Zx L&W Construction Private Limited Form Env - A

Project: IGATE PHASE II


Monthly Update Items Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Nov-17 Dec-17
A Noise                        
Max Max Max Max Max Max Max Max Max Max Max
  Noise Readings Level Max Level Level Level Level Level Level Level Level Level Level Level
  1 Day Reading (7am-7pm) 65 65 65 65 65 65
  2 Evening & Night Reading (7pm-7am) 60 60 60 60 60 60
                         
B Energy                      
    kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh
  1 Electricity Consumption 55026 54236 57920 66452 80366 78987
                       
                         
  2 Diesel Consumption (Litre) 30329 32509 38482 38941 38830 36124
                       
    kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh kWh
  3 Equivalent Electricity Consumption 227467.5 243817.5 288615 292057 291225 270930
  from Diesel (Diesel Consumption X 7.5)                      
                         
C Water Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M Cu. M
  1 Water Consumption for Construction 276 492 492 756 780 420
  Activities
 
  2 Water Consumption for Non- 2868 1584 2700 3504 2112 1488
  Construction Activities
 
  3 Total Water Consumption 3144 2076 3192 4260 2892 1908
               
               
D Waste Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg
  1 Blank paper (any size) purchased by the 200 200 200 300 350 450
  site office              
  2 Paper collected and sent for recycle 75 - - - -
    Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton Ton
  3 Scrap metal collected and recycled
       
E Water / Electricity Efficiency              
  1 Monthly Water Usage per Man-hour Work 0.02520 0.0105 0.0145 0.0345 0.0125 0.0747
  2 Monthly Electricity Usage per Man-hour 0.18236 0.27681 0.26377 0.3151 0.3480 0.3096
  Work              