Work Plan
• Introduction
• Preliminary Inspection(Causes of Deterioration
and Durability Aspects)
• Condition Survey and Non destructive evaluation
• Structural Analysis and Design
• Rehabilitation and Retrofitting Methods.
• Guidelines for Terms and conditions for repairs.
• Schedule for special Items of work and
specifications for Structural Repair work
Rational approach to Repair and Rehabilitation
etc..
• G5 : Major repairs
Considerations for repairs strategy.
• Identification of cause of problem.
• Assessment and extent of damage.
• Availability space and accessibility w.r.t. ongoing
activities in building.
• Propping structural members in case of major repairs ,
severely damaged elements (columns etc ).
• Safety measures to avoid mishaps.
Terms and conditions in repairs work execution
• Safety measures / Quality assurance / Environmental
protection
• Desirable to have item rate contract
• Time for repairs and Phasing of works depending on site
conditions.
• Constant Supervision and review of ongoing operations
at the site
• MCGM PROCEDURE TO BE FOLLOWED
• SPECIFICATIONS for materials / execution methods / quality /
measurements