Job N°: A-4354-17 Unit:

BELLELLI ENGINEERING S.p.A.


Rev.
Doc.No:

NITROGEN GENERATION PACKAGE


- 00

Sheet / of
1 / 1
Originator Company BELLELLI ENGINEERING S.p.A.
SPARE PARTS LIST
1
2 SPARE PARTS LIST FOR COMMISSIONING AND START-UP
3 - No. 1 Set of gaskets for all piping and vessels flanged connections
4 - 10 % the complete set of Stud Bolts & Nuts (min 2 pieces per size)
5 - No. 1 set of Filter Elements
6 - Oil filter for Air Compressors
7 - Air Filters for Air Compressors
8
9 SPARE PARTS LIST FOR 2 YEARS OF OPERATION
10 - No. 2 sets of gasket for all piping and vessels flanged connections
11 - 20 % the complete set of Stud Bolts & Nuts (min. 2 pieces per each size)
12 - 20 % the complete set of Stud Bolts & Nuts (min. 2 pieces per each size)
13 - No. 4 Solenoid Valves
14 - No. 1 Repairing Kit for Control Valve
15 - No. 1 set of UCP circuit breakers
16 - 50 mt wiring cables
17 - No. 1 Power Feeder for UCP
18 - Compressor Manufacturer Standard Kit for 2 Years Operation
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57

You might also like