Professional Documents
Culture Documents
mm cable
EEU INTAKE INCOMING with 3x95/50+35
DIRECTION PVC Dia. 100 mm Sq.
G
mm
1260
1260 200 520 181 339 600 Distribution Board schedule
200 520 181 339 600 767 76 70 50 70 38 70 49
767 76 70 50 70 38 70 49 Panel Name:MDB Mounting:Floor Stand
15
15
KWH
20
15
15
15 15
20
20
20 140 20 109 102 109 20
15 15 690
20
133
163
20 140 20 109 102 109 20 Bus Rating:200A, 50 KA
690 Service Voltage, 380/220 Volt, 3
133
TOILET TOILET
163
1 TOILET
CERAMICTILE F.F CERAMICTILE F.F CERAMICTILE F.F
243
TOILET TOILET TOILET phase 4 Wire +Earth, 50Hz.
15
CERAMICTILE F.F 2 CERAMICTILE F.F
1 CERAMICTILE F.F
243
2 20
CORRIDOR
15
418
TERRAZZO TILE F.F
378
378
TERRAZZO TILE F.F
20
95
95
140 44 65 2 52 1 65 59 65 20 load per phase (Kw) Connection
378
378
20
95
95
Circuit
20
20
548 16
NUMB DESCRIPTIO wire size No. of R S
Breaker R S T
548
20
20
548 16
3 ER N (mm2) Poles T
Rating
548
124
120
120
2 690 50 110 90 280
20 20 2 Lighting 2X2.5 1 10 0.2
124
120
120
Lighting 2X2.5 1
20
20
3 10 0.2
20
20
2 1 Socket Outlet 3X2.5 1
20
20
4 16 0.8
20
20
5 SDB-Shop 3X4 1 20 2.88
20
110
20 SDB-Cafe 3X6 1
130
144 36 510 171 338 601 6 25 4.58
20
110
20
130
20
100 51 59 174 120 96
20 8 SDB-TypF 3X10/6+6 3 40 8.376 8.392 8.462
20
100 51 59 174 120 96
20
20
40
9 SDB-TypF 3X10/6+6 3 40 8.376 8.392 8.462
20
20
410
40
390
120
410
100 116 324 20 SDB-4thF 3X10/6+6 3
445
20 11 40 8.376 8.392 8.462
390
TOILET 20
SHOP
120
100 116 324 20 Reserve
445
20 12
MDB
TOILET
SHOP 2 PVC TILE F.F
20 20 13 Reserve
265
1
15
200 510 171 319 100 71 65 324 20
275
PVC TILE F.F
20 20 Reserve
265
14
15
200 510 171 319 100 71 65 324 20 20 20
275
130
20 20 OFFICE Total Power (kw) 38.084 37.052 37.128
1533
2
455
130
OFFICE PVC TILE F.F
1533
455
20
20
2 1 VERENDAH
20
Diversity 0.75
530
20
20
20
20
VERENDAH TERRAZZO TILE F.F
20
20
120
20 20 SDB-SM 150 A, 3 phase Feeder Cable 3X95/50+35
MAIN SWITCH
1115
120
SDB-Ca fe
1
1115
432
432
1
40
1 1
ENTRANCE LOBBY
432
432
TERRAZZO TILE F.F
40
1 1
2
1
TERRAZZO TILE F.F
510
S
TTB
200 510 20 510 20 580 20 CAFE
510
660
660
CAFE PVC TILE F.F
TERRAZZO TILE F.F
370
330
660
660
PVC TILE F.F
TERRAZZO TILE F.F
DISTRIBUTION BOARD SCHEDULE
370
330
3
1 2
1 SUPERMARKET
3
303 110
116
303 110
116
3030
TERRAZZO TILE F.F
VERENDAH
1
40
3030
140
40 480 40 500 580 20
120
Load per Phase
117
Load per Phase
2 2 2 VERENDAH VERENDAH Breaker size
140
117
20
20
20
TERRAZZO TILE F.F TERRAZZO TILE F.F R S T R S T
20
2 180 345 95
180 345 95 520 520 600
1 Lighting 2x2.5 1 10 0.08
.
GROUND FLOOR LIGHTING INSTALLATION DESIGN .
1860 2 Socket Outlet 3x2.5 1 16 0.5
3 Stove 3x4 1 20 2
.
1260 A
200
767
520 181
76 70 50
339
70 38 70 49
Symbol
1
DESCRIPTIONS
4 Coffee Machine 3x4 1 20 2
.
5 Reserve
15
15
20
MDB
163
TOILET
CERAMICTILE F.F
TOILET
CERAMICTILE F.F
TOILET
CERAMICTILE F.F
Power Sub-Total 4.58
.
243
15
378
20 STOVE
95
95
M MITAD
Diversity 0.9
20
20
548 16
120
4
INCOMING MAIN SWITCH 25 A,1 Phase Feeder Cable 3x6 Sqr.mm
20
20
20
20
DIRECTION
110
20
130
20
410
20
390
2x2.5
OFFICE 1 Lighting 1 10 0.08 .
1533
455
20
VERENDAH 3 1 20 2
20
530
Revisions
20
20
6 Reserve
1115
432
40
S 20 A, 1-Phase 3x4 Sqr.mm CKT. Wire size in Sqr. Load per Phase(KW) Connection
CAFE MAIN SWITCH Feeder Cable
No.
Description
mm
No. of Poles Breaker size (A)
R S T R S T
OWNER:
660
660
330
3
2 Lighting 2x2.5 1 10 0.14
ENE ALEMITU GELEMO
3
3x2.5
SUPERMARKET 3 Socket Outlet 1 16 1
3x2.5
303 110
116
4 Socket Outlet 1 16 1
3
5
Reserve PROJECT NEW MODIFICATION AS-BUILT
VERENDAH Reserve STATUS
3030
117
Diversity 0.9
VERENDAH VERENDAH
TERRAZZO TILE F.F TERRAZZO TILE F.F
Power Demand(KW) 2.22
Date
20
20
Ch by
Dr. No.
EL
Approved by 01/02