You are on page 1of 2

10-ASSIGNMENT Defect Management

ASSIGNMENT: DEFECT MANAGEMENT

Goal
Goal of this assignment is to learn about documenting defects.

Procedure
Carry out the assignment individually or in small groups
Available time: 30 minutes.
Group discussion.

Background information

Review results of a System Test script that was executed in the Pilot environment: CITIZEN_Add_02.

Record defect in the given template.

List other steps you might take if you had found this defect.

Do not copy without permission Page 1 version 1.3


Field Description

Project:

Defect ID:

Summary:

Description:

Severity:

Date found:

System:

Found by:

Reproducibility:

Requirement:

Test:

Status:

Cause:

Test Level:

Attachment:

Assigned to:

Property of Sogeti - do not copy without permission Page 2 version 1.3

You might also like