Coal mine degasification was Coal Seam Gas (CSG) is the type of
Clarke Energy is the authorised distributor and service originally developed to improve gas collected from un-mined coal
partner for GE Energy’s gas engine division in a growing worker safety. The methane, if not beds. CSG consists of over 90%
number of countries across the world. In addition to captured, is usually vented to the methane and can be harvested
atmosphere through the use of independently of coal mining in
providing high-efficiency, reliable gas engines we combine
exhaust fans. The potential danger some locations. The gas
this with the expertise and resources to deliver unbeatable to the environment through mines composition is normally stable,
product support. gas and its main constituent meaning that the gas can be fed
methane (CH4, 25-60%) can be directly into the natural gas network
Whether your requirement is for the supply of a single gas reduced significantly considering or a gas engine.
engine generator or a complete turnkey power generation methane has a global warming
potential (GWP) 21 times that of CO2.
facility, we can meet that need. Our ability to add value by
offering an end-to-end service, from initial proposal to
reliable long-term maintenance, has led to us becoming a
multi-national company with operations in ten countries
across the globe. Our company prides itself on integrity,
delivering only the highest quality products whilst providing
a reliable accountable localised service.
Heat
exchanger
Heat
consumer
Electrical
energy
Coal mine gas
Coal Mine Methane (CMM) Power Generation Proven Solution Advantages
Coal Mine Methane (CMM) is the The first Jenbacher systems for The Clarke Energy “pre-engineered” — Supply the electrical
type of gas present in active mine utilisation of coal gas were installed cookie cutter power station model requirements of the mine where
sites. CMM is a mixture of methane in Germany and England during the has been designed from the onset to no network connection exists
& air that is released during the mid-1980’s. Currently in excess of allow coal gas producers to begin — Supply the electrical
process of coal mining and must be 183 units with a combined electrical generating power and hence early requirements of upstream
vented for safety reasons. CMM output of over 398MW are in monetisation of this valuable infrastructure such as;
typically has an oxygen content of operation worldwide. resource. The design model features – Reverse osmosis plants
5-12%. The methane content a modular design which facilitates – Gas compressor stations
ranges from 25-60%. However, the Clarke Energy, an internationally the earliest possible generation — Feed excess power into the local
methane/air proportion can change recognised specialist in this given work can start immediately grid
suddenly, thus complicating its use technology has installed over 100 upon award saving critical design — Alternative disposal of a problem
in gas engines units producing in excess of 225MW time at the front end. The proven gas whilst simultaneously
of electrical power generation from model also then allows steady harnessing it as an energy
coal seam gas and coal mine augmentation to coincide with the source
methane in Australia. development of the gas reserves — Smooth operation despite
and drilling program. This means fluctuations in gas pressure,
On working mine applications the that the coal gas producers can methane content and impurities
versatility of GE Jenbacher gas begin generating with as little as in the gas.
engines is further demonstrated 500kW and then grow this output to — Depending on the gas
under conditions where mining tens of megawatts as the gas wells composition, full output down to
activity produces varying methane come on line. the lowest calorific values with
gas content. 25% methane content
During the operating life of the — Avoid the liberation of methane
GE Jenbacher gas engines are able equipment Clarke Energy can into the atmosphere which has
to cope with this constantly maintain the generators with fully 21 times the global warming
changing gas to reliably produce comprehensive operation, potential of CO2
electrical power. At Australian sites it maintenance, and repair and
is not unusual to have methane overhaul services including remote
content less than 30% while the monitoring and guaranteed
gensets continues to maintain full availability. The overall installation,
power output. operation and maintenance of all GE
Jenbacher gas engines installed in
As well as varying methane content Australia is performed by factory
the mine gas invariably contains trained dedicated local Clarke
potentially damaging contaminants Energy commissioning and service
(eg dust/water). Clarke Energy has engineers.
developed gas conditioning
systems to cope with a wide variety
of these contaminants to ensure
reliable power generation without
increasing maintenance requirements.
Daandine, Australia, coal seam gas, 11 x JMS620 Glennies Creek, Australia, active mine, 10 x JMS320
If you would like to find out
more about how Clarke
Energy can help you
develop your coal gas
project, please contact your
local office for more details.
Algeria Ireland
Australia
New Zealand
Building 1
2-4 Stirling Street Unit 5
Thebarton 56 Pavilion Drive
South Australia Airpark II
Adelaide 5031 Mangere
Australia Auckland 2022
Tel. +61(0)8 8290 2100 New Zealand
Fax. +61(0)8 8443 5848 Tel. +64 (9) 256 9910
australia@clarke-energy.com Fax. +64 (9) 256 9912
newzealand@clarke-energy.com
China
Nigeria
No. 1906 Tower A
Chaowai SOHO 13B Obanta Road
6B Chaowai Dajie Apapa
Chaoyang District Lagos
Beijing 100020 Nigeria
China Tel. +234 (0)181 567 23
Tel. +86 (010) 5900 0561 nigeria@clarke-energy.com
Fax. +86 (010) 5900 0562
china@clarke-energy.com
Tunisia