Profile PDF
Profile PDF
Contact us 2
Organization Chart 3
Directional Drilling 4
6
Directional Drilling Projects References 7
Thrust Boring 8
Equipment Resources 11
Commercial License 13
Our focus and objective is always the safe completion of drilling and installation to
ensure the health and well-being of not only our team members, but all others related to
each project.
At Greenway Contracting LLC, we also take our responsibilities very seriously when it
comes to environmental protection and adhere strictly to all regulations, policies and
procedures. You can count on our professionalism, expertise and experience to get the
job done accurately, safely and successfully each and every time on bore holes ranging
from 2” to 24” and distances of up to 410 meters in length.
The company continues to deliver and improve on objectives through a multi skilled
workforce, Greenway Contracting LLC service consists of:
Through sharing knowledge and best practice Greenway Contracting LLC continues to
establish new clientele as well as maintain and develop existing relationships
Only then we can really be enthusiastic and take pride of the Vision we have embarked on.
We are your partner and we are "Building Your Way for the Future".
Head Office
Contact Us
E-mail : greenwaycontracting@yahoo.com
Driver PRO
Driver
Directional Drilling GPR System
Navaff
Operator
Chemical Engineer
Anoop
Locator
050-3604510
Assistant Driver
Mud Man
Helper
2 Nos
4 Nos
Driver
3 Nos
Thrust Boring
Ahmed Faraz
Operator
Assistant Driver
As with gas and oil, HDD can be used to carry water and
sewerage pipelines under and around almost anything. Lucas has
also used HDD to drill directly into deep underground sewer
tunnels. Apart from avoiding the cost and disruption of surface trenching, HDD's ability to
maintain a precise gradient and travel deep underground has dramatically reduced the
need for pumping stations, simplifying the sewerage system and reducing long-term costs.
As well as carrying conduits for fiber optic cables beneath rivers and other obstacles, Lucas
has used HDD to carry them to near-inaccessible mountain tops and microwave
transmission towers. By placing them deep into bedrock beneath the coastal sands and
surf zone, these fiber-optic cables are protected in the most vulnerable part of their route.
High-tension cables can be placed deep underground, protected from damage and avoiding
surface obstacles.
HDD has a wide variety of environmental uses: draining landslip-prone hillsides, extracting
methane gas from coal seams before mining, restoring sand to beaches, creating
underground barriers to reduce movement of contaminants, draining slag heaps and
rubbish dumps.
As per the drawings provided for the location where directional drilling works to be
carried out, detailed information of the existing utilities, proposed route drawings and
references marks.
Carry out survey to locate all existing utilities by making trail pits and by using Electronic
detectors if necessary to trace underground utilities and then to make soil test to
understand the ground condition. A surface level is taken prior to all Drilling works.
Make a bore plan (profile)clearly mentioning all existing utilities, exact location of entry
and exit pits and the different levels in which the directional drilling (Pilot bore) is to be
carried out.
Prepare the drilling location with all necessary safety materials, machines and required
length and dia meter of HDPE pipes joined together using butt fusion welding machine.
The machine (drill unit) is anchored to the ground, location supposed to be the entry pit
with anchor stakes for proper fixing the machine.
The pilot: a sonde contained metal body with angled bit is drilled into the ground in the
desired angle as to start the pilot bore as per the bore plan or profile made.
Fluid mixing system (Bentonite mixer): the Ditch Witch FM 13 mixing system comes
with a 1000 gal mixing capacity and can attain a maximum flow rate of 300 gal per minute.
Normal flow rate used is 10 gal per minute during pilot bore and 30 gal per minute during
back reaming/pipe pulling.
The fluid: a mixture of Bentonite (pure clay oil) and water mixed in a proper proportion
to obtain good slurry is sprayed with pressure through the pilot head (angle bit) at 10gal
per minute to lubricate the drill procedure and to cool the electronic tracking device sonde
inside the pilot.
When the drill head reaches the planned destination it is steered to the ground surface and
obtained in the receiving place on exit pit made.
The reamer: the back reamer is designed and made in different shapes and sizes so as to
reach the user requirement according to the soil condition and size of the pipe to be
installed as the size differs from diameter 110mm, 200mm, 225mm,
300mm,350mm,380mm, 415mm, 450mm and 480mm so as to be used for installation
pipes diameter differing from 100mm,110mm,160mm,180mm,200mm,315mm,400mm
and also installing number of pipes together like 3 way,4 way and 6 way of 100 mm and
110 mm,
3-way and 4 ways of 160mm, 180mm pipes and also 3-way of 200mm pipes.
The back reaming: when the drill head is received in the exit pit it is then de-attached
from the drill pipes and a back reamer is attached to it which is then pulled back to the
entry side using slurry with a pressure depending on the soil condition (30 gal per minute
for normal soil). The back reaming process is made a number of times in different sizes to
reach the required size of drill whole for the pipe to freely run through it.
Pipe installing: a swivel is attached to the back reamer, connected to the pipes to be
installed, towing to the machine (entry pit) side. Back reaming and pulling the pipes at the
same times will allow the pipes to be installed underground without excavation, during
this process the drill fluid will assist the lubrication factor and creating a slurried area
around the drill hole for the pipe to be installed without any void.
The back reaming and pull back will continue until reamer and pipes reach the launch side
of the directional drilling, then disconnect swivel and towing head from the pipes will
complete the drilling work.
A surface level is again repeated later six months and one year after the directional drilling
job is finished as for the surface settlement limit is not more than 2mm at a period of six
months and not more than 5mm at a period of one year. The formula for maximum surface
settlement is:
Smax = 0.313 VLD2/i
D excavated diameter of bore/tunnel
I distance form bore/tunnel centerline to point of inflexion of settlement trough
Smax maximum settlement with a settlement trough
VL volume loss as ratio of notional excavated volume of tunnel
As per O’Reilly and New proposal the relation between i and Zo for normal soil is:
i = 0.28Zo – 0.12
During Drilling we are main ting record of each Pilot for our client reference's.
Remarks : _______________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
Contract Ref:
Notes :
……………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………
Butt Welding is the most common method to joint HDPE pipes, stub ends, tees, elbow, bends etc.
The pieces to be welded are not added any welding material but the surfaces to be pointed are heated up by
means of a heater plate. The melted surfaces are then pressed together and the molecule chains will thus
intrude each other and form a strong joint. There is no chemical connection between the molecule chains;
the strength of the joint is based mainly on cohesion between the molecules.
The pressure applied in the weld will vary from stage to stage of the welding operation. For each size of a
welding machine the respective hydraulic pressures to be used for different outside diameters and wall
thickness.
Provided that the pipe ends are properly trimmed butted and aligned, the ends softened by the heat will
fuse and will remain so when the weld cools. A small bead has been formed inside and outside during the
operation.
The butt-welding is carried out with machines specially designed for this purpose. The machines have a
strong body frame, guide rods for the pipe end trimmer electric heater plate. The compressive thrust is
produced hydraulically or by means of lever or spring mechanism. To achieve a good welding result one
always has to use a machine for the operation.
Working Procedure
Client : Heliopolis
Location : Dubai U.A.E
Scope of Work : Directional Drilling
Purpose : 11KV Cable Laying in Dubai
Pipe Type : HDPE
Thrust Boring is also part of “Greenway Contracting LLC” service rendering to our valuable
customers. In this field we are in well experienced hand and never fail to develop and use modern
method and strategy.
Procedures
Set out thrust receiving pits as per approved drawing ensuring that the location is free
of obstruction and services.
Thrust and receiving pits shall be excavated as per relevant approved drawings,
nothing that trench shall be free of water by using dewatering pump at all times,
during the operations, if found necessary.
The dimension of the Thrust pit shall be 10 meter long with a width of 2 meter for
jacking 6-meter long pipe sleeves. If 3 meter long sleeves to be used, only the length
of the Thrust pit shall be 7 meter depth to decided by the consultant / Client. But
normally, the required for 200mm dia casing is between (1.2 to 1.5) meter and for
300mm dia the depth is between (1.5 to 2) meter.
Thrust and receiving pits excavation shall be 3 meter away from the edge of the road
asphalt or 2 meter from the edge of the footpath.
Thrust pit shall be leveled and compacted to provide solid bid for the guiding tracks
for proper alignment and level fixing at the required depth. Concrete thrust blocks
shall be firmly fixed in excavated trench.
If the crossing is longer than 30 meter, it is recommended that 5cm thickness of the
concrete to be castled in the Thrust pit to provide solid bed for proper alignment.
Thrust boring machine shall be installed in driving (Thrust) pit. The cradle guides shall
be installed in front of machine to the correct line and level.
Prior to work commencement, level control points shall be established to keep level
monitoring during Thrust bore operation. These points to be fixed at edges and center
of existing asphalt read. Level check by assigned surveyor to be recorded before,
during and after completing proposed Thrust bore.
6 / 3 meter length of 200 / 300mm dia steel pipe sleeves shall be jacked with
consequent 6 / 3 meter length pipe welded and jacked in the same manner.
The driving operation shall be continued till the head of cutter appears in the receiving
pit side. At this stage, the auger shall be retracted from the driving pit side.
While taking all precautionary measures to avoid any settlement to the existing asphalt
road as per requirements of concerned departments and applicable specification.
Once NDRC operation has been completed, the equipment shall be dismantled. The
contractor shall reinstate the area.
Various types of special cutter heads used for different types rocks. Under rock area
special heads used for as shown.
Minimum clearance between the thrust bit and edge of the road according to the
requirement of contract.
Client: Econ.
Water Tanker : 2 No
JCB Back Hoe Loader : 1 Nos
Bob cat : 1 No
Dewatering Machines : 4 Nos
Jetting Pump : 1 No
Steel Welding Machines : 3 Nos
Upvc Pipe Welding Machines : 2 No
Small Vibrating Roller 4 Ton : 1 No
Electric Generator BSP 7500 : 3 No
Sub site 750 Tracker Beacon Locator : 2 No
Sub site 66 TKRW Tracker Beacon Locator : 2 No
Trailer Flat : 2 Nos
Vacuum Tanker : 1 No