You are on page 1of 2
1150R1-001-RR-GNL-MAT-S-023 ee oan! a ‘SOBNIFTTAL FOR SAMPLE / MATERIAL / DOCUMENTS APPROVAL (SSMDA) a Cale fet Ne. 1150R1-001-RR-GD-MT-055213-01-00 “arabs ‘To: DAR AL- HANDASAH F: Subject Motos & Sample Subrial > sumital Deere: ater and sample submit for Barer Steel Hania +. Steel Railing pipe 101.6 mm, Think 3.0 mm 1 Stel Bracket Thickness 10 mm 5 stel Endcap Bam = e-anchor tlt Spc Fxz-A4 MB x 130( 8067) = [roman 5 Sco ot 0X20 HEX. Hod 06 FEB 2) od RECEIVED ee [suooer Catnsaton is fips + mean ee ewig Rat + Proje Drawings Ee Seetenton Rt lame tached MA Apron Cony coda: win fom 7 ot es a | wasaracruen a surruck Wott two Saul Company ans Aen 0 ox T0218 supper Aso Boxter, eh 2182 eee esl eee [2] ramet Teen = repre tamain Tee, offce Homme — Ta Ra Tre nw Mohammed ook thor Als Ein Fy ho bu Sea Taman tA NE [:menanre mneserhTneS comm —=— Ref. te comments ov tx attached eee ieee “ » RN oe Code C Melmalh 3 i — = A 18|92/2029 Fam No, MPF-ADSSMOARES Consultant: Contractor: Dasa hy 8 pal 9S Ban dar Haj Hse Gh ds gill Bt CONSULTANT'S COMMENTS FOR SUBMITTAL ( CCS ) Submittal Ref. No. 1150R1-001-RR-GD-MT-055213-01-00 Below the response to Submittal Ref. # 1150R1-001-RR-GD-MT-055213-01-00 - Materials and Sample Submittal for Barrier Steel Handrail - + Code (C) Revise and Resubmit. 1 - Product test reports according to ASTM E 894 and ASTM E 935 standards as per project specifications jrequirements are required . 2- Calculation sheets for all steel elements ( horizontal pipe, brackets, bolts, anchor bolts, etc.) should be lattached . 3 - Based upon sample preview the followings were noticed : a-4M 10 STEEL /HEX HEAD at each side (TOTAL NO 8) is required as per shop drawing, whilst bracket sample is only 4 No for two sides . b - Required steel brackets height is 310 mm whilst provided sample is 300 mm . c- Required steel pipe thickness is 3.2 mm, whilst provided sample is 3.0 mm d- End cap dimension doesn't match with steel pipe, embedded length not satisfactory, bad fabrication sample . 4- Attached justification letter to use steel sheet 3.00 mm for the steel pipe instead of 3.2 mm as per design drawings is not accepted and should be supported with calculation sheets for review - 5 - Samples for each type of exposed finish are required for verification . 6 - Mock up showing all cases STRAIGHT AND CURVATURE is required . 7 - Compliance sheet with ASTM standard in accordance with project specifications is required . 8 - Shop drawings based upon existing site condition are required . 9 - Submittal should include detailed data for the finishing in accordance with project specifications . 10 - Area of application inside MFRR project should be identified . Mg lmaleh Grice G a! Jo Kale oY )/2I/2o20 Form No. QMPF-S4-CCS-ROO

You might also like