Professional Documents
Culture Documents
rev 0.2
August 23, 2011
PTE/VPA – Tjeerd Garritsen
Information
Information with respect to First Contact Meetings can be obtained with:
Project Assurance Managers
(see list above)
Top Quartile Project Delivery:
Mark Ravenscroft mark.ravenscroft@shell.com
Wim Witte w.witte@shell.com
Luc Fermin luc.l.vermin@shell.com
General OC&AT/FCM:
Tjeerd Garritsen Tjeerd.W.Garritsen@Shell.com
Facilitators
Depending the project opportunity (headline size, complexity, status of project, setting, etc.)
facilitation is split between a FCM Facilitator and a TQPD expert.
For smaller more straightforward projects FCM can be done by FCM facilitator alone, but this will
strongly depend on the experience of the FCM Facilitator. Virtual facilitation (preferably video
conferencing) is an option especially for the second facilitator.
Facilitators have to be approved by the PTE/V Project Assurance Managers. In principle the
approval is based on ‘see one, do one, lead one’. Formal training (2-4 hours) is also available.
Attachment 1 provides is a list of approved facilitators.
page 1
First Contact Meeting – Procedure
Approval
According PS02 the OAP has to be approved by the DE.
PS02 states: “The proposal on Assurance level, Project Classification and Execution model by has
to be endorsed by OE VP Technical, the P&T VP Projects and the P&T VP Assurance.”
PS02 states: “For Major Projects formal approval of the accountable EVP is required in case the
Assurance Level deviates from the Assurance Level recommended by the Project Assurance
Manager.”
Attachment 2 provides a template email to be send to the OE VP Technical, the P&T VP Projects
and the P&T VP Assurance requesting endorsement. The replies have to be filed by the project.
Attachment 3 provides a template email for EVP approval if required. Note that this approval is
only required in case of disagreement.
Filing OAP
The OAP shall be filed by the project including the approval(s).
A copy for central filing shall be send to:
Hermine Kelder Hermine.Kelder@Shell.com
Raymond Doesema Raymond.Doesema@Shell.com
Tjeerd Garritsen Tjeerd.W.Garritsen@Shell.com
page 2
First Contact Meeting – Procedure
Attachment 1: Approved Facilitators
Nils Bosma PTE/V nils.bosma@shell.com
Paul Crabtree PTE/VVAS paul.crabtree@shell.com
Wim van Dam PTE/VPA w.vandam@shell.com
Luc Fermin PTP/GTPD luc.l.vermin@shell.com
Tjeerd Garritsen PTE/VPA tjeerd.w.garritsen@shell.com
Freedom Ifeobu PTE/VPA freedom.ifeobu@shell.com
Gareth Jenkins PTU/EDDI g.jenkins@shell.com
Evert Kroes PTE/VPA e.kroes@shell.com
Paul Mak PTP/GPVI paul.p.mak@shell.com
Robert-Jan van Melsen PTE/VVAS robertjan.vanmelsen@shell.com
Jay Moser PTE/VPA jay.moser@shell.com
Paul Murfitt PTE/VPA paul.murfitt@shell.com
Randolf Nales PTP/GTPD randolf.nales@shell.com
Mark Ravenscroft PTP/GPSE mark.ravenscroft@shell.com
Jan Arco de Reus PTE/VVAS janarco.dereus@shell.com
Iain Shaw PTE/VVAS iain.shaw@shell.com
Ernst van Strien PTE/VPA e.vanstrien@shell.com
Erik van der Weerd PTE/VVAS erik.vanderweerd@shell.com
Wim Witte PTP/GPVI w.witte@shell.com
page 3
First Contact Meeting – Procedure
Attachment 2: Template email for requesting endorsement
Dear .....
Please find attached the (draft) Opportunity Assurance Plan (OAP) for the ..... project. During the
First Contact Meeting the following classifications where selected:
Assurance Level : Self/Focussed/Premium Assurance
Project Classification : Base/Medium/Large
Execution Model : PT Executed/OE executed
(sub model if applicable)
Herewith we kindly request your endorsement in line with Project Standard 02.
Kind regards,
PS02 states: “The proposal on Assurance level, Project Classification and Execution model by has
to be endorsed by OE VP Technical, the P&T VP Projects and the P&T VP Assurance.”
page 4
First Contact Meeting – Procedure
Attachment 3: Template email for requesting approval accountable EVP
Dear .....
Please find attached the (draft) Opportunity Assurance Plan (OAP) for the ..... project. In contrast
to the recommendation it was decided to Self/Focussed/Premium Assurance instead of
Self/Focussed/Premium Assurance.
The main reason for this deviation is ..............
Herewith we kindly request your approval in line with Project Standard 02.
Kind regards,
PS02 states: “For Major Projects formal approval of the accountable EVP is required in case the
Assurance Level deviates from the Assurance Level recommended by the Project Assurance
Manager.”
page 5