Professional Documents
Culture Documents
30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 1 of 24
Fluor Project No. A2WD
Project Variation
Project Variation to
Fluor Limited
Fluor Project No. A2WD
Sugar Land, Texas
NRP/PMC-0001/CNSL 31.29.02.30-P6000CFP-000-PV I
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 2 of 24
Fluor Project No. A2WD
Project Variation
Record of Revisions
Rev. No. Date Description
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 3 of 24
Fluor Project No. A2WD
Project Variation
DEP 31.29.02.30-Gen, Centrifugal Pumps (amendments / supplements to ISO 13709) dated Feb 2011, is adopted
for the Clean Fuels Project (CFP) subject to the modification noted in this project variation. This PV (Project
Variation) shall be included, as a requirement, wherever DEP 31.29.02.30-Gen is referenced in any other project
documents, including all DEPs.
In general, the requirements stated in this PV have precedence over, and supersede those in the Shell DEPs. Any
discrepancy between this PV and other Clean Fuels Project documents shall be brought to the attention of the
Company for review and direction.
References in DEP 31.29.02.30-Gen to other Design and Engineering Practices (specifications, guidelines, etc.)
shall be amended, superseded, or otherwise revised by the associated PV of a given DEP, where available.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 4 of 24
Fluor Project No. A2WD
Project Variation
TABLE OF CONTENTS
APPENDICES
ANNEX P Scope of Inspection and Testing.............................................................................................. 24
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 5 of 24
Fluor Project No. A2WD
Project Variation
PART I INTRODUCTION
1.1 Scope
This PV shall be used in conjunction with data sheets 31.29.02.93-H-P6000CFP-000-PV and
31.29.02.93-V-P6000CFP-000-PV
Pump selection shall comply with 31.29.02.11-P6000CFP-000-PV.
1.4 Cross-references
Other documents referenced by this PV are listed in (Part V) in this document.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 6 of 24
Fluor Project No. A2WD
Project Variation
PART III PUMPS FOR NON-ESSENTIAL SERVICE AND SPARED PUMPS FOR ESSENTIAL
SERVICE (AMENDMENTS/SUPPLEMENTS TO ISO 13709)
4. GENERAL
5. REQUIREMENTS
ADD NEW CLAUSE:
5.3.3 In the case of conflicting requirements between documents relating to the enquiry or order, the
following hierarchy of documents shall apply:
- upper level: applicable regulations
- second level: purchase order and variations thereto;
- third level: data/requisition sheets and drawings;
- fourth level: this PV / DEP 31.29.02.30-Gen
6. BASIC DESIGN
6.1.4 REPLACE THE FIRST SENTENCE OF THIS CLAUSE BY:
Pumps with constant-speed drivers shall be capable of developing at least a 3 m (10 ft) or 5 percent
head increase (whichever is greater) at rated conditions, when a new impeller(s) (larger diameter)
and/or new diffuser(s) is installed. This criteria may not be met by special overbores of cases or
diffusers. Impeller diameters less than published minimum diameters are not acceptable.
6.1.6 ADD TO THIS CLAUSE:
Note: For variable speed applications the Pump Supplier is responsible for checking MAWP and shaft
horsepower ratings at maximum continuous speed.
6.1.7 ADD TO THIS CLAUSE:
The pump supplier is responsible for checking in all instances that the seal arrangement, axial thrust
load and bearing life is in compliance with this standard.
6.1.11 REPLACE CLAUSE BY:
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 7 of 24
Fluor Project No. A2WD
Project Variation
Pumps shall have stable head/capacity curves which continuously rise by at least 5 % from rated
capacity to shut-off. The gradient of the tangent to the curve shall continuously decrease from 125 %
of the best efficiency point to minimum continuous stable flow and shall remain positive. If parallel
operation is specified, the head rise from rated point to shutoff shall be at least 10 %.
Discharge orifice shall not be used as a means for providing continuous rise to shut-off. Unless
otherwise specified, head rise from rated flow to shut-off of more than 20% requires the approval of
the Principal.
The use of cooling water on the bearing bracket is left to the discretion of the pump supplier, but the
API requirements for bearing life shall be met.
ADD NEW CLAUSE:
6.1.36 Pumps shall not be provided with inducers, unless approved by the Principal.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 8 of 24
Fluor Project No. A2WD
Project Variation
The supplier shall use solid metal, metal-clad or confined and compression restricted, spiral-wound
metal or non-asbestos-filled gaskets conforming to ASME B16.20 for design temperatures over 177C
(350F). O-rings shall not be used under these conditions.
6.3.14 ADD TO THIS CLAUSE:
Studs are required; cap screws are not acceptable.
End suction top discharge pumps shall be self venting type by the arrangement of discharge nozzle.
Note: This happens when Austenitic stainless steel piping is used on C-6 pump cases, using the same
flange rating. Connections using a different material grade are acceptable only if the connection
flanged rating is increased to a higher pressure rating, for example using a 600# flanged drain
connection on a 300# R.F. C-6 pump.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 9 of 24
Fluor Project No. A2WD
Project Variation
6.6 Rotors
ADD THIS CLAUSE:
6.6.1.1 Cast iron and bronze impellers with peripheral velocities exceeding 60 m/sec (200 ft/sec) are not
acceptable.
ADD THIS CLAUSE:
6.6.1.2 Cast iron impellers and/or wear rings applied at pumping temperatures above 200°C (400°F) are not
acceptable.
6.6.10.e.1 REPLACE THIS CLAUSE:
For areas to be observed by radial vibration probes, 25 percent of the allowed peak-to-peak vibration
amplitude or 0.25 mil, whichever is less.
6.9 Dynamics
6.9.1 General
6.9.1.3 ADD TO THIS CLAUSE:
Single-stage overhung pumps (types OH2 and OH3) require the approval of the Principal if the
impeller tip speed exceeds 62.5 m/sec. If alternative shaft diameters are available, the larger shaft shall
be supplied.
6.9.2 Torsional analysis
6.9.2.10 ADD TO THIS CLAUSE:
Whenever a torsional analysis is performed, the manufacturer shall furnish a detailed report that
includes the requirements of 6.9.2.10a – 6.9.2.10e.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 10 of 24
Fluor Project No. A2WD
Project Variation
6.9.4 Balancing
6.11 Lubrication
6.11.2 ADD TO THIS CLAUSE:
Oil flingers are acceptable only in constant speed service. Flingers and/or oil rings shall be metallic.
6.12 Materials
6.12.1 General
6.12.1.2 REPLACE THIS CLAUSE BY:
The material specification of all components shall be clearly stated in the vendor’s proposal. The
vendor shall supply materials in accordance with Table H.2 using ASTM material designations.
Equivalent materials to the ASTM grades listed may be supplied using the other International table
H.2 grades if approved by the Principal (KNPC). The Supplier shall provide the necessary equivalence
data. The materials selected shall either meet the required ASTM material specified in table H-2 or be
equivalent materials to the ASTM grades. Equivalent materials shall be identified by reference to
applicable International Standards; including the material grade (Tables H.2 and H.3 may be used for
guidance).
6.12.1.4 DELETE SHELL DEP CLASE AND ADD THE FOLLOWING TO API 610:
Minor or unidentified parts other than static gaskets, O-rings, or shaft packing shall be metallic.
Plastic, phenolic, or similar materials are not acceptable.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 11 of 24
Fluor Project No. A2WD
Project Variation
6.12.3 Welding
6.12.3.3 ADD TO THIS CLAUSE:
Welding procedures (PQRs, WPSs and weld maps) for fabricated casings shall be submitted to the
Buyer for review and acceptance prior to fabrication.
6.12.4 REPLACE 2ND SENTENCE OF THIS CLAUSE IN SHELL DEP 31.29.02.30-GEN BY:
If this temperature is 0 °C (32 °F) or below, the materials of pressure-containing parts shall comply
with 30.10.02.31-P6000CFP-000-PV.
7. ACCESSORIES
7.1 Drivers
7.1.1 REPLACE THIS CLAUSE IN SHELL DEP 31.29.02.30-Gen BY:
Electric motor drivers shall be in accordance with 33.66.05.31- P6000CFP-000-PV.
7.1.4 DELETE CLAUSE FROM SHELL DEP 31.29.02.30-Gen AND REPLACE THE 1ST SENTENCE
OF API 610 WITH THE FOLLOWING:
Motors shall have power ratings, excluding the service factor (if any), at least equal to the percentages
of power at pump rated conditions given in TABLE 12. When the installation consists of two 50
percent flow pumps operating in parallel the motor power rating shall be sufficient for operation at
any point on the performance curve including end-of-curve. The motors for certain other pumps may
also need to be sized for the end-of-curve case. These situations will be noted on the pump data sheet.
7.1.7 DELETE CLAUSE FROM SHELL DEP 31.29.02.30-Gen
7.1.9 Delete “at Normal Steam Conditions” from the second sentence of this clause in API 610.
7.1.10 ADD TO THIS CLAUSE:
Gears in services operating at absorbed power above 1500 kW (2000 hp) shall be in accordance with
31.29.00.32- P6000CFP-000-PV.
Project Variation
7.2.4 DELETE CLAUSE FROM SHELL DEP 31.29.02.30-Gen AND REPLACE API 610 CLAUSE BY:
Pumps (except vertical high speed) with drivers rated above 1 MW or pump speeds greater than or
equal to 4000 rpm shall be supplied with API-671 couplings in accordance with 31.29.00.36-
P6000CFP-000-PV.
7.2.7 ADD TO THIS CLAUSE:
The minimum service factor for couplings shall be 1.25, the service factor for couplings complying
with API-671, shall be per API-671.
7.2.14 REPLACE SHELL DEP CLAUSE WITH THE FOLLOWING:
Guards shall be made of aluminium or aluminium alloys with a maximum content of 2 % magnesium
or 0.2 % copper or other spark resistant material approved by the Principal.
7.3 Baseplates
7.3.1 ADD TO THIS CLAUSE:
When full top decking is specified on the data sheet it shall be defined as meaning that the top surface
of the base plate is completely covered with steel plate. Grout fill and vent holes as described in 7.3.10
below shall be included in this design.
7.3.10 DELETE SHELL DEP CLAUSE AND ADD THE FOLLOWING TO API 610:
Baseplates shall be designed per paragraph 7.3.13. Baseplates shall have grout fill and vent holes for
non-shrink cement grout fill. The pump supplier shall not consider the grout, which will be added in
the field, for structural stiffness in the baseplate design. The baseplates shall have features to prevent
liquid accumulation inside.
Drain-rim or drain-pan baseplates with raised lip shall be specified. Baseplate drains shall be
connected to the drain system. Lube oil consoles shall be separate from the pump baseplate, located
adjacent to the pump.
7.4 Instrumentation
7.4.1 ADD TO THIS CLAUSE:
If supplied, the gauges shall comply with 32.31.09.31- P6000CFP-000-PV or 31.29.00.33-
P6000CFP-000-PV.
7.4.2 VIBRATION, POSITION AND TEMPERATURE DETECTORS
7.4.2.2 ADD TO THIS CLAUSE:
When hydrodynamic thrust/radial bearings are provided, multistage pumps of driver power 1000 kW
and larger shall be provided with two radial vibration probes at each bearing housings, two axial
probes at the thrust end and a one-event-per revolution probe.
7.4.2.3 ADD TO THIS CLAUSE:
When hydrodynamic thrust/radial bearings are provided, multistage pumps of driver power 1000 kW
and larger shall be provided with two bearing metal detectors in each radial bearing, three bearing
metal detectors in active side of the thrust bearing and two bearing metal detectors in inactive side of
thrust bearing
7.4.2.4 ADD TO THIS CLAUSE:
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 13 of 24
Fluor Project No. A2WD
Project Variation
When vibration probes and bearing temperature detectors are provided, vendor shall provide vibration
and temperature monitor in accordance with API-670.
7.5 Piping and appurtenances
7.5.1 General
7.5.1.2 ADD TO THIS CLAUSE:
Flange gaskets shall be nonasbestos filled. Center support ring and inner metal ring shall be Type 304
or 316 stainless steel. Carbon steel slip-on flanges are not permitted for lubricating oil piping.
8.1 General
8.1.1 ADD TO THIS CLAUSE;
Scope of witnessed inspection and testing is attached as Annex P.
8.3 Testing
8.3.1.2 REPLACE THIS CLAUSE BY:
At least 6 weeks before the first scheduled running test, the vendor shall submit to the purchaser, for
his review and comment, detailed procedures for all running tests and all specified optional tests,
including acceptance criteria for all monitored parameters. Any exceptions to the specified test
requirements shall be stated in the original proposal.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 14 of 24
Fluor Project No. A2WD
Project Variation
Cooling passages and components, including jackets for bearings, seal chambers, oil coolers and seal
coolers, shall be tested at 1.5 times the cooling water design pressure or 10.5 bar, whichever is higher.
Multistage pumps shall be retested if they are dismantled for any reason except inspection.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 15 of 24
Fluor Project No. A2WD
Project Variation
If a complete unit test is specified, only the motor driven unit shall be subject to the complete unit test
requirement. Steam Turbine driven pumps are exempt from the complete unit test requirement. Motor
driven pump complete unit tests shall be run with the job lube oil system, not a shop lube oil system.
Completely assembled pressurized lube oil systems shall be given a functional mechanical test at the
lube oil system supplier's shop or the pump Seller's shop prior to shipment. Test shall show successful
operation of all alarms and shutdowns. Flow rate at required pressure shall be verified by
measurement. This test is in addition to the complete unit test.
8.4.2.10 Mechanical seals, carbon rings and other sealing devices shall be installed for shipment.
8.4.5 REPLACE THIS CLAUSE BY:
(Substitution) Each item shall be tagged and impression stamped with the following information:
Tags shall be stainless steel. Tags shall be attached to each component with stainless steel wire.
Components shipped separately shall be tagged or marked with the equipment item number for which
they are intended. Equipment shipped in fully enclosed containers shall also include the above
information marked on the outside of the container.
Equipment containing insulating oils, anti-freeze solutions or other fluids shall be prominently tagged
at openings to indicate the nature of the contents and shipping and storage precautions.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 16 of 24
Fluor Project No. A2WD
Project Variation
Single stage overhung pumps shall meet the following maximum L3/D4 values:
L = Distance in mm (in.) from the centerline of the impeller to the centerline of the first radial bearing.
D = Shaft Diameter in mm (in) at the seal chamber.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 17 of 24
Fluor Project No. A2WD
Project Variation
9.1.3.9 All OH6 type pumps shall be supplied with a start-up pre-lube pump which will be
interlocked with the main motor drive, to provide pre-lube to the gearbox, before startup.
The pre-lube pump shall be supplied by the pump manufacturer.
9.2.7 Testing
9.2.7.5 ADD TO THIS CLAUSE:
Hydrodynamic radial bearings shall be removed (rolled out, bearings are not disassembled), inspected
by the Buyer or his representative, and re-placed after the performance test is complete. Any galling
or metal transfer, or rubs which result in grooving or heat discoloration will be cause for rejection.
The dressing of these surfaces by filing, honing, sanding, or any other polishing method without
resolving the cause is unacceptable. The cause must be determined, the bearing repaired and the
pump successfully retested and disassembled for inspection before final acceptance and release for
shipment. Minor scuffs and scratches and minor cosmetic repairs to these is not a cause for retest.
a. Bowls shall be flanged, have metal-to-metal rabbeted fits and be bolted with studs and nuts.
Stacked bowls secured by tie bolting and threaded bowls are not acceptable.
b. Column sections shall be flanged and piloted, incorporate bearing spiders and rabbeted fits for all
column sizes, and be bolted with studs and nuts. Integral bearing spiders shall be furnished with
replaceable inserts in the bearing retainer.
c. All pump discharge column pipe sections shall be flanged with a rabbet fit for proper alignment.
ADD NEW CLAUSE:
9.3.1.4 Double casing vertically suspended pumps shall have the suction and discharge nozzles located above
the mounting flange, with centerlines on the same elevation and 1800 apart.
9.3.1.5 Vertical, single casing pumps type VS-1, VS-2, VS-3, VS-4 and VS-5 shall be provided with a
cylindrical basket type strainer attached to the inlet nozzle or bell. Openings in the strainer shall be
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 18 of 24
Fluor Project No. A2WD
Project Variation
small enough to prevent the intake of solid particles that might damage the pump. The material of the
strainer shall be type 316 stainless steel. Other materials may be used if dictated by the pumping
service and approved by the Principal.
9.3.3 Rotors
9.3.3.2 ADD TO THIS CLAUSE:
When 2 piece or more shafts are approved and supplied, shaft couplings shall be keyed.
9.3.5 Dynamics
ADD TO THIS CLAUSE:
Seller shall submit an analysis of the structure and acceptance criteria for Buyer's review prior to
fabrication of pump.
9.3.8 Accessories
9.3.8.3 Mounting plates
9.3.8.3.5 REPLACE SHELL DEP REQUIRMENT WITH THE FOLLOWING:
Mounting plates shall be supplied. The plate shall be at least 50 mm (2 in) thick. The mounting plate
shall be drilled and tapped holes for mounting the pump, and the corresponding fasteners. The
mounting plate shall be supplied with a minimum of 4 anchor bolt holes, through-drilled, for securing
the mounting plate to the foundation. Anchor bolts will be furnished by the purchaser. If required,
grout holes and vent holes shall be provided. The bottom side and sides of the mounting plate (which
will be in contact with the grout) shall be sandblasted to SSPC SP 10 and coated with epoxy primer.
The top surface (and bottom surface of pump plate) unpainted and coated with a rust inhibitor.
1. The mounting plate shall be provided with vertical levelling screws at least 13 mm (0.5 in) in
diameter and at least 150 mm (6 in) long. Vertical levelling screws shall be located adjacent to
each anchor bolt (minimum 4) location. Corners of mounting plates shall be rounded to a radius of
at least 50 mm (2 in).
2. All vertical VS6 and VS7 type pumps in hydrocarbon service shall be supplied with an independent
liner. The liner shall be designed to be installed directly in concrete and shall be robust enough to
act as the inner form for concrete, as shown in Figure I-2.
9.3.10 Single-case diffuser (VS1) and volute (VS2) pumps
9.3.10.5 ADD TO THIS CLAUSE:
Line shafting shall not be furnished with sleeves under the bearings.
9.3.13 Double-casing diffuser (VS6) and volute (VS7) pumps
ADD TO THIS CLAUSE:
9.3.13.2 The inner casings of Types VS6 and VS7 pumps shall be hydrostatically tested at 1.5 times their
MAWP.
10 Vendor’s Data
10.3 Contract Data
10.3.2.1 ADD TO THIS CLAUSE:
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 19 of 24
Fluor Project No. A2WD
Project Variation
The dimensional outline drawing shall indicate a maximum fabrication tolerance of +/- 3 mm (1/8 in)
for pump suction and discharge nozzle face or centerline locations, referenced from the centerline of
the nearest baseplate anchor bolt hole. The same criteria applies to turbine inlet and exhaust nozzles
locations. The centerline of baseplate anchor bolt hole locations shall indicate a fabrication tolerance
of +/- 3 mm (1/8 in) from a common reference point on the baseplate.
Seller shall be required to add to his drawings all notes and data requested by Buyer including
equipment item numbers of various components, connection points, and locations, instrumentation,
and other data as required by Buyer.
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 20 of 24
Fluor Project No. A2WD
Project Variation
PART IV PUMPS FOR VITAL SERVICE AND UNSPARED PUMPS FOR ESSENTIAL SERVICE
(AMENDMENTS/SUPPLEMENTS TO ISO 13709)
8.3 Testing
8.3.3 Performance test
8.3.3.2 DELETE “When Specified” FROM SHELL DEP
8.3.4 Optional Tests
8.3.4.4 Complete unit test
DELETE “When specified” FROM SHELL DEP
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 21 of 24
Fluor Project No. A2WD
Project Variation
PART V REFERENCES
BRITISH STANDARDS
Noise procedure specification EEMUA 140
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 22 of 24
Fluor Project No. A2WD
Project Variation
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 23 of 24
Fluor Project No. A2WD
Project Variation
31.29.02.30-P6000CFP-000-PV_I.DOC
Kuwait National Petroleum Company (K.S.C.) 31.29.02.30-P6000CFP-000-PV
Clean Fuels Project 2020 REV I, 27 Aug 2013
KNPC Contract No. NRP/PMC-0001/CNSL Page 24 of 24
Fluor Project No. A2WD
Project Variation
Witnessed By
Description By Vendor Remarks
Contractor Company
1. Chemical & Physical Properties of √ In accordance with
Pump Parts this PV
2. NDE of Pump Parts √ In accordance with
this PV
3. Dynamic Balancing √
4. Residual Unbalance Test √ If required by API
5. Hydrostatic Test √ √
6. Performance Test √ √ √
7. Performance Test of Spare Rotor √ √ √
and Inner Casing Assemblies
8. NPSH Test √ √ √ If required by this
PV
9. Complete Unit Test including 4- √ √ √
Hour Mechanical Run Test
10. Inspection of Hydrodynamic √ √ √
Bearings after Test
11. Shop Verification of Unbalance √ √ √ If required by this
Response Analysis PV
12. Sound Level Test √ √ √
13. Bearing Housing Resonance Test √ √ √ If Driver > 150kW
for Single-stage Overhung Pumps
14. Resonance Test for Vertically √ √ √
Suspended Pumps
15. Visual and Dimensional Inspection √ √ √
16. Painting Inspection √ √ √
17. Final Inspection √ √ √