RM eens
INSTALLATION UNIT FOCUSED ASSESSMENT CHEGKUST
DISGPUNE
BIO)
PROIECT MILE
CONTRACTOR
ToCATON
DATE OF ASSESSMENT
MECHANICAL / ELECTRICAL
so-00900. 0003342
Procurewenr rascanon|
‘LoAD out &neDown,
TRANSPORTATION,
INSTALLATION ND
HOOK UP OF ABSF2.182/288
“ANDAR 6145/149
WELLHEAD PLATFORMS
ecIs
ana Maine Seren
esr eaagyua9
sutJan-20
FOCUSED ASSESSMENT AREA/ PROCESS
|cobio termination atthe AFD:
Si Is boing performed
lew performed a focus assessment to evaluate the Medium Voltage Cable Termination process-During the atv at ABSF-6,143/149 platfoxm,
a
Cotas ova an
re nem ened owes en _ dig foot ae comet ten | caro on
Sa se DW
hime eerie an foaratacmt faa cases,
a fees frosrane neue cou
ne cab spatter sal daa eb reung och se Tae
iis tnngSeenost St sacar fasou vrais
lastestenwatorteaum votage cess fae 2 econ ear teu
[ren aust rar 705
iar es
sestoresatcay accor anicsfasiot a, motte a
[ic wonne once 3708 fe [uc
Jumbercaco00130
‘Sout aco: Crpany General seiS escrmaend cane ere
ae Remon
ee eeeren te ara Recent,
fee eee feces |e poeaiaee:
pe ee tare prec See
=e nr pases
i? frre
on =.
eee on
|start the termination work process. [procedure PR-4- lad oeeeeeeeseeee
| manufacturer instruction. Jorooadure pri-a- YES Jeable termination is 8s per the
essen =
soe beni
peateenmntenamammene fen. tes sss ea re
= eer re paramere of a8|esessmont Done br: RATHEESH VIPYADHARNBADGEH240681,
horas; The feus assessments documented via LBEBADA dated 14-2020
oases are iat RT Waran fers Contin Bt
bh
[Contractor Qo: [Name: Signature & Date vo oe [Positive Comments / Opportunity for Improvement: During We focus assessment IPIU confirmed that ,ongoing MV Cable
oy SEL z cman pear hs owed Wo xan sen Atochment\ Pee 24, Pare? SHES P08 365A pros
me Uialhs. \Aleilreae lcrrawrottotApense skin s04c2Aciiy 2 SACP.2080m AB. Sk oped Yermaston pra PR
stars Puieanovaletone urd.
a oo
Para Suet
FRO
IES)