NOTES: 1.

ALL FIRE ALARM RELATED DEVICES SHALL BE UL LISTED AND ALL CONDUIT INSTALLATION
SHALL COMPLY WITH NFPA-70/NEC. ALL AUDIBLE AND VISUAL NOTIFICATION APPLIANCES
SHALL BE INSTALLED IN ACCORDANCE WITH NFPA-72 AND NFPA-70 (NEC).
ABBREVIATIONS: 2. WHERE OPENINGS ARE PROVIDED IN THE STRUCTURE TO CROSS CABLES/CONDUITS, THE
OPENING SHALL BE SEALED BY FIRE PROOF MATERIAL SUITABLY RATED, AFTER COMPLETE
NESMA & PARTNERS INSTALLATION OF CABLE/CONDUITS.
BPS BOOSTER POWER SUPPLY
ENG. DEPT. 3. CONTRACTOR'S FIRE FIGHTING DESIGN/ENGINEER AND SPECIALIST CONTRACTOR SHALL BE
BMS BUILDING MANAGEMENT SYSTEM LICENSED, DULY APPROVED BY CIVIL DEFENSE AUTHORITIES.
LEBANON
4. ALL DIMENSIONS ARE IN MILLIMETERS AND ARE TAKEN FROM CENTER OF DEVICE FROM
DTS DISTRIBUTED TEMPERATURE FINISHED FLOOR LEVEL (FFL), UNLESS OTHERWISE INDICATED ON DRAWING.
SENSING
5. ALL EXPOSED CONDUITS SHALL BE SURFACE MOUNTED HOT GALVANIZED RIGID STEEL TYPE
DVC DIGITAL VOICE COMMAND USING CLAMPS AND SADDLES. ALL EMBEDDED CONDUITS SHALL BE PVC TYPE.
CONDUIT DIAMETER SHALL BE 25MM FOR INDOOR INSTALLATION AND FOR VERTICAL
ECC EMERGENCY CONTROL CENTER RISERS. METAL CONDUITS SHALL BE FIXED WITH CLIPS AT EVERY 1500MM; CLIPS SHALL
BE ADDED AFTER AND BEFORE BENDS. METAL CONDUITS OF FIRE ALARM CABLES
ECP EXTINGUISHANT CONTROL PANEL SHALL BE MARKED USING RED STRIPES AT EVERY 3000MM.

6. EXACT LOCATION & MOUNTING HEIGHTS OF FIRE ALARM EQUIPMENT/DEVICES WILL BE


FACP FIRE ALARM CONTROL PANEL PROVIDED IN ENLARGED ELECTRICAL & TELECOM. ROOMS DETAILED DRAWINGS.
FARP FIRE ALARM REPEATER PANEL
7. HATCHED ROOMS ARE CONTROLLED BY GAS SUPPRESSION SYSTEM.
IFU INTERFACE UNIT MODULES HATCHED ROOMS ARE CONTROLLED BY FOAM SUPPRESSION SYSTEM.
(CAN CONTAIN MULTIPLE FOR MORE DETAILS REFER TO FIRE SUPPRESSION DRAWINGS.
INPUT/OUTPUT MODULES)
8. FIRE SYSTEM JUNCTION BOXES & COVERS TO BE "RED" COLORED.
MM MONITORING MODULE SURFACE MOUNTED BACK BOXES FOR MANUAL PULL STATION TO BE "RED" COLORED.
CM CONTROL MODULE SURFACE MOUNTED BACK BOXES FOR STROBE SOUNDER TO BE "RED" COLORED. THE
BACK-BOXES SHALL FOLLOW THE IP RATING OF THE APPROVED MATERIAL SUBMITTAL
RM REMOTE CONTROL MODULE & APPROVED FD DESIGN.
FOR MECHANICAL ROOMS, IT IS CONSIDERED BY DEFAULT WATER PROOF AREA FOR ALL
TYPE OF INSTALLATIONS.
SCS SMOKE CONTROL SYSTEM
9. THIS DRAWING IS PREPARED IN LINE WITH APPROVED EDWARDS MATERIAL SUBMITTAL FOR
CAR PARKS.
F.F.L FINISHED FLOOR LEVEL
10. FOR FACP BATTERY CALCULATIONS, KINDLY REFER TO PDF FILE "CP3 BATTERY CALCULATION
FOR EDWARDS EST3 PANEL"
EMT ELECTRICAL METALLIC TUBING
11. BPS HAS TWO MODULES (ONE MM TO MONITOR AC FAIL & ONE CM TO ACTIVATE ALL HORNS
AND STROBES).
PVC POLYVINYL CHLORIDE
12. WE HAVE ADDED 1 FAS CM NEAR PA RACKS IN BASEMENT 1 TO INTERFACE WITH AMPLIFIER
(BASED ON NUMBER OF LEVELS).
RSC RIGID STEEL CONDUIT FLOOR WISE, ALARM WILL BE SENT TO PAS AMPLIFIER TO ACTIVATE PAS ZONE IN CASE
OF FIRE

SLC SIGNALING LINE CIRCUIT 13. FIRE SUPPRESSION SYSTEM SHALL BE INTERFACED WITH FACP FOR MONITORING

14. FAS INTERFACE WITH PAS: LIVE MESSAGE TO BE ANNOUNCED THROUGH PA SYSTEM ONLY
NAC NOTIFICATION APPLIANCE CIRCUIT
BOCT BOTTOM OF CABLE TRUNK 15. FOR MEP SERVICES IN HATCHED AREA IN BF1 & BF3, KINDLY REFER TO DATA CENTER
PACKAGE WHICH IS DESIGNED BY EDARAT.
FO FIBER OPTIC
NO/C NORMALLY OPEN / CLOSED 16. FAS INTERFACE WITH ACS: WE HAVE ADDED 1 FAS CM TO INTERFACE WITH ACS DOOR
PAS PUBLIC ADDRESS SYSTEM CONTROLLER. IN CASE OF FIRE ON A PARTICULAR FLOOR, ACS SHALL SHUNT ALL ALARMS
GENERATED BY DOOR CONTROLLERS OF THAT FLOOR FOR UNAUTHORIZED EGRESS DUE TO
ACS ACCESS CONTROL SYSTEM FIRE ALARM.
JF JETFAN 17. CONTROL & MONITORING OF COMPLETE EDWARDS FAS NETWORK
SP STAIRS PRESSURIZATION OF ANY CAR PARK CAN BE DONE IN ANY ECC ROOM BY ANY ONE PANEL; EITHER FACP
EP ELEVATOR PRESSURIZATION OR FARP

REFERENCE DRAWINGS

DRAWING NO DRAWING TITLE

KAAR-ONW-PW-FD-CP3-FZS-MD3-ARC-53754.rvt Architectural REVIT Model (REF. TRANS. KAAR-COW-NPC-TRN-1172-C)


KAAR-COW-NPC-TRN-1056-G)
KAAR-COW-PW-FD-CP3-FZS-MD3-STR-53755.rvt Structural REVIT
Structural REVITModel
Model(REF. TRANS. KAAR-COW-NPC-TRN-1026-B)
KAAR-COW-PW-FD-CP3-FZS-MD3-FSE-53758 Fire Detection REVIT Model (KAAR-COW-NPC-TRN-1063-G )
KAAR-COW-PW-IC-CP3-MFL-DWG-FSE-37409 Car Park 3, IFC, Fire Detection & Alarm System, Mezzanine Level, Overview
(TRANS. No. KAAR-COW-NPC-TRN-1436-C)
T-ENG-MASAR-CP3-0303 CP3-Full MEP Federated Model

RFI REFERENCE
RFI NO. RFI TITLE

Symbols & Abbreviations

CABLE TRUNK TAGGING

CABLE TRUNK SIZE (mm)

TAG NAME BOCT mm (FROM FFL)

IR#126705
cable trunking
for fire alarm
system
50x50mm CABLE TRUNK FOR FIRE ALARM SYSTEM
grid(36-40)

33 34 35 36 37 38 39 40 41 42 43 44 45

EXPANSION JOINT

A KEO INTERNATIONAL CONSULTANTS & PARTNERS


KEO International Consultants

CABLE TRUNK

MFL-F-CTK-04 BOCT: 3025 mm


50x50 mm
MASAR - D&B Infrastructure Works
CABLE TRUNK 50x50 mm

STORAGE 02
SHOP DRAWING REVIEW
MFL-F-CTK-04 BOCT: 3150 mm

B
B - Approved subject to implemeting all comments
C STORAGE 03 A-Approved
CABLE TRUNK

MFL-F-CTK-04
50x50 mm

BOCT: 3110 mm
on site and reflect all on the As-Built Drawing
FAN ROOM 01 301.877m (FFL)
STAIRS 09 C- Rejected, to be resubmitted D- Noted, No Action Required
SHAFT
CORRIDOR
SHAFT 301.877m (FFL)
CABLE TRUNK 50x50 mm
Comments provided by the Engineer during shop drawings review, and/or subsequent
ACCESS AREA OF REFUGE 03
MFL-F-CTK-04 BOCT: 3035 mm

FEMALE TOILET
FAN ROOM 09
corrections to submittals, shall not relieve the Contractor from compliance with any and
OPENING
FAN ROOM 08 all of the Contract Documents. This review is only conducted in respect of general
302.454m (FFL)
FAN ROOM 07 CABLE TRUNK

MFL-F-CTK-02
50x50 mm

BOCT: 3135 mm STAIRS 03 301.877m (FFL) 301.877m (FFL) conformance with the design intent of the Project and compliance broadly. The
Contractor remains responsible, among other obligations, for the design, confirming
CABLE TRUNK 50x50 mm
300.634m (FFL)
D MFL-F-CTK-02 BOCT: 3240 mm

CABLE TRUNK 50x50 mm


CABLE TRUNK 50x50 mm METAL
and correlating quantities and dimensions, selecting materials, fabrication processes
UP
MFL-F-CTK-02 BOCT: 3025 mm
MFL-F-CTK-04 BOCT: 3125 mm STAIR
CABLE TRUNK 50x50 mm UP
CABLE TRUNK 50x50 mm
MFL-F-CTK-02 BOCT: 3190 mm CABLE TRUNK 50x50 mm
MFL-F-CTK-03 BOCT: 3160 mm

CORRIDOR
MFL-F-CTK-05 BOCT: 3250 mm

CABLE TRUNK 50x50 mm


VOID ABOVE LEVEL 0B
Callout 1 CABLE TRUNK 50x50 mm
SHAFT and techniques of construction, coordinating the Works with other trades, and the
LOBBY 03
SHAFT 301.877m (FFL)
CABLE TRUNK 50x50 mm
MFL-F-CTK-05 BOCT: 3075 mm

FEMALE ABLUTION
33047 MFL-F-CTK-06 BOCT: 5145 mm

execution in a safe and satisfactory manner, all in accordance with the Contract ”.
MFL-F-CTK-01 BOCT: 2925 mm
AREA OF REFUGE 09
301.877m (FFL)
CABLE TRUNK 50x50 mm

VENTILATION DUCT 03 / ESCAPE ROUTE


FEMALE SHOE RACKS ROOM
MFL-F-CTK-06 BOCT: 4960 mm
By: ______________________ Date: ______________________
ELECTRICAL ROOM 01 STUCTURAL
CABLE TRUNK 50x50 mm UP 303.583m (FFL) CONCRETE
CABLE TRUNK 50x50 mm
BEAM
E MFL-F-CTK-02 BOCT: 3115 mm MFL-F-CTK-06 BOCT: 4790 mm

UNDERGROUND SHAFT 03 CABLE TRUNK 50x50 mm

MFL-F-CTK-01 BOCT: 3005 mm


CABLE TRUNK

MFL-F-CTK-01 BOCT: 2780 mm


50x50 mm
JANITOR ROOM 01
301.877m (FFL)
KEY PLAN
ACCESS
UP OPENING
PART 1 PART 2 PART 3 PART 4 PART 5
301.877m (FFL) CORRIDOR
CORRIDOR 302.571m (FFL)
VOID ABOVE LEVEL 0B SLOPED FLOOR 3.9% NOT USED AREA

CABLE TRUNK 50x50 mm

MFL-F-CTK-05 BOCT: 2965 mm

VENTILATOR ROOM 03
FAHU ROOM JANITOR ROOM 02 UP
MALE ABLUTION

MALE SHOE RACKS ROOM


VOID ABOVE LEVEL 0B SHAFT
STAIRS 08 SHAFT
AREA OF REFUGE 11

INTAKE PLENUM 03
301.877m (FFL)
301.877m (FFL)

TBD
FAN ROOM 11
N

303.204m (FFL)
BOULEVARD SHAFT 03
G UM AL QURA ROAD

WAY

UP

SECOND RING ROAD


MCC0
EXPRESS

MCJ0
UM AL
MECCA QURA
JEDDAH ROAD

MN12
6+457
MN10

M000
MC09
NORTH ROAD

URAIF ROAD
301.877m (FFL)

MN11
ABDULLAH
NORTH ROAD

ACCESS PANEL NORTH ROAD

NORTH ROAD MOSQUE PLAZA MOSQUE STATION


CAR PARK
MOSQUE (BY OTHERS)

MALE TOILET
MC60 NORTH ROAD
SOUTH ROAD

AREA OF REFUGE 04
MC02
KAAR
JEDDAH-

SOUTH ROAD
AY
ESSW

MS02

AL MANSOUR ROAD
A EXPR

MS03
H MECC
JEDDA
SOUTH ROAD

CAR

SECOND RING ROAD


MS01
MS07

SHAFT STAIRS 11 MECH ROOM 04 SOUTH ROAD

MA20
M004

MA10
JEDDAH-KAAR

301.877m (FFL)

MC06

MC07
MS05

ABDULLAH URAIF ROAD

MCL0
MCM0
MS09
303.204m (FFL)
MS04

PARK 3
STAIRS 10 MS06

AL MANSOUR ROAD
MC03
MC00 MS08

CORRIDOR MC70

MECH ROOM 03 303.204m (FFL) MC10

300.519m (FFL)

MCXX MC50

REFER TO DRG. NO.: KAAR-NPC-PW-CS-CP3-MFL-SPD-ELE-33045


REFER TO DRG. NO.: KAAR-NPC-PW-CS-CP3-MFL-SPD-ELE-33046
ELECTRICAL ROOM 02
UPS ROOM 02 BATTERY ROOM

303.204m (FFL)
303.204m (FFL)
303.204m (FFL)

K
SHAFT

MATCH LINE
00 FOR APPROVAL T.B. 17/09/21

PREPARED
REV. DESCRIPTION CODE DATE
BY

CHECKED BY: CHECKED BY: CHECKED BY: APPROVED BY:


DISCIPLINE ENGINEER SENIOR ENGINEER HEAD OF DEPARTMENT ENG'G MANAGER

MAHMOUD ABDUL LATIF MAHMOUD ABDUL LATIF ARAFAT GADALLA M. ABDUL SATER
DATE: N&P DATE: N&P DATE: N&P DATE: N&P

PROJECT :

PM/CM :

KEO INTERNATIONAL
CONSULTANTS

MAIN CONTRACTOR :

AUTHORIZED VENDOR OF EDWARDS FIRE ALARM SYSTEM :

‫ةلوش ملنم مساجملاش مسن ركرش‬


Nesma Trading- Co. Ltd.
DESIGN CONSULTANT :

DESIGN ITEM :

CAR PARK 3

DRAWING TITLE :

FIRE DETECTION & ALARM SYSTEM


CABLE TRUNKS COORDINATION LAYOUT
MEZZANINE LEVEL, OVERVIEW
DATE: PREPARED BY: CHECKED: APPROVED
17/09/21
T.B. P.T. P.T.
Doc. Scale
Project ID Orig. Phas. Stag. Area Floor Type Disc. Ser.No.
1:400
AT (A0) SIZE

KAAR NPC PW CS CP3 MFL SPD ELE 33190 Rev. 00