CONSEQUENCE
CONSEQUENCE
MOVEMENT WITHIN
PROBABILITY
PROBABILITY
RISK RATING
(A,B,C,D,E)
(A,B,C,D,E)
RESIDUAL
(0,1,2,3,4,5)
(0,1,2,3,4,5)
RATING
WORKSITES
RISK
RECOVERY
CONTROL MEASURES
MEASURES
SIGNIFICANT HSE
EFFECT
HAZARD
Movement of Health
Unauthorised
personnel -NA- -NA- NA -NA-
Safety 3 C M Access control arrangements (fencing & site 1 B L Emergency
security) to prevent unauthorised entry of Response
- Personnel Injuries personnel.
due to slips, trips & Provision of barriers & warning signs.
falls / hit by or Visitors to report at site office and
against objects / subsequently be accompanied by a site staff
vehicles / equipment. after necessary briefing on HSE requirements,
- Asset loss / damage. if required to enter into site.
Availability of appropriate PPE (eg: Helmet,
safety boots, mask, goggles, high visibility
vest) at site office for visitors.
Environment
CONSEQUENCE
CONSEQUENCE
MOVEMENT WITHIN
PROBABILITY
PROBABILITY
RISK RATING
(A,B,C,D,E)
(A,B,C,D,E)
RESIDUAL
(0,1,2,3,4,5)
(0,1,2,3,4,5)
RATING
WORKSITES
RISK
RECOVERY
CONTROL MEASURES
MEASURES
SIGNIFICANT HSE
EFFECT
HAZARD
CONSEQUENCE
CONSEQUENCE
MOVEMENT WITHIN
PROBABILITY
PROBABILITY
RISK RATING
(A,B,C,D,E)
(A,B,C,D,E)
RESIDUAL
(0,1,2,3,4,5)
(0,1,2,3,4,5)
RATING
WORKSITES
RISK
RECOVERY
CONTROL MEASURES
MEASURES
SIGNIFICANT HSE
EFFECT
HAZARD
Environment 2 C M Plan the storage, use and control resources to 1 B L Collection &
avoid wastages. management
- Wastage of
Maintain good housekeeping. of wastes.
resources.
Sharp objects Health 2 C M Maintain good housekeeping. 0 C L Medical Aid
(protruding Keep the area of clear of sharp objects;
nails, rebars, - Infections (tetanus, protruding rebar pieces shall be suitably
metal sheets, etc.) capped.
etc.) Metal sheets with sharp edges shall be stored
separately and suitably barricaded.
Warning signs.
Use of PPEs – Safety boots, coverall, goggles,
gloves, helmet)
Safety 3 C M Ensure adequacy of resources required and 1 B L Emergency
plan the work area properly to avoid Response
- Personnel Injuries accumulation of materials, spills, wastages,
due to contact with etc., that harm personnel at site.
nails, rebars, metal Establish clearly maintained walkways and
sheets, etc. and slips, for movement of vehicles / equipment,
trips & falls / hit by wherever possible.
or against objects. Plan & control vehicle / equipment movement
with the presence of an authorised banksman.
Proper storage of materials.
Maintain good housekeeping in worksites.
Establish a site cleanup schedule for
collection & disposal of wastes, spills,
accumulations, etc.
Keep the area of clear of sharp objects;
protruding rebar pieces shall be suitably
capped.
CONSEQUENCE
CONSEQUENCE
MOVEMENT WITHIN
PROBABILITY
PROBABILITY
RISK RATING
(A,B,C,D,E)
(A,B,C,D,E)
RESIDUAL
(0,1,2,3,4,5)
(0,1,2,3,4,5)
RATING
WORKSITES
RISK
RECOVERY
CONTROL MEASURES
MEASURES
SIGNIFICANT HSE
EFFECT
HAZARD