Debit Rencana

Q=NFR*A/e total

Ep= 0.95
Es= 0.9
Ets= 0.85
Ett= 0.72675

Luas daerah= 1000 ha


NFR 1

Q rencana= 1375.989 lt/dt

Kebutuhan Air
Tersier (NFR*Luas Daerah)*1/Ets
1176.471 lt/dt 1.176471 m3/dt

Sekunder Sigma TOR*(1/Es)


1307.19 lt/dt 1.30719

Primer Sigma TOR mc*(1/Ep)


1375.989 lt/dt 1.375989

Tersier

h air b=2h A V Qrencana Qhit Delta Q


m m m2 m/dt m3/dt m3/dt m3/dt
0.5 1 0.5 0.528431 1.176471 0.264216 0.912255 Q1
0.6 1.2 0.72 0.528431 1.176471 0.380471 0.796 Q2
0.7 1.4 0.98 0.528431 1.176471 0.517863 0.658608 Q3
0.8 1.6 1.28 0.528431 1.176471 0.676392 0.500078
0.9 1.8 1.62 0.528431 1.176471 0.856059 0.320412
1 2 2 0.528431 1.176471 1.056863 0.119608
1.055 2.11 2.22605 0.528431 1.176471 1.176315 0.000156

SEKUNDER
h air b=2h A V Qrencana Qhit Delta Q
m m m2 m/dt m3/dt m3/dt m3/dt Q1
0.7 1.4 0.98 0.537146 1.30719 0.526403 0.780786 Q2
0.8 1.6 1.28 0.537146 1.30719 0.687547 0.619643 Q3
0.9 1.8 1.62 0.537146 1.30719 0.870176 0.437013
1 2 2 0.537146 1.30719 1.074292 0.232898
1.105 2.21 2.44205 0.537146 1.30719 1.311737 -0.004548
1.2 2.4 2.88 0.537146 1.30719 1.54698 -0.239791
1.3 2.6 3.38 0.537146 1.30719 1.815553 -0.508364

PRIMER

h air b=2h A V Qrencana Qhit Delta Q


m m m2 m/dt m3/dt m3/dt m3/dt
0.7 1.4 0.98 0.541733 1.375989 0.530898 0.845091 Q1
0.8 1.6 1.28 0.541733 1.375989 0.693418 0.682571 Q2
0.9 1.8 1.62 0.541733 1.375989 0.877607 0.498382 Q3
1 2 2 0.541733 1.375989 1.083465 0.292524
1.128 2.256 2.544768 0.541733 1.375989 1.378584 -0.002595
1.2 2.4 2.88 0.541733 1.375989 1.56019 -0.184201
1.3 2.6 3.38 0.541733 1.375989 1.831056 -0.455067
0.75 V1 0.5
1.5 V2 0.55
1.176471 V3 0.52843137
0.75 V1 0.5
1.5 V2 0.55
1.30719 V3 0.53714597

0.75 V1 0.5
1.5 V2 0.55
1.375989 V3 0.5417326