Ø80 HS
A=3.50m² 6. ALL PLUMBING WORKS PERFORMED SHOULD BE CARRIED BY LICENSED
FD Ceramic tile f.f ROOF FLOOR PLUMBER.
80 A=30.00m² BALCONY +15.30
LWH p.v.c tile f.f CERAMICTILE F.F
7. ALL MATERIALS, METHOD OF INSTALLATION AND QUALITY OF
WORKMANSHIP SHOULD BE SUBJECT TO THE APPROVAL OF THE
Ø100 Up T/A SANITARY ENGINEER.
Ø25 Ø25
Ø100 Down T/B 8. INTERNAL INSTALLATION OF COLD AND HOT WATER PIPES SHOULD BE
Ø25 Ø25
S 3 Ø100 Ø100 BE POLYPROPYLENE RANDOM COPOLYMER RESINES PP, TYPE 3 RAW
Ø80 Ø80
MATERIAL; PPR PIPES OF MINIMUM PN-20.
9. ALL PPR PIPE DIAMETERS SIZE GIVEN ARE EXTERNAL DIAMETER.
10. ALL HDPE PIPE DIAMETERS SIZE GIVEN ARE INTERNAL DIAMETER.
SH
11. FLOOR SLAB OF ALL WET AREAS (TOILET, KITCHEN, SHOWER, ETC.)
W4 MADE WITH APPROVED QUALITY CMENTIOUS WATER PROOFING
Ø25 Down F/A Ø80
REF.
FOURTH FLOOR Ø8 BEFORE FLOOR FINISH BEING DONE. CONSULT THE ENGINEER.
Ø25 Down T/B 0 FD
Bed Room S 4 Ø100
+12.10 WC KS
Ø50
12. UNPLASTICIZED POLYVINYL CHLORIDE (uPVC) OF MINIMUM PN-6 PIPES
AND FITTINGS SHOULD BE USED FOR ALL WASTE, DOWN PIPES AND
A=14.15m² Ø80 HWB
50
Ø100 Up T/A Ø80
p.v.c tile f.f S 7 Ø25 VENT DRAINAGE SYSTEM.
Ø
FD
Ø40 Down F/A Kitchen Ø100 Down T/B Ø25 BALCONY Ø80 Ø80 ALL uPVC WASTE WATER PIPES SHOULD NOT BE HEATED FOR
50
Ø100 Up T/A Ø50
Ø40 Down T/B A=10.00m² CERAMICTILE F.F
Ø
Ø100 Ø100 CONNECTION. ALL PIPING CONNECTION SHOULD BE MADE WITH
Ceramic
Ø100 tile f.f
Down T/B
W 6 APPROVED FITTINGS. ALL uPVC WASTE WATER INSTALLATION TO
50
Bed Room
Ø25
Ø25
Ø80
BE DONE EXPOSED UNDER SLAB.
LWH
Ø80
Kitchen FD
Ø80 80 A=14.50m²
p.v.c tile f.f
A=6.00m² CORRIDOR LWH
HS
Toilet SH
Ø25
Ø25
Ø80
Ceramic tile
FDf.f
Ø25
Ø25
Ø80
Ø80
THIRD FLOOR Ø8
Ø25
Ø25
Ø80
Ø80 50 0 FD
BALCONY +9.90 WC KS
PVC TILE F.F FD LWH
Ø80 HWB
Ø50 LEGEND(SN)
50
Ø80
Ø25
Ø
Ø80 FD
Ø80 Ø80
BT Bath Tub
Ø25
50
FH 2,3 & 4
Ø40 Down F/A Ø50 DP Down Pipe
Ø100 Up T/A F.EXT
Ø
Ø100
Ø100 Down T/B Ø40 Down T/B CORRIDOR FD Floor Drain
TERRAZZO TILE F.F
REF.
A=32.60m² Ø80 HWB Hand Wash Basin
p.v.c tile f.f SECOND FLOOR Ø8
0 FD
+6.70 WC KS KS Kitchen Sink
Ø50
Ø80 HWB
LS Laboratory Sink
50
Ø80
Kitchen
Ø
FD
Ø80 Ø80 LWH Liter Water heater
A=9.30m²
50
Ø50
Ceramic tile f.f Living and Dining MH Manhole
Ø
Ø25
Ø25
Ø80
Ø100 Ø100
Ø80 A=24.00m² S-1 Waste Water Riser
80Toilet
A=4.00m²
LWH
Bed Room
A=30m²
FD p.v.c tile f.f SH Shower
HS
Ceramic tileØ80
f.f T/B To Aove
Ø25
Ø25
Ø80
50
Ø25 PVC TILE F.F
Ø25 Ø25 Down F/A Ø80
Ø25BALCONY Ø100 Down T/B Hot Water Supply PPR Pipe
Ø
Ø32 Down T/B FD
Ø25
PVC TILE F.F
Ø25 Ø32 Down T/B Ø80 Ø80
Water Pipe With Gate Valve
50
Ø100 Up T/A S 8 Ø50
Ø
Ø100 Down T/B Waste Water Drainage Pipe
To
To
Ø100 Ø100 Ø100 Ø100
M
M
1st- 3rd FLOOR PLAN
H
H
Sanitary Installation
Ø1
Ø1
GROUND FLOOR
00
00
Sc 1:50 +0.40
WC WC WC
Ø100
WC
Ø100
Project:
MIXED USE BUILDING
Owner:
ENE ALEMITU GELEMO
SN
Dwg Title: Roof plan Sanitary Installation
Fire Fighting System & Details
Des. by:
Drawn By:
02
Checked by: 03
Date:
Scale: 1:50, 1:100 June ,2020