1150R1-001-RR-GNL-MAT-S-023
ee oan!
a
‘SOBNIFTTAL FOR SAMPLE / MATERIAL / DOCUMENTS APPROVAL (SSMDA)
a Cale
fet Ne. 1150R1-001-RR-GD-MT-055213-01-00
“arabs
‘To: DAR AL- HANDASAH
F: Subject Motos & Sample Subrial
> sumital Deere:
ater and sample submit for Barer Steel Hania
+. Steel Railing pipe 101.6 mm, Think 3.0 mm
1 Stel Bracket Thickness 10 mm
5 stel Endcap Bam =
e-anchor tlt Spc Fxz-A4 MB x 130( 8067) = [roman
5 Sco ot 0X20 HEX. Hod 06 FEB 2) od
RECEIVED
ee [suooer Catnsaton is
fips + mean ee
ewig Rat + Proje Drawings Ee
Seetenton Rt lame
tached MA Apron Cony coda: win fom 7
ot es a
| wasaracruen a surruck Wott two Saul Company
ans Aen 0 ox T0218
supper Aso Boxter, eh 2182
eee esl eee [2] ramet Teen
= repre tamain Tee, offce Homme
— Ta Ra Tre nw Mohammed ook thor Als Ein Fy
ho bu Sea
Taman tA NE
[:menanre mneserhTneS comm —=—
Ref. te comments ov tx attached eee ieee
“ » RN oe
Code C Melmalh 3 i
— =
A 18|92/2029 Fam No, MPF-ADSSMOARESConsultant: Contractor:
Dasa hy 8 pal 9S Ban
dar Haj Hse Gh ds gill Bt
CONSULTANT'S COMMENTS FOR SUBMITTAL ( CCS )
Submittal Ref. No. 1150R1-001-RR-GD-MT-055213-01-00
Below the response to Submittal Ref. # 1150R1-001-RR-GD-MT-055213-01-00 - Materials and Sample
Submittal for Barrier Steel Handrail - +
Code (C) Revise and Resubmit.
1 - Product test reports according to ASTM E 894 and ASTM E 935 standards as per project specifications
jrequirements are required .
2- Calculation sheets for all steel elements ( horizontal pipe, brackets, bolts, anchor bolts, etc.) should be
lattached .
3 - Based upon sample preview the followings were noticed :
a-4M 10 STEEL /HEX HEAD at each side (TOTAL NO 8) is required as per shop drawing, whilst
bracket sample is only 4 No for two sides .
b - Required steel brackets height is 310 mm whilst provided sample is 300 mm .
c- Required steel pipe thickness is 3.2 mm, whilst provided sample is 3.0 mm
d- End cap dimension doesn't match with steel pipe, embedded length not satisfactory, bad fabrication
sample .
4- Attached justification letter to use steel sheet 3.00 mm for the steel pipe instead of 3.2 mm as per design
drawings is not accepted and should be supported with calculation sheets for review -
5 - Samples for each type of exposed finish are required for verification .
6 - Mock up showing all cases STRAIGHT AND CURVATURE is required .
7 - Compliance sheet with ASTM standard in accordance with project specifications is required .
8 - Shop drawings based upon existing site condition are required .
9 - Submittal should include detailed data for the finishing in accordance with project specifications .
10 - Area of application inside MFRR project should be identified .
Mg lmaleh
Grice G a! Jo Kale
oY )/2I/2o20
Form No. QMPF-S4-CCS-ROO