) ICT WR SE 01-06-2020 10:18 Attending main Tank-top oil leakege 01-06-2020 17:37 7:19:00 0
14 765/400 kV ICT-II at Bilaspur ICT WR SO 10-06-2020 10:44 AMP Works 10-06-2020 20:34 9:50:00 0
15 765/400 kV ICT-II at Pune ICT WR SO 25-06-2020 10:19 AMP work 25-06-2020 21:03 10:44:00 0
16 765/400 kV ICT-II at Wardha ICT WR SE 01-06-2020 14:42 Low oil level and leakage observed 01-06-2020 19:22 4:40:00 0
17 765/400 kV ICT-II at Wardha ICT WR SO 22-06-2020 10:15 AMP Works 22-06-2020 21:07 10:52:00 0
18 765/400 kV ICT-III at Bilaspur ICT WR SO 26-06-2020 09:28 AMP works 26-06-2020 20:09 10:41:00 0
19 765/400 kV ICT-III at Raigarh-PS(Kotra) ICT WR SO 20-06-2020 07:05 PRV operated in Y-phase 20-06-2020 11:57 4:52:00 0
20 765/400 kV ICT-III at Raigarh-PS(Kotra) ICT WR SO 20-06-2020 11:59 Sparking observed in Y-ph Isolator- hand tripped 20-06-2020 13:24 1:25:00 0
21 765/400 kV ICT-III at Wardha ICT WR SO 29-06-2020 09:59 Spare ICT Changeover 30-06-2020 06:28 20:29:00 0
22 765/400kV ICT-I at Banaskantha ICT WR SO 08-06-2020 09:44 For switching with spare ICT. Dia to be kept open on both sides. 08-06-2020 18:11 8:27:00 0
23 765/400kV ICT-I at Banaskantha ICT WR SE 13-06-2020 10:53 To attend hotspot at 421 89T Y1 isolator 13-06-2020 14:55 4:02:00 0
24 765/400kV ICT-I at Khandwa(PS) ICT WR TS 04-06-2020 04:42 Due to PRD-2 operated in R phase 04-06-2020 09:12 4:30:00 1
25 765/400kV ICT-I at Khandwa(PS) ICT WR TS 06-06-2020 21:30 Due to PRD operated on R-phase 09-06-2020 22:16 72:46:00 2
26 765/400kV ICT-I at Khandwa(PS) ICT WR SO 25-06-2020 14:17 R-phase CT SF6 Lockout in 403 Bay 25-06-2020 17:15 2:58:00 2
27 765/400kV ICT-II at Khandwa(PS) ICT WR TS 04-06-2020 04:42 PRD operated 04-06-2020 11:45 7:03:00 1
28 765/400kV ICT-II at Khandwa(PS) ICT WR TS 09-06-2020 14:48 Operation of PRD of R ph 09-06-2020 21:20 6:32:00 2
29 765/400kV ICT-II at Khandwa(PS) ICT WR TS 27-06-2020 00:46 MOLG-Magnetic oil level gauge(OLTC) Low Trip in B-Phase 27-06-2020 09:23 8:37:00 3
30 765 kV Durg-Champa-I Line WR TL 29-06-2020 13:49 B-N Fault 29-06-2020 18:32 4:43:00 1
31 765 kV Durg-Champa-I Line WR SO 29-06-2020 10:11 Shutdown availed for rectification of open jumper rectification at location no:119 29-06-2020 19:18 9:07:00 1
32 765kV Akola-Koradi-I Line WR MO 17-06-2020 00:32 Manually opened due to High Voltage. 17-06-2020 01:20 0:48:00 0
33 765kV Aurangabad-Dhule(BDTCL) Line WR MO 16-06-2020 21:49 Manually opened due to High Voltage. 24-06-2020 06:20 176:31:00 0
34 765kV Aurangabad-Dhule(BDTCL) Line WR MO 28-06-2020 17:45 Manually opened due to High Voltage. 29-06-2020 08:09 14:24:00 0
35 765kV Aurangabad-Phadge Ckt-I Line WR MO 12-06-2020 17:56 Manually opened due to High Voltage. 15-06-2020 11:22 65:26:00 0
36 765kV Aurangabad-Sholapur-II Line WR MO 09-06-2020 21:11 Manually opened due to High Voltage. 25-06-2020 07:32 370:21:00 0
37 765kV Aurangabad-Sholapur-II Line WR MO 25-06-2020 23:39 Manually opened due to High Voltage. 01-07-2020 00:00 120:21:00 0
38 765kV Aurangabad-Sholapur-II Line WR MO 01-06-2020 00:00 Manually opened due to High Voltage. 08-06-2020 06:44 174:44:00 0
Tripped on Y-phase fault; broken conductor connector of Y phase found towards Switch yard
39 765kV Bhuj-Banaskantha-I Line WR TS 07-06-2020 15:01 07-06-2020 23:27 1
side at Bhuj end. 8:26:00
40 765kV Bhuj-Banaskantha-I Line WR SO 26-06-2020 08:40 For AMP work 26-06-2020 19:24 10:44:00 1
41 765kV Bhuj-Banaskantha-I Line WR SO 27-06-2020 09:07 AMP Works 27-06-2020 18:48 9:41:00 1
42 765kV Bhuj-Banaskantha-II Line WR SE 08-06-2020 18:53 Due to Heavy spark at R phase line isolator at Banaskantha end 23:27 08-06-2020 23:27 4:34:00 0
43 765kV Bhuj-Banaskantha-II Line WR SO 26-06-2020 10:38 For AMP work 26-06-2020 19:24 8:46:00 0
44 765kV Bhuj-Banaskantha-II Line WR SO 28-06-2020 09:10 AMP Works 28-06-2020 18:52 9:42:00 0
45 765kV Bhuj-Banaskantha-II Line WR SO 29-06-2020 09:29 AMP works 29-06-2020 18:59 9:30:00 0
46 765kV Bilaspur-Rajnandgaon-II Line WR TS 19-06-2020 18:32 Line tripped at Bilaspur end only on DT received and remained charged from Rajnandgaon. 19-06-2020 21:07 1
2:35:00
47 765kV Bina-Gwalior-I Line WR MO 21-06-2020 09:32 Manually opened due to High Voltage. 21-06-2020 21:53 12:21:00 0
48 765kV Bina-Gwalior-I Line WR SO 30-06-2020 11:16 To attend broken isolator at Bina end 30-06-2020 23:37 12:21:00 0
49 765kV Bina-Gwalior-II Line WR SE 22-06-2020 13:28 E/S/D to attend sag in Y-ph line isolator dropper 22-06-2020 20:23 6:55:00 0
Line Tripped on R-N fault, , Attempt taken at 21:58 Hrs but tripped on SOTF. earth wire
50 765kV Bina-Gwalior-III Line WR TL 17-06-2020 21:11 18-06-2020 14:53 1
snapped at loc.no.512 reported 17:42:00
62
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
51 765kV Dhule-Vadodara Line WR SO 10-06-2020 10:11 AMP Works 10-06-2020 20:24 10:13:00 0
52 765kV Dhule-Vadodara Line WR SO 11-06-2020 10:03 AMP Works 11-06-2020 19:55 9:52:00 0
53 765kV Durg-Wardha-I Line WR MO 03-06-2020 14:24 Manually opened due to High Voltage. 25-06-2020 07:45 521:21:00 0
54 765kV Durg-Wardha-I Line WR MO 28-06-2020 13:05 Manually opened due to High Voltage. 01-07-2020 00:00 58:55:00 0
55 765kV Durg-Wardha-III Line WR MO 09-06-2020 19:03 Manually opened due to High Voltage. 01-07-2020 00:00 508:57:00 0
56 765kV Durg-Wardha-IV Line WR MO 01-06-2020 00:00 Manually opened due to High Voltage. 09-06-2020 11:02 203:02:00 0
57 765kV Indore-Bhopal Line WR TL 11-06-2020 17:49 Line tripped on B-E fault 11-06-2020 20:54 3:05:00 1
58 765kV Indore-Bhopal Line WR TL 25-06-2020 17:45 B-N Fault 25-06-2020 18:44 0:59:00 2
59 765kV Indore-Bhopal Line WR SE 27-06-2020 09:53 To attend sag in earth wire at Loc. no-24/5 to 24/6 27-06-2020 15:22 5:29:00 2
60 765kV Indore-Vadodara Line WR SE 05-06-2020 17:29 E/S/D to rescue person climbed on tower 05-06-2020 19:41 2:12:00 0
61 765kV Jabalpur-Bhopal Line WR SO 12-06-2020 10:26 To verify CSD setting 12-06-2020 19:28 9:02:00 0
62 765kV Jabalpur-Dharamjaigarh-I Line WR MO 01-06-2020 00:00 Manually opened due to High Voltage. 01-07-2020 00:00 720:00:00 0
63 765kV Jabalpur-Dharamjaigarh-II Line WR TL 13-06-2020 15:44 Y-N Fault 13-06-2020 16:01 0:17:00 1
64 765kV Jabalpur-Dharamjaigarh-III Line WR SO 16-06-2020 07:18 Bent Leg and bracing rectification. 16-06-2020 22:57 15:39:00 0
65 765kV Jabalpur-Dharamjaigarh-III Line WR MO 01-06-2020 00:00 Manually opened due to High Voltage. 16-06-2020 07:17 367:17:00 0
66 765kV Jabalpur-Dharamjaigarh-IV Line WR TL 11-06-2020 13:34 Y phase fault; FD-209.4 KM, Fault Current- 3.8Ka from Dharamjaygarh end 11-06-2020 15:46 2:12:00 1
67 765kV Jabalpur-Dharamjaigarh-IV Line WR SO 16-06-2020 07:43 Bent Leg and bracing rectification. 16-06-2020 23:00 15:17:00 1
68 765kV Jabalpur-Dharamjaigarh-IV Line WR MO 16-06-2020 23:01 Manually opened due to High Voltage. 01-07-2020 00:00 336:59:00 1
69 765kV New Parli - Solapur Ckt-I Line WR SO 09-06-2020 10:01 AMP Works 09-06-2020 20:36 10:35:00 0
70 765kV New Parli - Solapur Ckt-II Line WR MO 03-06-2020 03:49 Manually opened due to High Voltage. 03-06-2020 07:10 3:21:00 0
71 765kV New Parli - Solapur Ckt-II Line WR MO 03-06-2020 14:09 Manually opened due to High Voltage. 05-06-2020 22:49 56:40:00 0
72 765kV Pune - Aurangabad - I Line WR MO 03-06-2020 15:54 Manually opened due to High Voltage. 06-06-2020 08:22 64:28:00 0
73 765kV Pune - Aurangabad - I Line WR SO 11-06-2020 10:32 Replacement of broken clamp at Pune(GIS) end 11-06-2020 19:07 8:35:00 0
74 765kV Pune-Phadge Line WR MO 11-06-2020 19:57 Manually opened due to High Voltage. 01-07-2020 00:00 460:03:00 0
75 765kV Pune-Sholapur Line WR MO 20-06-2020 19:58 Manually opened due to High Voltage. 01-07-2020 00:00 244:02:00 0
76 765kV Pune-Sholapur Line WR MO 01-06-2020 00:00 Manually opened due to High Voltage. 20-06-2020 09:53 465:53:00 0
77 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-I Line WR SO 19-06-2020 09:59 To attend the missing earth wire cotter nuts 19-06-2020 14:56 4:57:00 0
78 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-I Line WR SO 28-06-2020 07:48 AMP Work 28-06-2020 19:48 12:00:00 0
79 765kV Raigarh-PS(Kotra)-Raipur-PS(Durg)-II Line WR SO 27-06-2020 08:47 AMP Works 27-06-2020 19:59 11:12:00 0
80 765kV Sasan - Vindhyachal(PS)-II Line WR TL 22-06-2020 16:42 Y-N fault, FC: 21.17kA, 1km from Sasan 23-06-2020 15:50 23:08:00 1
Tripped on R-E fault, due to tower bent on location number 430./Tower Collapse
81 765kV Sasan-Satna-I Line WR TL 01-06-2020 00:00 10-06-2020 17:18 1
233:18:00
82 765kV Sasan-Satna-II Line WR TL 01-06-2020 00:00 Tripped due to tower bent on location number 673./Tower Collapse 07-06-2020 12:57 156:57:00 1
83 765kV Satna-Bina-I Line WR TL 18-06-2020 16:36 Due to Y-phase fault, Satna end 62.88 km, 7.9 kamp, Bina end 209.8 km, 3.35 kamp 19-06-2020 00:37 8:01:00 1
84 765kV Satna-Bina-I Line WR SO 24-06-2020 08:50 AMP Works 24-06-2020 20:22 11:32:00 1
85 765kV Seoni-Wardha-I Line WR TL 10-06-2020 16:35 Y-B fault , Wardha end -FC-26.85, FD-0KM Seoni end FC-3.744kA FD 267kM 10-06-2020 17:47 1:12:00 1
86 765kV Seoni-Wardha-I Line WR SO 17-06-2020 09:30 for rectification of clearance from Gantry tower to end tower 17-06-2020 19:06 9:36:00 1
87 765kV Seoni-Wardha-II Line WR SO 15-06-2020 09:17 For LR Radiator Replacement. 15-06-2020 23:26 14:09:00 0
88 765kV Seoni-Wardha-II Line WR SE 15-06-2020 23:27 Air trap in BUCHHOLZ relay of L/R at Wardha; Air was released from relay and the Radiator 16-06-2020 01:40 0
2:13:00
89 765kV Tirora-Koradi-II Line WR SE 07-06-2020 11:34 E/S/D for jumper rectification work 07-06-2020 14:53 3:19:00 0
90 765kV Vindhyachal(PS)- Jabalpur- I Line WR TS 19-06-2020 10:29 To attend oil leakage in R Ph neutral bushing 19-06-2020 21:52 11:23:00 1
For relay replacement (voltage coil of backup imp relay (21R) has got faulty) at Vindhyachal
91 765kV Vindhyachal(PS)- Jabalpur- I Line WR SO 16-06-2020 11:49 16-06-2020 15:12 1
(PS). 3:23:00
92 765kV Vindhyachal-Satna-II Line WR TS 05-06-2020 07:02 Reactor protection optd at Satna end 05-06-2020 08:42 1:40:00 1
93 765kV Wardha-Aurangabad-I Line WR SO 03-06-2020 10:30 To attend broken line to isolator dropper connectorr 03-06-2020 17:05 6:35:00 0
94 765kV Wardha-Aurangabad-II Line WR MO 17-06-2020 21:00 Manually opened due to High Voltage. 19-06-2020 07:23 34:23:00 0
95 765kV Wardha-Aurangabad-II Line WR MO 19-06-2020 18:14 Manually opened due to High Voltage. 01-07-2020 00:00 269:46:00 0
96 765kV Wardha-Aurangabad-II Line WR MO 01-06-2020 00:00 Manually opened due to High Voltage. 09-06-2020 06:25 198:25:00 0
97 765kV Wardha-Aurangabad-III Line WR MO 30-06-2020 01:05 Manually opened due to High Voltage. 01-07-2020 00:00 22:55:00 0
98 765kV Wardha-Aurangabad-IV Line WR MO 03-06-2020 17:25 Manually opened due to High Voltage. 18-06-2020 10:30 353:05:00 0
99 765kV Wardha-Aurangabad-IV Line WR MO 19-06-2020 01:31 Manually opened due to High Voltage. 28-06-2020 09:05 223:34:00 0
100 765kV Warora-Gadarwara Ckt-II Line WR SO 10-06-2020 09:39 AMP Works 10-06-2020 18:33 8:54:00 0

63
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

Eastern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 B/R-II at Ranchi New Bus Reactor ER SO 10-06-2020 09:44 AMP Works & spare switching 10-06-2020 17:27 0
7:43:00
2 HVDC Alipurdaur Pole-3 HVDC ER MO 01-06-2020 00:00 Pole blocked to facilitate testing 01-06-2020 09:54 9:54:00 0
To facilitate shutdown of ICT-3. Spare unit from ICT-2 to be removed for replacing leaking B Ph
3 765/400 kV ICT-II at Angul ICT ER SO 01-06-2020 15:40 01-06-2020 18:38 0
unit of ICT-3 2:58:00
4 765/400 kV ICT-III at Angul ICT ER SO 01-06-2020 19:06 Oil leakage in B Ph Unit 02-06-2020 02:40 7:34:00 0
5 765kV Angul-Jharsuguda-I Line ER SO 25-06-2020 09:39 AMP of Line Reactor & Line Maintenance work at Jharsuguda end 25-06-2020 19:39 10:00:00 0
6 765kV Angul-Jharsuguda-II Line ER MO 26-06-2020 03:32 Manually opened due to High Voltage. 26-06-2020 22:48 19:16:00 0
7 765kV Angul-Jharsuguda-II Line ER SO 26-06-2020 09:48 AMP of Line Reactor & Line Maintenance work 26-06-2020 19:06 9:18:00 0
8 765kV Angul-Jharsuguda-III Line ER MO 27-06-2020 02:39 Manually opened due to High Voltage. 01-07-2020 00:00 93:21:00 0
9 765kV Angul-Jharsuguda-III Line ER MO 01-06-2020 00:00 Manually opened due to High Voltage. 04-06-2020 09:56 81:56:00 0
10 765kV Angul-Jharsuguda-IV Line ER MO 07-06-2020 11:45 Manually opened due to High Voltage. 24-06-2020 10:40 406:55:00 0
Rectifying/realigning of Conductor Swing Issue at the entry to Gantry-Bay 09; Strengthening of
11 765kV Jharsuguda-Darlipalli Ckt-II Line ER SO 03-06-2020 15:33 05-06-2020 17:20 0
damaged portion of the B phase conductor strand 49:47:00

Southern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month
1 240Mvar B/R-I at Cuddapah Bus Reactor SR SO 06-06-2020 11:15 Spare changeover work 06-06-2020 14:30 0
3:15:00
2 B/R -I Chilkuripetha Bus Reactor SR SO 26-06-2020 10:05 AMP Works 26-06-2020 17:36 0
7:31:00
3 765/400 kV ICT-I at Cuddapah ICT SR SO 24-06-2020 09:08 Installation of backup impedance relay. 24-06-2020 19:33 10:25:00 0
4 765/400 kV ICT-II at Cuddapah ICT SR SO 25-06-2020 09:25 Installation of backup impedance relay for ICT-2 - 765/400KV 25-06-2020 18:06 8:41:00 0
5 765/400 kV ICT-II at Vemagiri ICT SR SO 11-06-2020 09:21 AMP Works 11-06-2020 18:11 8:50:00 0
6 765/400kV ICT-I at Chilkuripetha ICT SR SO 23-06-2020 10:06 For AMP Work 23-06-2020 18:37 8:31:00 0
7 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 16-06-2020 20:38 Manually opened due to High Voltage. 01-07-2020 00:00 339:22:00 0
8 765kV Cuddapah- Chilkuripetha Ckt-II Line SR MO 01-06-2020 00:00 Manually opened due to High Voltage. 01-07-2020 00:00 720:00:00 0
9 765kV Cuddapah-Thiruvalam Ckt-I Line SR MO 08-06-2020 18:06 Manually opened due to High Voltage. 09-06-2020 08:44 14:38:00 0
10 765kV Cuddapah-Thiruvalam Ckt-I Line SR MO 10-06-2020 18:13 Manually opened due to High Voltage. 15-06-2020 10:42 112:29:00 0
11 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 07-06-2020 03:11 Manually opened due to High Voltage. 08-06-2020 10:27 31:16:00 0
12 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 16-06-2020 02:22 Manually opened due to High Voltage. 17-06-2020 08:36 30:14:00 0
13 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 21-06-2020 01:27 Manually opened due to High Voltage. 22-06-2020 07:50 30:23:00 0
14 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 23-06-2020 01:38 Manually opened due to High Voltage. 23-06-2020 07:55 6:17:00 0
15 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 23-06-2020 20:26 Manually opened due to High Voltage. 24-06-2020 09:05 12:39:00 0
16 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 24-06-2020 20:31 Manually opened due to High Voltage. 25-06-2020 09:01 12:30:00 0
17 765kV Cuddapah-Thiruvalam Ckt-II Line SR MO 25-06-2020 18:22 Manually opened due to High Voltage. 01-07-2020 00:00 125:38:00 0
18 765kV Nizamabad- Maheswaram-I Line SR MO 09-06-2020 21:08 Manually opened due to High Voltage. 10-06-2020 07:19 10:11:00 0
19 765kV Nizamabad- Maheswaram-I Line SR MO 11-06-2020 20:33 Manually opened due to High Voltage. 12-06-2020 08:19 11:46:00 0
20 765kV Nizamabad- Maheswaram-II Line SR MO 02-06-2020 01:17 Manually opened due to High Voltage. 09-06-2020 07:11 173:54:00 0
21 765kV Nizamabad- Maheswaram-II Line SR MO 10-06-2020 17:58 Manually opened due to High Voltage. 11-06-2020 08:04 14:06:00 0
22 765kV Nizamabad- Maheswaram-II Line SR MO 12-06-2020 15:05 Manually opened due to High Voltage. 16-06-2020 10:51 91:46:00 0
23 765kV Nizamabad- Maheswaram-II Line SR MO 16-06-2020 20:52 Manually opened due to High Voltage. 28-06-2020 07:04 274:12:00 0
24 765kV Raichur-Kurnool-I Line SR SE 08-06-2020 12:14 Hotspot in line isolator at Kurnool end 08-06-2020 14:46 2:32:00 0

64
23. List of Outages of Elements monitored by NLDC for the month of JUNE-2020
Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

North Eastern Region Elements


Number of
Type of the Region Tripping Date and Restoration Date and Cumulative
S. No. Name of Transmission Element Catagory Brief Reason/Relay Indication Outage Duration
element Involved Time Time tripping in the
month

1 HVDC Biswanath Chariali Pole-1 HVDC NER SE 26-06-2020 13:14 E/S/D of Pole 1 at BNC taken to attend leakage in valve cooling. 27-06-2020 10:37 21:23:00 0

TL= Tripping due to Line Fault


TS= Tripping due to S/S Fault
MO= Opened due to system constraints
TV= Tripped on Overvoltage
SC= Planned Shutdown for
construction activities
SO= Planned Shutdown for O&M activities
SE= Emergency Shutdown
TP= Protection Maloperation
ME= Miscellanous outage

65
24. ALL TIME HIGHEST
As on 30-06-2020
Demand Met during
Maximum Demand Met Energy Met Hydro Gen. Wind Gen. Solar Gen.
Regions Evening Peak
during the day (MW) (MU) (MU) (MU) (MU)
hrs(MW)
66687 62627 1493 389 71 46.6
NR 03-07-2019 03-07-2019 01-07-2019 12-08-2017 14-07-2019 03-04-2020
59385 54589 1293 167 199 31.5
WR 21-02-2020 15-10-2018 16-10-2018 18-12-2014 27-07-2019 13-03-2020
53465 50436 1157 208 245 103.6
SR 18-03-2020 24-02-2020 18-03-2020 31-08-2018 20-07-2018 17-02-2020
23783 23016 496 146 - 5.5
ER 14-06-2019 31-08-2019 25-06-2019 30-06-2020 25-06-2020
3145 2944 58 37 - 0.2
NER 07-09-2019 29-08-2019 22-08-2019 03-07-2019 22-11-2019
182610 176381 4145 816 467 178.1
All India 30-05-2019 29-05-2019 30-05-2019 09-09-2019 12-06-2018 28-03-2020

Max. Demand Met Energy Consumption


Regions States during the day (MW) (MU)
As on date As on date
Punjab 13041 03-07-2019 300.0 03-07-2019
Haryana 10850 03-07-2019 237.2 03-07-2019
Rajasthan 14209 06-02-2020 280.3 19-06-2020
Delhi 7254 02-07-2019 147.1 02-07-2019
NR Uttar Pradesh 22110 12-06-2020 471.8 05-06-2019
Uttarakhand 2753 08-06-2018 53.2 14-06-2019
Himachal Pradesh 1786 31-01-2020 34.0 18-08-2019
J&K(UT) & Ladakh(UT) 2934 04-01-2020 56.5 18-12-2018
Chandigarh 380 02-07-2019 7.4 03-07-2019
Chhattisgarh 4736 21-07-2019 111.6 23-07-2019
Gujarat 18305 07-06-2019 403.2 21-09-2018
Madhya Pradesh 14785 03-02-2020 278.5 12-11-2017
Maharashtra 24962 22-10-2018 522.1 23-05-2019
WR 07-09-2018
Goa 613 13-12-2019 14.4
Daman & Diu 662 05-07-2018 9.5 14-07-2018
Dadar& Nagar Haveli 826 24-07-2019 19.5 05-03-2020
AMNSIL 880 17-06-2020 19.4 29-06-2020
Andhra Pradesh* 10207 18-03-2020 205.1 17-03-2020
Telangana* 13168 28-02-2020 256.2 18-03-2020
Karnataka 13258 16-03-2020 273.3 26-03-2019
SR 23-05-2019
Kerala 4316 13-04-2019 89.4
Tamil Nadu 16386 03-04-2019 365.4 12-04-2019
Puducherry 480 18-04-2019 9.7 21-06-2019
Bihar 5972 03-09-2019 121.4 02-09-2019
DVC 5422 13-02-2019 77.3 20-03-2017
Jharkhand 4308 30-06-2018 31.6 24-01-2016
ER 02-10-2018
Odisha 5679 23-08-2018 123.5
West Bengal 9989 14-06-2019 198.5 10-05-2019
Sikkim 193 24-01-2020 2.8 25-01-2020
Arunachal Pradesh 165 26-04-2019 2.9 16-11-2018
Assam 1968 29-08-2019 38.0 21-08-2019
Manipur 220 25-01-2020 3.2 16-01-2020
NER Meghalaya 394 13-01-2020 6.9 06-02-2020
Mizoram 126 28-01-2020 2.2 24-11-2018
Nagaland 170 05-09-2019 2.8 05-05-2017
Tripura 344 26-03-2016 6.6 27-06-2019
Andhra Pradesh
*SR 13162 23-03-2014 284.8 22-03-2014
(Undivided)
Note : 'All Time Highest' touched in the month are Highlighted

66
25.System Reliability Indices Report for the month of June 2020

Percentage (%) of times ATC was violated

Number of Blocks Number of Hours


S.No. Corridor %Violation
Violated Violated
1 WR-NR 0 0.00 0.00

2 ER-NR 30 7.50 1.16

3 Import of NR 0 0.00 0.00

4 NEW-SR 0 0.00 0.00

5 NER Import 0 0.00 0.00

Percentage(%) of times (N-1) Criteria was violated

Number of Blocks Number of Hours


S.No. Corridor %Violation
Violated Violated
1 WR-NR 0 0.00 0.00

2 ER-NR 9 2.25 0.35

3 Import of NR 0 0.00 0.00

4 NEW-SR 0 0.00 0.00

4 NER Import 0 0.00 0.00

Remarks: Flows crossing Total Transfer Capability (TTC) on interregional corridors has been worked out as a
proxy for (N-1) violation.

67
POWER SYSTEM OPERATION CORPORATION LIMITED
पॉवर सिस्टम ऑपरे शन कारपोरे शन सिसमटे ड
NATIONAL LOAD DESPATCH CENTRE – राष्ट्रीय भार प्रेषण केन्द्र
First floor, B-9, Qutab Institutional Area,
Katwaria Sarai, New Delhi-110016.

68