Quantity Cost 311 Structural Steel Material Structural Steel kg 1.05 98.00 102.90 Labour Skilled Md 0.02 1,030.00 20.60 Unskilled Md 0.03 750.00 22.50 Subtotal 146.00 Tools and Plants (7%) 10.22 Total 156.22 Cost per kg with 15 % overhead 179.65 411 Material and Equipment Transportation by Truck From : Kathmandu Metalled Road, km 25.00 1.000 276.00 6.90 To: Bridge site Non Metalled Road, km 1.000 7.71 Transportation by Porter (Rate=Daily wage/38) 1.000 8.55 Transportation by Air Subtotal 6.90 Total per kg 6.90 Cost per kg with 15 % overhead 7.94 572 Erection of Truss Bridge Material Bamboo P 6.00 210.00 1,260.00 Dori kg 2.00 60.00 120.00 Labour Skilled Md 1.90 325.00 617.50 Unskilled Md 15.00 325.00 4,875.00 Subtotal 6,872.50 Cost per m with 15 % overhead 7,903.38 351 Hot Dip Galvanisation Material Zinc kg 0.095 295.00 28.03 HydrocloricnAcid Ltr 0.065 39.00 2.54 Chemical for pre-fluxing Kg 0.025 577.00 14.43 Fuel Ltr 0.056 96.50 5.40
Labour Skilled Md 0.001 1,030.00 0.72
Unskilled Md 0.005 750.00 3.94 Subtotal 55.05 Tools and Plants 5% 2.75 57.80 Cost per m³ with 15 % overhead 66.47