FPU.SF-19.

REQUEST FOR QUOTATIONS (RFQ)


AND
GENERAL INSTRUCTION TO SUPPLIERS (GIS)1

Ref. No.: RFQ2017.033.LTA.IOM


Date : 19 October 2017

The International Organization for Migration (IOM) is an intergovernmental organization


established in 1951 and is committed to the principle that humane and orderly
migration benefits both migrants and society.

IOM invites interested eligible Suppliers to submit Quotations for the Supply and
Delivery of Armored Vehicles (AV) under a Long Term Agreement (LTA) for One (1)
Year with possibility of extension.
Item No. Description Qty Unit
1 2018 model, Brand NEW, 4x4, Middle-East or N/A ea
Tropical Version LHD Toyota GXR LC200, V8
Options: petrol or diesel engine 4.6L,
with high altitude compensator,
Options: automatic or manual transmission,
white colored,
and fully certified armouring level at VR7 with
Ballistic Level options B6/B7
Refer to GIS for the complete specifications.
With this RFQ is the GIS which include the Instructions to Suppliers, Technical
Specifications and administrative requirements that Suppliers will need to follow in
order to prepare and submit their quotation for consideration by IOM.

IOM reserves the right to accept or reject any quotation, and to cancel the procurement
process and reject all quotations at any time prior to award of Purchase Order or
Contract, without thereby incurring any liability to the affected Supplier/s or any
obligation to inform the affected Supplier/s of the ground for IOM’s action.

Very truly yours,

______________
Vladimir Maslarov
GPSU Head
Global Procurement and Supply Unit

GENERAL INSTRUCTION TO SUPPLIERS (GIS)


1
IOM is encouraging companies to use recycled materials or materials coming from sustainable resources or
produced using a technology that has lower ecological footprints.

1
1. Description of Goods

IOM request prospective Suppliers to submit quotation for the Supply and
Delivery of Armored Vehicle (AV) under a Long Term Agreement (LTA) valid for
One (1) Year with possibility of extension.

Item
Item Description
No.
VEHICLE SPECIFICATIONS
2018 model, Brand NEW, 4x4, Middle-East or Tropical Version LHD Toyota GXR LC200,
V8, with high altitude compensator, white colored, and fully certified armouring level at
1.0 VR7 with Ballistic Level options B6 or B7
options: petrol or diesel engine 4.6L,
options:
automatic or manual transmission,
2.0 MOSS Accessories: TO BE PRICED PER ITEM
2.1 TJM Heavy Duty Front T15 Bull Bar (with HF/VHF Antenna Brackets)
2.2 Warn Electric Winch 12 volt fixed in the heady duty front bull bar (6 tons capacity)
2.3 Driver Side Window Lifter
2.4 Heavy Duty Jack (4,000kgs)
2.5 Bulb Fuse Kit
2.6 Steel Roof Rack
2.7 2nd Spare Wheel Incl. Runflat
2.8 2nd spare wheel holder on the roof rack
2.9 2 plastic jerry cans (20L) and two funnels with twin holders on the roof rack
2.10 Wheel Wrench X-Type, 17,19,21 (13/16) 22mm
2.11 Tow Rope (5,000kgs) 3M
2.12 Blackhawk Sledgehammer
2.13 Heavy Duty Jump Leads
2.14 Winch Recovery Accessories in Storage Bag
2.15 Replacement Rear Bumper Bar, Including Hi-Lift Jacking Points
2.16 Ball type heavy duty tow bar with electrical socket
2.17 Fog lamps, 2 x 55W with the bull bar
2.18 Dashboard fitted blue flashing lights
2.19 Strobe Lights Front mounted on Bull Bar
2.20 Tail light kill switch
2.21 Rear cargo area anchor points & elasticated net
2.22 Yellow color spherical warning system different than ambulance and police vehicles
2.23 Advanced First Aid Kit / trauma kit
2.24 Two roadside warning triangles
2.25 Belkins DC to AC power source
2.26 Rechargeable torch light
2.27 Essential Tool Kit (OEM tools)
2.28 Shovel with Handle
One handheld 1 kg fire extinguisher securely mounted in the front forward passenger foot-well
2.29
(pictures to be included in submission)

2
One hand held 1 kg fire extinguisher to be securely mounted (internally) to the right rear cargo
2.30
door (pictures to be included in submission)
3.0 Additional Accessories, Tools and Spare Parts to be PRICED SEPARATELY
3.1 Dealer network manual
3.2  Operator’s manual

3.3 Electrical wiring manual


3.4 Communication equipment manuals
3.5 Keys one (1) plus two (2) spare
3.6 Touch-up paint
One air vehicle (bottle) jack to cope for additional weight of armour and wheel changing
3.7
accessories
3.8 Extra One wheeled garage jack with minimum capacity of 4 tons
3.9 One “hooligan” bar and hammer required for emergency entry
3.10 Extra First Aid Kit
3.11 Heavy-duty electrical “jumper” cables
One nylon snatch strap with reinforced loops at each end, minimum of 8m length with a minimum
3.12
capacity of 4 tons
3.13 Two large U-bolts of a minimum capacity of 2,5 tons
4.0 Radio Equipment to be PRICED SEPARATELY
Full Package Motorola VHF Radio Mobile Station DM4601 with all accessories and antenna, 255
4.1 Channel, 25W & Remote Mount Kit. The VHF antennae must be securely fitted to one of the
front fenders of the vehicle, and not the roof. Magnetic mounting will not be accepted.
Package Codan HF Radio Mobile Station, Codan Envoy HF Radio with all accessories
 Full
4.2
(GPS enabled). The HF antennae should preferably be installed at the rear of the vehicle.
 Full
Package Iridium Sat Phone Car Docking Station (handset not included) for handset Model
9555, or, Thuraya Vehicle Docking Station (Handset not included) for handset compatible model
4.3
– Southern Hemisphere & External Mag Antenna, including charging-cradle, headset and
external antennae, to be installed during the armoring process.
OPTIONAL ACCESSORIES to be PRICED SEPARATELY
Four cameras with resolution 1080 HD, with recording capacity up to 48 hrs (not less):
One mounted in front with wide view of the front road;
One mounted in the back with wide view of the rear;
One with wide view, mounted in the front upper corner, above the windshield, in front of
passenger seat with view of the passenger, driver and back seats;
One mounted with view on the outside the driver’s window, i.e. to record anyone approaching the
5.0 driver.
A siren, intercom and public address system, of European manufacture, must be installed with
switching and handset located in the front compartment in such a way as to enable equal ease of
operation by both the driver and the front passenger who is usually a security officer and will
usually operate this equipment. The siren should only provide one distinct acoustic sound; the
variable type is not required. Equipment may not be installed in the glove box.
GPS tracking system to track the movement of the AV. Not the satellite one, but the one
operating under the local GSM network grid

Delivery:
6.0
         EXW Manufacturing Plant

3
         Indicate export restrictions and how much time it takes Getting exportation
license/permissions from the hosting authorities (if any).

2. Corrupt, Fraudulent, and Coercive Practices

IOM requires that all IOM Staff, manufacturers, suppliers or distributors, observe
the highest standard of ethics during the procurement and execution of all
contracts. IOM shall reject any proposal put forward by Suppliers, or where
applicable, terminate their contract, if it is determined that they have engaged in
corrupt, fraudulent, collusive or coercive practices. In pursuance of this policy, IOM
defines for purposes of this paragraph the terms set forth below as follows:

 Corrupt practice means the offering, giving, receiving or soliciting, directly or


indirectly, of anything of value to influence the action of the
Procuring/Contracting Entity in the procurement process or in contract
execution;

 Fraudulent practice is any act or omission, including a misrepresentation, that


knowingly or recklessly misleads, or attempts to mislead, the
Procuring/Contracting Entity in the procurement process or the execution of
a contract, to obtain a financial gain or other benefit to avoid an obligation;

 Collusive practice is an undisclosed arrangement between two or more


bidders designed to artificially alter the results of the tender procedure to
obtain a financial gain or other benefit;

 Coercive practice is impairing or harming, or threatening to impair or harm,


directly or indirectly, any participant in the tender process to influence
improperly its activities in a procurement process, or affect the execution of a
contract

3. Conflict of Interest

All Suppliers found to have conflicting interests shall be disqualified to participate


in the procurement at hand. A Supplier may be considered to have conflicting
interest under any of the circumstances set forth below:

 A Supplier has controlling shareholders in common with another Supplier;

 A Supplier receives or has received any direct or indirect subsidy from another
Supplier;

 A Supplier has the same representative as that of another Supplier for


purposes of this quotation;

 A Supplier has a relationship, directly or through third parties, that puts them in
a position to have access to information about or influence on the Quotation of
another or influence the decisions of the Mission/Procuring Entity regarding this
quotation process;

4
 A Supplier submits more than one Quotation in this Quotation process;

 A Supplier who participated as a consultant in the preparation of the design or


technical specifications of the Goods and related services that are subject of
this quotation process.

4. Eligible Suppliers

Only Suppliers that are determined to be qualified shall be considered for award.
The Supplier shall fill up and submit the standard IOM Vendor Information Sheet
(VIS) (Annex E) to establish their eligibility together with the Quotation.

The Supplier must have at least 5 years in the sale or manufacture of armoured
vehicles.

In addition to above criteria, the eligibility will be evaluated per below:

Eligibility Documents Pass/Fail


Presence or absence of the documents
As listed in Vendor Information Sheet (VIS)

5. Cost of Preparing the Quotation

The Supplier shall bear all costs associated with the preparation and submission of
his Quotation and IOM will not in any case be responsible and liable for the costs
incurred.

6. Errors, omissions, inaccuracies and clarifications

The documents and forms requested for the purpose of soliciting Quotations shall
form part of the Contract; hence care should be taken in completing these
documents.

Suppliers shall not be entitled to base any claims on errors, omissions, or


inaccuracies made in the Quotation Documents.

Suppliers requiring any clarifications on the content of this document may notify
the IOM in writing at email address fpu@iom.int.

Clarifications sent to other IOM email address will NOT be entertained.

IOM will respond to any request for clarification received during the period of 19
October 2017 until 27 October 2017, 1500HRS Manila Time. Copies of the
response including description of the clarification will be given to all Suppliers
who received this General Instruction, without identifying the source of the
inquiry.

Any other clarification received after this date will no longer be entertained.

5
7. Confidentiality and Non-Disclosure

All information given in writing to or verbally shared with the Supplier in connection
with this General Instruction is to be treated as strictly confidential. The Supplier
shall not share or invoke such information to any third party without the prior
written approval of IOM. This obligation shall continue after the procurement
process has been completed whether or not the Supplier is successful.

8. IOM’s Right to Accept any Quotation and to Reject any and all Quotations

IOM reserves the right to accept or reject any Quotation, and to cancel the
procurement process and reject all Quotations, at any time prior to award of
contract, without thereby incurring any liability to the affected Supplier/s or any
obligation to inform the affected Supplier/s of the ground for IOM’s action.

9. Requirements

9.1 Quotation Documents

The following shall constitute the Quotation Documents to be submitted by


the Suppliers:

9.1.1 Technical Requirements Related to Quality (Annex A)


9.1.2 Technical Proposal Checklist Page (Annex B)
9.1.3 Technical Specifications (Annex C)
9.1.4 Financial Proposal/Price Schedule Form (Annex D)
9.1.5 Vendor Information Sheet (Annex E)
9.1.6 IOM Long Term Agreement Template (Annex F)
9.1.7 Proforma Bank Guarantee for Advance Payment (Annex G)

Suppliers are required to use the forms provided as Annexes in this document.

9.1a Suppliers are advised to read the specifications carefully (see Annex C),
as there are some special requirements. The technical specifications presented
herein are not to be construed as defining a particular manufacturer’s product.
Vehicle offered must meet or exceed all requirements herein. It must conform in
strength, quality and workmanship to the accepted standards of the relevant
industry. Modifications of and/or additions to basic standard products of less size
or capability to meet these requirements will not be acceptable.

9.2 Quotation Form

The Quotation Forms (Annex C and D) and other required documents


shall be duly signed and accomplished and typewritten or written in
indelible ink. Any correction made to the prices, rates or to any other
information shall be rewritten in indelible ink and initialed by the person
signing the Quotation Form.

9.3 Validity of Quotation Price

6
The Quotation shall remain valid for a minimum period of 45 calendar days,
after the deadline for submission.

In exceptional circumstances, prior to expiry of the period of validity of


quotations, IOM may request that the Suppliers extend the period of validity
for a specified additional period. The request and the response thereto
shall be made in writing. A supplier agreeing to the request will not be
required or permitted to modify its quotation.

9.4 Documents Establishing Supplier’s Eligibility and Qualification

The Supplier shall furnish, as part of its Quotation, documents establishing


the Supplier’s eligibility to submit Quotation and its qualifications to perform
the contract if its Quotation is accepted. These include, but are not limited
to the following:

1. That, Suppliers should submit with their quotation any


information updating their original Vendor Information Sheet (VIS) or
company profile on file or, alternatively, confirm in their bids that the
originally submitted information remains essentially correct as of the
date of bid submission
2. That, in the case of a Supplier offering to supply goods under the
Contract which the supplier did not manufacture or otherwise produce,
the Supplier shall submit the Manufacturer’s Authorization to
demonstrate that it has been duly authorized by the vehicle
manufacturer or producer to supply the goods in the country of final
destination;
3. That, to the best of the Supplier ’s knowledge and signing
declaration that supplier it is not included in the UN 1267 List or the UN
Ineligibility List, nor in any and all of UN list of suspended and removed
vendors
4. That, In the case of a Supplier not doing business within the
Mission’s country, the Supplier is or will be (if awarded the contract)
represented by an Agent in that country equipped, and be able to carry
out the Supplier’s maintenance, repair and spare parts-stocking
obligations prescribed in the Conditions of Contract and/or Technical
Specifications.

10. Submission of Quotation Documents

Quotation should be sent via email to fpu@iom.int and attachments must not
exceed 2MB per email and must be submitted on or before 13 November 2017,
2200HRS Manila Time. Late Quotations will not be accepted.

Quotation should include below forms:


a. Technical Proposal (Annex C)
b. Financial Proposal (Annex D)

10.1 Technical Proposal and Content

7
Refer to Annex A for the complete list of requirements

10.2 Financial Proposal and Content

The financial offer is to be submitted as per the Price Schedule Form (Annex
D). Offers submitted using different price representation will not be accepted.
The language of the Quotation shall be in English and prices shall be quoted
in US Dollars or USD, exclusive of VAT.

Prices indicated on the Price Schedule shall be based on Incoterms 2010


indicated.

Prices quoted by the Supplier shall be fixed during Supplier performance of


the Long Term Agreement and not subject to price escalation and variation on
any account, unless otherwise approved by IOM. A submitted quotation with
an adjustable price quotation will be treated as non responsive and will be
rejected.

11. Opening of Quotations

At the indicated time and place, the opening of Quotations shall be carried out by
IOM in the presence of the Contractors who wish to attend. IOM reserve the right
to conduct opening of Quotations in public or not.

12. Acceptance of Quotations

IOM is not bound to take an immediate decision on the acceptability or


unacceptability of Quotations at the time of their opening.

13. Rejection of Quotations

Quotation can be rejected for the following reasons:

(a) the Quotation is not presented in accordance with this General Instruction;
(b) the Quotation Form or any document which is part of the Quotation
Document is not signed;
(d) the Supplier is currently under list of blacklisted suppliers;
(e) the Supplier offer imposes certain basic conditions unacceptable to IOM

IOM is not bound to accept any offer received and reserves the right to waive
any minor defect in an offer, provided, however, that such minor defect (i) does
not modify the substance of the offer and (ii) does not change the relative
ranking of the Suppliers.

14. Evaluation of Quotations

8
IOM shall evaluate and compare the Quotations on the basis of the following:

14.1 Technical Evaluation

(a) Technical Specifications Pass/Fail


Compliance/Non compliance
(b) Quality Requirements Pass/Fail
As described in Annex A

After completion of the Technical Proposal evaluation, IOM shall notify those
Suppliers whose proposal were considered non responsive based on the above
Technical Evaluation Criteria, indicating that their Financial Proposals shall be
returned unopened after the completion of the selection process.

IOM shall simultaneously notify the Suppliers that have passed the Technical
Evaluation.

14.2. Financial Evaluation

The Financial Proposal of Suppliers who passed the technical evaluation shall
be opened. The Supplier with the lowest financial offer per region will be invited
for negotiation.

Arithmetical errors will be corrected on the following basis. If there is a


discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail, and the total
price shall be corrected. If the Supplier does not accept the correction of the
errors, its Quotation will be rejected. If there is a discrepancy between words and
figures, the amount in words will prevail.

15. Award of Contract

The Supplier/s that has submitted the lowest EVALUATED Price and
substantially responsive to the requirements of this General Instruction and who
has been determined to be qualified to perform the contract shall be selected
and awarded the contract.

A sample LTA Contract is attached as Annex F. IOM shall notify the selected
Supplier/s through a Notice of Award. IOM shall also notify in writing, the other
Suppliers who were not selected without disclosing the reason for rejection.

15.1 IOM reserves the right to award contract to one or more Suppliers
depending on the location of the Supplier/s manufacturing plant in order to
address delivery charges and transit time considerations by IOM Field Missions
which are located in more than 200 locations worldwide.

16. Post Qualification and Quality Assurance

Prior to contract signature, post-qualification will be carried out by IOM to further


determine the selected Supplier’s technical and financial capability to perform the

9
contract. IOM shall verify and validate any documents/information submitted, and
shall conduct reference check with other clients and ocular inspection of the office,
plant and equipment, with or without notice to the supplier.

17. Inspection:

The Armoring Manufacturer, and the Supplier if two separate entities, to


provide certification of agreement from full and unfettered access, and
guaranteeing full cooperation and support, to IOM personnel and/or
technical consultants duly appointed by IOM and acting on behalf of IOM, for
the purpose of conducting various inspections, audits and quality checks to
ensure that the vehicles to be provided under the Long Term Agreement
(LTA) are fully certified and compliant with all the specifications
contained within this RFQ .

These inspections and audits shall include, but not be limited to, the following:

17.1 Initial Technical Inspection


(at the premises of the armouring manufacturer):
To include but not limited to;
 Inspection of the vehicles, to be supplied under this RFQ, after completion of the
first stage of armouring (no interior fitted) to ensure that the materials used
comply fully with the necessary ballistic certification in accordance with the
specified international CEN standards of level B6.
 Inspection of all welding to ensure that the correct standards have been applied
and that heat stress factors have not adversely affected the quality of these
materials used.
 Inspection of all mechanical modifications and upgrades to ensure that the
systems, components and installations will fully comply with the specifications
provided by IOM.

17.2 Final Technical Inspection


(at the premises of the armouring manufacturer):
To include but not limited to;
 Inspection of the vehicles prior to delivery ensuring that the completed vehicles
comply fully with the specifications provided by IOM.
 Inspection and testing of all functions, controls and equipment ensuring proper
operation as stipulated within the specifications provided by IOM.
 Conduct a test drive and quality inspection ensuring that the mechanical upgrades
and modifications contained within the specification provided by IOM have been
completed in full and that the required levels of safety, performance and operation
of the components are met.

The Armoring Manufacturer, and the Supplier if two separate entities, to


provide Certification of agreement that at their own costs at no additional
charge to IOM, they will conduct any and all works, replacements,
modifications and upgrades required to rectify or correct any mistakes in
workmanship and/or non-compliance, of their own doing, with the
specifications provided and contained in this RFQ.

10
If any, the cost for the two Technical Inspections, Initial and Final, as described
above, will be borne by IOM. The costs for any additional inspections, over and
above the Initial and Final Technical Inspections described above, resulting from any
fault or non-compliance with the technical specification by the supplier and/or
armouring manufacturer, will be borne by the Supplier and will be deducted from the
final payment.

18. Delivery Site and Period of Delivery

The Incoterms for the Long Term Agreement will be ExWorks Supplier's
Manufacturing Plant under Incoterms 2010.

Final Delivery Destination and delivery charges will be captured per Purchase
Order (PO) issuance.

Final arrangement will be captured in the contract.

19. Liquidated Damages

If the Supplier fails to deliver any or all of the goods within the period specified in
Clause 18 above, a penalty payment of 0.1% of the price of the undelivered
goods for every day of breach of the delivery schedule by the Supplier will be
requested. The Maximum number of days delayed is until 20 days only, with
next course of action as Termination of contract.

20. Payment

Payment shall be made only upon IOM’s acceptance of the goods, and upon
IOM’s receipt of invoice describing the goods delivered.

IOM may grant an advance payment equivalent to maximum of 10% of the


Contract Amount upon submission of a claim and a Bank Guarantee for the
equivalent amount valid until the goods are delivered and in the form provided in
Annex G. The bank guarantee may be waived if the advanced amount is less
than USD Five Thousand Dollars (USD5,000).

21. Warranty

Warranty shall be quoted based on the standard warranties provided by the


manufacturer unless specified in the Technical Specifications of this General
Instruction. A Warranty Certificate shall be provided by the Supplier.

22. Settlement of Dispute

11
The United Nations Commission on International Trade Law (UNCITRAL)
arbitration rules will apply for any dispute, controversy or claim that will arise in
relation to the procurement process.

Annex A - Technical Requirements related to Quality

12
1.0 Content of Technical Proposal

The detailed content of the Technical Proposal will be evaluated on non-


discretionary PASS or FAIL rating through compliance to the following
requirements:

1.1 Compliance to IOM technical specifications

1.2. Vendor’s Expertise and Qualifications

This section should provide description of the company and related


information:

a. Management structure, technical qualifications and proof of financial


stability;
b. Recommendation for satisfactory performance on similar nature project
with United Nations and/or International Organizations. Provide three (3)
client recommendation letters;
c. If Bidder is a manufacturer, submit Manufacturing capacity;
d. If Bidder is not the manufacturer valid authorization from the manufacturer.

1.3. Vendor’s understanding on the required methodology

This section should establish vendor’s understanding of the requirements and


technical specifications by:

a. Identifying the processes how requirements will be met point by point;


b. Describing if the bid meets or exceeds the requirements, while ensuring
suitability of the bid. Providing supporting documents such as
Implementation Timetable, including Transportation and Delivery Schedule
where needed, that is within the duration of the contract.

1.4. Schedule of Technical data

1.4.a Full technical data on the armoring methodology of opaque


areas.
1.4.b Full technical data on the armoring methodology of
transparent areas.
1.4 c. Full technical data and drawings on ballistic steel frames
for all armored glazing indicating shields and splash
Guards.
1.4.d Full technical data on the armoring methodology of the
roof and floor areas
1.4.e Full technical data on the armoring methodology of the
engine compartment area, including drawings where required.
1.4.f Full technical data on the armoring methodology for the
fuel tanks, including drawings where required
1.4.g Full technical data and drawings on ballistic steel frames
for all armored doors indicating shields and splash guards

13
1.4.h Suppliers must retain a 1m x 1m sample of the ballistic
steel(s) used during the production of the vehicles for a period
of 3 (Three) years. This is to be clearly marked, recorded
and placed in storage, this may be necessary for
independent testing in the event of an incident involving
the vehicle to investigate any failure of the ballistic material(s)
used.

1.5 Schedule of Required Certifications

1.5.a Valid certification, in the name of the armouring manufacturer, from a


recognized government testing agency, that the vehicles to be provided under
this RFQ are fully compliant with the European Committee for Standardization
(CEN) VRG standards to Level 7 (VR7) VPAM BRV 2009 – DIN EN 1063,
1522 and 1523VRG, where a complete armoured vehicle of the same model
and type as specified within this RFQ, shall have undergone a comprehensive
destructive testing process from a recognized government testing agency, and
shall have demonstrated the ability as a completed product to successfully
defeat all threats defined in VPAM-BRV 2009 Guideline for VR7 Level

A copy of the test report (not older than 5 years) must be supplied with
the bid and will be returned to the bidder after the evaluation of the bids. The
vehicle that was tested should have been submitted for testing in complete
driving condition with axles, wheels, engine, fuel tank, interior trim and seats.

1.5.b Valid certifications of road worthiness, TUV/MOT of EU standard or


equivalent, for the specific vehicles to be provided under this specific RFQ

1.5.c Valid certification, in the name of the armouring manufacturer, from a


recognized government testing agency, confirming that all armour plating and
glazing used in the up-armour production of these specific vehicles, as
required and supplied under this specific RFQ, fully comply with the European
Committee for Standardization (CEN) VRG standards to Level 7 (VR7)
VPAM BRV 2009 (VR7) - EN 1063 2000 Glazing EN 1522 1998 Opaque
Armor EN 1523 1998 testing methods for ballistic protection.

1.5.d The explosive tests shall be in accordance with the VPAM ERV2010
and the VPAM guidelines or Standardization Agreement (STANAG) 4569.

Please note that the preferred agency should be the German National
Ballistics Laboratory, known as the Beschussamt Mellrichstadt. , because
it is the original publisher of the “B” system of armoring standards, others such
as IABG will also be accepted.

1.6 Quality Management System

1.6.a Quality Certificate (ISO9001) including Quality Manual and Policy


and other information describing the processes applied for the manufacturing of

14
the armoured vehicle. If supplier is trader, it is mandatory that they submit the
above information regarding each manufacturer.

1.6.b Environmental Compliance Certificates, Accreditations,


Markings/Labels, and other evidences of the supplier’s practices which
contributes to the ecological sustainability and reduction of adverse
environmental impact (e.g., use of non-toxic substances, recycled raw
materials, energy-efficient equipment, reduced carbon emission, etc.), either in
its business practices or in the goods it manufactures

1.6.c Quality Assurance Mechanisms in place


Provide summary of quality assurance mechanism in place at each facility
location where vehicles are manufactured to ensure consistency with the
Technical Specifications (Annex B) including presence and characteristics of in-
house Quality Control laboratory (if any).

1.7 Warranty/Guarantee

1.7.a Certification of agreement from the Armouring Manufacturer, and


the Supplier if two separate entities, that the original Toyota mechanical and
electrical warranties on the base vehicles will remain intact and valid after the
armouring manufacture process , for a minimum period of 2 years (24
months) or 60,000km (Sixty Thousand Kilometers) whichever occurs first

1.7.b Certification of agreement from the Armouring Manufacturer, and


the Supplier if two separate entities to provide a full warranty covering the
entire up-armoring and modification conversion, including the braking and
suspension systems and the dual-battery system, for a minimum period
of 2 years (24 months) or 60,000km (Sixty Thousand Kilometers)
whichever occurs first.

1.7.c Certification of agreement from the Armouring Manufacturer, and


the Supplier if two separate entities, that the supplier must provide a full
warranty for a minimum period of 2 years (24 months) or 60,000km
(Sixty Thousand Kilometers) whichever occurs first. covering delaminating
on all glazing to be supplied and included in the up-armoring and
modification conversion of the specific vehicles to be provided as per this
RFQ.

1.7.d Certification of agreement from the Armouring Manufacturer, and


the Supplier if two separate entities, to provide a 5 year (60 months) anti-
perforation corrosion warranty on the ballistic steel used in the up-armoring
and modification conversion of the specific vehicles to be provided as per this
RFQ.

1.7.e Certification of agreement from the Armouring Manufacturer, and


the Supplier if two separate entities to provide detailed Dealer (Toyota),
Operator and supplemental electrical wiring manuals for the specific vehicles
to be supplied under this RFQ

15
1.7.f Certification of agreement from the Armouring Manufacturer, and
the Supplier if two separate entities that full details of warranty claims
procedure will be provided.

1.7.g Certification of agreement from the Armouring Manufacturer, and


the Supplier if two separate entities that Service Unit will be provided when
purchased unit is under repair within warranty period.

1.8 Additional Content

1.8.a Technical data sheet that includes information about fuel


consumption rate per 100KM, and the emission rate. Apart from
the actual manufacturer’s data on fuel economy, bidders are to
indicate the third party organization where fuel economy tests for
their vehicles has been carried out such as US EPA, FIA
foundation or equivalent.

1.8.b Spare parts list with Part Number, Spare parts price list (Indicate
discount rates if any)

1.8.c After sales service such as:


- Training
- Spare Parts Availability
- Local Dealer / representative in the region certified to perform
aftersales services

2.0 Technical Evaluation

2.1 The technical proposals of Supplier shall be evaluated based non-discretionary


PASS or FAIL. Suppliers must PASS all criteria outlined per below table.
Technical Evaluation Table

Criteria Evaluation
Technical Specifications Form Pass/Fail

Pass/Fail
Vendor’s Expertise and Qualifications
Vendor’s understanding on the required methodology Pass/Fail
Schedule of Technical data Pass/Fail
Schedule of Required Certifications Pass/Fail
Quality Management System Pass/Fail
Warranty/Guarantee Pass/Fail

2.2 After completion of the Technical Proposal evaluation, IOM shall notify those
Suppliers whose proposal were considered non responsive based on the
Technical Evaluation Table, indicating that their Financial Proposals shall not
be opened for evaluation after the completion of the selection process.

2.3 IOM shall simultaneously notify the Suppliers that have passed the Technical
Evaluation.

16
ANNEX B - CHECKLIST FOR TECHNICAL PROPOSAL

No. Document
Submitted
1 Technical Specifications Form  

2 Vendor’s Expertise and Qualifications


Vendor’s understanding on the required
3 methodology  

4 Schedule of Technical data  

5 Schedule of Required Certifications  

6 Quality Management System  

7 Warranty/Guarantee  

TECHNICAL SPECIFICATIONS Annex C

17
Ref No. : ____________________
Item No. : ____________________
Item Description : ____________________

Manufacturer : ________________________________________________
Origin : ________________________________________________
Model : ________________________________________________

IOM’S SPECIFICATIONS BIDDER'S SPECIFICATIONS


And indicate COMPLY or NOT COMPLY
2018 model, Brand New, 4x4, Middle-East or
Tropical Version LHD Toyota GXR LC200, V8
Options: petrol or diesel engine 4.6L, with high
altitude compensator,
Options: automatic or manual transmission,
white colored,
and fully certified armouring level at VR7 with
Ballistic Level options B6/B7
MOSS Accessories:
(to be installed at the armoring factory)

1. TJM Heavy Duty Front T15 Bull Bar (with HF/VHF


Antenna Brackets)
2. Warn Electric Winch(or equivalent brand) 12 volt
fixed in the heady duty front bull bar (6 tons
capacity)
3. Driver Side Window Lifter
4. Heavy Duty Jack (4,000kgs)
5. Bulb Fuse Kit
6. Steel Roof Rack
7. 2nd Spare Wheel Incl. Runflat
8. 2nd spare wheel holder on the roof rack
9. 2 plastic jerry cans (20L) and two funnels with
twin holders on the roof rack
10. Wheel Wrench X-Type, 17,19,21 (13/16) 22mm
11. Tow Rope (5,000kgs) 3M
12. Blackhawk Sledgehammer
13. Heavy Duty Jump Leads
14. Winch Recovery Accessories in Storage Bag
15. Replacement Rear Bumper Bar, Including Hi-Lift
Jacking Points
16. Ball type heavy duty tow bar with electrical
socket
17. Fog lamps, 2 x 55W with the bull bar
18. Dashboard fitted blue flashing lights
19. Strobe Lights Front mounted on Bull Bar
20. Tail light kill switch
21. Rear cargo area anchor points & elasticated net
22. Yellow color spherical warning system different

18
than ambulance and police vehicles
23. Advanced First Aid Kit / trauma kit
24. Two roadside warning triangles
25. Belkins DC to AC power source
26. Rechargeable torch light
27. Essential Tool Kit (OEM tools)
28. Shovel with Handle
29. One handheld 1 kg fire extinguisher securely
mounted in the front forward passenger foot-well
(pictures to be included in submission)
30. One hand held 1 kg fire extinguisher to be
securely mounted (internally) to the right rear cargo
door (pictures to be included in submission)

Accessories, Tools and Spare Parts to be


included for each vehicle:

1. Dealer network manual


2. Operator’s manual
3. Electrical wiring manual
4. Communication equipment manuals
5. Keys one (1) plus two (2) spare
6. Touch-up paint
7. One air vehicle (bottle) jack to cope for additional
weight of armour and wheel changing accessories
8. Extra wheeled garage jack with minimum capacity
of 4 tons
9. One “hooligan” bar and hammer required for
emergency entry
10. Extra First Aid Kit
11. Heavy-duty electrical “jumper” cables
12. One nylon snatch strap with reinforced loops at
each end, minimum of 8m length with a minimum
capacity of 4 tons
13. Two large U-bolts of a minimum capacity of 2,5
tons
Radio Equipment:

Radios and communications systems


Installation options:
1. Can be installed during armouring process
2. Can be shipped out separately and only pre
wiring installation will be required.

Final instruction will be captured per Purchase


Order.

The radio and sat phone communications


equipment must be positioned in the front
compartment in such a way as to enable equal ease
of operation by both the driver and the front
passenger (the space between the driver and
passenger seat may be utilized but changing of
channels and operation of equipment must be
possible without stopping the vehicle).
All wiring must be run through pre-installed conduit

19
tubing so as to facilitate the ease of any post-
manufacture replacement and/or maintenance of
wiring and equipment. Wiring must be incorporated
in the certified armoring design and manufacture in
order to prevent the creation of gaps in the armor
during the installation of the equipment. Manuals
must be provided for the radios and Thuraya
communications equipment. Equipment should not
be installed in the glove box. Items are:

1. Full Package Motorola VHF Radio Mobile


Station DM4601 with all accessories and
antenna, 255 Channel, 25W & Remote
Mount Kit. The VHF antennae must be
securely fitted to one of the front fenders of
the vehicle, and not the roof. Magnetic
mounting will not be accepted.
2. Full Package Codan HF Radio Mobile
Station, Codan Envoy HF Radio with all
accessories (GPS enabled). The HF
antennae should preferably be installed at
the rear of the vehicle.
3. Full Package Iridium Sat Phone Car Docking
Station (handset not included) for handset
Model 9555, or, Thuraya Vehicle Docking
Station (Handset not included) for handset
compatible model – Southern Hemisphere &
External Mag Antenna, including charging-
cradle, headset and external antennae, to be
installed during the armoring process.

OPTIONAL ACCESSORIES

Four cameras with resolution 1080 HD, with


recording capacity up to 48 hrs (not less):
 One mounted in front with wide
view of the front road;
 One mounted in the back with
wide view of the rear;
 One with wide view, mounted in
the front upper corner, above the
windshield, in front of passenger
seat with view of the passenger,
driver and back seats;
 One mounted with view on the
outside the driver’s window, i.e. to
record anyone approaching the
driver.
A siren, intercom and public address system, of
European manufacture, must be installed with
switching and handset located in the front
compartment in such a way as to enable equal ease
of operation by both the driver and the front
passenger who is usually a security officer and will
usually operate this equipment. The siren should
only provide one distinct acoustic sound; the

20
variable type is not required. Equipment may not be
installed in the glove box.
GPS tracking system to track the movement of the
AV. Not the satellite one, but the one operating
under the local GSM network grid
Other options can be included and priced
separately.
BIDDER'S SPECIFICATIONS
Other IOM Requirements: And indicate COMPLY or NOT COMPLY or
BETTER OFFER (indicate the alternative
offer)
1. The back compartment: the back armored wall
shall be installed at the very end of the vehicle
allowing to include two (2) additional protected back
seats behind the main back seat.
2. Smooth and professional finishing.
3. No rough edged shall be left not properly finishing
especially for the steel works.
4. Steel frame on the front windshield should be
protected by a rubber covers to avoid being rust
also to avoid injuring hands.
5. The towing hook at the rear bumper shall be from
the closed type (not the open type).
6. A rear power source shall be installed to light up
the towed compartment.
7. A full welded metal front bull bar (not nickel
and/or any fragile material) shall be also extended to
cover the front lights as well (not only the middle
part of the engine).
8. The back armored door (bulk head door) shall
have a latch from inside to prevent access to the AV
from outside.
9. The engine compartment shall be properly sealed
with some metal or Kevlar material through the hood
(hood protection). The hood has a proper locking
system that will prevent it from flying out to block
driver view.
10. Engine bay fire system should be installed.
Base Vehicle Specifications And Upgrades:
 The vehicle should be designed for simplicity,
and must be mechanically and electronically
simple to maintain without special diagnostic
tools.
 Ignition System: the electronic push-button
electronic ignition system must be replaced with
a key-operated ignition system.
 Cooling System: An auxiliary engine oil cooler
must be installed, and an additional radiator fan
must be installed (depending on the
geographical location and conditions).
 Braking System: the standard original brake
fluid pipes must be replaced with (steel braided)
high-performance tubing to sustain additional
fluid pressures. The standard original OE brake
fluid must be replaced with high-performance
brake fluid to minimum specification of DOT 5.1

21
(Proof of compliance will be required). The
standard original front brake disc systems must
be replaced with high-performance disc brake
system incorporating a 6-piston caliper system,
dual-ventilated high-performance type brake
discs that are at least 40% larger than the OE
discs, and high-performance brake disc pads
such as that manufactured by AP Racing or
Alcon, or similar. The standard original rear
brake disc systems must be replaced with high-
performance disc brake system incorporating a
4-piston caliper system, high-performance type
brake discs that are at least 40% larger than the
OE discs and high-performance brake disc pads
such as manufactured by AP Racing or Alcon or
similar. Bidders are required to provide technical
specifications on the entire braking systems to
be installed on the specific vehicles to be
supplied in terms of this RFQ
 Fuel Tanks: combined total fuel tank capacity of
at least 90-litre is required. The original fuel
tanks must be replaced with EXPLOSAFE type
tanks (certification to be provided). All fuel tanks
and fuel pipes must be protected with armour
steel to a minimum of Level B6. Bidders are
required to provide technical specifications on
the upgraded fuel tank systems to be installed
on the specific vehicles to be supplied in terms
of this RFQ.
 Central Locking: the driver must be able to lock
all doors internally and centrally without
stopping. Remote locking is not standard
requirement under this specification but at the
minimum a key-operated central locking from
the driver’s door must be provided, i.e. when the
driver’s door is locked externally all doors are
simultaneously locked. Child security locks on
the rear doors are required.
 Seats and Interior Upholstery: both front seats
must be “single” seats, if the base vehicle is
provided with front passenger bench-type seat
this must be removed and replaced with a single
seat of the same dimensions as the driver’s seat
(pictures to be included in submission). Seat
belts must be provided and must be long
enough to accommodate a Large to Extra-Large
person wearing a ballistic vest. The standard
rear type bench seat with seat belts for two
passengers is to be retained. The interior
upholstery must be of a heavy-duty, durable and
washable fabric (not plastic or vinyl), to match
the colour of the dashboard, and must offer
some degree of burn resistance and be of semi-
luxury quality. The floor of the entire vehicle
must be covered in a durable and washable
rubber matting (not carpeting). The floor must

22
retain the standard vehicles insulation against
road-noise, heat and cold. Bidders are required
to provide specifications on the interior
upholstery to be installed on the specific
vehicles to be supplied in terms of this RFQ.
 HVAC System: the original heating, ventilation
and air-conditioning (HVAC) system must be
upgraded to compensate for the extremely hot
climates where summer temperatures reach in
excess of 40°C. The HVAC system must provide
variable controlled ducting and ventilation for
both front and rear passenger compartments.
The HVAC system must include upgraded
compressors, condensers and evaporators.
Bidders are required to provide technical
specifications of the heavy duty and upgraded
air-conditioning system required to be installed
on the specific vehicles to be supplied in terms
of this RFQ.
 Wheels, Tyres, and Run-Flat Assemblies: all
wheel rims, including the two spare wheels,
supplied with the vehicles must be of steel
construction certified according to TUV/MOT
type recommendations and legal requirements
to carry the additional weight of the armouring
(alloy rims will not be accepted). All six wheels
must be fitted with heavy-duty all terrain tyres,
similar to BF Goodrich All Terrain, each tyre
rated to a minimum payload of 1,350 kg @80psi.
All six wheels must be fitted with run-flat
systems rated at 50km at a speed of 80 km/h
run-flat capability supplied by either Hutchinson
or Runflat International. No other type will be
accepted. Bidders are required to provide
technical specifications on the steel rims, the
run-flat systems and the tyres to be installed on
the specific vehicles to be supplied in terms of
this RFQ. Suppliers are to label the
recommended tyre pressures both Bar and PSI
for the supplier’s vehicles on the inside of the
fuel filler cover.
 Doors and Door Hinges: all standard door
hinges on all doors must be removed and
replaced with engineered-for-purpose heavy-
duty type hinges capable of sustained
functioning of the heavier armored doors. All
four passenger doors must be fitted with gas
springs to assist with ease of opening and
closing, and to prevent slamming when closing.
All door pillars must be armored and specially
reinforced to prevent distortion caused by the
additional weight of the doors. All door hinges
must directly connect the armouring steel in the
doors to the armouring steel in the pillars; no
weight may be carried by the standard sheet
steel of the base vehicle. Door check straps

23
must be fitted to all doors to prevent doors from
reaching full articulation. All internal door panels
(6 doors) must be fitted with reinforced robust
grab handles adequately secured to enable
sustained opening and closing of the heavier
armored doors. All doors (5 doors) must be fitted
with manual “Battle Lock” deadbolts. Bidders are
required to provide technical specifications on
heavy-duty door hinge systems and the
reinforcement of the door pillars to be installed
on the specific vehicles to be supplied in terms
of this RFQ.
 Suspension System: The standard original
suspension system must be completely replaced
with an engineered-for-purpose high
performance suspension system providing
constant loading. Only Bilstein and/or Eibach
components will be accepted. Off-the-shelf
suspension system components providing
temporary loading, such as those manufactured
for heavy-duty off-road use, will not be accepted.
Upgraded steering dampers, front and rear
shock absorbers from a high quality
manufacturer of sufficient design to prevent fluid
from boiling, front and rear springs as well as the
front and rear anti-roll bars (of a minimum
diameter of 32mm) must be installed. Only
Bilstein and/or Eibach components will be
accepted. Suspension turrets and anchoring
points must all be strengthened and reinforced
to enable the additional load. Bidders are
required to provide complete technical
specifications on the heavy-duty engineered-for-
purpose suspension systems, and the reinforced
suspension turrets and anchoring points, to be
installed on the specific vehicles to be supplied
as per this specific RFQ. Bidders are required to
provide independent certification that the
suspension is sufficient for the additional weight
of the specific vehicle offered and not just
certified as heavier duty.
 Steering: upgraded steering dampers, from a
high quality manufacturer such as Bilstein must
be installed.
 Bumpers and Side-Step Rails: the original
front and rear standard bumpers must be
replaced with black heavy-duty wrap-around
steel bumpers/bull bar, such as those
manufactured by ARB (specify specific model)
or similar, to the front and rear. (Steel tube for
the rear bumper will not be accepted). The rear
steel bumper must include a towing hook with
spring loaded closer/retainer. The front bumpers
must include two reinforced towing points, one
right and one left, for the attachment of shackles
and towing straps. The heavy duty steel

24
bumpers (front and rear) and the towing hook
are to be securely fixed with tungsten steel bolts
to ensure secure towing of the heavier vehicles
under situations of duress. Black steel side-step
rails, as manufactured by ARB (specify) or
similar, must be fitted to both sides of the
vehicles. Winches must not be provided as
standard; unless specifically requested. Bidders
are required to provide technical specifications
and photographs of the front and rear bumpers
to be fitted as well as the fixing specifications.
 Roof Rack: the vehicle must be fitted with a
black steel roof rack, such as those
manufactured by ARB or similar. The roof rack is
to be modified to include secure but quick-
release restraints for the spare wheel and the
jack. Two steel steps must be positioned on the
right rear side of the vehicle to facilitate access
to the roof rack. Bidders are required to provide
technical specifications and photographs of the
roof racks to be fitted as well as the fixing
specifications.
 Spare Wheel Mounts: one spare wheel is to be
mounted underneath the rear of the vehicle (as
is standard) and one on the roof rack. Spare
wheels should not be mounted to the rear of the
vehicle impeding the opening of the rear cargo
doors. The second spare wheel is to be
mounted on the roof rack, and is to be secured
with quick-release, but lockable, restraints.
Bidders are required to provide technical
specifications and photographs of the spare
wheel swing-out bracket to be fitted as well as
the fixing specifications.
 Clutch: the original standard clutch assembly
(clutch plate, pressure plate and release
bearing) must be replaced with a complete
heavy-duty high-performance clutch assembly
specifically designed and engineered to function
for sustained periods under extreme conditions
and to cope with the additional loading factors
resulting from the additional weight of the
armouring. Bidders are required to provide
technical specifications on heavy-duty clutch
assembly to be installed on the specific vehicles
to be supplied in terms of this RFQ. Bidders are
required to provide dynamometer test results of
the vehicle after armouring with a minimum full
power test period of 10 minutes.
 Lights: all standard original lights, including the
interior cabin lights, on the vehicles will be
required to function as normal after the
armouring modification and conversion has been
completed. Dual blue strobe lights, of European
manufacture, must be installed in the front
radiator grille and at the rear of the vehicle. The

25
front and rear strobe lights must have
independent switches (one for front and one for
rear) located in the front compartment in such a
way as to enable equal ease of operation by
both the driver and the front passenger who is
usually a security officer and will usually operate
this equipment. The vehicle must be fitted with
fog/sandstorm lights with one switch located in
the front compartment in such a way as to
enable equal ease of operation by both the
driver and the front passenger. The vehicle must
be fitted with an additional interactive “kill switch”
that will enable all vehicle lights to switched off
and must be fitted in such a way as to enable
equal ease of operation by both the driver and
the front passenger.
 Batteries and Electrical: all vehicles provided
under this RFQ must be fitted with a dual or
auxiliary battery system, managed by an
intelligent split charging system, with additional
battery status monitoring dials mounted on the
dashboard as required. An electrical power cut-
off or isolation switch is to be installed in the
engine compartment enabling the batteries to be
isolated when the vehicle is not in use so as to
avoid power drainage. The original standard
batteries must be removed and all batteries
supplied and installed must be the leak resistant
Optima “gel” type to reduce the potential for acid
spray. The vehicles must be fitted with front a
rear wipers, water sprayers and defoggers which
must function as normal after the armouring
modification and conversion has been
completed. The vehicles are to be provided with
the standard Toyota sound system incorporating
a front-loading CD player (cassette players will
not be accepted). The selected supplier will be
required to provide a complete electrical manual
depicting all modifications to the original
standard electrical wiring systems and must
provide complete circuit/wiring diagrams.
 Protected Tailpipe: The tailpipe must be
protected against the insertion of any foreign
object.
 Rear-View and Side Mirrors: Standard left and
right side mirrors must be adjustable from inside
the vehicle. A secondary rear-view mirror must
be installed, alongside or above the OE internal
rear-view mirror, for the front passenger who is
usually a security officer.
 Sump and Steering Protection: Steel
protection plates must be installed to protect the
underside of the engine and steering
components in the event the vehicle crosses a
central lane divider or extremely rough ground.
These must be easily removable for the

26
purposes of vehicle maintenance. Bidders are
required to provide technical specifications on
the engineered sump and steering protection
systems to be installed on the specific vehicles
to be supplied in terms of this RFQ.
ARMOURING SPECIFICATIONS AND
UPGRADES
The passenger cabin should be well protected
according to minimum protection level B6 including
all sidewalls, doors, pillars, roof, floor, front,
bulkhead, and rear door.

Edges and seams are armored by utilizing an


overlap design system which minimizes gaps and
preventing penetration.

The ballistic steel panels are covered with cathodic


dip painting before installation.

There is no armoured bulkhead with ballistic glass


as separation between passenger cabin and cargo
compartment (fully armored vehicle – front to rear).

The vehicle resembles a normal civilian low profile


vehicle – meaning that the vehicle is nearly visually
identical to a standard vehicle. Therefore, unwanted
attention while travelling is avoided.

1. Materials:
All armouring materials used in the armouring
process such as steel, aramid and glass shall have
undergone a thorough destructive testing process
from a recognized government testing agency, and
shall have demonstrated the ability as a completed
product to successfully defeat all threats defined in:

VPAM-BRV 2009 Guideline for VR7 Level

2. Opaque Areas:
All opaque areas, including the roof, are to be
protected with steel plating against soft core
projectiles fired with the following and all lesser
weapons at 90 degree and 45 degree (roof) impact
angle.
 5.56 X 45mm (SS 109)
 5.45 X 39mm Kalashnikov
 7.62 X 51mm (NATO) ball
 7.62 X 39mm Kalashnikov ball
 A minimum of 2 X DM51 hand grenades
detonated simultaneously directly on top and
underneath the vehicle

3. Transparent Areas:
All transparent areas are to be protected against
projectiles fired with the following and all lesser
weapons at 90 degree impact angle;

27
 Calibre 7.62 x 39 mm, FJ/PB/SC, AK 47
(Kalashnikov) OBR-43 PS
 Calibre 5.45 x 39.5 mm AP, FJ/PB/SCP,
AKS 74 (Kalashnikov) OBR-74
 Calibre 5.56 x 45 mm, FJ/PB/SCP, US Rifle
M16 A2, SS-109 / M-8555
 Calibre 7.62 X 51 MM, FJ/PB/SC, “FAL” /
“LAR” NATO Rifle

All ballistic glass must be installed in a ballistic steel


frame to ensure that angled shots cannot penetrate
through the sides of the glass.

All ballistic glass must have zero tinting.

The driver’s door window must be fitted with a


window lifter & lock system to allow opening of at
least 10cm.

4. Floor:
The floor of the vehicle is to be designed in such a
way that it will defeat at least two DM 51 hand
grenades detonated simultaneously per square
meter and all lesser explosives in full compliance
with the European Committee for Standardization
(CEN) VRG standards to VPAM-BRV 2009
Guideline for VR7 Level, ballistic level options
B6/B7, as certified by a recognized government
testing agency.

Bolted on under-floor plates will not be acceptable.

5. Engine Compartment:
Both batteries are to be protected within steel
armoured boxes within the engine compartment
against projectiles and splinters. Armoured boxes
must be easily removed for maintenance or
transportation.

The vehicle management system, including fuse


boxes, which controls essential electrical vehicle
functions, must be protected with armoured steel to
level B6 or B7 to protect it against splinters and
fragmentation.
The vehicle must be fitted with an Emergency Fire
Suppression System. The 5.0liter bottle of Aqueous
Film Forming Foam must be located and adequately
secured in the luggage compartment. In the event of
a fire in the engine area, the suppressant system is
to be controlled by pressing a switch on the vehicle
control panel operated with equal ease by either the
driver or the front passenger who is usually a
security officer and will usually operate this
equipment.

Full length armoured steel to the level of options B6

28
or B7 ballistic certification is to be mounted on both
sides of the engine compartment behind the vehicle
wings protecting the engine compartment.

An armoured grille, to the level B6 or B7, must be


installed to provide protection to the radiator and
engine from frontal attack. Construction of such a
grille may not inhibit the cooling capacity of radiator,
or the air intake capacity of the HVAC system.

The dashboard, bulk head, firewall and openings for


normal vehicle functions such as steering column,
foot pedals and other controls, must all be protected
by ballistic steel to level options B6 or B7.

6. Protected Fuel Tanks:


All fuel tanks (including diesel) must be fully
armoured using blast steel to combat ballistic and
fragmentation attacks.

Aramid armour or blast mats may not be used.

All fuel tanks (including diesel vehicles) fitted to


vehicles must be of the EXPLOSAFE type.

Fuel line hoses must also be protected against blast


and projectiles.

7. Door Apertures:
Each and every door aperture must have a ballistic
steel overlap and splash return around the entire
door aperture, through 360° of the aperture, to
prevent any ballistic leakage and also to keep the
armoured door in place in the event of a large side
blast.

Cross sectional drawings through pillars, can trails


and sills for all door installations, must be provided
by the bidder.

8. Roof Escape Hatch:


A ballistic steel roof hatch, to a minimum level-B6 or
B7, must be installed with access from both inside
and outside the vehicle by means of a locking lever
carried in each vehicle.

The locking lever of the escape hatch is to be spring


mounted allowing the escape of gasses and the
shockwave usually generated by an IED or similar
explosive device.

The aperture of the roof escape hatch must also be


fitted with ballistic steel overlap and splash returns
around the entire opening.

The aperture of the escape hatch must be large


enough to allow unhindered passage during escape

29
by a Large to Extra-Large person wearing a ballistic
vest.

The profile of the escape hatch above the roof


profile must be kept to a minimum.

30
DELIVERY SCHEDULE
including period of base vehicle
ITEM COUNTRY ExW TOTAL acquisition,
ITEM DESCRIPTION QUANTITY UNIT IOM initial inspection,
NO. OF ORIGIN PRICE PRICE armoring, installation of accessories,
IOM final inspection
processing of export licenses
Offered Vehicle
1
per Annex B
Price of Each MOSS and
2
other Accessories
Price of
3 Telecommunication
Equipment
Spare Parts List and Price
4 (indicate discount rate if
any)
 TOTAL    
Annex D

PRICE SCHEDULE FORM

PROJECT TITLE : Supply and Delivery of Armored Vehicles to IOM Under Long Term Agreement for One (1) Year
REF NO. : RFQ2017.033.LTA.IOM

Note: We require prices for all options. Vendor may offer one or all options in terms of transmission (Manual/Automatic), engine
type(Diesel/Petrol) and ballistic level (B6/B7)

________________________________________
Suppliers authorized signature over printed name

31
Annex E

VENDORS INFORMATION SHEET (VIS)

Name of the Company __________________________________________________________

Address Leased Owned Area: _______sqm

House No _____________________________________________________
Street Name _____________________________________________________
Postal Code _____________________________________________________
City _____________________________________________________
Region _____________________________________________________
Country _____________________________________________________

Contact Numbers/Address
Telephone Nos. __________________ Contact Person: ___________________
Fax No. ____________________
E mail Address ____________________ Website: ___________________

Location of Plant/Warehouse Leased Owned Area: ______sqm


__________________________________________________________________
__________________________________________________________________
__________________________________________________________________

Business Organization Corporation Partnership Sole Proprietorship

Business License No.: __________ Place/Date Issued:_________ Expiry Date ________

No. of Personnel ___________ Regular ___________ Contractual/Casual ____________

Nature of Business/Trade

Manufacturer Authorized Dealer Information Services

Wholesaler Retailer Computer Hardware

Trader Importer Service Bureau

Site Development/ Consultancy Others ____________


Construction __________________

Number of Years in business: _________


Complete Products & Services
__________________________________________________________________
__________________________________________________________________

Payment Details

32
Payment Method Cash Check Bank Transfer Others

Currency Loc.Currency USD EUR Others

Terms of Payment 30 days 15 days 7 daysupon receipt of invoice

Advance Payment Yes No % of the Total PO/Contract

Bank Details:

Bank Name ________________________________________________


Bldg and Street ________________________________________________
City ________________________________________________
Country ________________________________________________
Postal Code ________________________________________________
Country ________________________________________________
Bank Account Name ________________________________________________
Bank Account No. ________________________________________________
Swift Code ________________________________________________
Iban Number ________________________________________________

Key Personnel & Contacts (Authorized to sign and accept PO/Contracts & other commercial
documents)

Name Title/Position Signature

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

Companies with whom you have been dealing for the past two years with approximate value in US
Dollars:

Company Name Business Value Contact Person/Tel. No.

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

33
Have you ever provided products and/or services to any mission/office of IOM?

Yes No

If yes, list the department and name of the personnel to whom you provided such goods and/or
services.

Name of Person Mission/Office Items Purchased

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

Do you have any relative who worked with us at one time or another, or are presently employed with
IOM? If yes, kindly state name and relationship.

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

Trade Reference

Company Contact Person Contact Number

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

Banking Reference

Bank Contact Person Contact Number

_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

34
_______________________ _______________________ _______________________

_______________________ _______________________ _______________________

REQUIREMENTS CHECK LIST

Please submit the following documents together with the Information Sheet:

For IOM use only


No. Document Not
Submitted
Applicable
Company Profile (including the names of owners,
1    
key officers, technical personnel)
Company's Articles of Incorporation, Partnership
2 or Corporation, whichever is applicable, including    
amendments thereto, if any.
Certificate of Registration from host country's
3 Security & Exchange Commission or similar    
government agency/department/ministry
4 Valid Government Permits/Licenses    

5 Audited Financial Statements for the last 3 years*    


Certificates from the Principals (e.g.
Manufacturer's Authorization, Certificate of
6 Exclusive Distributorship, Any certificate for the    
purpose, indicating name, complete address and
contact details)
7 Catalogues/Brochures    

8 List of Plants/Warehouse/Service Facilities    


List of Offices/Distribution Centers/Service
9    
Centers
Quality and Safety Standard Document / ISO
10    
9001
List of all contracts entered into for the last 3
11    
years (indicate whether completed or ongoing ) *
Certification that Non-performance of contract did
not occur within the last 3 years prior to
12    
application for evaluation based on all information
on fully settled disputes or litigation
For Construction Projects: List of machines &
equipment (include brand, capacity and indication
13    
if the equipment are owned or leased by the
Contractor)

* For Competitive Biddings, number of years may increase depending on the estimated contract
amount.

35
** Indicate if an item is not applicable. Failure to provide any of the documents mentioned above will
result in automatic "failed" rating.

I hereby certify that the information above are true and


correct. I am also authorizing IOM to validate all claims
with concerned authorities.

Received by:

_______________________ _______________________
Signature Signature

_______________________ _______________________
Printed Name Printed Name

_______________________ ______________________
Position/Title Position/Title

_______________________ _______________________
Date Date

__________________________FOR IOM USE ONLY_________________________

Purchasing Organization ___________________


Account Group ___________________

Industry 001 002 003

where 001 - Transportation related to movement of migrants


002 - Goods (e.g. supplies, materials, tools)
003 - Services (e.g. professional services, consultancy, maintenance)

Vendor Type Global Local

36
ANNEX F

IOM office-specific Ref. No.:


IOM Project Code:
LEG Approval Code / Checklist Code

AGREEMENT FOR THE RECURRING SUPPLY AND DELIVERY OF GOODS


Between
The International Organization for Migration
And
[Name of the Other Party]

This Agreement for the Supply and Delivery of Goods (the “Agreement”) is entered into by the
International Organization for Migration (“IOM”) of [insert address] represented by [insert Name, Title
of Chief of Mission], hereinafter referred to as “IOM,” and [Name of the Supplier] of [insert address],
represented by [insert Name, Title of the representative of the Supplier], hereinafter referred to as the
the “Supplier” on [insert date]. IOM and the Supplier are also hereinafter referred to individually as a
“Party” and collectively as the “Parties.”

1. Introduction and Integral Documents

1.1 The Supplier agrees to provide IOM with [insert description of goods] upon request by IOM in
accordance with the terms and conditions of this Agreement and its Annexes, if any, from
[starting date] to [end date].

1.2 The following documents form an integral part of this Agreement: [add or delete as required]

a) Annex A - Bid/Quotation Form;


b) Annex B - Price Schedule;
c) Annex C - Technical Specifications;
d) Annex D – Sample Purchase Order
e) Annex E - Accepted Notice of Award (NOA); and
f) Annex F - Performance Security.
g) Annex G - RFQ Documents.

2. Goods/Services Supplied

2.1. The Supplier agrees to supply the Goods to IOM when requested by Purchase Order (sample
attached as Annex D) in the amounts outlined therein in strict accordance with the
specifications, and at the price stated for each item in the Price Schedule in Annex B, in

37
accordance with the Technical Specifications outlined in Annex C and in line with the delivery
schedule outlined by each Purchase Order.

2.2 IOM doesn’t warrant that any quantity of Goods will be purchased during the term of this
Agreement.

2.3 In the event of any advantageous technical changes and/or downward pricing of the Supplies
during the duration of this Agreement, the Supplier shall notify IOM immediately. IOM shall
consider the impact of any such event and may request an Amendment to the Agreement.

2.4 The Supplier agrees to supply the following incidental services (the “Incidental Services”):
[add or delete as required]

(a) Performance or supervision of on-site assembly and/or start-up of the supplied Goods;
(b) Furnishing of tools required for assembly and/or maintenance of the supplied Goods;
(c) Furnishing of a detailed operations and maintenance manual for each appropriate unit of
the supplied Goods;
(d) Performance, supervision, maintenance and/or repair of the supplied Goods, for a period
of time agreed by the Parties, provided that this service shall not relieve the Supplier of any
warranty obligations under this Contract; and
(e) Training of IOM’s personnel, at the Supplier’s plant and/or on-site, in assembly, start-up,
operation, maintenance, and/or repair of the supplied Goods.

2.5 Nothing in this Agreement shall be interpreted as creating an exclusive relationship between
the Parties for the supply and delivery of Goods.

2.6 The terms and conditions of this Agreement shall apply to all Purchase Orders issued under this
Agreement. In case of discrepancy between the terms and conditions of the Purchase Order
and the terms and conditions outlined in this Agreement, the terms and conditions outlined in
this Agreement prevail.

2.7 The Supplier shall keep all items outlined in Annex B in stock in sufficient quantities at all times.
If the stock of the Supplier is temporarily depleted, the Supplier shall inform IOM in writing
when said items are expected to be back in stock.

3. Charges and Payment

3.1 The total price for each supply and delivery of Goods and any Incidental Services under this
Agreement is determined by each Purchase Order in accordance with the Price List in Annex B
(the “Price”).

3.2 The Supplier shall invoice IOM upon completion of each delivery in accordance with this
Agreement and the relevant Purchase Order. Payment shall become due 30 (thirty) calendar
days after acceptance by IOM of the Goods.

3.3 The invoice for each delivery will be accompanied by the following documents: air way bill
number, shipping invoice, packing list, certificate of origin, copy of signed Purchase Order [add
or delete as required]

38
3.4 Payments shall be made in [currency] (currency code) by bank transfer to the following bank
account of the Supplier:

[bank account details]

3.5 The Price specified in in each Purchase Order in accordance with the Price List (Annex B) is the
total charge to IOM. The Supplier shall be responsible for the payment of all taxes, duties,
levies and charges assessed on it in connection with this Agreement. IOM shall not be charged
for the cost of previous storage of any Goods or related costs.

3.6 IOM shall be entitled, without derogating from any other right it may have, to defer payment
of part or all of the Price until the Supplier has completed, to the satisfaction of IOM, the
delivery of the Goods and the Incidental Services to which those payments relate.

3.7 The Price List (Annex B) shall remain valid for a period of at least [enter period, preferably at
least one year]

4. Delivery

4.1 The Goods shall be delivered to [insert place of delivery or state ”to the place outlined by each
Purchase Order”] according to the delivery schedule in each Purchase Order. The cost of
delivery is deemed included in the Price specified in each Purchase Order and the Price List
(Annex B). The Incidental Services as described in Article 2.4 shall be performed at the place of
delivery and completed by the same delivery date, unless otherwise stated in Article 2.4 of
this Agreement.

4.2 In the event of breach of this clause IOM reserves the right to:

(a) Terminate this Agreement without liability by giving immediate notice, and to charge the
Supplier any loss incurred as a result of the Supplier's failure to make the delivery within
the time specified; or
(b) Charge a penalty of 0.1% (one-tenth of one per cent) of the Price for every day of delay or
breach of the delivery schedule by the Supplier.

5. Performance Security (applicable for Purchase Orders with value over USD 250,000)

5.1 If any Purchase Order exceeds a value of USD 250,000, the Supplier shall furnish IOM
with a performance security (the “Performance Security”) in an amount equivalent to
[10 (ten)] per cent of the Price, to be issued by a reputable bank or company, and in
the format acceptable to IOM.

5.2 The Performance Security shall serve as the guarantee for the Supplier’s faithful
performance and compliance with the terms and conditions of this Agreement. The
amount of the Performance Security shall not be construed as the limit of the
Supplier’s liability to IOM, in the event of breach of this Agreement by the Supplier.
The Performance Security shall be effective until 30 (thirty) days from the completion

39
of Supplier’s obligations under relevant Purchase Order following which it will be
discharged by IOM.

6. Inspection and Acceptance

6.1 Where any annexed Technical Specifications (Annex C) and Request for Quotation (Annex G)
state what inspections and tests are required and where they will be carried out, those terms
will prevail in the event of any inconsistency with the provisions in this clause.

6.2 IOM or its representative shall have the right to inspect and/or test the Goods at no extra cost
to IOM at the premises of the Supplier, at the point of delivery or at the final destination. The
Supplier shall facilitate such inspections and provide required assistance.

6.3 IOM shall have 30 (thirty) calendar days after proper receipt of the Goods purchased to
inspect them and either accept or reject them as non-conforming with this Agreement. Based
on an inspection of a valid sample, IOM may reject the entire delivery. IOM may also charge
the cost of inspecting rejected Goods to the Supplier. All rejected Goods will be returned to
the Supplier, transportation charges collect, or held by IOM for disposition at Supplier's risk
and expense. IOM’s right to reject the Goods shall not be limited or waived by the Goods
having been previously inspected or tested by IOM prior to delivery.

6.4 The Supplier agrees that IOM’s payment under this Agreement shall not be deemed
acceptance of any Goods delivered hereunder.

6.5 The Supplier agrees that any acceptance by IOM does not release the Supplier from any
warranty or other obligations under this Agreement.

6.6 Title to the Goods shall pass to IOM when they are delivered and accepted by IOM. Risk of
loss, injury, or destruction of the Goods shall be borne by the Supplier until title passes to
IOM.

7. Adjustments

7.1 IOM reserves the right to change at any time the quantities, packaging, unit size, place,
method and/or time of delivery or the Incidental Services to be provided. Where the Goods
are being specifically produced for IOM, IOM may also make changes to the drawings, designs
or specifications.

7.2 The Supplier agrees to proceed with this Agreement in accordance with any such change(s)
and to submit a claim request for an equitable adjustment in the Price or delivery terms
caused by such change(s).

7.3 IOM may deem any claim by the Supplier for equitable adjustments under this clause waived
unless asserted in writing within 10 (ten) days from the date of receipt by the Supplier of
IOM’s change(s).

7.4 No change in, modification of, or revision to this Agreement shall be valid unless made in
writing and signed by an authorized representative of IOM.

40
8. Packaging

8.1 The Supplier must provide proper and adequate packaging in accordance with best
commercial practice, to ensure that the Goods being delivered to IOM will be free of damage.
Packaging must be adequate to allow for rough handling during transit, exposure to extreme
temperatures, salt and precipitation during transit and open storage, with consideration for
the type of Goods and transportation mode. IOM reserves the right to reject any delivery that
is deemed not to have been packaged adequately.

8.2 Packing, marking and documentation shall comply with any requirements or instructions
notified by IOM.

9. Warranties

9.1 The Supplier warrants that all Goods supplied under this Contract shall have no defect,
arising from design, materials, or workmanship or from any act or omission of the
Supplier that may develop under normal use of the supplied Goods in the conditions
prevailing in the country of final destination.

9.2 The Supplier warrants that all Goods supplied under this Contract are new, unused, of
the most recent or current models and that they incorporate all recent improvements
in design and materials unless provided otherwise in this Contract. All Goods/Services
delivered under this Contract will conform to the specifications, drawings, samples, or
other descriptions furnished or specified by IOM.

9.3 The Supplier warrants that the original Toyota mechanical and electrical warranties on
the base vehicles will remain intact and valid after the armouring manufacture
process, for a minimum period of 2 years (or 24 months) or 60,000km (Sixty Thousand
Kilometers), whichever occurs first. Certification of Agreement from the Armouring
Manufacturer and the Supplier if two separate entities should be included in the
delivery of the Armoured Vehicles.

9.4 The Supplier must provide a full warranty covering the entire up-armoring and
modification conversion, including the braking and suspension systems and the dual-
battery system, for a minimum period of 2 years (or 24 months) or 60,000km (Sixty
Thousand Kilometers), whichever occurs first. Certification of Agreement from the
Armouring Manufacturer and the Supplier if two separate entities should be included
in the delivery of the Armoured Vehicles.

9.5 The Supplier warrants that a full warranty for a minimum period of 2 years (or 24
months) or 60,000km (Sixty Thousand Kilometers), whichever occurs first covering
delaminating on all glazing to be supplied and included in the up-armoring and
modification conversion of the specific vehicles to be provided as per this RFQ will be
provided. Certification of Agreement from the Armouring Manufacturer and the

41
Supplier if two separate entities should be included in the delivery of the Armoured
Vehicles.

9.6 The Supplier warrants to provide a 5-year (or 60 months) anti-perforation corrosion warranty
on the ballistic steel used in the up-armoring and modification conversion of the specific
vehicles to be provided as per this RFQ. Certification of agreement from the Armouring
Manufacturer and the Supplier if two separate entities,

9.7 The Supplier warrants to provide detailed Dealer (Toyota), Operator and supplemental
electrical wiring manuals for the specific vehicles to be supplied under this RFQ.
Certification of Agreement from the Armouring Manufacturer and the Supplier if two
separate entities should be included in the delivery of the Armoured Vehicles.

9.8 The Supplier warrants that full details of warranty claims procedure will be provided.
Certification of Agreement from the Armouring Manufacturer and the Supplier if two separate
entities should be included in the delivery of the Armoured Vehicles.

9.9 The Supplier warrants that Service Unit will be provided when purchased unit is under repair
within warranty period. Certification of Agreement from the Armouring Manufacturer and the
Supplier if two separate entities should be included in the delivery of the Armoured Vehicles.

9.10 IOM shall promptly notify the Supplier in writing of any claims arising under this
warranty.

9.11 Upon receipt of such notice, the Supplier shall, within the time period specified in the
notice, repair or replace the defective Goods or parts thereof, without cost to IOM.

9.12 IOM’s continued use of such Goods after notifying the Supplier of their defect or
failure to conform or breach of warranty will not be considered a waiver of the
Supplier’s warranty.

9.13 The Supplier further represents and warrants that:

(a) It has full title to the Goods, is fully qualified to sell the Goods to IOM, and is a
company financially sound and duly licensed, with adequate human resources,
equipment, competence, expertise and skills necessary to carry out fully and
satisfactorily, within the stipulated completion period, the delivery of the Goods in
accordance with this Agreement;
(b) It shall comply with all applicable laws, ordinances, rules and regulations when
performing its obligations under this Agreement;
(c) In all circumstances it shall act in the best interests of IOM;

42
(d) No official, employee or agent of IOM or any third party has received from, will be
offered by, or will receive from the Supplier any direct or indirect benefit arising
from this Agreement or award thereof;
(e) It has not misrepresented or concealed any material facts in the procuring of this
Agreement;
(f) The Supplier, its staff or shareholders have not previously been declared by IOM
ineligible to be awarded contracts by IOM;
(g) It shall abide by the highest ethical standards in the performance of this
Agreement, which includes not engaging in any discriminatory or exploitative
practice or practice inconsistent with the rights set forth in the Convention on the
Rights of the Child;
(h) The prices for the Goods under this Agreement do not exceed those offered for
similar goods to Supplier’s other customers;
(i) The Price specified in Article 3.1 of this Agreement shall constitute the sole
remuneration of the Supplier in connection with this Agreement. The Supplier shall
not accept for its own benefit any trade commission, discount or similar payment
in connection with activities pursuant to this Agreement or the discharge of its
obligations hereunder. The Supplier shall ensure that any subcontractors, as well
as the officers, employees, and agents of either of them, similarly, shall not receive
any additional remuneration.

9.14 The Supplier further warrants that it shall:

(a) Take all appropriate measures to prohibit and prevent actual, attempted and threatened
sexual exploitation and abuse (SEA) by its employees or any other persons engaged and
controlled by it to perform activities under this Agreement ( “other personnel”). For the
purpose of this Agreement, SEA shall include:
1. Exchanging any money, goods, services, preferential treatment, job opportunities or
other advantages for sexual favours or activities, including humiliating or degrading
treatment of a sexual nature; abusing a position of vulnerability, differential power or
trust for sexual purposes, and physical intrusion of a sexual nature whether by force
or under unequal or coercive conditions. 
2. Engaging in sexual activity with a person under the age of 18 (“child”), except if the
child is legally married to the concerned employee or other personnel and is over the
age of majority or consent both in the child’s country of citizenship and in the country
of citizenship of the concerned employee or other personnel.
(b) Strongly discourage its employees or other personnel having sexual relationships with
IOM beneficiaries.
(c) Report timely to IOM any allegations or suspicions of SEA, and investigate and take
appropriate corrective measures, including imposing disciplinary measures on the person
who has committed SEA.
(d) Ensure that the SEA provisions are included in all subcontracts.
(e) Adhere to above commitments at all times. Failure to comply with (a)-(d) shall constitute
grounds for immediate termination of this Agreement.

9.15 The above warranties survive the expiration or termination of this Agreement.

43
10. Assignment and Subcontracting

10.1 The Supplier shall not assign or subcontract the Agreement or any work under this
Agreement in part or all, unless agreed upon in writing in advance by IOM. Any
subcontract entered into by the Supplier without approval in writing by IOM may be
cause for termination of the Agreement.

10.2 In certain exceptional circumstances by prior written approval of IOM, specific jobs
and portions of the Agreement may be assigned to a subcontractor. Notwithstanding
the said written approval, the Supplier shall not be relieved of any liability or
obligation under this Agreement nor shall it create any contractual relation between
the subcontractor and IOM. The Supplier remains bound and liable there under and it
shall be directly responsible to IOM for any faulty performance under the subcontract.
The subcontractor shall have no cause of action against IOM for any breach of the
subcontract.

11. Force Majeure

Neither Party will be liable for any delay in performing or failure to perform any of its
obligations under this Agreement if such delay or failure is caused by force majeure, such as
civil disorder, military action, natural disaster and other circumstances which are beyond
the control of the Party in question. In such event, the Party will give immediate notice in
writing to the other Party of the existence of such cause or event and of the likelihood of
delay.

12. Independent Contractor

The Supplier shall provide the Goods under this Contract as an independent contractor and not as
an employee, partner, or agent of IOM.

13. Audit

The Supplier agrees to maintain financial records, supporting documents, statistical records
and all other records in accordance with generally accepted accounting principles to
sufficiently substantiate all direct and indirect costs of whatever nature involving
transactions related to the supply and delivery of Goods and the Incidental Services under
this Agreement. The Supplier shall make all such records available to IOM or its designated
representative at all reasonable times until the expiration of 7 (seven) years from the date
of final payment, for inspection, audit, or reproduction. On request, employees of the
Supplier shall be available for interview.

14. Confidentiality

44
All information which comes into the Supplier’s possession or knowledge in connection with
this Agreement is to be treated as strictly confidential. The Supplier should not
communicate such information to any third party without the prior written approval of
IOM. The Supplier shall comply with IOM Data Protection Principles in the event that it
collects, receives, uses, transfers or stores any personal data in the performance of this
Agreement. These obligations shall survive the expiration or termination of this Agreement.

15. Notices

Any notice given pursuant to this Agreement will be sufficiently given if it is in writing and
received by the other Party at the following address:

International Organization for Migration (IOM)


Attn: [Name of IOM contact person]
[IOM’s address]
[IOM’s email address]

[Full name of the Supplier]


Attn: [Name of the Supplier’s contact person ]
[Supplier’s address]
[Supplier’s email address]

16. Dispute Resolution

16.1. Any dispute, controversy or claim arising out of or in relation to this Agreement, or the
breach, termination or invalidity thereof, shall be settled amicably by negotiation between
the Parties.

16.2. In the event that the dispute, controversy or claim has not been resolved by negotiation
within 3 (three) months of receipt of the notice from one party of the existence of such
dispute, controversy or claim, either Party may request that the dispute, controversy or claim
is resolved by conciliation by one conciliator in accordance with the UNCITRAL Conciliation
Rules of 1980. Article 16 of the UNCITRAL Conciliation Rules does not apply.
16.3. In the event that such conciliation is unsuccessful, either Party may submit the dispute,
controversy or claim to arbitration no later than 3 (three) months following the date of
termination of conciliation proceedings as per Article 15 of the UNCITRAL Conciliation Rules.
The arbitration will be carried out in accordance with the 2010 UNCITRAL arbitration rules as
adopted in 2013. The number of arbitrators shall be one and the language of arbitral
proceedings shall be English, unless otherwise agreed by the Parties in writing. The arbitral
tribunal shall have no authority to award punitive damages. The arbitral award will be final
and binding.

16.4. The present Agreement as well as the arbitration agreement above shall be governed
by internationally accepted general principles of law and by the terms of the present
Agreement, to the exclusion of any single national system of law that would defer the
Agreement to the laws of any given jurisdiction. Internationally accepted general
principles of law shall be deemed to include the UNIDROIT Principles of International
45
Commercial Contracts. Dispute resolution shall be pursued confidentially by both
Parties. This Article survives the expiration or termination of the present Agreement.

17. Use of IOM’s Name

The official logo and name of IOM may only be used by the Supplier in connection with this
Agreement and with the prior written approval of IOM.

18. Status of IOM

Nothing in this Agreement affects the privileges and immunities enjoyed by IOM as an
intergovernmental organization.

19. Indemnification and Insurance

19.1 The Supplier shall at all times defend, indemnify, and hold harmless IOM, its officers,
employees, and agents from and against all losses, costs, damages and expenses (including
legal fees and costs), claims, suits, proceedings, demands and liabilities of any kind or nature
to the extent arising out of or resulting from acts or omissions of the Supplier or its
employees, officers, agents or subcontractors, in the performance of this Agreement. IOM
shall promptly notify the Supplier of any written claim, loss, or demand for which the Supplier
is responsible under this clause.

19.2 This indemnity shall survive the expiration or termination of this Agreement.

19.3 The Goods supplied under this Agreement shall be fully insured in a freely convertible
currency against loss or damage resulting from or related to manufacture or acquisition,
transportation, storage, and delivery. Further insurance requirements may be specified in the
Technical Specifications.

20. Waiver

Failure by either Party to insist in any one or more instances on a strict performance of any of the
provisions of this Agreement shall not constitute a waiver or relinquishment of the right to enforce
the provisions of this Agreement in future instances, but this right shall continue and remain in full
force and effect.

21. Termination and Re-procurement

21.1 IOM may terminate this Agreement, in whole or in part, at any time with written notice to the
Supplier. Any monies paid in advance by IOM shall be refunded on or before the date of
termination.

21.2 If IOM terminates this Agreement in whole or in part for default on the part of the Supplier, it
may acquire elsewhere goods similar to those terminated and the Supplier shall be liable for
any excess costs to IOM for the re-procurement of those goods as well as the removal of any
or all of the Supplier’s product or equipment from IOM’s premises or other places of delivery.

46
The Supplier shall not be liable for any excess costs if the failure to perform under this
Agreement arises from causes beyond its control and without fault or negligence of the
Supplier.

21.3 Upon any such termination, the Supplier shall waive any claims for damages including loss of
anticipated profits on account thereof.

22. Severability

If any part of this Agreement is found to be invalid or unenforceable, that part will be severed from
this Agreement and the remainder of the Agreement shall remain in full force.

23. Entirety

This Agreement and any Annexes embody the entire agreement between the Parties and supersede
all prior agreements and understandings, if any, relating to the subject matter of this Agreement.

24. Special Provisions (Optional)

Due to the requirements of the Donor financing the Project, the Implementing Partner shall agree
and accept the following provisions:

[Insert all donor requirements which must be flown down to IOM’s implementing partners and
subcontractors. In case of any doubt, please contact LEGContracts@iom.int]

25. Final Clauses

25.1 This Agreement will enter into force upon signature by both Parties and shall remain in
force until completion of all obligations of the Parties under this Agreement.

25.2 Amendments to this Agreement may be made by mutual agreement in writing between
the Parties.

Signed in duplicate in English, on the dates and at the places indicated below.

For and on behalf of For and on behalf of


The International Organization [Full name of the Supplier]
for Migration

Signature Signature

_________________________ ____________________________
Name Name
Position Position
Date Date
Place Place

47
Annex G

BANK GUARANTEE FOR ADVANCE PAYMENT

To: [name and address of IOM Mission]

Contract Name: [insert name of Contract]

Gentlemen:

In accordance with the provisions of the General Instruction, Article No. 19 (“Payment”) of the
above-mentioned Contract, [name and address of Supplier] (hereinafter called “the Supplier”)
shall deposit with [insert name of IOM Mission] a Bank Guarantee to guarantee his proper and
faithful performance under the said Clause of the Contract in an amount of [amount of
Guarantee in words and figure].

We, the [Bank name and address ] as instructed by the Supplier, agree unconditionally and
irrevocably to guarantee as primary obligator and not as Surety merely, the payment to [name
of IOM Mission and address] on his first demand without whatsoever right of objection on our
part and without his first claim to the Supplier, in the amount not exceeding [amount of
Guarantee] [amount in words and required currency].

We further agree that no change or addition to or other modification of the terms of the
Contract to be performed there under or of any of the Contract documents which may be made
between [name of IOM Mission and address] and the Supplier, shall in any way release us from
any liability under this Guarantee, and we hereby waive notice of any such change, addition, or
modification.

This Guarantee shall remain valid and in full effect from the date of the advance payment under
the Contract until [name of IOM Mission and address] receives full repayment of the same
amount from the Supplier.

Yours truly,

Signature and seal:

Name of Bank:
Address:
Date: