You are on page 1of 24
* J. MITSUBISHI mrsusisis ELECTRIC STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO.: ME/EWIC/3485-2006/2007 ‘Supply & Installation of Kifan "W" 300/132KV Substation Test Report Commissioning Test Report < 300kV 1Cx6*1600mm? Oil-Filled Power Cables > Kifan "W" 300/132kV Substation ~ da MITSUBISHI wirsusisi ELECTRIC STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO.: ME/EWIC/3485-2006/2007 ‘Supply & Installation of Kifan "W" 300/132kV Substation 4. 300kV 10x6%1600mm? Oil-Filled Power Cable 1.1 High voltage test & insulation resistance 41.2 High voltage test on PVC Sheath 1.3. Conductor resistance 4.4 Conductor capacitance 1.5. Impregnation-Coefficient 1.6 Oil-flow * a MITSUBISHI wirsusisn evecraic STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO.: ME/EWIC/3485-2006/2007 ‘Supply & Installation of Kf "W" 300/132KV Substation Commissioning Te 4. High Voltage Test & Insulation Resistance Testing Date: 200006.26 827 ‘Substation KIFAN W 300/32KV Substation CiruitWe, FAN W -ABRIVA W- ‘able {00KV fextx1600 sqmm OFF Cable oy Red Phase (R1¢R2) ‘Yellow Phase (¥9+¥2) Blue Phose(61+82) Length 3006.21007224 soos 2101835 2006 2802421 4.2 ltomiaad Test - High Voltage Test [Feet Equipment: HPOTRONICS MODEL BY74 PL 7KW (OC INSULATION TESTER) ‘Set Leakage: 0.12 mA [Test Voliage Dic SBE 16 in. osther: Ee Temperature: 2 0 Humidity: 42% Testtimeiminy) [| 4 [2] 3/4] s[6|[7[e,e|oinle| a] ul | 0800 | eo | 0800 | osc | 0.800 | ooo | a0 | 0.800 | asco | 0.800 | oso | 800 | ooo | ease | asco beakage Current | [es | 200 | 600 | 00 | eo | eco | aso [ooo | 000 | ooo | 0500 | ooo [ooo | 0900 | 0800 | e500 [0800 | 0302 | ooo | asc | 00 | ooo | aso | 000 | asco | 0.00 | a | 0800 | 0100 | asco TestResult: OK 13 tomized Tost- Insulation Resistance Test ‘Test Equipment {5000 Megger (Unit: G-Ohms) Phase ‘Belore HVDC test ‘After HVDC test Red >18 > Yellow > > Blue > 8 TeatResut: OK ‘Wain contractor (Meles) Engineer MEW Engineer dy MITSUBISHI weve ELECTRIC STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO: ME/EWIC/3485-2006/2007 ‘Supply & Installation of Kifan W 300/132KV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath 14 General information Testing Dato: 2009.04.29. ‘Substation KFAN“W" SIS Circuit No. ‘300KV GIS BAY NO. 09 ~ JABRIVA“W" 172. cable 300KV tex6x1600sq.mm OFF Cable cable Red Phase (R1R2) ‘Yellow Phase (V1#Y2) Blue Phase (61-62) benath() ‘2391248 2aH1246 ‘237782 1.2 tomizod tost - PVC sheath high voltage tot & insulation resistance measuromont Test equipment: DC HV Generator ZGS 30KV/40mA Set leakage: 0.03mA Test voltage: D.C. 10 ¥V/ min. ‘Weather: Temperature: 31 Humidiy: 22% Tnsulation Resstance (Unit Meg-ohms) Phase High Vottage Tost fore HV teat ‘Alter HV test Red Withstood >20| >200 Yellow Withstood >200) >200 Blue Withetood >200 >20| TestResuit: OK Test By: Subcontractor Test Engidesr Witnessed By: Witnessed By: Wain contractor (Melco) Engineer MEW Engineer ~ fe MITSUBISHI ‘STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO: ME/EWICI3485-2006/2007 ‘Supply & Instatation of Kian 'W" 200/132RY Substation Commissioning Test: 2. High Voltage Test on PVC Sheath MITSUBISHI ELECTRIC 414 General Information Testing Dato: 2009.04.29, Test By: edit Sieg Engineer Witnessed By: oO ‘Main contractor (Melco) Engineer ‘Substation KFAN-W" SiS Circuit No. IABRIVA"W" 1/2 JP = JABRIVA"W" 213 JP ‘able 300KV Jex6xt600eq:mm OF Cable a Red Phase (RiR2) ‘Yeliow Phase (Y9¥2) Blue Phase (6182) Length (M) 1680172, 168/171 4671170 1.2 ltemized test - PVC sheath high voltage test & insulation resistance measurement Test equipment: DC HV Generator ZGS 30KVI40mA Set leakage: 0.09mA Test voltage: D.C. 10 KV min Weather Fine Temperature: 31 Humidiy: 29% Insulation Resistance (Unit Mog-ohms) Phase ‘High Voltage Test Betore HV test ‘After HV test withstood >200 3200) Withatood >200 >200 withatood >200 >200 Test Result: OK (EW Engineer fa MITSUBISHI wireueish! eLecrac STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO: ME/EWIC/3485-2006/2007 ‘Supply & Installation of Kifan"W 300/132KV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath 4.4 General Information Testing Date: 2009.06.23. Substation KIFAN °W" iS ‘iret No. S00KV GIS BAY NO. 09 ~ JABRIVA"W" 72 JP Cable 300KV tex6x16006q.mm OFF Cable cable Yellow Phase (V7¥2) Blue Phase (B1¥82) Length) Ed 2ai208 2371082 1.2 Momized test - PVC sheath high voltage test & insulation resistance moasurement Test equipment: DG HV Generator ZGS 30KV40mA Set leakage: 0.03mA Test voltage: D.C. 10 KV min. Wosther: Fine Temperature: 96 "C Humiaiy: 48% Inulation Resistance (Unit Meg-ohme) Phase igh Voltage Test Before HV test ‘AMter HV test Red withstood >200 | >200 Yellow withstood >200| 3200) Blue withstood >20| 3200) ‘TeatReeult: OK Test By: ‘Subcontractor Fett Engiesr Witnessed By: a. Wain contractor (Melco) Engineer MEW Engineer ~ a MITSUBISHI wirsuuisit execrme STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER ‘CONTRACT NO: ME/EWIC/3485-2006/2007 Supply & installation of Kifan W" 300/132kV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath 14 General Information “esting Date: 2008.06.23. ‘Substation KIFAN Ww" 883 Circuit. JABRIVA-W" 172 JP = JABRIVA "W213. JP Coble ‘300KY Yex6x16008q.mm OFF Cable aa Red Phase (RiR2) Yellow Phave (Y1#¥2) Blue Phase (6182) Length od “ear ser70 1.2 temizod test - PVC sheath high voltage test & insulation resistance measurement Testo ipment: DC HV Generator 26S 30KVH40mA Set leakage: 0.03mA Test voltage: D.C. 40 8V/4 min Weather: Fine Tempersure: 36 Humidity: 18% phone vgn Votoge rst Tnsulation Resstance (Unit Meg-ohms) Before HV teat ‘After HV test Rea Withstood 2200 3200 Yellow Withatood 3200 7200 Blue withstood >200 3200 TestResut: OK Test By: ‘Subcontractor Fest Eng Witnessed By: Witnessed By: ee ‘Main contractor (Melco) Engineer MEW Engineer fe MITSUBISHI 24 Genera information STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER CONTRACT NO: ME/EWIC/3485-2008/2007 ‘Supply & Installation of Kiln W" 300/32KV Substation Commissioning Test: 3. Conductor Resistance MITSUBISHI ELECTRIC “Testing Date: 2000.06.15 Note: Ray = Re / [4407-20] 4. Rx Measured Value 2. Copper conductor tomperature coefficient (0=0.00393 ) Test By: Subcontractor Tedf engine Witnessed By: = Main contractor (Melco) engineer ‘Substation KFANW 8 Grune, 3008 GIS BAY NO 9 JABRIVA "We cable 200K text 1ag mm OF Cable cue Rea Phse RIOR) Yew Pane (FF) Bie Phase (61-82) Length soos 207274 s09.2not9.21 e006 219024.24 2.2itomized test ~ Conductor resistance Test equipment: Hz 2822 Weather Fine Tempore, 34 Huis: 22% ‘Adjusted for length and conected Phase hd Lena km) to temperature of 2° ‘onmnn) RvR ox * or ca on * ores B82 oc * ato TestRanuts OK ‘MEW Engineer "Ae MITSUBISHI STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER ‘CONTRACT NO: ME/EWIC/3485-2006/2007 ‘Supply & intalition of Kifan W200/452RV Substation Commissioning Test: 4, Conductor Capacitance MITSUBISHI ELECTRIC $34 Gonoral Information ‘esting Date: 2009.08.18 ‘Substation FAW" SIS Circuit No. 300KV GIS BAY NO, 09 ~ JABRIVA"W" ‘cable 300KV 1ex6x16000q.mm OFF Cable es Red Phase (R16R2) ‘Yellow Phase (1+¥2) Blue Phase (6182) mgt (M) '9006.21/9022.21 2009.21/9019.21 '9006.21/9024.21 3.2 tomized test - Insulation capacitance “Test equipment: YY2810 Weather: Fine Temperature: 38 “0 Humidiy: 48% so Measured value ™ ‘Adjustment Pras (x10) emma (xt0*Frkm) RR 740 18 oat vane Ta, 1° oat e162 738 8 ato ‘TeatResutt: OK Test By: Lien ‘iain contractor (Melco) Engineer icor (Viscas)Engineer Witnessed By: oo ‘MEW Engineer oaic’ 960 OIL IMPREGNATION TEST FOR 300 KV OIL FILLED CABLE Feeder : (300 KV GIS Bay at Jabrieh "W" SISTN. - Kifan “W" S/STN. - Group No.1 Cable 300 KV 1600 mm‘ Oil Filled Power Cable (Before Jointing Work to Existing Power Cables coutome. | av pr | pa ae u ‘ Phase ee) (ry | tegiem | carom (m) iy a sudgement —___|- |__| frsfemty TC uNien®) — Red 04/06/09 32 0.520 1.500 0 1.500 147.150, 381.000, 1,379.164 | 2.5623 x 10 * Good Yellow 04/06/09 32 0.470 1.400 0 1.400 137.340 381.000 1,379.164 | 2.4813 x10 * Good Blue 04/06/09 32, 0.670 1.880 o 1.880 184.428 381.000 1,379.164 | 2.6341 x 10* Good Formula: K = dvxt (Measurement value should NOT be greater than 45x 10°) v de Were : 4 kafom* = 0.981 x 1" kN dP : Drop in pressure (Nim?) dV : Volume of oil withdrawn: (Lr) Vs : Volume of oil in unit length of cable (Lim ) : 1600 mm‘ of oil filled cable = 2.444 lim = ( High = 0.454 Iim + Low = 1,990 Im ) Oitpine = 0.3 Un Gis = 78 Vs0t Straight Joint = 60 Uset Oil Capacity of Prysmian PT= 260 Ir Ly Gable tongth (m) Ly £01 Pipe length (m) Vs Total volume of o (Ur): v= (eax Ly (7) + 60. 2)+ 0.3 x Ly) + 260 (Prysmian PT Oil Capacity) OitType: DDB Hara 994.164 + 75+ 1204 3 +250 eres 21379:164L Air Tomp. = 28°C uy La Phase | cable Length [Oi Pipe Length Witnessed by Witnessed by () om) {2 R | ter+100 | 10.00 Signature EL == ¥_|_tor+190 | 1000 Name [A SZ k sada | Atha Ropb 8 | t9rr190 | 1000 Viscas Corp. (Subcontractor) | _ Melco (Main Contractor) MEW OIL IMPREGNATION TEST FOR 300 KV OIL FILLED CABLE Feeder : (300 KV GIS Bay at Jabrieh "W" S/STN. - Kifan"W" SISTN. - Group No.2 Cable: 300 KV 1600 mm: Oil Filled Power Gable (Before Jointing Work to Existing Power Cables) —— av Pt P2 a ry v urdgeme ee (try | (kgtem) | (kotem) (m) may « a kglcm? Nim?) Red 04/06/09 35 0.620 1.700 0 1.70 166.770 381.000 1,379.164 2.6956 x 10° Good ‘Yellow 04/06/09 35 0.490 1.300 1.30 127.530 381.000 1,379.164 2.7859 x 10° Good Blue 04/06/09 35 0.690 1.800 1.80 176.580 381.000 1,379.164 2.8333 x 10% Good Formula: K = d¥x4 (Measurement value should NOT be greater than 4.5 x 107) Vv dB Where 4 kolem* = 0,904 x 10° kN? AP : Drop in pressure (Nim? ) Volume of oll withdrawn (uy Ve : Volume of ei in unit length of cable (Lim ): 1600 mm* of oll filed cable = 2.444 Um = (High = 0.454 lim + Low = 1.990 um ) Olt pipe = 0.3 um Gis = 75 Veet Straight Joint = 60 Vset Oil Capacity of Prysmian PT = 250 Ir Ly : Cable length im) Lz : Oil Pipe length (m) V': Total volume of olin installation (Le): V= (2.448 xy) + (75) + (60 x 2) + (0.3 x L) + 260 (Prysmian PT OW! Capacity) Oil Type : DDB Hard 31.464 + 75 + 120+ 3+ 250 Oil Temp. = 35 °C 379.464 Lr. ‘Air Tomp.= 28 °C u ke Phase | Cable Length | oil Pipe Length Tested by Witnessed by Witnessed by (m) (m) R 191 + 190 10.00 Signature Ae Boe | Y [tere ss0 [1000 wane | awe £. SALE 4 7s dq | Alin Roz B 191 +190 10.00 ‘Viscas Corp. (Subcontractor) | _ Melco (Main Contractor) ‘MEW OIL FLOW LEST REPORT FOR 300 KV OIL FILLED POWER CABLE Feeder : (300 KV GIS Bay at Jabrieh "W" S/STN. - Kifan "W" S/STN, - Group No.t Cable: 300 KV 1600 mm* Oil Filled Power Cable (Before Jointing Work to Existing Power Cables) Test Date : 04/06/2009 Presse at PresaureDiteence : cove 801 el oy voy natcotriew | Rate ofFow an See | orem. | onvszoety [MLS ERPP| otvatime Wiosued) | Gnesetea) Pt cc) L doen ih) | ot (kgicm*) | (kNim*) wa |e] 00 | ono sos [me] eee | aero) oo co | voor | oonrane Yeton | aa | t0 | e4o | ooze | 98) eas] onto | ano co] 0008856 | oonsres Blue 1.80 1.00 0.80 78.48 36 8.208 391.00 0.720 60 0.012000 0.011833 Theoretical rate of flow is calculated by following formula : - 0.981 x 10* kNim? Rate of oil flow theoretical (Lrisec ) Qt = dPxrex19 —_(Atis ess than am) Rate of ol flow measured (Lrisec ) 2.54xCPxL Total pressure difference (KN/m?) Viscosity of oil (cP) Internal radius of cable oll duct = 6 mm (mm) ‘Actual installed cable length + Actual installed Oil feeding pipe length (m) Phase | Actualcable | oipipe | Tah saie Length, m | Length, m | 16 ah in R 190+ 191 10.00 391.00 190+191 | 1000 391.00 8 ya0+101 | 10.00 391.00 Tested by Witnessed by Witnessed by Signanre FEZ [At name | fond K Sp eeP a, LZ rcy Affe Ragas Viscas Corp. (Subcontractor) Metco (Main Contractor) MEW 4/07/2009 OIL FLOW _ 2ST REP FOR 300 KV OIL FILLED PL JER CABLI Feeder : (300 KV GIS Bay at Jabrieh "W" S/STN. - Kifan "W" S/STN. - Group No.2 Cable: 300 KV 1600 mm? il Filled Power Cable (Before Jointing Work to Existing Power Cables) Test Date : 04/06/2009 Pressure during) pressure Difference , Cable & Oil : Rate of Flow | Rate of Flow Flow ‘dP = Pi -P2 oitemp. | OVSES"Y | Pipe Lengin | OH Volume (Measured) P2 (C) L he (kglem® (m) a) (Lilsec) Ckgiem*) | (ktm) 0.009833 0.008650 Yellow 1.30 1.00 030 | 2043 36 8.88 391.00 028 60 0.004666 0.004325 Bi 1.61 1.00 cet | 5986 36 888 391.00 0.58 60 0.009666 0.008794 ‘Theoretical rate of flow is calculated Where by following formula : - ‘Lkglem? = 0,081 x 10° KNIm? ‘Qt = Rate of ol low theoretical (Liisec ) Qt = gPxrex to? ( Qtis less than Qm ) Qm_ = Rate of oii flow measured (Liisec ) 2.54xPxL dP = Total pressure difference (KNim? ) CP = Viscosity of oil (CP) += Intemal radius of cable oll duct = 8 (mm) L_= Actual installed cable length + Actual installed Oil feeding pipe length (m) _ ‘Actual Cabie [oi Pipe Length, |"0%2! cable &| ase ail pipe Length, m m \ougtn R 190101 10.00 391.00 Y 190+191 10.00 391.00 8 190+191 10.00 391.00 Tested by ‘witnessed by ‘witnessed by Signature a to KZ gt Tone Ad RESALE Phe Scncls, | Ae Kop Viscas Corp. (Subcontractor) | Melco (Main Contractor) MEW ~ ,AaNITSUBISHI reuse ELECTR STATE OF KUWAIT [WINISTRY OF ELECTRICITY & WATER MEveWic13488.200872007 ‘Supply & Installation of Kin "W" & Jaa °X" 300/22KV Suttons Commissioning Test: 4. High Voltage Test & Insulation Resistance 1.4 Genera information Sabaaion ‘ian “W" SOON Substation irene. Titan "W SISTN.- Town "W" STH. Cable SOOKY 1061600 mm OF Cable = Rea Prana ‘Yetow phase (Ya Blue phase (B.) Length ‘S133 3765 ETE 379813748 1.2 emia tat - High voage test Testing Date: 16.07.2008 [Test equipment: Hipotronies Mode! 675 PL KW (DC Insulation Teter [setleakage: 0.12 mA Testvorage: 0. 30K Testiocaon: 200 nV GIS Bulding [Weather Fine Tenperatres uri: a [rime in) tp2fs}ets[e[r Tets|wpalefslule iz | 1900 | 1.500 | 1.500 | +500 | 1800 | 1.500 | +800 | +500 | 1.800 | 1.500 | +200 | 1.500 | +500 | +500 | 1.500 etae Sart | Yan | 1500] +200 | son | 500 | +500 | tn | ton | 00 | +20 | +200 | see | 00 | 1500 Bxa_ | 1500 | 1.500 | 1800 | 1.500 | +500 | 1.500 | 4.500 | +500 | 1.500 | 1.500 | 1.800 | 1.500 | +500 | 1.500 | 1.500 Test RGR OK 1.3 maize test Insulation resistance test Test equipment 15000 V Megger (Uni: GOhms) Phase Belore VDE test ‘Aer VDE eat Red >a 340 Yeon 0 >a i mao Pao TestReeuit: OK fa MITSUBISHI MITSUBISHI ELECTRIC ‘STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER ME/EWIC/3485 - 2006/2007 Supply & installation of Kifan'W'& Jahra x’ 300/132KV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath 44 General Information Testing Date: 2009.06.13. Substation KIFAN-W" SiS icuit No. 00MVA GIS BAY NO. 03 = TOWN -~W" 172 ‘cable {300KV 4ex6x16006q.mm OIF Cable aoa Red Phase (R1+R2) Yellow Phase (V1#Y2) Blue Phase (61482) Length () 9034 2007224 Ea 1.2 temized test - PVC sheath high voltage test & Insulation resistance measurement ‘Test equipment: DC HV Generator ZGS 30KVI40™A Test voltage: DC. 10 kV! t mi, Set leakage: 0.34 mA Weather Fie Tempore: 38 Homi aa Insulation Resistance (Unie Mepohms) High Voge Tost, Before HV tot ‘Aer HV ist ea Witstood 2200 >avo Witetood 200 >av0 Witetood 2200 >a00 TeetRewuit OK Test By: Supervised By: re Engineer ctor (VSEaS)ENQIROST Witnessed iinessed By: (EW Engineer ” Ja MITSUBISHI STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER (MEVEWIC/3485 - 2006/2007 ‘Supply & installation of Kitan'W"& Jahra x’ 300/132KV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath MITSUBISHI ELECTRIC 414 General Information Testing Date: 2009.04.29. ‘Subatation KIFAN-W SIS Circuit No. TTWON=W"12 JP = TOWN -W 28 JP Cable 300KY4ex6x6005q.mm OFF Cable an Fed Phase (RR2) Yellow Phase (79+¥2) Blue Phase (1-82) Lenath on) “owns? 70088 202/96 1.2 Itemized test - PVC sheath high voltage test & insulation resistance measurement Test equipment: DC HV Generator ZGS 30KV4OmA “Test voltage: D.C. 10 kV! min, Set leakage: 0.25.mA Wester Fi Tenpertre at Homidiyy an Insulation Resistance (Uni: Megs) High Voage Test, Before HV tat ‘Aer tot ea Witstood >a00 >200 Wittood >to a0 Bue Wititood >am0 >a00 TeatResutt; RIPVE Sheath Felt Test By: shen Hoag Gia ‘Subcontractor Teét Engineér i (Viscas)Engineer Witnessed By: Witnessed By: Main contractor (Melco) Engineer (EW Engineer ,fe MITSUBISHI ‘STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER ME/EWIC/3486 - 2006/2007 MITSUBISHI ELECTRIC ‘Supply & installation of Kifan"W"& Jahra x’ 200/132KV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath 414 General information ‘esting Date: _2 Substation KIFAN"W" S'S ‘Circuit No, ‘300MVA GIS BAY NOO3 ~ TOWN-W" 172 JP ‘cable {300K 1ex6x16008q.mm OFF Cable — Red Phase (R+R2) ‘Yellow Phase (V#+¥2) Blue Phase (6182) Length (wm) “e0r4 ‘oon ‘poate 1.2 tomized test - PVC sheath high voltage test & insulation resistance measurement Test equipment: DC HV Generator ZGS 30KV40mA ‘Set leakage: 124A Test voltage: D.C. 10 RV 4 min Weather: Fine Temperature: 39 "0 Humidiy: 23% Insulation Resistance (Unit Meg-ohms) Phase High Votage Test Botore HV test ‘Aer HV test Rea Withstood >200 9200 Yellow Withstood >200 >200 Blue Withstood >200 >200 TestResut: OK Test By: Don. Jeg Song — ‘Subesntractor Test Engines! Witnessed B: ‘Main contractor (Melco) Engineer Witnessed By: MEW Engineer fe MITSUBISHI irsusisHt ELECTRIC STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER (MEVEWIC/3485 - 2008/2007 ‘Supply & installation of Kifan"W'& Jahra x’ 200/182KV Substation Commissioning Test: 2. High Voltage Test on PVC Sheath 414 General Information ‘Testing Date: 2009.07.08. ‘Substation OFAN "Ww" 88 Circuit Wo, "TWON *W? 12 JP = TOWN -W" 20 ‘able 300KV 1ex6x16008qjmm OF Cable an Fed Phase (R1R2) ‘Yellow Phase (17+¥2) ‘Blue Phase (6182) Length () ‘ower 2000 202/96 1.2 temized test - PVC sheath high voltage test & insulation resistance measurement ‘Test equipment: DC HV Generator ZGS 30KV/40mA Set leakage: 1.19,mA ‘Test voltage: D.C. 10 KV/4 min Weather Fine Temperature: 39 Humiaiy: 23% Insulation Resistance (Unit Meg-ohms) Phase High Vottage Test ‘Before HV test ‘After HV teat Red ‘witistood >200) >200 Yellow ‘Withetood >200 >200 Blue ‘withstood 3200) >200 TTestResult: OK Test By: nor Jong Subcontractér Fest Eni Witnessed By: iain contractor (Melco) Engi (EW Engineer ” de MITSUBISHI MITSUBISHI ELECTRIC ‘STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER ME/EWIC/2485 - 2006/2007 ‘Supply & instalation of Kifan 'W & Jahra x’ 300/132KV Substation Commissioning Test: 3. Conductor Resistance 2.41 General information esting Date: 2008.07.11 iar rae a Ses = ee cone Rar Rae ) Length (Mm) (3733/3765, (3734/3753 (3738/3744 Eemetun manera Sr = pee ae Cari snes date erg nd coro na momicin | agnomy |i me one eae ; a aa a ; ia ra aad ; aaa aes Ree een arco Se eens ccc) ‘Subcontractor TestEngi Witnessed By: Qik ‘coftractor(Melco) Ergmneer AWesuda MEW Engineer * de MITSUBISHI - ‘STATE OF KUWAIT MINISTRY OF ELECTRICITY & WATER ME/EWIC/3485 - 2008/2007 ‘Supply & installation of Kifan ‘W" & Jahra x 300/132KV Substation MITSUBISHI ELECTRIC ‘Commissioning T 4, Conductor Capacitance 34 General Information ‘esting bste:_200po7.4 ‘Subeaton EAs Crean. {Wok 68 BAY HO. 63 = TOWN WE cab 200K texas OF Cable — Red Phase (ORD) Yow Phase (V2) Ble Phase (82) th 708/765 a4 3788 { rae 374 3.2 tomized test- Insulation capacitance “Test equipment: YY2810 Weather: Fine Tempersture: 3g © Humidiy: 20% Mossured value ‘Adjustment pase e107) ane (t0* Fm) RoR 343 8 0361 vane aa * 0390 B62 33 8 0381 Test Result: OK Test By: AN don i “Subcontractor Test Engines Witnessed By: Witnessed By: ogee (Metco) = A cope Cae ome MEW Engineer owrs009 + OIL FLOW 1 EST REPORT FOR 300 KV OIL FILLED POWER CABLE SISTN. - Group No.1 Feeder : (300 KV GIS Bay at Kifan "W" S/STN. - Town’ Cable: 300 KV 1600 mm Oil Filled Power Cable (Before Jointing Work to Existing Power Cables) Test Date : 25/06/2009 Pressure Pressure at Pressure Difference Cable & 01 Pipe Rate of Flow | Rate of Flow Start during dP =P1-P2 Oil Temp. Ca visccsRy) Length Osea) Time (Measured) (Theoretical) Phase Flow ° cP Collected PL P2 (ec) cP) L (Lr) (sec) Qm at (ia!em) | agra (m) (Liisec) (Liisec) (kg/em*) | (kN/m?) 180 7.00 080 | 7848 | 36 9:25 402.00 0.880 60 0.014666 | 0.010769 Yelow | _ 1.50 1.00 oso | 4905 | 35 925 402.00 0.640 60 o.oroes | 0.006730 160 4,00 060 | 5686 | 35 9.25 402.00 0.570 60 0.009500 | 0.008076 Theoretical rate of fw is calculated Where by following formula = “Thaler? = 0,981 10° kNim® {t= Rate of ol flow theoretical (Lilsec) Qt = gPxrsx 10 ( Qtis less than Qm ) Qm_ = Rate of oil flow measured (Lrisec ) 254xOPxL aP = Total pressure éiference (Nim) CP = Viscosity of oil (CP) T= Internal radius of cable oil duct = 6 mm (mm ) L__ = Actual installed cable length + Actual installed Oil feeding pipe length (m) Total cable Actual Cable | Oi Pipe Phase n & oil pipe Length, m Length, m length, m R_| tes+a2s | 1000 | 40200 ¥__ | t68+226 | 1000 | 40200 8 | 166+226 | 1000 | 40200 fasted Witnessed by Witnessed by Sirti ae — | eee | name | fer k. SHER 2g. p7yecads | fitio Reser Viscas Corp. (Subcontractor) Melco (Main Contractor) Mew IL FLOW Feeder : (300 KV GIS Bay at Kifan "W" S/STN. - Town sT REPORT FOR 300 KV OIL FILLED Pu .JER CABLE SISTN. - Group No.2 Cable: 300 KV 1600 mm Gil Filled Power Cable (Before Jointing Work to Existing Power Cables) Test Date : 25/06/2009 Pressure at Pressure during] Pressure Difference Cable & Oil 1.60 4.00 0.60 58.86 cos va orae | stat Flow SPeP TEE | orem. | OFMHEEHY | peLengh | AVUME | Ting PL P2 (°c) (cP) L (Lr) (sec) (kg/cm) (kgiem*) (m) (kglom?)_| (kNim? ) 36 8.88 402.00 0.740 60 04/07/2008 Rate of Flow | Rate of Flow (Measured) | (Theoretical) am at (Lrisec ) (Lelsec ) 0.012333 0.008413 Yellow 1.80 1.00 0.80 78.48 36 8.88 402.00 0.880 60 0.014866 0.011217 1.00 0.60 58.86 1.60 36 8.88 402.00 0.700 60 0.011666 0.008413 ‘Theoretical rate of flow is calculated Where by following formula: ~ 1 kg/om? = 0.984 x 108 kNim# ‘Qt = Rate of cl flow theoretical Qt = gPxrax10? (Qtis less than Qm ) Qm_ = Rate of oil flow measured 2.64 xCP xL P= Total pressure difference CP = Viscosity of ol = Intemal radius of cable oil duct = 6 L_ = Actial installed cable length + Actual installed Oil feeding pipe length ‘Actual Cable | Oil Pipe Length, |"@! cable Phase | Artal Gabi tl oil pipe ath, length, m 166 +226, 10.00 402.00 166 +226, 70.00 402.00 8 166 +226 10.00 402.00 (Lrisec ) (Lrisec ) (KNim ) (cP) (mm) (m) Tested by Witnessed by Signaturg-+} Sy Name [A AiR e4 fy oar 080 —____—— oiltemp. | av Pt Pa ep b Phase | TestDate (ec) (or | tkatem® | atoms (m) ey Cision") cent Red 25/06/09 36 0.630 1.800 1.80 176.580, 392.000 1,406.048 2.5375 x 10° Yellow 25/06/09 35 0.560 1.500 1.50 147.150 392.000 1,406.048 2.7066 x 10* Good Blue 25/06/09 35 0.580 1.600 1.60 156.960 392.000 1,406.048 2.6281 x 10° Good Formula K. = d¥x1 (Measurement value should NOT be greater than 4.5 10°) Vv oP Where: 4 kglem! = 0.981 x 10°kNInt

You might also like