You are on page 1of 1

A B B' C D B B' C D

1410 A
200 520 520 170
1260
F3 F2 F3 200 520 520 600
X X
4
12 12

L=140
50

L=185
C1 X C1 X C1
L=370 Ø10C/C15L737 L=175

12
190 20 500 20 500 20 160 Ø10C/C15L1122

12
L=550

L=415
398
L=740

Ø10C/C15L=719
Ø10C/C15L=787
Ø 8 C/C 200 t
s
Ø10C/C15L382

548
Ø 8 C/C 200 t
s
Y Y X X Ø12C/C15L=350

12
548

L=590
L=370

L=140
507
175 175
X X 450
12
195 415
Ø10C/C15L895

50
F1 F2 F2 L=895
F3 F3 12

170

100
90
110
Y

Y
3
20 3

20

L=250
C1 C1 C2 C2 C1
Y

Y
Ø10C/C15L1049
Ø10C/C15L382 Ø10C/C15L382

12
L=370 L=200 L=200

12
L=370

1534

12
12
1533

Ø10C/C15L895

455

455
L=625

Ø10C/C15L=842
Ø 8 C/C 200 t
s Ø 8 C/C 200 t
X X
435

435
Ø 8 C/C 200 t
455

455
Y Y s
Y Y s
L=895

L=580
12

Ø10C/C15L=1127

stair bar

Ø10C/C15L=697
F1 F1

L=920

L=560
F2 F2

1135

1070
Y
2 2
20

20

Ø10C/C15L=697
L=120
C1 C1 C1 C1 Ø12C/C15L=350 Ø12C/C15L=375
Y

L=560
175 175 175 200
50 140 20 500 20 500 20 560 50

370

370
L=370 Ø10C/C15L570
350

350
370

370
Y Y Ø10C/C15L1122 L=200

12
X X L=570 Ø10C/C15L852

12
X X Ø 8 C/C 200
s
t Ø 8 C/C 200
s
t Ø 8 C/C 200
s
t
L=740
F1 L=640

L=125
F2 F2 Ø12C/C15L=350
F3 175 175

L=195
1 1 12
80 20

80 20

L=125
141
C1 C1 C1 C1

145
X X X 12
140

140
50

50
12

210 152 178 265 445 205 415


200 520 520 600
X X X 210 520 520 600
1860 1870

GROUND FLOOR SLAB REINFORCEMENT & FOOTING LAY 1st,2nd&3rd FLOOR SLAB REINFORCEMENT
SLAB THICKNESS 100mm SCALE 1:50
OUT. SLAB THICKNESS 100mm @ LEVEL +0.00 SCALE 1:50

Revisions
Scale 1:75 PROJECT:

MIXED USE
LOCATION:
GONDAR KEB. =18 H. No = -

OWNER:

ta il liateD
m ne t De tnem
ecro
PROJECT NEW MODIFICATION AS-BUILT

force
STATUS

ein fnieR Drawing Tit.


STRUCTURE

S ati ir R riaitS
Modified by Reg. No. Sign.
Date
2011Et.C
BEDRU HAMID Cad by Dr. No.

Ch by
ST
Approved by 01/03

You might also like