You are on page 1of 1
ore firs @rdRert sie geen fakes Se (ue eae vem) POWER GRID CORPORATION OF INDIA LIMITED @Govemmentof ina Esterpee) Tere ae wieiew “Wai hie @ 2 Gaetan. erie 22 oon ear 11 2671700. 790, sha" 2574760, 2071701 me et ‘Comer Otice: "Saar Pit No.2, Sector, Gurgaon 122 00" Haryana oh" 2571700 = 719, Fax 2571700, 297178) Grarh NATORIDY set 00 /Ret, Number C-ENGG-NER-PB-S2/TTR/01 fee Date 19/11/2010 2 8 /To_> JME THR! Sector-65, Nc 11 301, Uttar Pradesh, India. Kind Attn: fre Sub: Contract Agreement No. C-62002-S319.3/G7/CA/3294 & CAcII/3295 dated 15- 03-2010, R S/S3KV substations at Roing. Tee, Nam and 132kV extension substations at Zico & Pasighat) under Transmis Pallatana GBPP and Bongaigaon TPS in NER Regi: Type test Report Approval for 30kV Lightning Arrester (CGL Make! Dear Sir, ‘This is reference to your transmittal no. AREVA/5427PKOI5/COMB/04-SUPDOC/RO & E-MAIL dated 30.09.20104e 11-11-2010 vide which the type test reports of 30kV Lightning Arrester, Class-2 have been submitted for approval. The type test reports have been reviewed by us and our comments are mentioned below. mn system associated with Si.No. ‘Name ofthe test Report ref. & date Remarks 1 | Insulation withstand test PHIV/02/1986 DT07/12/2007 | Acceptable -Wet PIF Voltage Lightning Impulse Vollaige | HV/1(CG)/05/2427/ CCL ‘Acceptable 2 | Residual Voltage test Beare Tong duration current impulse | HV/1(ICG)/05/2843/CGL ‘Acceptable L_ withstand test _| De14/07/2005 ‘Switching Surge operating duty | HV/1(ICG)/0976290/CGL ‘Acceptable test Di.t6/ 02/2009 3 | Power frequency vollageVs | HV/1(ICG)/05/2461/CGL. ‘Acceptable ‘Time curve test Dt28/ 07/2005, - © | Short Circuit test-High Current, | HPL08229 D127/01/2009 ‘Acceptable Low current HPL08230 D127/01/2009 [7 | Partial Discharge Measurement | HIMP/06/1131-4 Dtd.21.12.2009 | Acceptable ® MMCHTR0aS2332 DT ‘Acceptable 49/11/2006, 9 [Seismic Test 40/2008 DT 13/71/2008 ‘Acceptable 10 | Contamination test PL-OOM dated 25-10-2008 ‘Acceptable 1 | 1P-67 test on surge counter PLV/06/P/1017 Dated Acceptable : 14/08/2007 ‘With the above, all the requirement df'type test reports for the 30kV LA is completed, Thanking you. ‘Yours faithfully a (K. Rathore) AGM (ENGGS/S) ‘ Copy to: 1) Shri, M.Hazarika, GM (Projects), NERTS, RHQ, Shillong-793001 ~ For kind information please. ‘ga wre: Go, gon eee es weal wee of Ree - 110016 Ger: osco1aT en ont ese0O% we ACS AegteredOfice : 05, Quad Instttna Aen, Katwaa Sar, New Dei ~ 10008 Ta : 6560121 Fax: O11-6560039 Gram : WATERD’

You might also like