Tanahun District

DPR of Rising Kot and Durbar

Quantity Calculation Sheet


S.N. Description of works no. Length Breadth Height Quantity Unit Remarks
3.00 Steel Structures
Supply and fabrication of steel
structures (IS 226-1975 ) as per from quantity
3.10 1935.75 kg
design, specification and direction of sheet
engineer
Bolts, Nut and Washers for steel
from quantity
3.20 works as per design and direction of 89.96 kg
sheet
engineer.
4.00 Galvanization
Hot Dip Galvanization (IS 2629:1966,
IS 4759:1984, IS 8629:1977) as per from quantity
4.10 1666.60 kg
specification and direction of sheet
Engineer
5.00 Transportation
Material transportaion from from quantity
5.10 2067.54 kg
kathmandu to bridge site sheet
6.00 Civil Structures works
Excavation in Roadway , drain and
foundation of structure including
removal and satisfactory disposal of
all materials up to a lead of 50m
6.10
along the lead route using excavator
or breaker and finishing manually
wherever and to what extent
necessary
2 2.00 1.50 1.50 9.00
Total 9.00 Cu.m.
Providing and placing machine mixed
cement concrete eqivalent to 20 Mpa
6.20 compresive strenght on the top of the
retaining wall including compaction
curing and all relavant lead etc
2 2.00 1.50 0.30 1.80
Total 1.80 Cu.m.
Providing and laying of Random
rubble stone masonry works in
cement mortar 1:4 in foundation and
6.30 in structure as per drawing and
technical specification (assuming
ratio of foundation work and Structure
works to be 25% :75%)
2 2.00 1.50 1.50 9.00
Total 9.00 Cu.m.
7.00 Finishing Works
Erection of Truss Bridge as per
7.10
design and instruction of engineer.
1 8.00 8.00
Total 8.00 R-m