Professional Documents
Culture Documents
H
Issued 1993-06
AUDIT CRITERIA
Revised: 2014-9
161Thorn Hill Road
Warrendale, PA 15086-7527 Superseding AC7102 Rev. G.
Baseline
AC7102
AC7102/1 (If seeking Brazing approval)
AC7102/2 (If seeking Aluminum approval)
AC7102/3 (If seeking Carburizing approval)
AC7102/4 (If seeking Nitriding approval)
AC7102/5 (If Hardness testing is used in support of in-house heat
treating)
AC7102/6 (If seeking HIP approval)
AC7102/7 (If seeking Induction Hardening approval)
AC7102/8 (If seeking Heat Treating approval)
AC7102/10 (If seeking Localized Heat Treating approval)
AC7101/3 (If Tensile testing is used in support of in-house heat
treating)
AC7101/4 (If Metallography and Microindentation testing are used
in support of in-house heat treating)
AC7102/S (If seeking Primes specific approval)
All non-conformances shall be corrected by the corrective action system, prior to
the actual audit. Nonconformance of a technical nature found during the actual
audit will, at the Task Group’s discretion, require a follow-up audit at the supplier’s
expense. This self-audit shall be maintained by the Supplier for review by the
auditor.
During the self-audit the Supplier shall record each procedure and paragraph
number for each checklist question requiring an answer on procedures.
PRI operating procedures provide that "This report is published by PRI to advance the state of technical, engineering, and quality
sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent
infringement arising there from, is the sole responsibility of the user."
PRI values your input. To provide feedback on this document, please contact the appropriate commodity staff engineer.
(Contact information is located at http://www.eauditnet.com under “Contact Us”.)
Copyright 2014 Performance Review Institute. All rights reserved.
t-frm-15 2-Jan-14
PRI AC7102 Revision H -2-
Ready availability of all documentation required by the Nadcap auditor will speed
up the audit process significantly.
1.1.2 The Supplier shall send the following to the auditor 30 days prior to the scheduled YES NO
audit (in English, unless otherwise agreed between auditor and supplier):
1.2.1 The Supplier should provide for an in-briefing for the auditor. Key members of the
Suppliers’ staff should attend the in-briefing so the audit purpose, methods and
assessment process can be discussed.
1.2.2 Working space for the auditor with desks or tables, chairs, telephone, clerical,
typing and reproduction services should be provided as required.
1.2.3 Auditor shall verify the scope of accreditation and modify it in eAuditNet as
required in agreement with the Supplier.
1.2.4 A final debriefing shall be conducted at the completion of the audit. Each
nonconformance report (NCR) shall be reviewed and the Supplier will be given the
opportunity to seek clarifications.
NOTE: The Heat Treating Task Group may, upon review, change the auditor’s
determination of a finding.
1.2.5 The Supplier has 21 calendar days to submit corrective actions and effective
dates for each NCR. The supplier shall respond to each individual NCR using the
appropriate form/media (see Public Documents on eAuditNet). Supporting
documentation shall be traceable to each individual NCR. The response must
address the root cause of the nonconformance from a systems management
approach and the actions taken or to be taken to preclude reoccurrence
1.3.1 For definitions and interpretations see Heat Treating Task Group Audit Handbook.
1.3.2 (Info) When noted (as shown) below, the “YES/NO” column indicates a question
that is asked for information only, with no corresponding requirements. The “NO”
PRI AC7102 Revision H -3-
1.4.1 In addition to the commodity checklist noted herein, there may be other pertinent
data such as audit handbooks, attachments and preparatory instructions
necessary for the completion of the audit. These can be found and downloaded
from eAuditNet under “Public Documents”.
1.4.2 Questions marked with (U) codes are applicable to all Suppliers. (Uxx)
codes indicate that there are additional related questions in AC7102/S.
Those questions concern only the corresponding prime and shall be
answered only if the prime is identified as a customer.
DIVISION:
COMMENTS:
Supplier.
2.4
Yes/No Plant Location Changed
Yes/No QC Manager Changed
Yes/No Equipment Moved
Yes/No Common Findings to Previous Audit
3.1.1 Are the applicable revisions of the appropriate documents available at the YES NO
appropriate workstation? (To make an Audit Handbook clarification/descriptive)
3.2.1 Are contracts and incoming purchase orders reviewed to ensure that: YES NO
g. Does the supplier flow contractual requirements down internally and to sub-
tier suppliers?
3.3.1 Is the nonconforming material controlled, and the customer notified of each YES NO
instance of nonconforming product in accordance with the contractual
requirements?
3.4.1 Are all corrective actions from the previous Nadcap audit still implemented (check YES NO NA
the last full audit)?
3.5.1 Are planned and documented internal quality audits performed on a scheduled YES NO
PRI AC7102 Revision H -5-
3.5.2 Are all Nadcap elements within the scope of the Supplier’s accreditation properly YES NO
addressed in the internal audit?
3.6 Quality Planning – These requirements must be checked through all job
audits performed.
3.6.1 Is only the heat treating equipment which meets the requirements of the applicable YES NO
specifications for instrumentation and temperature uniformity used for processing?
3.6.2 Are specified times based on the appropriate thickness of the part or other criteria YES NO
in accordance with the applicable specification?
3.6.3 Are tensile specimens and other test specimens included with production loads YES NO NA
when required?
3.6.4 Are there procedures that address the use and placement of load thermocouples YES NO NA
when required by specification or customer requirements?
3.7.1 When customer approved fixed processes are required, is the Supplier working to YES NO
the latest revision approved by the Customer and is the evidence of this approval
on file?
3.8.1 Is engineering first lot inspection and approval documented when required by the YES NO
customer?
3.8.2 Are records maintained for the development of fixturing and racking sketches, for YES NO
first article inspection when required by specification or customer requirements?
3.9 Purchasing
3.9.1 Are all facilities used for subcontracted testing and processing approved by either YES NO NA
the Customer or Prime, as required?
3.10.2 Is there evidence that software used to control and record Heat Treatment YES NO
equipment (programmable controller, electronic charts, etc.), is compliant with
approved procedure?
3.10.3 Are all software revisions verified by first lot inspection to ensure compliance with YES NO
specification requirements?
PRI AC7102 Revision H -6-
4. PERSONNEL
4.1 Training
4.1.1 Are there training procedures that assure personnel performing contract review, YES NO
job planning, heat treating and associated quality and test functions are competent
to perform assigned tasks?
4.1.2 Do records indicate that training is scheduled and attended in accordance with YES NO
procedures and documented?
4.2.1 Do procedures require periodic evaluation to ensure that approved personnel YES NO
maintain proficiency in their assigned heat treating and related tasks?
4.2.2 Do records indicate that the evaluations are performed at documented frequencies YES NO
and the results reviewed with employees in a program of continuous improvement
of personnel??
5.1.1 Are identification, count and quality discrepancies resolved prior to processing of YES NO
parts?
5.1.2 Do procedures ensure that incoming customer documents remain traceable to YES NO
those specific jobs throughout processing?
5.2.1 Does the internal procedure require that parts be clean prior to loading for YES NO
processing in the furnaces? (U18)
5.2.2 Do records and observations indicate that the procedure is followed? YES NO
5.3.1 Does the internal procedure require that all PH steel parts with any finish machined YES NO
surfaces are cleaned prior to heat treatment and handled with clean gloves after
cleaning? (U11)
5.3.2 Do records and observations indicate that the procedure is followed? YES NO
5.4.1 Does the internal procedure for cleaning Titanium surfaces preclude the using of YES NO
halogenated substances?
5.4.2 Does the internal procedure require that parts with any finished surfaces be YES NO
handled with clean gloves?
6. INSPECTION
PRI AC7102 Revision H -7-
6.1.1 Is each heat treatment cycle reviewed for job traceability, correct temperature, time YES NO
at temperature and all other related parameters? (U11)
6.1.2 Is this review performed by Quality Assurance, other designated personnel, or self- YES NO
inspected by the automated computer control and monitoring system?
(See Heat Treating Audit Handbook) (U11, U7)
6.1.3 Is the review documented in accordance with the customer requirements? (U11)
6.1.4 Are the acceptance status and any test data recorded on the shop paper only after YES NO
the operation for that job has been completed?
6.2.1 Does the supplier have a procedure that details all aspects of sampling inspection YES NO
that is in accordance with all customer heat treating specification sampling
requirements?
6.2.3 Are sampling plans approved by the customer, when required? YES NO NA
6.2.4 Is there documented training in the use of the sampling plan which includes sample YES NO
size and selection, reduced and tightened plans, and when to implement them?
6.2.5 Does a sampling of jobs where sample inspection is permitted indicate that customer YES NO
requirements have been flowed down correctly to the inspector or delegated
operator and are met?
7.1 Does the Supplier have procedures or other documentation in place that addresses YES NO
all required Heat Treat process control testing? (See Heat Treating Audit Handbook)
a. All applicable specifications when testing is specified? (See section 3.2) YES NO NA
frequency, actual results, compliance, etc.) from the Supplier’s Process Control
System and evaluate them against the applicable specification requirements,
including interval and test method. Two of these verifications may be selected as
part of the Job Audits or they may all be selected separately.
7.4.1 For information only, does the supplier perform hardness and/or conductivity testing? YES NO
(info)
If the Supplier performs hardness testing and/or conductivity testing for acceptance
of product, Nadcap AC7102/5 checklist shall be executed.
7.5 Metallography/Microhardness
7.5.1 For information only, does the supplier perform metallography and microhardness YES NO
testing? (U18) (info)
7.6.1 For information only, does the supplier perform mechanical testing? (U11) YES NO
(info)
7.7.1 For information only, does the supplier prepare the specimens for the mechanical YES NO
testing? (info)
c. Carburization of steels?
7.8.4 Is there a system in place to ensure that decarburization tests are performed at the YES NO
proper frequency, whether it is periodic or with the load? (U11)
7.9.1 Is there a system in place to control the test coupons and their use when required? YES NO
7.9.2 Does the internal documentation support that the test coupons are used in YES NO
accordance with the procedures/specifications?
7.9.3 Is there a system in place and adequate procedures for the control of hydrogen pick YES NO
up that meets the method and frequency specified by the customers’ requirements?
8.2 Do procedures and job planning specify time/temperature limits for sub-ambient/sub- YES NO
zero treatments?
9.1.1.1 Are the current operating manuals or instructions available to furnace operators, YES NO
maintenance personnel and other personnel requiring the information?
9.1.2.1 Does the internal procedure specify the method for determining heat-up rate, start of YES NO
soaking time, end of soaking time and cooling rate? (U10)
9.1.2.2 Do records on the furnace chart or furnace log indicate compliance to the above YES NO
procedure and customer requirements?
9.2 Maintenance
9.2.1 Are all components of each furnace that can affect the functionality inspected and YES NO
maintained in accordance with a documented preventative maintenance schedule?
(U3)
PRI AC7102 Revision H - 10 -
9.2.2 Do records indicate that the inspection and maintenance have been performed in YES NO
accordance with the schedule?
9.3.1 Does the internal procedure specify how atmospheres are to be controlled and YES NO
monitored to ensure conformance to the requirements?
9.4 Metering NA
9.4.1 Are the flow meters operational and appropriate for the gas and flow rates used? YES NO
9.4.2 Do the inspection and maintenance schedule include periodic checks of flow meters YES NO
to ensure that they are functioning?
9.4.3 Does the internal procedure address the safety shut-off valves and the emergency YES NO
gas purges?
9.5 Purging NA
9.5.1 When the atmosphere is changed, is the furnace purged in accordance with an YES NO
internal procedure that assures elimination of the effects of previous atmosphere?
9.5.2 Does the internal procedure for purging Ammonia bearing atmospheres used for YES NO
nitriding include an Ammonia cut-off and purge in accordance with specification
requirements?
9.6.1 Is each salt bath tested periodically in accordance with the applicable heat treatment YES NO
specifications?
9.6.2 Do the salt bath test results demonstrate conformance to carburization, YES NO
decarburization, nitriding, and intergranular attack requirements?
9.7.1 Do the internal procedures specify a system of maintenance and calibration of carbon YES NO
control indicators?
9.7.2 Do records indicate that the maintenance and calibrations are performed as required YES NO
by the procedures and applicable specifications?
9.7.3 Is the accuracy of the carbon control system confirmed by the results of tests YES NO
required by the heat treatment specifications?
9.8.1 Are there procedures that address snap tempering within the time limits required by YES NO
the customers’ specifications? (U11)
PRI AC7102 Revision H - 11 -
9.9.1 Are the quench mechanisms operational and capable of meeting maximum quench YES NO
delay provisions of the specifications?
YES NO
9.10 Quenchant Maintenance NA
9.10.1 Does the internal procedure specify that quenchant temperatures are to be controlled YES NO
and documented?
9.10.3 Do quenchant agitation and/or agitation of the product during quenching conform to YES NO
the applicable specifications?
9.11.1 Is there a system in place that ensures polymer quenching is only used when YES NO
permitted by the particular specification for the alloy and metal thickness?
9.11.2 Do procedures define the polymer concentration in accordance with the YES NO
requirements?
9.11.4 Do procedures specify the frequency and methods for determining the polymer YES NO
concentration in accordance with the requirements?
9.12.1 Do procedures specify the frequency and methods for the testing of oil quenchants YES NO
in accordance with all customer requirements?
(See Section 7)
9.12.2 Do the records indicate that quenchant effectiveness is consistent and meets the YES NO
specifications’ requirements?
9.13.1 Are the expander pressure, the cylinder pressure, and the number and force of hold YES NO
down springs, and applicable tolerances documented on or traceable to the traveler
for each job?
9.14.1 Do internal procedures require that, when a part requires a specially designed YES NO
fixturing or racking method, that the specific fixturing or racking is used?
9.14.2 Are there internal procedures, racking sketches, or other means to ensure that YES NO
spacing between the parts is adequate for circulation of the heating medium and
coolant/quenchant as required by the specifications?
9.14.4 Does the internal procedure require that the racks/fixtures/baskets are examined for YES NO
integrity, and repaired or scrapped as necessary?
PRI AC7102 Revision H - 12 -
9.15 Fasteners NA
9.15.1 Is there a system in place to ensure that the fasteners are only processed in qualified YES NO
containers to approved procedures and customer requirements, or, when qualified, in
a continuous furnace?
9.16 Plating NA
Note: For purposes of this section, plating is limited to the plating operations utilized
for temporary masking or other operations for successful heat treatment or brazing.
This is not intended to replace plating for finishing purposes as controlled by
Chemical Processing Task Group.
If the supplier has a current Nadcap Chemical Processing accreditation that includes
both plating and stripping, questions 9.16.1 through 9.16.7.2 are YES unless
otherwise noted as part of the finding during this Special Process audit.
9.16.1.5 The specified plate thickness and method(s) of its measurement? YES NO
9.16.2.3 Does the fixturing and racking facilitate solution neutralization and removal during YES NO
rinsing, and minimize solution and rinse water drag-out and cross contamination of
process tanks?
9.16.2.4 Do the fixturing, racking, electric circuit design and lifting equipment preclude YES NO
mechanical damage or electrical arcing?
9.16.3.1 Are processing tanks identifiable for their contents and specified temperature YES NO
ranges?
9.16.3.2 Are the tanks with specified temperature ranges operating within those ranges at the YES NO
time of processing?
9.16.3.3 Are tanks of sufficient volume and dimensions to contain hardware during processing YES NO
and assure sufficient coverage of parts?
9.16.3.4 Are tanks that require uniform temperature and solution concentration agitated? YES NO
PRI AC7102 Revision H - 13 -
9.16.3.5 Are tanks for electrolytic coatings equipped and configured to promote the required YES NO
uniform deposition rate?
9.16.4 Are anodes controlled and specific to each process solution to avoid cross YES NO
contamination?
9.16.5 Are equipment and solutions in compliance with applicable customer requirements? YES NO
9.16.6 Do the records show that the specified thickness of plate is achieved? YES NO
9.16.7 Stripping NA
9.16.7.1 Are the methods and materials for removal of plating as specified or approved by the YES NO
customer?
9.16.7.2 Do stripping procedures include an inspection of the stripped component following YES NO
the strip operation?
The auditor shall execute Nadcap AC7102/8 checklist as part of this audit.
11.1 Procedures
11.1.1 Does the internal procedure or other documentation specify cleaning of parts, tooling YES NO
and baskets by methods and with materials that ensure freedom from contamination
during vacuum heat treating?
11.1.2 Does the internal procedure, photographic evidence, or other documentation specify YES NO
placement of load thermocouples, racking of parts, and furnace loading? (U10)
c. Quench gas purity and/or dew point (i.e. does the gas certification meet YES NO
specification requirements)?
e. For partial pressure atmosphere, does the dew point of the gas is periodically YES NO NA
checked as the gas enters the furnace?
11.2.2 Does the calibration interval of the vacuum system’s sensor, control panel and YES NO
recorder meet the frequency of the customer specification?
11.2.3 Are calibration acceptance criteria defined in the internal procedure? Yes NO
PRI AC7102 Revision H - 14 -
11.2.4 Do records indicate that the tests and calibrations are performed as required by the YES NO
internal procedure and all applicable specifications?
11.2.5 Is the vacuum level in the heating and cooling chambers recorded during all thermal YES NO
cycles requiring vacuum? (U10)
12. to 13. The Auditor shall execute two (2) completed long job audits (including final testing).
When the “YES/NO” is followed by (Info), the info notation indicates a question that is asked for
information only, with no corresponding requirement. A “NO” answers to these questions do not
require a nonconformance report or an explanation.
14. to 21. The Auditor shall execute eight (8) abbreviated in-process job audits for a single lot of in-process
parts, except when the in-process Heat Treating jobs are replaced by an equal amount of in-process
Brazing jobs (part of the checklist AC7102/1 performed in conjunction with AC7102 checklist). When
eight (8) abbreviated in-process jobs cannot be witnessed, completed jobs may substitute the in-
process jobs, but not for more than four (4).
When the “YES/NO” is followed by (Info), the info notation indicates a question that is asked for
information only, with no corresponding requirement. A “NO” answers to these questions do not
require a nonconformance report or an explanation.
PRI AC7102 Revision H - 15 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
12.1.1 Does the job planning contain all of the applicable items described below? YES NO
12.2 Racking NA
12.2.4 Did racking ensure that air is not entrapped detrimentally during the quench? YES NO NA
Furnace used:
Check if used
(EC)
Control
Recorder (EC)
High/Low - (EC)
Type A or C
Instrumentation
PRI AC7102 Revision H - 17 -
Load (EC)
Thermocouples
Quenchant (EC)
Temperature Start
Quenchant (EC)
Temperature End
Quenchant (EC)
Temperature Rise
Quench gauge
calibration
(EC)
Delay to the next
operation
12.3.5 Was the furnace stabilized at or below set temperature (including the room YES NO
temperature for vacuum furnaces) before loading the parts?
12.3.6 What is the basis for determining the start and the end of the soak?
Describe:
PRI AC7102 Revision H - 18 -
12.3.7 Does the method for determining the start and the end of soak meet the customer YES NO
requirements?
12.4 Offsets NA
Describe:
12.5.1 Is the uniformity requirement or furnace number specified on shop paper? YES NO
(List below):
12.5.3 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
12.5.5 Does all thermal treatment meet the specified requirements? YES NO
12.5.6 Is there evidence that heat treatment cycles are reviewed for job traceability, YES NO
correct temperature and time at temperature?
12.5.7 Was this review performed by QA or other designated personnel and the review YES NO
documented in accordance with the customer requirements? (U11)
Furnace used:
12.6.2 What is the basis for determining the tempering temperature for alloy steels?
(EC)
a. Specified in the shop paper
b. As quenched hardness
c. Other (Describe)
Temperature
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(List below):
12.8.3 Does the furnace possess the control and recording instrumentation required by the YES NO
governing specification for this heat treatment?
12.8.5 Does all thermal treatment meet the specified requirements? YES NO
12.8.6 Is there evidence that the heat treatment cycles are reviewed for job traceability, YES NO
correct temperature and time at temperature?
12.8.7 Was this review performed by QA or other designated personnel and the review YES NO
documented in accordance with the customer requirements? (U11)
12.10.1 Are the load thermocouples required for this job either by the customer or internal YES NO
procedure?
12.10.2 Did the usage and placement of load thermocouples conform to requirements? YES NO
Sample/Parts
tested
*record if sample or part tested
12.14 Additional Periodic and Lot testing required: (Charpy impact, Tensile NA
test, Fracture toughness, Metallographic and/or Microhardness tests,
etc.)
PRI AC7102 Revision H - 23 -
12.14.1 Are these tests properly documented in the Supplier’s Process Control System? YES NO
12.15.1.1 Does the certificate show compliance to all applicable drawing, specification and YES NO
PO requirements including documentation of any exceptions (e.g. pre- and post-
cleaning, straightening, testing, etc.)?
12.15.1.2 Does the certificate list the revision level of the specification to which the parts YES NO
were processed?
12.15.1.4 Is the shop paper verified and accepted by authorized personnel? YES NO
12.15.2.1 Is the shop paper verified and accepted by authorized personnel? YES NO
12.16 Did this job comply with all other requirements? YES NO
PRI AC7102 Revision H - 24 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
13.1.1 Does the job planning contain all of the applicable items described below? YES NO
13.2 Racking NA
13.2.4 Did racking ensure that air is not entrapped detrimentally during the quench? YES NO NA
Furnace Used:
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
PRI AC7102 Revision H - 26 -
Load (EC)
Thermocouples
Quenchant (EC)
Temperature Start
Quenchant (EC)
Temperature End
Quenchant (EC)
Temperature Rise
Quench gauge
calibration
Delay to the next (EC)
operation
13.3.5 Was the furnace stabilized at or below set temperature (including the room YES NO
temperature for vacuum furnaces) before loading the parts?
13.3.6 What is the basis for determining the start and the end of the soak?
Describe:
PRI AC7102 Revision H - 27 -
13.3.7 Does the method for determining the start and the end of soak meet the customer YES NO
requirements?
13.4 Offsets NA
Describe:
(List below):
13.5.3 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
13.5.5 Does all thermal treatment meet the specified requirements? YES NO
13.5.6 Is there evidence that heat treatment cycles are reviewed for job traceability, YES NO
correct temperature and time at temperature?
13.5.7 Was this review performed by QA or other designated personnel and the review YES NO
documented in accordance with the customer requirements? (U11)
Furnace Used:
13.6.2 What is the basis for determining the tempering temperature for alloy steels?
(EC)
b. As quenched hardness
c. Other (Describe)
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace Used:
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(List below):
13.8.3 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
13.8.5 Does all thermal treatment meet the specified requirements? YES NO
13.8.6 Is there evidence that the heat treatment cycles are reviewed for job traceability, YES NO
correct temperature and time at temperature?
13.8.7 Was this review performed by QA or other designated personnel and the review YES NO
documented in accordance with the customer requirements? (U11)
13.10.1 Are the load thermocouples require for this job either by the customer or internal YES NO
procedure?
13.10.2 Did the usage and placement of load thermocouples conform to requirements? YES NO
Sample/Parts
tested
*record if sample or part tested
13.14 Additional Periodic or Lot testing required: (Charpy impact, Tensile test, NA
Fracture toughness, Metallographic and/or microhardness tests, etc.)
13.14.1 Are these tests properly documented in the Supplier’s Process Control System? YES NO
13.15.1.1 Does the certificate show compliance to all applicable drawing, specification and YES NO
PRI AC7102 Revision H - 32 -
13.15.1.2 Does the certificate list the revision level of the specification to which the parts YES NO
were processed?
13.15.1.4 Is the shop paper verified and accepted by authorized personnel? YES NO
13.15.2.1 Is the shop paper verified and accepted by authorized personnel? YES NO
13.16 Did this job comply with all other requirements? YES NO
PRI AC7102 Revision H - 33 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (e.g. fixed process approval) - See sections 3.2, 3.7 and 7:
(EC) l. Pre-heat treatment requirements on the shop paper - See sections 5 and 9:
14.1.1 Does the job planning contain all of the applicable items described below? YES NO
Furnace used:
14.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
14.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
14.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
14.5.1 Is the operation signed off or data recorded only after completion? YES NO
14.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 38 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
15.1.1 Does the job planning contain all of the applicable items described below? YES NO
Furnace used:
15.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
15.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
furnace
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
Furnace used:
15.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time end of soak
PRI AC7102 Revision H - 42 -
(EC)
Media for Cooling
(EC)
Cooling Condition
15.5.1 Is the operation signed off or data recorded only after completion? YES NO
15.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 43 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
16.1.1 Does the job planning contain all of the applicable items described below? YES NO
applicable.
Furnace used:
16.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Media for Cooling
Furnace used:
16.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
Furnace used:
16.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Cooling Condition
16.5.1 Is the operation signed off or data recorded only after completion? YES NO
16.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 48 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
17.1.1 Does the job planning contain all of the applicable items described below? YES NO
Furnace used:
17.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
17.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
Furnace used:
17.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Cooling Condition
(EC)
(EC)
(EC)
17.5.1 Is the operation signed off or data recorded only after completion? YES NO
17.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 53 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
18.1.1 Does the job planning contain all of the applicable items described below? YES NO
Furnace used:
18.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
18.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
18.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
18.5.1 Is the operation signed off or data recorded only after completion? YES NO
18.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 58 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the audit.
Technical information on parts which have been designated “Export Controlled – License Required”
(EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those which
cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add the
comment “EC Technical Data Restricted”. If Auditors have any questions about this, they should
contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
19.1.1 Does the job planning contain all of the applicable items described below? YES NO
as applicable.
Furnace used:
19.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
19.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
Furnace used:
19.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time end of soak
(EC)
Media for Cooling
PRI AC7102 Revision H - 62 -
19.5.1 Is the operation signed off or data recorded only after completion? YES NO
19.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 63 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
20.1.1 Does the job planning contain all of the applicable items described below? YES NO
applicable.
Furnace used:
20.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
20.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
20.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Media for Cooling
(EC)
Cooling Condition
20.5.1 Is the operation signed off or data recorded only after completion? YES NO
20.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO
PRI AC7102 Revision H - 68 -
The Supplier needs to clearly identify the Export Control status of all parts being used in the
audit. Technical information on parts which have been designated “Export Controlled – License
Required” (EC-LR) cannot be input into eAuditNet.
Throughout the Compliance section of the audit specific questions/data entry points are marked
with an (EC). These are questions which have been designated by the Task Group as those
which cannot be answered in eAuditNet IF the part is (EC-LR). Do not enter technical data, add
the comment “EC Technical Data Restricted”. If Auditors have any questions about this, they
should contact the Staff Engineer for directions.
d. Part description:
e. Part size:
g. Number of parts:
(EC) j. Heat treat and other process and test requirements specified by customer
specification (i.e. fixed process approval):
21.1.1 Does the job planning contain all of the applicable items described below? YES NO
Furnace used:
21.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
Furnace used:
21.3.1.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
furnace
(EC)
Time start of soak
(EC)
Time end of soak
(EC)
Cooling Condition
Furnace used:
21.3.2.2 Does the furnace possess the control and recording instrumentation required by YES NO
the governing specification for this heat treatment?
Check if used
(EC)
Control
(EC)
Recorder
High/Low - (EC)
Type A or C
Instrumentation
Load (EC)
Thermocouples
(EC)
Cooling Condition
21.5.1 Is the operation signed off or data recorded only after completion? YES NO
21.5.2 Did the treatment of hardware conform to customer’s specified requirements? YES NO