After completion of the fit-up, the Since 1942, The Bayou Companies has been providing welding sub-arc head is lowered on the services from its New Iberia facility. Recently, Bayou announced pipe and welding begins. The pipe its new subsidiary, Delta Double Jointing (DDJ), as a dedicated unit rotates while the welding head providing expert welding capabilities utilizing high-quality processes. remains fixed. The welding bead is grinded and a good tie-in is • Portable racks can be set up in pipe staging area or in the achieved. coating yard • Facing machines are static and enable higher-quality, straighter fit-ups and double joints Step Five: Cap Weld • Pipe rotation capability at the facing station enables orientation of Pipe is then indexed to the second the long or spiral seam to any required position welding station (capping station) • Submerged arc process can be utilized for jointing of pipe where it undergoes a welding • Fully compliant with API Standard 1104 welding requirements process very similar to the first • Quality processes result in historical repair rates at less than 1% station, without the fit-up. A visual inspection for obvious defects of Technical Specifications the cap is made during the second welding process. Single joint length 15 to 56 feet Double joint length 50 to 85 feet Step Six: Internal Weld Diameter 16- to 48-inches The pipe is then indexed to the next Wall thickness 0.188- to .999 inches station for ID welding. A submerged arc welding machine, mounted on Maximum grade X80 a lance, controlled by an operator using a camera and remote controls, is inserted to the weld area. After Process completion of the weld, the flux is cleaned with a metal chipping hammer, swept in a pan, and removed from the pipe. A visual Step One: Pipe End Preparation inspection is again performed to identify any obvious defects. DDJ uses high speed facing machines. These machines are mounted in a fixed position and the Delta Double Jointing pipe is indexed to the machine. Employees of DDJ are all members of both the United States and Canada United Association of Journeymen and Apprentices of the Step Two: Pipe Preheat Plumbing and Pipe Fitting Industry or the International Union of The pipe must be preheated Engineers. according to project specifications prior to welding. After it is preheated, it is rolled in to the fit-up station. Preheat temperature is verified.
Step Three: Pipe Fit-Up
The line-up clamp is inserted from the end. Once engaged, the line-up clamp is not released until completion of the first pass of the pipe. The pipes are drawn together and aligned using a hydraulic system. The Bayou Companies, Inc. 5200 Curtis Lane, New Iberia, LA 70560 www.bayoucompanies.com 337-369-3761