Professional Documents
Culture Documents
LCL for the R chart is given by __________ c) Limits driven by the inherent variability of
a) D3 R the process
b) D2 R d) Statistical limits
c) R – D3 R
d) d2 R 8. What type of chart will be used to plot the
number of defectives in the output of any
2. In the general equation of UCL of a control process?
chart, for any x chart, which of these is used a) x bar chart
as the estimator of μ? b) R chart
a) x¯ c) c chart
b) R¯ d) p chart
c) x¯¯
9. The natural variability of the process is
d) R¯¯
measured by ____________
3. Which term is having a closest meaning as a) Process mean
Sampling Distributions? b) Sample standard deviation
a) Control charts c) Process standard deviation
b) On site inspection d) Sample mean
c) Whole lot inspection
11. Control limits are ___________
d) Acceptance sampling
a) Limits defined by customers
4. Process capability generally uses b) Limits driven by the natural variability of
__________ the process
a) Specifications c) Limits driven by the inherent variability of
b) Control Limits the process
c) Process standard deviation d) Statistical limits
d) Mean of any one sample