Professional Documents
Culture Documents
01 Struktur Bangunan Utama Lengkap PDF
01 Struktur Bangunan Utama Lengkap PDF
47-BP2
7'
46-BP2
AS BUILT DRAWING
JUDUL GAMBAR :
01 TC-BP2 02 TC-BP2
75-BP2 78-BP2 81-BP2 84-BP2
5 DENAH TITIK BORE FILE
175-BP2 174-BP2 72-BP2 73-BP2 74-BP2 76-BP2 79-BP2 82-BP2 85-BP2
77-BP2 80-BP2 83-BP2 86-BP2
04 TC-BP2 03 TC-BP2
BANGUNAN UTAMA
100-BP2 99-BP2
NAMA TIM
96-BP2 93-BP2 90-BP2 87-BP2
97-BP2 94-BP2 91-BP2 88-BP2
4
176-BP2 177-BP2 178-BP2 179-BP2 180-BP2 104-BP2 103-BP2 102-BP2 101-BP2
98-BP2 95-BP2 92-BP2 89-BP2
ANGGOTA TIM
1. KETUA TIM
108-BP2 111-BP2
109-BP2 112-BP2
114-BP1 115-BP1
119-BP2
121-BP1 122-BP1 3 2. ANGGOTA 1
187-BP2 186-BP2 185-BP2 184-BP2 183-BP2 182-BP2 181-BP2 105-BP2 106-BP2 107-BP2
110-BP2 113-BP2 116-BP1 123-BP1
● KETERANGAN
4.
140-BP1 141-BP1 144-BP1 145-BP1 148-BP2 151-BP2
149-BP2 152-BP2
1 5.
142-BP1 143-BP1 146-BP1 147-BP1 150-BP2 153-BP2
6.
7,
NO. GAMBAR
1 : 300
JUMLAH GAMBAR
23/07/2019
001 110
FFL. ±0.000 (FINISH LT. DASAR) FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR) SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING) ELV. -0.170 (TANAH URUG FINISHING)
PILECAP PILECAP
ELV. -0.400 (TANAH URUG EKSISTING) ELV. -0.400 (TANAH URUG EKSISTING)
SFL. -VAR. (TOP PILECAP) SFL. -VAR. (TOP PILECAP)
PEMBESIAN PEMBESIAN
TOP OF BOREPILE PEDESTAL KOLOM TOP OF BOREPILE PEDESTAL KOLOM
LEBIH TIINGGI 10cm LEBIH TIINGGI 10cm
DARI BOTTOM PILECAP -SFL. -VAR. (BOTTOM PILECAP) DARI BOTTOM PILECAP -SFL. -VAR. (BOTTOM PILECAP)
800
NAMA PROYEK
POT. 01
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI) Skala 1 : 30
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
600
DETAIL BORE FILE
BANGUNAN UTAMA
POT. 02
Skala 1 : 30
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
CONCRETE GRADE CONCRETE GRADE
K-250 Kg/cm² K-250 Kg/cm²
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 45
1800 1800
1475
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
1475
KABUPATEN TOBA SAMOSIR,
900 900
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL AS BOREPILE
BANGUNAN UTAMA
NAMA TIM
ANGGOTA TIM
1558 1558
1. KETUA TIM
3. ANGGOTA 2
500 1000
● KETERANGAN
1.
900
2.
900
900
3.
900
4.
5.
900
900
6.
50
17
900
7,
1500
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 50
003 110
A B C D E F G H I J K L L' M
NAMA TIM
PC3 PC3 PC3 PC3
PC2 PC1 PC1 PC1 PC2 PC2
4
ANGGOTA TIM
1. KETUA TIM
PC3 PC3
PC2 PC2 PC2 PC2 PC5 PC5
PC1 PC1 2. ANGGOTA 1
3
2' 3. ANGGOTA 2
● KETERANGAN
PC3 PC3 PC4 PC4 1.
2 2.
PC1 PC1 PC1 PC1 PC1
3.
4.
PC4 PC4 PC3 PC3
5.
1
6.
7,
004 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
005 110
4116
500
300x600
4600
500 1800 1800 500
900
3D13
500
D19-200
NAMA PROYEK
KOLOM K1
TIE BEAM T1 D19-200 TIE BEAM T4
900
300x500
KOLOM K1
300x500 TIE BEAM T4
300x500
PEDESTAL TIE BEAM T4
300x500 HOTEL 8 LANTAI
PEDESTAL
2800
1800
4600
D25-100
LOKASI PROYEK
D25-80
900
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
D25-200
D19-200
500
3D13 AS BUILT DRAWING
D19-200
D25-100
900
JUDUL GAMBAR :
TIE BEAM T6
300x600
500
3D13
DETAIL & POTONGAN
5374
K1-PC6 & K1-PC8
TIE BEAM T4
300x600
H.250.250.9.14 H.250.250.9.14
40
60
60
40
60
60
ANGGOTA TIM
40 40
P10
L P10
L
H400.400.13.21 P12
L
P12
L H400.400.13.21 P12
L
P12
L
50
50
1. KETUA TIM
70
70
L
P12 L
P12 42Ø22
70
70
42Ø22
85
85
70
70
880
70
70
50
50
5
5
56
56
P.12
L P.12
L TIE BEAM T4
TIE BEAM T1 BASE PLATE P.30.430.600
L TIE BEAM T4 TIE BEAM T4 BASE PLATE P.30.430.600
L
300x500 GROUTNG t=25
RIB P.12
L
300x500
FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)
300x500
GROUTNG t=25
RIBP.12
L 300x500 FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)
2. ANGGOTA 1
ELV. -0.170 (TANAH URUG FINISHING) ELV. -0.170 (TANAH URUG FINISHING)
KOLOM PEDESTAL 800x600 KOLOM PEDESTAL 800x600
500
500
500
500
PILE CAP ELV. -0.400 (TANAH URUG EKSISTING)
PILE CAP ELV. -0.400 (TANAH URUG EKSISTING)
3. ANGGOTA 2
800
800
ANGKUR 16D25 L=800 ANGKUR 16D25 L=800
50
Bg.D13-150 Bg.D13-150
D19-200 D19-200 D19-200 D19-200
● KETERANGAN
D19-500 D19-500 D19-500 D19-500
100
100
1.
3D13 3D13 3D13 3D13
1450
1450
100
100
24D22 24D22
D25-200 2.
760
760
D25-80 D25-200
3.
DARI ELV. -0.400
50
100
100
9000
4.
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI)
5.
6.
7,
006 110
KOLOM K2
TIE BEAM T7
PEDESTAL
KOLOM K2 300x600
PEDESTAL
2800
TIE BEAM T1 TIE BEAM T1
300x500 1D13 300x500 TIE BEAM T1 TIE BEAM T1
8D16
500
300x500 3D13 300x500
500
8D19
NAMA PROYEK
8D16
8D16
D19-150
1000
D19-150
8D16
500
HOTEL 8 LANTAI
500
1D13 16D22
3D13
500 500
TIE BEAM T1
H.300.300.9.14 H.300.300.9.14
300x500
NAMA TIM
760
760
500
500
PILE CAP
500
500
800
8D19
800
50
12D19 SFL. -0.550 (TOP PILECAP)
50
Bg.D13-150
1. KETUA TIM
D19-150
8D16
100
100
400
1D13 1D13
550
950
PILE CAP
760
100
50
3. ANGGOTA 2
100
50
SFL. -1.550 (BOTTOM PILECAP)
● KETERANGAN
1.
9000
9000
2.
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI)
3.
4.
5.
6.
7,
600 600
600
007 110
300
TIE BEAM T6
300x600
2800
500 900 900 500
3D13
500
1000
D19-200
D22-100
KOLOM K3b
PEDESTAL
1560
300x500
PEDESTAL
D19-200
2400
TIE BEAM T4
1D13 300x500
8D16 KOLOM K4
500
PEDESTAL
8D16
8D16
1390
D22-100
8D16
500
1D13
KOLOM K2a
500 500 PEDESTAL
1000
550
500
3D13
P10
L 40
P12
L 60
P12
L 60
50
40
70
P10
L
P12
L
70
42Ø22 P12
L
85
50
70
70
H.300.300.9.14 TIE BEAM T4 300X500
70
70
50
42Ø22
85
5
70
760
56
BASE PLATE LP.30.500.330 H.300.300.9.14
70
LANTAI t=12cm
50
GROUTING t=25
5
56
760
120
BASE PLATE LP.30.500.330 FFL. ±0.000 (FINISH LT. DASAR)
ELV. -0.170 (TANAH URUG FINISHING) GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
120
50
ELV. -0.400 (TANAH URUG EKSISTING) ELV. -0.170 (TANAH URUG FINISHING)
50
1200
KOLOM PEDESTAL 500x500
Bg.D10-150
1200
1530
Bg.D13-150
1650
Bg.D10-150
12D19
Bg.D13-150
8D16
SFL. -1.700 (TOP PILECAP) KOLOM PEDESTAL 500x500
1D13
9000
600
400
D19-200
DARI ELV. -0.400
PILE CAP
50
SFL. -2.300 (BOTTOM PILECAP)
100
8D16
9000
12D19
ELV. -2.500 (TANAH ASLI)
100
100
D22-100
50
600
800 800
7,
6.
2.
3.
5.
4.
STR
008
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 40
K2a-PC1 & K2a-PC5
DETAIL & POTONGAN
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
TIE BEAM T6
300x600
1000 1500
500
KOLOM K3
TIE BEAM T4 D19-200
PEDESTAL 300x500 KOLOM K3
PEDESTAL
D16-150
2800 3D1
NAMA PROYEK
D19-200
3
16D22
900
TIE BEAM T1 TIE BEAM T4
TIE BEAM T1 TIE BEAM T1 300x500 300x500
500
300x500 3D13 300x500
HOTEL 8 LANTAI
D16-150
500
8D19
D19-150
1000
D19-150
500
LOKASI PROYEK
500
900
16D22
3D13 16D22
KABUPATEN TOBA SAMOSIR,
D19-200
500 900 900 500 SUMATRA UTARA
TIE BEAM T4
300x600
500
AS BUILT DRAWING
DETAIL K3 - PC2 3D13
JUDUL GAMBAR :
Skala 1 : 40 500 1500 500
300x600
TIE BEAM T6
NAMA TIM
H.400.400.13.21
880
H.400.400.13.21
880
TIE BEAM T1 BASE PLATE LP.30.430.430 TIE BEAM T1
300x500 300x500 BASE PLATE LP.30.430.430
GROUTING t=25 FFL. ±0.000 (FINISH LT. DASAR)
TIE BEAM T1
GROUTING t=25
TIE BEAM T4
FFL. ±0.000 (FINISH LT. DASAR)
ANGGOTA TIM
SFL. -0.050 (LATNTAI DASAR) 300x500 300x500
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING)
KOLOM PEDESTAL 600x600 ELV. -0.170 (TANAH URUG FINISHING) 1. KETUA TIM
500
500
PILE CAP
ELV. -0.400 (TANAH URUG EKSISTING)
500
500
ANGKUR 2x4D32 L=1000 PILE CAP
8D19 ELV. -0.400 (TANAH URUG EKSISTING)
50
D16-150
50
SFL. -0.550 (TOP PILECAP)
950
D19-150
2. ANGGOTA 1
KOLOM PEDESTAL 600x600
Bg.D10-150 D16-150
Bg.D10-150
2D13 Bg.D13-150 2D13
3. ANGGOTA 2
950
Bg.D13-150
760
950
12D22
16D22 D19-150
D19-200 16D22 16D22 D19-200 ● KETERANGAN
100
50
100
50
2.
DARI ELV. -0.400
3.
9000
ELV. -2.500 (TANAH ASLI)
ELV. -2.500 (TANAH ASLI) 4.
5.
6.
7,
600 600
TANGGAL 15 NOVEMBER 2020
600
KODE GAMBAR SKALA
STR 1 : 40
POTONGAN K3 - PC2 POTONGAN K3 - PC3
NO. GAMBAR JUMLAH GAMBAR
Skala 1 : 40 Skala 1 : 40
009 110
300
TIE BEAM T6
300x600
2800
500 900 900 500
3D13
500
TIE BEAM T4
1000
D19-200
300x500
D22-100
500 1800 500 KOLOM K3b
PEDESTAL
3D13
1560
500
KOLOM K3a
PEDESTAL
16D19
TIE BEAM T5 TIE BEAM T4
3950
900
24D25
300x500 300x500
D19-200
2400
KOLOM K4
300
PEDESTAL
D16-150
1390
D22-100
900
KOLOM K2a
1246
24D25 PEDESTAL
500
550
500
3D13
3D13
H.250.250.9.14
40
60
60
40
P10
L
P12
L
H400.400.13.21 P12
L
50
H.250.250.9.14
70
70
40
P12
L 42Ø22
85
60
70
60
40
70
L
P10
P12
L
50
880
P12
L H400.400.13.21
5
50
56
70
42Ø22 L
P12
85
RIB P.12
L
70
ELV. -0.170 (TANAH URUG FINISHING) PLAT LANTAI t=12cm PLAT LANTAI t=12cm
P.12
L
PILE CAP ANGKUR 16D25 L=800 BASE PLATE P.30.430.600
L RIB P.12
L FFL. ±0.000 (FINISH LT. DASAR)
500
500
KOLOM PEDESTAL L 800x600 ELV. -0.400 (TANAH URUG EKSISTING) GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
120
16D19
800
50
SFL. -0.550 (TOP PILECAP) ELV. -0.170 (TANAH URUG FINISHING)
50
D16-150 Bg.D10-150 KOLOM PEDESTAL L 600x600 ELV. -0.400 (TANAH URUG EKSISTING)
Bg.D13-150 ANGKUR 8D32 L=1200
24D22
2D13 2D13
950
1200
Bg.D10-150
760
760
24 D25 24 D25
Bg.D13-150
1650
1480
50
SFL. -1.550 (BOTTOM PILECAP)
100
PILE CAP
9000
D19-200
DARI ELV. -0.400
9000
D22-100
50
800 800
800 800
7,
6.
2.
3.
5.
4.
010
STR
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 40
K3a-PC4 & K3b-PC5
DETAIL & POTONGAN
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
300
TIE BEAM T6
300x600
2800
500 900 900 500
3D13
500
1000
D19-200
D22-100
KOLOM K3b
PEDESTAL
1560
KOLOM K5
TIE BEAM T7
PEDESTAL
3950
300x600
D19-200 2800
2400
KOLOM K4 TIE BEAM T1 TIE BEAM T1
300x500 3D13 300x500
PEDESTAL
8D19
500
1390
D22-100
1000
D19-150
D19-150
500
KOLOM K2a 16D22
PEDESTAL 3D13
550
500
3D13 TIE BEAM T7
300x600
1990
DETAIL K4 - PC5
TIE BEAM T4 DETAIL K5 - PC2
300x500 Skala 1 : 40
Skala 1 : 40
H.250.250.9.14
760
PLAT LANTAI t=12cm BASE PLATE P.20.280.280
L
RIB P.10
L GROUTING t=25 FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)
120
H.300.300.9.14 H.300.300.9.14
ELV. -0.170 (TANAH URUG FINISHING)
50
TIE BEAM T1
ELV. -0.400 (TANAH URUG EKSISTING)
300x500
640
640
1200
SFL. -0.050 (LATNTAI DASAR)
Bg.D10-150 ELV. -0.170 (TANAH URUG FINISHING)
ANGKUR 2x3D22 L=800 ANGKUR 2x3D22 L=800
1650
Bg.D13-150
1480
500
KOLOM PEDESTAL 500x500 KOLOM PEDESTAL 500x500 ELV. -0.400 (TANAH URUG EKSISTING)
8D19
800
50
Bg.D10-150 Bg.D10-150
PILE CAP
Bg.D13-150 Bg.D13-150
D19-200
9000
12D16 12D16
760
16D22 D19-150
12D19
50
D22-100
9000
50
600 600
600
7,
6.
2.
3.
5.
4.
011
STR
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
K4-PC5 & K5-PC2
SKALA
1 : 40
DETAIL & POTONGAN
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
KOLOM K6 KOLOM K7
TIE BEAM T7 TIE BEAM T7
PEDESTAL PEDESTAL
300x600 300x600
2800
2800
500
500
8D19
D19-150
1000
D19-150
D19-150
1000
D19-150
NAMA PROYEK
500
500
16D22 16D22
HOTEL 8 LANTAI
3D13 3D13
TIE BEAM T7
TIE BEAM T7
300x600 300x600 LOKASI PROYEK
WF.700.300.13.24 WF.700.300.13.24
DETAIL & POTONGAN
H.300.300.9.14 K6-PC2 & K7-PC2
880
880
TIE BEAM T1
RIB P.12
L 300x500 TIE BEAM T9 RIB P.12
L PLAT LANTAI
PLAT LANTAI
t=12cm BASE PLATE P.30.730.330
L BASE PLATE P.30.330.330
L 250x500 BASE PLATE P.30.730.330
L t=12cm FFL. ±0.000 (FINISH LT. DASAR)
FFL. ±0.000 (FINISH LT. DASAR)
GROUTING t=25 GROUTING t=25 SFL. -0.050 (LATNTAI DASAR) GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
120
ELV. -0.170 (TANAH URUG FINISHING) ELV. -0.170 (TANAH URUG FINISHING)
ANGKUR 6x2D25 L=800 ANGKUR 2x3D22 L=800 NAMA TIM
500
PILE CAP KOLOM PEDESTAL 900x500
50
KOLOM PEDESTAL 900x500 KOLOM PEDESTAL 500x500 ELV. -0.400 (TANAH URUG EKSISTING) ELV. -0.400 (TANAH URUG EKSISTING)
ANGKUR 6x2D25 L=800
330
800
800
50
SFL. -0.550 (TOP PILECAP) SFL. -0.550 (TOP PILECAP)
Bg.D13-150
Bg.D10-150 D19-150 Bg.D10-150
950
760
1. KETUA TIM
760
18D22 12D19
16D22 D19-150 16D22 D19-150
100
50
SFL. -1.550 (BOTTOM PILECAP)
100
50
3. ANGGOTA 2
9000
9000
● KETERANGAN
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI)
1.
2.
3.
4.
5.
600 600 600 600
6.
7,
012 110
TIE BEAM T8
3300x600
500
8D16
8D16
FFL. ±0.000 (FINISH LT. DASAR)
8D16 SFL. -0.050 (LATNTAI DASAR)
500
ELV. -0.170 (TANAH URUG FINISHING) NAMA PROYEK
1D13
AS BUILT DRAWING
JUDUL GAMBAR :
500
Bg.D10-150
ANGKUR 2x2D22 L=800 ELV. -0.400 (TANAH URUG EKSISTING) NAMA TIM
800
50
50
8D16
400
1D13 1D13
550
12D16
PILE CAP
KOLOM PROFIL BAJA
ANGGOTA TIM
BESI PEDESTAL
100
50
40D
25 25
60 50 230 50 60
50
T9 250x500
SFL. -0.050 (LATNTAI DASAR)
KOLOM PEDESTAL ELV. -0.170 (TANAH URUG FINISHING) KOLOM PEDESTAL 3. ANGGOTA 2
9000
400x400 Bg.D10-150
500
Bg.D13-150
ANGKUR 2x2D22 ELV. -0.400 (TANAH URUG EKSISTING)
ELV. -2.500 (TANAH ASLI) 8D19 BEGEL PEDESTAL ● KETERANGAN
50
500
1.
ANGKUR
2.
TULANGAN PEDESTAL
3.
Skala 1 : 40
6.
DETAIL ANGKUR TERHADAP ±0.000
Skala 1 : 40 7,
STR 1 : 40
013 110
L' M
3000
200 2800 200
PC 8
4116x4600x1500
PC 1
1000x1000x600
T4 300x500
200
7"
NAMA PROYEK
500
T4 300x500
T4 300x500
D13-150
D13-150 HOTEL 8 LANTAI
2800
3000
D13-150
D13-150
D13-150
D13-150
500
PC 1
LOKASI PROYEK
1000x1000x600
200
7' SUMATRA UTARA
PC 8
4116x4600x1500
AS BUILT DRAWING
PIT LIFT AS L' - M , AS 7'' - 7' JUDUL GAMBAR :
Skala 1 : 75
1650
TIE BEAM T4 D10-200 D10-200 TIE BEAM T4 ANGGOTA TIM
300x500 300x500
PILECAP 01 PILECAP 08
9000
8D16
400 100
100
ELV. -1.700 (TOP PILECAP) SFL. -1.700 (TOP PILECAP)
200
2. ANGGOTA 1
500
600
400
1D13
1D13
3. ANGGOTA 2
ELV. -2.300 (BOTTOM PILECAP) 8D16
ELV. -2.500 (TANAH ASLI) ● KETERANGAN
1.
760
2.
SFL. -3.200 (BOTTOM PILECAP)
3.
4.
5.
6.
7,
014 110
PELAT LT t=120 PELAT LT t=120
LT.KERJA t=50 200 2200 200 LT.KERJA t=50
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING)
L M ELV. -0.400 (TANAH URUG EKSISTING)
6000 TIE BEAM 300x500
Water proofing Water proofing
System Integral System Integral
TIE BEAM 300x500
TANAH URUG DI TANAH URUG DI
D13-150 D13-150
1650
PADATKAN PADATKAN
CBR = 6 CBR = 6
T6 300x600
T6 300x600
PC 5 PC 5 D10-200 D10-200
3950x2800x1500 3950x2800x1500
200 5800 200 WATER STOP Water proofing NAMA PROYEK
BATAS COR System Integral
D13-150
100
100
SFL. -1.700 (TOP PILECAP)
HOTEL 8 LANTAI
200
T5 300x500
200
3 500
600
600
760
9000
LOKASI PROYEK
D13-150
D13-150
ELV. -2.500 (TANAH ASLI)
2450
D13-150
D13-150 SUMATRA UTARA
AS BUILT DRAWING
500
200
200
350 1100 470 430 1576 422 432 1100 350
200
DETAIL PIT LIFT AS L'-M,
800
2450
800 AS 2'-3 & POTONGAN B & C
2' 3
PIT LIFT AS L - M , AS 2' - 3
NAMA TIM
Skala 1 : 75
POTONGAN C (PIT LIFT)
Skala 1 : 40
ANGGOTA TIM
1. KETUA TIM
PELAT LT t=120 PELAT LT t=120
LT.KERJA t=50 200 5800 200 LT.KERJA t=50
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING) 2. ANGGOTA 1
ELV. -0.400 (TANAH URUG EKSISTING)
Water proofing Water proofing
System Integral System Integral
TIE BEAM 300x500
3. ANGGOTA 2
D13-150 D13-150
1650
100
SFL. -1.700 (TOP PILECAP)
2.
200
500 500
600
600
3.
760
760
5.
7,
7 HOTEL 8 LANTAI
LOKASI PROYEK
DENAH KOLOM,
5
PEDESTAL & TIE BEAM
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
3 2. ANGGOTA 1
2'
3. ANGGOTA 2
● KETERANGAN
1.
2
2.
3.
4.
1 5.
6.
016 110
T1 = 300 x 500 T2 = 300 x 500 T3 = 400 x 600
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
TABEL PEMBESIAN
TIE BEAM
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
T7 = 300 x 600 T8 = 300 x 600 T9 = 250 x 500
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
TABEL PEMBESIAN TIE BEAM
Skala 1 : 40
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 40
017 110
PENT NAMA PROYEK
HOUSE 8 8
ROOF P.12
L
P.12
P.12
8 8
HOTEL 8 LANTAI
L
LOKASI PROYEK
H.300.300.9.14 H.300.300.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14
TOP 12D16 12D16 12D16 12D16 12D16 12D16 12D16 12D16 12D16 12D16
FLOOR KABUPATEN TOBA SAMOSIR,
BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150
SUMATRA UTARA
TOP 8
8
8 AS BUILT DRAWING
FLOOR 8 8 P.12
L 8 P.12
L
P.12
P.12
8 8
JUDUL GAMBAR :
L
LT. 6
H.300.300.9.14 H.300.300.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 TABEL KOMPOSIT
12D19 12D19 12D22 12D16 12D16 12D16 12D16 12D16 12D19 12 D19
BG.D13-150 BG.D13-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D13-150 BG.D10-150 BG.D10-150 BG.D13-150 BG.D13-150 KOLOM (01)
LT.6
8 8
8 8
P.12
L P.12
L 8 8
P.12
L
P.12
P.12
8 8
NAMA TIM
L
L
LT. 5 H.350.350.12.19 H.350.350.12.19 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19
ANGGOTA TIM
16D22 16D22 12D19 12D19 12D19 12D19 12D19 12D19 16D22 16D22
BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150
1. KETUA TIM
LT.5 P.12
L P.12
L
8 8
8 8
P.12
L 8 8 2. ANGGOTA 1
P.12
P.12
8 8
L
L
3. ANGGOTA 2
LT. 3 H.350.350.12.19 H.350.350.12.19 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19
● KETERANGAN
16D22 16D22 12D19 12D19 12D19 12D19 12D22 12D22 16D22 16D22
BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 1.
P.12
L 2.
LT. 3 8 L P.12
L 8 P.12
L
P.12
P.12
8 8
8 8
3.
L
8 8
4.
H.400.400.13.21 H.400.400.13.21 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.400.400.13.21 H.400.400.13.21 H.400.400.13.21 H.400.400.13.21
5.
GROUND 24D22 24D22 12D19 12D19 12D19 12D19 12D22 12D22 24D22 24D22
FLOOR BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150
6.
KOLOM K 1 KOLOM K 2 KOLOM K 2a KOLOM K 3 KOLOM K 3a K 3b
7,
STR 1 : 45
018 110
PENT
HOUSE
ROOF NAMA PROYEK
P.12
L
HOTEL 8 LANTAI
H.250.250.9.14 H.250.250.9.14
TOP 12D16 12D16
FLOOR LOKASI PROYEK
BG.D10-150 BG.D10-150
NAMA TIM
LT. 5 H.250.250.9.14 H.250.250.9.14
12D19 12D19
BG.D13-150 BG.D13-150
ANGGOTA TIM
LT.5
1. KETUA TIM
P.12
L
2. ANGGOTA 1
3.
H.250.250.9.14 H.250.250.9.14 H.300.300.9.14 H.300.300.9.14 WF.700.300.13.24 & H.300.300.9.14 WF.700.300.13.24 & H.300.300.9.14 WF.700.300.13.24 WF.700.300.13.24 H.200.200.8.12 H.200.200.8.12
GROUND 12D19 12D19 12D16 12D16 18D22 12D19 16D22 12D19 18D22 18D22 12D16 12D16 4.
FLOOR BG.D13-150 BG.D13-150 BG.D10-150 BG.D10-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D10-150 BG.D10-150
5.
KOLOM K 4 KOLOM K 5 KOLOM K 6 KOLOM K 7 KOLOM K 8
6.
STR 1 : 45
019 110
A B C D E F G H I J K L L' M
8
7''
7'
NAMA PROYEK
7
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
5
LAYOUT BASE PLAT
NAMA TIM
4
ANGGOTA TIM
1. KETUA TIM
3
2. ANGGOTA 1
2'
3. ANGGOTA 2
● KETERANGAN
2 1.
2.
3.
4.
1 5.
6.
LAYOUT BASE PLATE
7,
BANGUNAN UTAMA
Skala 1 : 300
0 TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
-1
STR 1 : 300
020 110
HB400.400.13.21
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
021 110
HB300.300.10.15
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
022 110
HB300.300.10.15
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
023 110
HB400.400.13.21
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
600*600
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
024 110
HB400.400.13.21
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
025 110
HB400.400.13.21
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
026 110
HB250.250.9.14
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
027 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
HB300.300.10.15
HB300.300.10.15
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
028 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
WF700.300.13.24
HB300.300.10.15
ANCHOR BOLT NO MARK
KOLOM K6
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
029 110
WF700.300.13.24
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
030 110
HB200.200.8.12
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
031 110
NAMA PROYEK
HB200.200.8.12
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
032 110
A B C D E F G H I J K L L' M
8
7''
7'
NAMA PROYEK
7
Ø8-200
Ø8-200
AS BUILT DRAWING
JUDUL GAMBAR :
5
DENAH PLAT LANTAI
DASAR SFL.
± 0.000
4
NAMA TIM
ANGGOTA TIM
3
1. KETUA TIM
2'
2. ANGGOTA 1
2 3. ANGGOTA 2
Ø8-200
● KETERANGAN
1.
Ø8-200
2.
1
Ø8-200
Ø8-200
3.
4.
5.
0 6.
BANGUNAN UTAMA
Skala 1 : 350 TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 350
033 110
NAMA PROYEK
DETAIL PENULANGAN
PLAT LANTAI
DASAR & POTONGAN 1
TANAH URUG DIPADATKAN
CBR = 6
DETAIL A NAMA TIM
7 Skala 1 : 20
ANGGOTA TIM
1. KETUA TIM
SFL. ±0.000 FFL. +0.050 (FINISH LT. DASAR)
(PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR) 2. ANGGOTA 1
ELV. -0.170 (TANAH URUG FINISHING)
FFL. -0.400
(FINISH LANDSCAPE)
ELV. -0.400 (TANAH URUG EKSISTING) 3. ANGGOTA 2
TANAH URUG DIPADATKAN, CBR = 6
SFL. -0.550 (TOP PILECAP)
● KETERANGAN
1.
7 6 2.
3.
4.
5.
6.
7,
STR 1 : 30
034 110
NAMA PROYEK
AS BUILT DRAWING
SFL. ±0.000 SFL. ±0.000 FFL. +0.050 (FINISH LT. DASAR) JUDUL GAMBAR :
(PLAT LANTAI DASAR) (PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR)
NAMA TIM
SFL. -1.700
(PLAT LANTAI PITLIFT)
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
2'
● KETERANGAN
3 1.
2
2.
3.
POTONGAN 02 PLAT LANTAI DASAR
Skala 1:30 4.
5.
6.
7,
3
DETAIL C
TANGGAL 15 NOVEMBER 2020
Skala 1 : 20
KODE GAMBAR SKALA
STR 1 : 30
035 110
FFL. +0.050 (FINISH LT. DASAR) SFL. ±0.000
(PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR)
HOTEL 8 LANTAI
LOKASI PROYEK
7
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
POTONGAN 03 PLAT LANTAI DASAR
AS BUILT DRAWING
Skala 1:30
JUDUL GAMBAR :
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 30
DETAIL PERTEMUAN TIE BEAM BEDA ELEVASI
NO. GAMBAR JUMLAH GAMBAR
Skala 1:30
036 110
A B C D E F G H I J K L L' M
8
7''
7'
Ø8-200
Ø8-200
Ø8-200
Ø8-200
5
2'
Ø8-200
2
NAMA PROYEK
Ø8-200
Ø8-200
Ø8-200
0
-1
HOTEL 8 LANTAI
KEYPLAN
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
G H I
DENAH PIT ESKALATOR
DETAIL POTONGAN
Skala 1:100 PIT ESKALATOR
DETAIL BEAM
Skala 1 : 20
1. KETUA TIM
SFL. -1.150
(PIT ESKALATOR) 2. ANGGOTA 1
SFL. -1.150 (PIT ESKALATOR)
3. ANGGOTA 2
● KETERANGAN
1.
2.
H
3.
6.
SFL. -1.150 (PIT ESKALATOR)
7,
037 110
A B C D E F G H I J K L L' M
8
7''
7'
C D E F G H I
6
2'
2 NAMA PROYEK
8 1
0
HOTEL 8 LANTAI
KEYPLAN
-1
LOKASI PROYEK
7 AS BUILT DRAWING
JUDUL GAMBAR :
6
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
5 2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
4
3.
4.
5.
6.
7,
3
038 110
SFL. ±0.000 (LANTAI BALLROOM)
NAMA PROYEK
as HOTEL 8 LANTAI
DETAIL DOWEL DETAIL
Skala 1 : 10 Skala 1 : 15 LOKASI PROYEK
as
NAMA TIM
1. KETUA TIM
as 2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
DETAIL 1.
Skala 1 : 15
as PE
TY
AN 2.
RI
VA
3.
as as
4.
5
5.
6.
Y PE
NT
TAMPAK ISOMETRI POT. 2 RIA 7,
VA
200
Skala 1:100
TAMPAK ISOMETRIA PLAT LANTAI BALLROOM TANGGAL 15 NOVEMBER 2020
as Skala 1:100 KODE GAMBAR SKALA
VARIAN TYPE VARIAN TYPE
5
STR 1 : 20
039 110
7'
8
0
8000 8000 8000 8000 8000 8000 8000 8000 8816
2000 3000 3000 3000 3000 2000 2750 2750 2500 2750 2300 2949 2750 2650 2600 2450 2825 2725 3000 2400 2600 4000 4000
2095
1075
M
3000
NAMA PROYEK
6000
3000
HOTEL 8 LANTAI
L
4000
LOKASI PROYEK
SUMATRA UTARA
6000
AS BUILT DRAWING
JUDUL GAMBAR :
J
DENAH KOLOM
6000
NAMA TIM
6000
H'
H
ANGGOTA TIM
800
1. KETUA TIM
6000
BANGUNAN UTAMA
2. ANGGOTA 1
G
3. ANGGOTA 2
Skala 1 : 300
6000
● KETERANGAN
1.
F
2.
6000
3.
4.
E
5.
6000
6.
7,
D
1760
STR 1 : 300
C
040 110
C 6000
D 6000
E 6000
F 6000
G 6000
H 6000
I 6000
J 6000
K 4000
L 6000
M
800 H'
3000 3000
8
2000
7'
A12 A12
1760 A15
3000
A14
2095
8000
A08 A08
A09 1075
A13
3000
3000
A10 A10
7
A09 A09 A09 A09
3000
3000
8000
6
A06 A06 A06 A06 A06
2750
A22
A06 A06 A06 A06 A06
8000
2750
3000
A07 A07 A07 A07 A07
2500
5
A06 A06 A06 A06 A06
2750
3000
A05 A05 A05 A05 A05 A22
2300
8000
4
A01 A01 A01 A01 A01 A17 A06 A06 A06
2750
A22
A17 A17 A17
8000
2650
3
A19 A19 A19
2450
2
A06 A09
2750
3000
A22
A17 A11
8000
2650
2400
1
4000
8000
4000
0
8816
7,
6.
2.
3.
5.
4.
STR
041
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 300
LANTAI 1st (+5.460)
DENAH METALDECK
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
C 6000
D 6000
E 6000
F 6000
G 6000
H 6000
I 6000
J 6000
K 4000
L 6000
M
800 H'
250
400 6000
270
270
5450 530 530 450 8
300 2940
3000 3000
SHAFT 6000
1600
300
250
2000
500x300
805
505
7'
100
300
SHAFT
1575x620
400
1760
1400
3000
1375
2095
8000
5912
1420 1075
2662
3000
3000
SHAFT 625
500x100
SFL. +5.460 4580 7
1075
T=120
3000
3000
SFL. +5.460
8000
T=120
3000
500x100
32000
Ø10-200 6
2750
1760
8000
2750
Ø10-200
SHAFT SHAFT
3000
SHAFT
2500
600x300 600x200
500x100
32000
5
2750
3000
2300
8000
SHAFT
500x300
100
100
4
2925
2750
3053
SFL. +5.460
7900
8000
2650
1669
30
3011
T=120
59
Coming
UP
SHAFT SHAFT SHAFT
500x300 going 600x300 600x300
2600
DN 1075 1300
75
1936
3000
125
250
250
SHAFT
3
24375 11275 SHAFT
600x200 600x200
50
2450
250 300
150
8000
2825
8000
1420 4580
100
SHAFT
SHAFT
1485x500
600x200
2550
2725
75
1300 2
15750
75
SHAFT
176
SHAFT
600x300 325x200
2750
1075
2987
3000
SFL. +5.460
T=120
85
8000
2650
2400
4925
1000
1
1000
16000 995
300
4000
8000
4000
0
SHAFT SHAFT
800x200 600x200
8816
3800
7,
6.
2.
3.
5.
4.
STR
042
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
DENAH PLAT
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 300
LANTAI 1st (+5.460)
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
PLAT LANTAI t=120 100
SHEAR SHEAR
CONNECTOR CONNECTOR Selimut=20
TULANGAN Ø10-200 PLAT LANTAI t=120
Ø10-200 TULANGAN Ø10-200 Ø10-200 Ø10-200
150
FFL. +5.500 (FINISH 1st FLOOR) Selimut=20 FFL. +5.500 (FINISH 1st FLOOR) 2 LAPIS
SFL. +5.460 (1st FLOOR) SFL. +5.460 (1st FLOOR)
120
120
SFL. +5.330 (TOP BEAM BAJA) SFL. +5.330 (TOP BEAM BAJA)
530
WF.400.200.8.13
ARSITEK
WF.300.150.6,5.9 1075
KOLOM K1 WF.400.200.8.13 NAMA PROYEK
KOLOM K3
1000
M 1 HOTEL 8 LANTAI
LOKASI PROYEK
POTONGAN 1 POTONGAN 4
Skala 1 : 20 Skala 1 : 20 KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
AS BUILT DRAWING
SHEAR JUDUL GAMBAR :
CONNECTOR
FINISHING LANTAI
Ø10-200 SEALANT t=15mm SHEAR
PLAT LANTAI t=120 SLANG Ø3/4"
CONNECTOR
SHEAR TULANGAN Ø10-200 PLAT 5mm TULANGAN Ø10-200
Ø10-200
CONNECTOR DYNABOLT
50
Selimut=20
SFL. +5.460 (1st FLOOR) SFL. +5.460 (1st FLOOR)
1,2,3,4, & 5
120
120
SFL. +5.330 (TOP BEAM BAJA) SFL. +5.330 (TOP BEAM BAJA)
STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm 375 50 375 STEELDECK t=0.75mm
TYPE A06 TYPE A21 TYPE A03 TYPE A03
NAMA TIM
WF.400.200.8.13
● KETERANGAN
1.
SHEAR SHEAR 2.
CONNECTOR CONNECTOR
PLAT LANTAI t=120
Ø10-200 TULANGAN Ø10-200 PLAT LANTAI t=120 Ø10-200
FFL. +5.500 (FINISH 1st FLOOR)
SFL. +5.460 (1st FLOOR)
Selimut=20 3.
120
SFL. +5.330 (TOP BEAM BAJA) 4.
STEELDECK t=0.75mm STEELDECK t=0.75mm
TYPE A20 TYPE A20 WF.200.100.5,5.8 5.
WF.400.200.8.13 6.
WF.300.150.6,5.9 2375 7,
KOLOM K2a
POTONGAN 3 STR 1 : 20
043 110
PLAT LANTAI t=120 Ø10-200
PLAT LANTAI t=120 Selimut=20 2 LAPIS
SHEAR
CONNECTOR Selimut=20
TULANGAN Ø10-200
Ø10-200 Ø10-200
FFL. +5.500 (FINISH 1st FLOOR) 2 LAPIS
SFL. +5.460 (1st FLOOR)
120
SFL. +5.330 (TOP BEAM BAJA) PLAT LANTAI t=120
Selimut=20
STEELDECK t=0.75mm SFL. +5.460 Ø10-200
TYPE A09 (1st FLOOR) 2 LAPIS
SFL.
+5.460
(1st
FLOOR)
WF.300.150.6,5.9 WF.300.150.6,5.9
KOLOM K3 WF.400.200.8.13 NAMA PROYEK
I BALOK BAJA
HOTEL 8 LANTAI
POTONGAN 6 LOKASI PROYEK
DETAIL TULANGAN KONVENSIONAL
Skala 1 : 20 KABUPATEN TOBA SAMOSIR,
Skala 1 : 20 SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
SHEAR CONNECTOR
Ø10-200
DETAIL POTONGAN
SHEAR
CONNECTOR 6&7
PLAT LANTAI t=120 DUDUKAN
Ø10-200 DINDING SAMBUNGAN
Selimut=20 PRECAST
LAS
TULANGAN Ø10-200 20x200mm
Ø10-200
70
FFL. +5.500 (FINISH 1st FLOOR) 200 2 LAPIS
SFL. +5.460 (1st FLOOR) NAMA TIM
100
20
STEELDECK t=0.75mm ¼b ½b ¼b
TYPE A12 b = beam
ANGGOTA TIM
120
120
3.
4.
5.
METAL DECK METAL DECK
t=0.75mm t=0.75mm
6.
BALOK BAJA BALOK BAJA
7,
AS SAMBUNGAN LAS
AS SAMBUNGAN LAS
044 110
H 6000
I 6000
J 6000
K 4000
L 6000
M
800 H'
250
250
2000
SHAFT
7'
2095 905
500x300
SHAFT
1400
1575x620
8000
1375
NAMA PROYEK
SHAFT
500x100
250
7 HOTEL 8 LANTAI
450
LOKASI PROYEK
8000
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
SHAFT SHAFT SHAFT SHAFT SHAFT
500x100 600x300 600x300 600x300 600x300
AS BUILT DRAWING
250
300
300
300
300
6 INSTALASI PLUMBING
JUDUL GAMBAR :
450 300 300 300 300
8000
DIMENSI SHAFT
120
LANTAI 1st (+5.460)
STEELDECK t=0.75mm
SHAFT
500x100 SHAFT SHAFT TYPE A09
600x300 600x200
250
300
5 BALOK BAJA
300
8000
DINDING SHAFT
PAS. BATA 10cm ANGGOTA TIM
KOLOM COMPOSIT
SHAFT SHAFT SHAFT SHAFT SHAFT
500x300 600x300 600x300 600x300 600x300 1. KETUA TIM
250
300
300
300
300
3. ANGGOTA 2
● KETERANGAN
SHAFT SHAFT SHAFT
500x300 600x300 600x300 300
300
1.
300
250
300
300
SHAFT
3
250 SHAFT
600x200
300 300 300 600x200 2.
3.
8000
4.
100
SHAFT
SHAFT
600x200 300 1485x500 5.
300
75
75
2 6.
300
300
300
1 STR 1 : 250
300 300 300 300
DIMENSI SHAFT 1st FLOOR (SFL. +5.460) NO. GAMBAR JUMLAH GAMBAR
0
8000 8000 8000 8000 8000 8000 8000 8000
2000 3000 3000 2700 2675 2625 2700 2675 2625 2675 2675 2650 2675 2650 2675 2450 2825 2725 2700 2670 2630 2750 2650 2600 3680 4490
2095
M
NAMA PROYEK
HOTEL 8 LANTAI
6000
LOKASI PROYEK
L
4000
AS BUILT DRAWING
6000
JUDUL GAMBAR :
J
DENAH KOLOM
6000
NAMA TIM
6000
H'
H
ANGGOTA TIM
800
2. ANGGOTA 1
G
3. ANGGOTA 2
6000
● KETERANGAN
F
1.
2.
BANGUNAN UTAMA
6000
3.
E
4.
Skala 1 : 300
6000
5.
6.
D
7,
6000
STR 1 : 300
046 110
C D E F G H I J K L M
6000 6000 6000 6000 6000 6000 6000 6000 4000 6000
800 H'
B19
8
2000
B18
B14
B16
3000
B14
2675
WAITER
6
B04 B04 B04 B04 B04 B04 B04 B04 B04
2700
2675
5
B02 B02 B02 B02 B02 B02 B02 B02 B02
2675
2675
B14
B06 B06 B06 B06 B06 B06 B06 B06 B06
2650
4
B02 B02 B02 B02 B02 B02 B02 B02
2675
B20 3
B07 B07 B07 B07 B07
2450
2
B04 B04 B04 B04
2700
2670
1
B11 B11 B11
2750
2650
0
B21 B21 B21 B21
3680
4490
7,
6.
2.
3.
5.
4.
STR
047
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 300
2nd FLOOR (+9.460)
DENAH METALDECK
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
C D E F G H I J K L M
6000 6000 6000 6000 6000 6000 6000 6000 4000 6000
800 H'
360
2060 30000
1480
1480
T=120 T=120
400 530 530 400 8
5641 5600 2940 5984
1580
120
300
2000
805
505
7'
420
400
SFL. +8.950
3000
T=120
2095
8000
T=120
SFL. +9.460
3000
1675
7
SFL. +9.460
2700
T=120
SFL. +9.460
8000
2675
T=120
2625
6
2700
SFL. +8.950
40000
8000
2675
Ø10-200
T=120
T=120
SFL. +9.460
2625
32230
5
Ø10-200
2675
2675
T=120 T=120
2650
4
SFL. +9.460
2675
T=120
SFL. +8.950
T=120
2650
8000
T=120
SFL. +9.460
700
75
2675
550
SFL. +9.460 SFL. +9.460 3
2060 18000 6006
2450
8000
2825
8000
15
95
2
2725
75
2
700
2700
2670
T=120 T=120
3321
2630
1
2750
19605
12130
8000
2650
SFL. +9.460
2600
T=120
680
0
0 00
R3 103
3680
47
12
16000 1675
4490
7,
6.
2.
3.
5.
4.
STR
048
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
DENAH PLAT
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 300
LANTAI 2nd (+9.460)
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
100
SHEAR PLAT LANTAI t=120
SHEAR CONNECTOR Selimut=20
CONNECTOR TULANGAN Ø10-200 Ø10-200 Ø10-200
150
TULANGAN Ø10-200 PLAT LANTAI t=120
Ø10-200 FFL. +9.500 (FINISH 2nd FLOOR) 2 LAPIS
FFL. +9.500 (FINISH 2nd FLOOR) Selimut=20 SFL. +9.460 (2nd FLOOR)
SFL. +9.460 (2nd FLOOR)
120
LISTPLANK
120
SFL. +9.330 (TOP BEAM BAJA) FINISHING
SFL. +9.330 (TOP BEAM BAJA)
ARSITEK
STEELDECK t=0.75mm
STEELDECK t=0.75mm STEELDECK t=0.75mm TYPE A18
TYPE B03 TYPE B03
WF.300.150.6,5.9
NAMA PROYEK
530
WF.400.200.8.13
WF.300.150.6,5.9 1662
13 WF.400.200.8.13
HOTEL 8 LANTAI
KOLOM K3 1675
KOLOM K3
1000
LOKASI PROYEK
M 1
KABUPATEN TOBA SAMOSIR,
POTONGAN 1 POTONGAN 4 SUMATRA UTARA
Skala 1 : 20 Skala 1 : 20 AS BUILT DRAWING
JUDUL GAMBAR :
SHEAR
SHEAR
CONNECTOR
FINISHING LANTAI
Ø10-200 SEALANT t=15mm SHEAR DETAIL POTONGAN
PLAT LANTAI t=120 SLANG Ø3/4"
CONNECTOR
Ø10-200
TULANGAN Ø10-200 PLAT LANTAI t=120 TULANGAN Ø10-200 PLAT 5mm
DYNABOLT
CONNECTOR
TULANGAN Ø10-200
Ø10-200 1,2,3,4 & 5
Selimut=20
Ø10-200 Ø8-500
600 FFL. +9.500 (FINISH 2nd FLOOR)
50
FFL. +9.500 (FINISH 2nd FLOOR) 2 LAPIS
SFL. +9.460 (2nd FLOOR) SFL. +9.460 (2nd FLOOR)
120
120
SFL. +9.330 (TOP BEAM BAJA) SFL. +9.330 (TOP BEAM BAJA)
NAMA TIM
STEELDECK t=0.75mm STEELDECK t=0.75mm 375 50 375 STEELDECK t=0.75mm
TYPE B05 TYPE A03 TYPE A03
WF.400.200.8.13
ANGGOTA TIM
WF.300.150.6,5.9 1662 WF.300.150.6,5.9 WF.300.150.6,5.9
13 400 400
KOLOM K3 1675 WF.400.200.8.13 WF.400.200.8.13
KOLOM K5 KOLOM K5
1. KETUA TIM
M H H' 2. ANGGOTA 1
POTONGAN 2 POTONGAN 5
3. ANGGOTA 2
Skala 1 : 20 Skala 1 : 20
● KETERANGAN
1.
SHEAR
CONNECTOR 2.
SHEAR Ø10-200
PLAT LANTAI t=120
CONNECTOR Selimut=20
PLAT LANTAI t=120
Ø10-200 TULANGAN Ø10-200 Ø10-200 3.
FFL. +9.500 (FINISH 2nd FLOOR) 2 LAPIS
SFL. +9.460 (2nd FLOOR)
4.
120
SFL. +9.330 (TOP BEAM BAJA)
WF.400.200.8.13 6.
049 110
PLAT LANTAI t=120 Ø10-200
PLAT LANTAI t=120 Selimut=20 2 LAPIS
SHEAR
CONNECTOR Selimut=20
Ø10-200 Ø10-200
FFL. +9.500 (FINISH 2nd FLOOR) TULANGAN Ø10-200 2 LAPIS
SFL. +9.460 (2nd FLOOR)
120
SFL. +9.330 (TOP BEAM BAJA) PLAT LANTAI t=120
Selimut=20
STEELDECK t=0.75mm SFL. +9.460 Ø10-200
TYPE A09 (2nd FLOOR) 2 LAPIS
SFL. +9.460
(2nd
FLOOR)
WF.300.150.6,5.9 WF.300.150.6,5.9
NAMA PROYEK
KOLOM K3 WF.400.200.8.13
HOTEL 8 LANTAI
I BALOK BAJA
LOKASI PROYEK
POTONGAN 6
DETAIL TULANGAN KONVENSIONAL KABUPATEN TOBA SAMOSIR,
Skala 1 : 20 SUMATRA UTARA
Skala 1 : 20
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
SHEAR CONNECTOR
Ø10-200
6&7
SHEAR
CONNECTOR
PLAT LANTAI t=120 DUDUKAN
Ø10-200 DINDING SAMBUNGAN
Selimut=20 PRECAST
TULANGAN Ø10-200 20x200mm
Ø10-200
LAS NAMA TIM
70
FFL. +9.500 (FINISH 2nd FLOOR) 200 2 LAPIS
SFL. +9.460 (2nd FLOOR)
100
20
¼b ½b ¼b
ANGGOTA TIM
STEELDECK t=0.75mm
TYPE A12 b = beam
1. KETUA TIM
DETAIL SHEAR CONNECTOR
WF.300.150.6,5.9 Skala 1 : 5 2. ANGGOTA 1
WF.400.200.8.13
KOLOM K1
300
3. ANGGOTA 2
SHEAR CONNECTOR SHEAR CONNECTOR
Ø10-200 Ø10-200
7' TULANGAN PLAT LANTAI TULANGAN PLAT LANTAI
● KETERANGAN
SFL. +9.460 Ø10-200 SFL. +9.460 Ø10-200 1.
POTONGAN 7 (2nd FLOOR) (2nd FLOOR)
2.
Skala 1 : 20
3.
120
120
4.
5.
6.
METAL DECK METAL DECK
t=0.75mm t=0.75mm
7,
BALOK BAJA BALOK BAJA
AS SAMBUNGAN LAS
AS SAMBUNGAN LAS
050 110
I 6000
J 6000
K 4000
L 6000
M
8
2000
7'
SHAFT
1575x620
1400
2095 905
8000
1375
SHAFT
600x200
300
7
400
8000
300
300
6
300 300 300 300
INSTALASI PLUMBING
8000
200
120
300 300
STEELDECK t=0.75mm
TYPE A09
BALOK BAJA
8000
300
300
DINDING SHAFT 4
PAS. BATA 10cm 300 300 300 300
KOLOM COMPOSIT
SHAFT
as SHAFT SHAFT SHAFT 150x150
400x200 600x300 600x300 300
225
300
200
300
3
300 300 300
DETAIL SHAFT
Skala 1 : 20
8000
100
SHAFT
SHAFT SHAFT
1485x500
400x200 400x300
75
200
200
2
75
300
300
1
300 300 300 300
8000
SHAFT SHAFT
600x200 400x200
200
300
0
300 300
7,
6.
2.
3.
5.
4.
051
STR
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
DIMENSI SHAFT
SKALA
1 : 250
LANTAI 2nd (+9.460)
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
L L' M
6000
400
3000 3000
300
NAMA PROYEK
HOTEL 8 LANTAI
7"
LOKASI PROYEK
1443
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
3000
DENAH PLAT LIFT
SERVICE 3rd FLOOR
1557
NAMA TIM
ANGGOTA TIM
6000
1. KETUA TIM
7' 2. ANGGOTA 1
3. ANGGOTA 2
400 ● KETERANGAN
1.
2.
3000
3.
4.
5.
6.
7,
7 STR 1 : 30
052 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN 1
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2.
3.
4.
5.
6.
7,
053 110
7''
7'
0
6000 8000 8000 8000 8000 8000 8000 8000
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
NAMA PROYEK
2100
HOTEL 8 LANTAI
M
3000
LOKASI PROYEK
6000
SUMATRA UTARA
L
AS BUILT DRAWING
JUDUL GAMBAR :
4000
K
NAMA TIM
J
ANGGOTA TIM
6000
1. KETUA TIM
2. ANGGOTA 1
I
3. ANGGOTA 2
6000
● KETERANGAN
1.
H
2.
800
3.
6000
4.
5.
G
6.
BANGUNAN UTAMA
7,
Skala 1 : 200
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 200
054 110
G 6000
H H' 6000
I 6000
J 6000
K 4000
L 6000
M
3000 3000
800
7''
C04 C04
3000
C05
2100
6000
7'
C03
3000
7
C01 C01 C01
4000
4000
8000
4000
4000
6
C01 C01 C01
4000
4000
8000
5
C01 C01 C01 C01
4000
4000
8000
4
C01 C01 C01 C01 C01
4000
4000
8000
2000 4000
1900 3
C06 C06 C06 100 C06
2450
2450
2720
2
C09
C01 C01 C01
4000
4000
8000
C10
1
C01 C01 C01
4000
4000
8000
C10
DENAH METALDECK FLOOR SFL.+13.460 0
1900
BANGUNAN UTAMA
100
Skala 1 : 200 C08 C08 C08
3680
1.
7,
6.
2.
3.
5.
4.
STR
055
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 200
FLOOR SFL. + 13.460
DENAH METALDECK
HOTEL 8 LANTAI
15 NOVEMBER 2020
JUMLAH GAMBAR
G H I J K L M 400
6000 H' 6000 6000 6000 4000 6000
530 2940 530 3000 3000
800
805
505 300
400 7''
395
3000
2100
5995
7'
S1
1775
6000
3000
2885
305
305
2000
S1 S1
7
1575
2000
4000
8000
11647
4000
S1 S1
6
S1 S1
815
4000
S2 S2
R7
50
8000
0
S2 S2
4353
27912
4000
°
60
S1
S1
31913
5
S1 S1
4000
2763 96 S2 S2
80
8000
S2 S2
4000
R2
S1
25 S1
0
SFL. +13.460 SFL. +13.460
106°
T=130 T=130 4
148
S1
S1
4000
469 S2
S1
+13.400 T=130
92 T=130 S2
38 S2
S1
4000
S1
50
6161
3
SFL. +13.460 S1
2450
T=130
S2 SFL. +13.460
T=130
2825
8000
8000
S2
46°
2725
S1
50
2
S1 S1
0 1775 600
00
R15
4000
S2 S2
8000
23913
S2 S2
4000
S1 S1
SFL. +13.460
16000
T=130 1
SFL.
S1+13.460 S1
13744
19630
4000
S2 S2
SFL. +13.400
8000
T=130
S2 S2
4000
S1 S1
Skala 1 : 200
6000 6000 4000 6000 1775
1.
7,
6.
2.
3.
5.
4.
STR
056
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 200
FLOOR SFL. + 13.460
HOTEL 8 LANTAI
15 NOVEMBER 2020
JUMLAH GAMBAR
SHEAR CONNECTOR
∅10-200
WIREMESH M8-150 PLAT LANTAI t=130
1 LAPIS Selimut=20
WF.400.200.8.13
NAMA PROYEK
WF.300.150.6,5.9
KOLOM
HOTEL 8 LANTAI
M
LOKASI PROYEK
DETAIL POTONGAN 1 SHEAR CONNECTOR
AS BUILT DRAWING
STEELDECK t=0.75mm STEELDECK t=0.75mm
JUDUL GAMBAR :
WF.400.200.8.13
WF.300.150.6,5.9
KOLOM DETAIL POTONGAN
PLAT LANTAI 3 (1)
M
DETAIL POTONGAN 2 NAMA TIM
BANGUNAN UTAMA
Skala 1 : 20
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
M
● KETERANGAN
DETAIL POTONGAN 3 1.
BANGUNAN UTAMA 2.
Skala 1 : 20
3.
4.
5.
6.
7,
057 110
NAMA PROYEK
HOTEL 8 LANTAI
6 LOKASI PROYEK
DETAIL POTONGAN
PLAT LANTAI 3 (2)
6 NAMA TIM
DETAIL POTONGAN 6
BANGUNAN UTAMA
SHEAR CONNECTOR ANGGOTA TIM
∅10-200
WIREMESH M8-150 PLAT LANTAI t=130 Skala 1 : 20
1 LAPIS Selimut=20
1. KETUA TIM
WF.350.175.8.13
WF.300.150.6,5.9 3. ANGGOTA 2
KOLOM
● KETERANGAN
1.
5 2.
SHEAR CONNECTOR
DETAIL POTONGAN 7 ∅10-200
WIREMESH M8-150 PLAT LANTAI t=130 3.
BANGUNAN UTAMA 1 LAPIS Selimut=20
Skala 1 : 20 4.
7,
WF.300.150.6,5.9
KOLOM
058 110
SHEAR CONNECTOR
SHEAR CONNECTOR
∅10-200
∅10-200 WIREMESH M8-150 PLAT LANTAI t=130
PLAT LANTAI t=130 WIREMESH M8-150
1 LAPIS Selimut=20
Selimut=20 1 LAPIS
WF.350.175.6,5.9
HOTEL 8 LANTAI
KOLOM
KOLOM WF.300.150.6,5.9
LOKASI PROYEK
SHEAR CONNECTOR
∅10-200
PLAT LANTAI t=130
WIREMESH M8-150
1 LAPIS DETAIL POTONGAN
Selimut=20
PLAT LANTAI 3 (3)
STEELDECK t=0.75mm
WF.300.150.8.13
NAMA TIM
ANGGOTA TIM
7
DETAIL POTONGAN 12 1. KETUA TIM
DETAIL POTONGAN 11 BANGUNAN UTAMA
BANGUNAN UTAMA Skala 1 : 20 2. ANGGOTA 1
Skala 1 : 20
3. ANGGOTA 2
● KETERANGAN
SHEAR CONNECTOR
∅10-200 1.
PLAT LANTAI t=130
WIREMESH M8-150 Selimut=20
2 LAPIS
2.
3.
STEELDECK t=0.75mm
TYPE C01
4.
WF.300.150.8.13
WF.450.200.6,5.9 5.
KOLOM
6.
7,
0 DETAIL POTONGAN 13
BANGUNAN UTAMA DETAIL TUNGAN PADA SHAFT
TANGGAL 15 NOVEMBER 2020
Skala 1 : 20 BANGUNAN UTAMA
KODE GAMBAR SKALA
Skala 1 : 40
STR 1 : 20
059 110
SHEAR CONNECTOR
∅10-200
WIREMESH M8-150 PLAT LANTAI t=130
1 LAPIS Selimut=20
WF.400.200.8.13
WF.450.200.6,5.9
NAMA PROYEK
KOLOM
AS BUILT DRAWING
STEELDECK t=0.75mm STEELDECK t=0.75mm
WF.350.175.8.13
JUDUL GAMBAR :
WF.350.175.8.13
WF.400.200.8.13 WF.400.200.8.13
ANGGOTA TIM
STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm
WF.250.125.8.13
WF.400.200.8.13 WF.400.200.8.13 1. KETUA TIM
2. ANGGOTA 1
WF.350.175.6,5.9 WF.350.175.6,5.9 KOLOM WF.350.175.6,5.9
KOLOM
3. ANGGOTA 2
L M ● KETERANGAN
DETAIL POTONGAN 16 1.
BANGUNAN UTAMA PLAT LANTAI t=130
Selimut=20 SHEAR CONNECTOR
SHEAR CONNECTOR ∅10-200 2.
Skala 1 : 20 ∅10-200 PLAT LANTAI t=130
WIREMESH M8-150 WIREMESH M8-150 Selimut=20
1 LAPIS 1 LAPIS
3.
4.
STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm
WF.200.100.8.13 WF.200.100.8.13
WF.400.200.8.13 WF.400.200.8.13 5.
6.
WF.300.150.6,5.9 WF.300.150.6,5.9 WF.300.150.6,5.9
KOLOM KOLOM
7,
060 110
PLAT LANTAI t=130 PLAT LANTAI t=130
Selimut=20 Selimut=20
WIREMESH M8-150
SHEAR CONNECTOR SHEAR CONNECTOR
1 LAPIS
∅10-200 WIREMESH M8-150 ∅10-200
1 LAPIS
NAMA PROYEK
STEELDECK t=0.75mm
WF.350.175.8.13
WF.300.150.8.13 STEELDECK t=0.75mm HOTEL 8 LANTAI
WF.250.125.6,5.9
LOKASI PROYEK
KOLOM
KABUPATEN TOBA SAMOSIR,
KOLOM
SUMATRA UTARA
AS BUILT DRAWING
3 JUDUL GAMBAR :
DETAIL POTONGAN 18
BANGUNAN UTAMA DETAIL POTONGAN
PLAT LANTAI 3 (5)
Skala 1 : 20
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
D10-200 2. ANGGOTA 1
2D13
3. ANGGOTA 2
2D13
● KETERANGAN
1.
2.
3.
4.
5.
DETAIL POTONGAN 19 DETAIL BP
BANGUNAN UTAMA BANGUNAN UTAMA 6.
Skala 1 : 20 Skala 1 : 5 7,
STR 1 : 20
061 110
7''
7'
0
8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
LOKASI PROYEK
M
SUMATRA UTARA
6000
AS BUILT DRAWING
JUDUL GAMBAR :
L
NAMA TIM
6000
ANGGOTA TIM
J
1. KETUA TIM
6000
2. ANGGOTA 1
3. ANGGOTA 2
I
● KETERANGAN
2.
H'
3.
H
800
4.
5.
6.
BANGUNAN UTAMA
7,
STR 1 : 200
Skala
NO. GAMBAR JUMLAH GAMBAR
062 110
7''
7'
0
8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
D06
D07
1775
LOKASI PROYEK
M
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D08
D02
KABUPATEN TOBA SAMOSIR,
3000
SUMATRA UTARA
6000
AS BUILT DRAWING
D04
JUDUL GAMBAR :
L
D02
D07
D08
D05
D01
D01
D01
D01
D01
D01
D01
D01
D06
D01
D01
D01
D01
DENAH METALDECK 4th
4000
NAMA TIM
D04
D08
6000
D01
D01
D01
D06
D02
D07
D01
D01
D01
D01
ANGGOTA TIM
D01
J
D01
D02
D02
D02
1. KETUA TIM
D09
D01
6000
D01
D01
2. ANGGOTA 1
3. ANGGOTA 2
I
2.
H'
3.
H
800
4.
5.
6.
BANGUNAN UTAMA
7,
STR 1 : 200
Skala
NO. GAMBAR JUMLAH GAMBAR
063 110
7''
7'
0
8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
305
HOTEL 8 LANTAI
600
2100
LOKASI PROYEK
1775
M
AS BUILT DRAWING
6000
5400
5800
BP BP BP BP BP BP BP BP BP BP BP BP JUDUL GAMBAR :
2088
S1
S1
S1
S1
S1
1875
S1
S1
S1
S1
S1
530
S1
S1
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
S1
S1
L
BP BP BP BP BP BP BP BP BP BP BP
4000
805
K
S2
S2
S2
S2
S2
BP
BP
BP
BP
BP
BP
BP
BP
BP
S1
S1
S1
S1
S1
S1
S1
BP
NAMA TIM
S1
S1
BP BP BP BP BP BP BP BP BP BP
6000
BP BP BP BP
ANGGOTA TIM
J
1. KETUA TIM
905
905
905
905
2873
2873
2930
2930
3596
2025
2025
88
2. ANGGOTA 1
6000
3. ANGGOTA 2
● KETERANGAN
I
2.
H'
3.
H
4.
800
5.
6.
BANGUNAN UTAMA
7,
STR 1 : 200
Skala
NO. GAMBAR JUMLAH GAMBAR
064 110
NAMA PROYEK
HOTEL 8 LANTAI
M LOKASI PROYEK
DETAIL POTONGAN
PLAT LANTAI 4th (1)
M
NAMA TIM
DETAIL POTONGAN 2
BANGUNAN UTAMA
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
M 1.
DETAIL POTONGAN 3 2.
BANGUNAN UTAMA 3.
Skala
4.
5.
6.
7,
065 110
NAMA PROYEK
HOTEL 8 LANTAI
6
LOKASI PROYEK
DETAIL POTONGAN 5
BANGUNAN UTAMA KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 4th (2)
6 NAMA TIM
DETAIL POTONGAN 6
BANGUNAN UTAMA
ANGGOTA TIM
Skala
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
5
2.
DETAIL POTONGAN 7
3.
BANGUNAN UTAMA
Skala 4.
5.
6.
7,
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 4th (3)
NAMA TIM
3. ANGGOTA 2
● KETERANGAN
DETAIL POTONGAN 12 1.
BANGUNAN UTAMA
7 2.
Skala
3.
4.
5.
0
DETAIL POTONGAN 13 6.
BANGUNAN UTAMA
7,
Skala
067 110
NAMA PROYEK
DETAIL POTONGAN 14 0
HOTEL 8 LANTAI
BANGUNAN UTAMA
LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 4th (4)
2 DETAIL POTONGAN 15
BANGUNAN UTAMA NAMA TIM
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
L M ● KETERANGAN
1.
DETAIL POTONGAN 16
BANGUNAN UTAMA 2.
Skala
3.
4.
5.
6.
7,
068 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
3 AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN 18
BANGUNAN UTAMA DETAIL POTONGAN
Skala PLAT LANTAI 4th) (5
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
7 7'
3.
4.
DETAIL POTONGAN 19 DETAIL TUL. BP
BANGUNAN UTAMA BANGUNAN UTAMA 5.
Skala Skala 6.
7,
STR 1 : 20
069 110
7''
7'
0
8000 8000 8000 8000 8000 8000 8000
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680 NAMA PROYEK
2100
HOTEL 8 LANTAI
1775
LOKASI PROYEK
M
3000
AS BUILT DRAWING
JUDUL GAMBAR :
L
4000
DENAH KOLOM
LANTAI 5-6th
K
6000
NAMA TIM
J
ANGGOTA TIM
1. KETUA TIM
6000
2. ANGGOTA 1
I
3. ANGGOTA 2
● KETERANGAN
6000
1.
H'
2.
H
800
3.
5.
BANGUNAN UTAMA
6.
7,
Skala
STR 1 : 200
070 110
7''
7'
0
8000 8000 8000 8000 8000 8000 8000
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680 NAMA PROYEK
2100
HOTEL 8 LANTAI
D06
D07
1775
LOKASI PROYEK
M
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D08
D02
3000
D04
AS BUILT DRAWING
JUDUL GAMBAR :
L
D02
D07
D08
D05
D01
D01
D01
D01
D01
D01
D01
D01
D06
D01
D01
D01
D01
4000
DENAH METALDECK
5-6th FLOOR
D03
K
D04
D08
6000
NAMA TIM
D01
D01
D01
D06
D02
D07
D01
D01
D01
D01
D01
J
ANGGOTA TIM
D01
D02
D02
D02
D09
D01
1. KETUA TIM
6000
D01
D01
2. ANGGOTA 1
I
3. ANGGOTA 2
● KETERANGAN
6000
1.
H'
2.
3.
4.
5.
BANGUNAN UTAMA
6.
7,
Skala
STR 1 : 200
071 110
NAMA PROYEK
7''
7'
0
HOTEL 8 LANTAI
8000 8000 8000 8000 8000 8000 8000
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
LOKASI PROYEK
2100
KABUPATEN TOBA SAMOSIR,
1775
SUMATRA UTARA
M
AS BUILT DRAWING
3000
JUDUL GAMBAR :
6000
BP BP BP BP BP BP BP BP BP BP BP BP
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
BP
S1
S1
5-6th FLOOR
L
275
BP BP BP BP BP BP BP BP BP BP BP
4000
BP BP BP BP BP BP BP BP BP BP BP BP BP
NAMA TIM
K
S2
S2
S2
S2
S2
BP
BP
BP
BP
BP
BP
BP
BP
BP
S1
S1
S1
S1
S1
S1
S1
BP
S1
S1
BP BP BP BP BP BP BP BP BP BP
6000
ANGGOTA TIM
BP BP BP BP
1. KETUA TIM
J
2. ANGGOTA 1
6000
3. ANGGOTA 2
● KETERANGAN
1.
I
2.
6000
3.
4.
H
5.
800
BANGUNAN UTAMA
6.
7,
Skala
STR 1 : 200
072 110
NAMA PROYEK
M HOTEL 8 LANTAI
DETAIL POTONGAN 1 LOKASI PROYEK
BANGUNAN UTAMA
KABUPATEN TOBA SAMOSIR,
Skala
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 5-6th (1)
M
DETAIL POTONGAN 2
BANGUNAN UTAMA NAMA TIM
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
M ● KETERANGAN
1.
DETAIL POTONGAN 3
BANGUNAN UTAMA 2.
Skala 3.
4.
5.
6.
7,
073 110
NAMA PROYEK
HOTEL 8 LANTAI
6
LOKASI PROYEK
DETAIL POTONGAN 5
BANGUNAN UTAMA KABUPATEN TOBA SAMOSIR,
Skala SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 5-6th (2)
6 NAMA TIM
DETAIL POTONGAN 6
BANGUNAN UTAMA
ANGGOTA TIM
Skala
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
5 2.
DETAIL POTONGAN 7 3.
BANGUNAN UTAMA
4.
Skala
5.
6.
7,
7" STR 1 : 20
DETAIL POTONGAN 8
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
HOTEL 8 LANTAI
LOKASI PROYEK
7" DETAIL POTONGAN 9 DETAIL POTONGAN 10
J KABUPATEN TOBA SAMOSIR,
BANGUNAN UTAMA BANGUNAN UTAMA
SUMATRA UTARA
Skala Skala
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 5-6th (3)
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
L' M
DETAIL POTONGAN 11 2. ANGGOTA 1
BANGUNAN UTAMA
3. ANGGOTA 2
Skala
● KETERANGAN
1.
2.
3.
4.
7 5.
DETAIL POTONGAN 12 6.
BANGUNAN UTAMA 7,
Skala
TANGGAL 15 NOVEMBER 2020
075 110
NAMA PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 5-6th (4)
2 DETAIL POTONGAN 15
BANGUNAN UTAMA NAMA TIM
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
L M
DETAIL POTONGAN 16 1.
BANGUNAN UTAMA 2.
Skala
3.
4.
5.
6.
7,
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
3 JUDUL GAMBAR :
Skala
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
DETAIL POTONGAN 19 DETAIL TUL. BP
6.
BANGUNAN UTAMA BANGUNAN UTAMA
7,
Skala Skala
STR 1 : 20
077 110
7''
7'
0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
SUMATRA UTARA
6000
275
AS BUILT DRAWING
JUDUL GAMBAR :
L
275
NAMA TIM
6000
ANGGOTA TIM
J
1. KETUA TIM
6000
2. ANGGOTA 1
3. ANGGOTA 2
I
● KETERANGAN
6000
1.
2.
H
3.
5.
BANGUNAN UTAMA
6.
7,
Skala
STR 1 : 200
078 110
7''
7'
0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
E08
E10
LOKASI PROYEK
M
E01
E01
E01
E01
E01
E01
E01
E01
E09
E01
E01
E01
E01
E07
KABUPATEN TOBA SAMOSIR,
3000
SUMATRA UTARA
6000
275
AS BUILT DRAWING
E02
JUDUL GAMBAR :
E09
L
E07
275
E10
E08
E04
E01
E01
E01
E01
E01
E01
E01
E01
E01
E01
E01
E01
DENAH METALDECK
4000
7-8th FLOOR
K
E02
E03
E07
NAMA TIM
6000
E01
E01
E01
E01
E01
E01
E01
E01
E08
E09
E10
E01
E01
E01
E01
ANGGOTA TIM
J
E05
E05
E06
E01
1. KETUA TIM
E01
6000
E01
E01
E01
2. ANGGOTA 1
3. ANGGOTA 2
I
● KETERANGAN
6000
1.
2.
3.
4.
5.
BANGUNAN UTAMA
6.
7,
Skala
STR 1 : 200
079 110
7''
7'
0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
1775
LOKASI PROYEK
M
SUMATRA UTARA
6000
275
BP BP BP BP BP BP BP BP BP BP BP BP BP BP AS BUILT DRAWING
JUDUL GAMBAR :
530
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
L
275
BP BP BP BP BP BP BP BP BP BP BP BP BP BP
4000
506
DENAH TOP SLAB
300
805
BP
530
7-8th FLOOR
K
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
S1
BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP
NAMA TIM
6000
402
ANGGOTA TIM
J
2. ANGGOTA 1
3. ANGGOTA 2
I
● KETERANGAN
6000
1.
2.
3.
4.
5.
BANGUNAN UTAMA
6.
7,
Skala
STR 1 : 200
080 110
NAMA PROYEK
HOTEL 8 LANTAI
M
LOKASI PROYEK
DETAIL POTONGAN 1
KABUPATEN TOBA SAMOSIR,
BANGUNAN UTAMA
SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 7-8th (1)
M
DETAIL POTONGAN 2 NAMA TIM
BANGUNAN UTAMA
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
M
1.
DETAIL POTONGAN 3 2.
BANGUNAN UTAMA
3.
Skala
4.
5.
6.
7,
HOTEL 8 LANTAI
6 LOKASI PROYEK
DETAIL POTONGAN 5
KABUPATEN TOBA SAMOSIR,
BANGUNAN UTAMA SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 7-8th (2)
NAMA TIM
6
DETAIL POTONGAN 6
BANGUNAN UTAMA ANGGOTA TIM
Skala
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
5 2.
DETAIL POTONGAN 7 3.
BANGUNAN UTAMA
4.
Skala
5.
6.
7,
7" STR 1 : 20
DETAIL POTONGAN 8
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
Skala
082 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
DETAIL POTONGAN
PLAT LANTAI 7-8th (3)
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
L' M
DETAIL POTONGAN 11 3. ANGGOTA 2
BANGUNAN UTAMA
● KETERANGAN
Skala
1.
2.
3.
4.
5.
6.
7,
7
TANGGAL 15 NOVEMBER 2020
0
DETAIL POTONGAN 12 DETAIL POTONGAN 13 KODE GAMBAR SKALA
BANGUNAN UTAMA BANGUNAN UTAMA STR 1 : 20
Skala Skala
NO. GAMBAR JUMLAH GAMBAR
083 110
NAMA PROYEK
HOTEL 8 LANTAI
DETAIL POTONGAN 14 0
LOKASI PROYEK
BANGUNAN UTAMA
Skala KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT LANTAI 7-8th (4)
2 DETAIL POTONGAN 15
NAMA TIM
BANGUNAN UTAMA
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
L M 1.
DETAIL POTONGAN 16
BANGUNAN UTAMA 2.
Skala 3.
4.
5.
6.
7,
STR 1 : 20
DETAIL POTONGAN 17
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
Skala
084 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
3 JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
STR 1 : 20
085 110
H I J K L M
6000 6000 6000 4000 6000
3000
7''
3000
2100
7'
6000
3000
7
4000
8000
4000
6
DET. TUL. KOLOM K8b
BANGUNAN UTAMA
4000
Skala
8000
4000
5
4000
8000
8000
8000
4000
4
4000
8000
8000
Skala 3
2450
2825
8000
2825
8000
363
3350 4000 3000 3000
2725
2725
2
4000
8000
8000
4000
8000
8000
4000
BANGUNAN UTAMA
Skala
1775
1.
7,
6.
2.
3.
5.
4.
STR
086
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 200
ROOF (SFL.+34.460)
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
7''
7'
0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
2100
HOTEL 8 LANTAI
F01
F01
F08
F10
LOKASI PROYEK
1775
F01
F01
M
F01
F01
F01
F01
F01
F01
F09
F01
F01
F07
KABUPATEN TOBA SAMOSIR,
3000
SUMATRA UTARA
6000
AS BUILT DRAWING
F02
JUDUL GAMBAR :
L
F01
F01
F01
F01
F01
F01
F09
F01
F01
F07
DENAH METALDECK
F04
F01
F01
F08
4000
ROOF FLOOR
F01
F01
F10
(SFL.+34.460)
K
NAMA TIM
F01
F02
F03
F01
F01
F01
F01
F01
F01
F01
F01
F08
F09
F10
F01
F01
F01
F07
6000
ANGGOTA TIM
J
F05
F05
F06
1. KETUA TIM
F01
F01
6000
2. ANGGOTA 1
F01
F01
F01 3. ANGGOTA 2
I
2.
3.
H
4.
5.
6.
7,
BANGUNAN UTAMA
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 200
Skala
NO. GAMBAR JUMLAH GAMBAR
087 110
7''
7'
0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
2100
HOTEL 8 LANTAI
LOKASI PROYEK
1775
M
BP BP
SUMATRA UTARA
6000
BP BP BP
BP
AS BUILT DRAWING
BP
BP
JUDUL GAMBAR :
BP
S1
BP
L
BP
BP BP
BP
DENAH TOP SLAB
4000
BP
BP BP BP
ROOF FLOOR
(SFL.+34.460)
K
NAMA TIM
6000
ANGGOTA TIM
J
1. KETUA TIM
6000
2. ANGGOTA 1
3. ANGGOTA 2
I
● KETERANGAN
2.
3.
H
4.
5.
6.
7,
BANGUNAN UTAMA
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 200
Skala
NO. GAMBAR JUMLAH GAMBAR
088 110
DETAIL POTONGAN 1 NAMA PROYEK
BANGUNAN UTAMA
Skala M HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL PERTEMUAN
BANGUNAN UTAMA
DETAIL POTONGAN
Skala
PLAT ROOF FLOOR (1)
DETAIL POTONGAN 2
BANGUNAN UTAMA
Skala
M NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
M L
DETAIL POTONGAN 3 2.
BANGUNAN UTAMA
3.
Skala
4.
5.
6.
7,
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PLAT ROOF FLOOR (2)
3
DETAIL POTONGAN 6
BANGUNAN UTAMA NAMA TIM
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
7 7'
DETAIL POTONGAN 7 2.
BANGUNAN UTAMA
3.
Skala
4.
5.
6.
7,
STR 1 : 20
L' M
DETAIL POTONGAN 8 NO. GAMBAR JUMLAH GAMBAR
BANGUNAN UTAMA
Skala 090 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
DETAIL POTONGAN
PLAT ROOF FLOOR (3)
NAMA TIM
ANGGOTA TIM
0 1. KETUA TIM
7" DETAIL POTONGAN 12
BANGUNAN UTAMA 2. ANGGOTA 1
Skala
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
0 1
DETAIL POTONGAN 13 TANGGAL 15 NOVEMBER 2020
BANGUNAN UTAMA KODE GAMBAR SKALA
Skala
STR 1 : 20
091 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
DETAIL POTONGAN
PLAT ROOF FLOOR (4)
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
DETAIL POTONGAN 15
BANGUNAN UTAMA
L 2. ANGGOTA 1
Skala
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
J DETAIL TUL. BP
DETAIL POTONGAN 16 DETAIL DINDING ROOF GARDEN BANGUNAN UTAMA TANGGAL 15 NOVEMBER 2020
BANGUNAN UTAMA BANGUNAN UTAMA KODE GAMBAR SKALA
Skala
Skala Skala
STR 1 : 20
092 110
I J K L M
6000 6000 4000 6000
3000
1000 300
8
300
2000
300
7''
3000
3000
2100
8000
G02 G04
6000
7'
3000
3000
7
1000
1000
1000 4000 6000
300
4000
8000
4000
6
4000
8000
1600
1600
G07
5
4000
8000
8000
8000
4000
4
G01 G02 G01
2877
2877
3575
250
1250
7700
8000
4000
4000
4350
3000 3000
250
2123
300
75
1123
1123
750
3350 2000
3
2000
G06
2450
2800
G01 G02
600
G04
8000
8000
2825
8000
6000
2800
S1
G01 G02
G05
2725
2000
3250
3350 1950
2000 2000 5099 3000 2951
3000
2
1020
225
1500 250
720
4000
8000
8000
4000
8000
8000
BANGUNAN UTAMA
Skala 0
3350 2000 2000 3000
7,
6.
2.
3.
5.
4.
STR
093
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 200
DENAH KOLOM TOP
ROOF (SFL. +37.950)
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
I J K L M
6000 6000 4000 6000
3000
1000 300
8
300
2000
300
7''
3000
3000
2100
8000
G02 G04
6000
7'
3000
3000
7
1000
1000
1000 4000 6000
4000
300
8000
4000
6
4000
8000
1600
1600
G07
5
4000
8000
8000
8000
4000
4
G01 G02 G01
2877
2877
3575
250
1250
7700
8000
4000
4000
4350
3000 3000
250
2123
300
75
1123
1123
750
3350 2000
3
2000
G06
2450
2800
G01 G02
600
G04
8000
8000
2825
8000
6000
2800
S1
G01 G02
G05
2725
2000
3250
3350 1950
2000 2000 5099 3000 2951
3000
2
1020
225
1500 250
720
4000
8000
8000
4000
8000
8000
BANGUNAN UTAMA
Skala 0
3350 2000 2000 3000
7,
6.
2.
3.
5.
4.
STR
094
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 200
ROOF (SFL. +37.950)
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
I J K L M
6000 6000 4000 6000
3000
1000 300
8
300
2000
300
7''
3000
3000
2100
8000
G02 G04
6000
7'
3000
3000
7
1000
1000
1000 4000 6000
4000
300
8000
4000
6
4000
8000
1600
1600
G07
5
4000
8000
8000
8000
4000
4
G01 G02 G01
2877
2877
3575
250
1250
7700
8000
4000
4000
4350
3000 3000
250
2123
300
75
1123
1123
750
3350 2000
3
2000
G06
2450
2800
G01 G02
600
G04
8000
8000
2825
8000
6000
2800
S1
G01 G02
G05
2725
2000
3250
3350 1950
2000 2000 5099 3000 2951
3000
2
1020
225
1500 250
720
4000
8000
8000
4000
8000
8000
BANGUNAN UTAMA
Skala 3350 2000 2000 3000
0
3350 4000 3000
1.
7,
6.
2.
3.
5.
4.
STR
095
TANGGAL
JUDUL GAMBAR :
● KETERANGAN
NO. GAMBAR
KODE GAMBAR
NAMA TIM
1. KETUA TIM
ANGGOTA TIM
2. ANGGOTA 1
NAMA PROYEK
3. ANGGOTA 2
LOKASI PROYEK
AS BUILT DRAWING
SUMATRA UTARA
110
SKALA
1 : 200
ROOF (SFL. +37.950)
DENAH TOP SLAB TOP
HOTEL 8 LANTAI
15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,
JUMLAH GAMBAR
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN 1 L
BANGUNAN UTAMA
Skala DETAIL POTONGAN
PLAT ROOF TOP (1)
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
M L 4.
5.
DETAIL POTONGAN 2
6.
BANGUNAN UTAMA
Skala 7,
STR 1 : 20
096 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
M L
JUDUL GAMBAR :
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
097 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN 5
BANGUNAN UTAMA
3 2' 2 DETAIL POTONGAN
Skala
PLAT ROOF TOP (3)
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
DETAIL POTONGAN 6
BANGUNAN UTAMA 7" ● KETERANGAN
Skala 1.
2.
3.
4.
5.
6.
7,
300
HOTEL 8 LANTAI
DETAIL POTONGAN A
700
BANGUNAN UTAMA LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,
300
SUMATRA UTARA
AS BUILT DRAWING
700
JUDUL GAMBAR :
300
DETAIL POTONGAN
2800 600 2800 PONDASI MESIN ROOF (1)
DETAIL POTONGAN B
DENAH PONDASI ROOF TANK BANGUNAN UTAMA
BANGUNAN UTAMA NAMA TIM
Skala
Skala
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
4000
3. ANGGOTA 2
● KETERANGAN
1.
2.
DETAIL POTONGAN C
1500
BANGUNAN UTAMA 3.
Skala 4.
5.
6.
7,
DENAH PONDASI POMPA BOSTER
BANGUNAN UTAMA TANGGAL 15 NOVEMBER 2020
DETAIL POTONGAN D
Skala KODE GAMBAR SKALA
BANGUNAN UTAMA
Skala STR 1 : 30
099 110
NAMA PROYEK
4000
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN
PONDASI MESIN ROOF (2)
DENAH PONDASI PRESSURE TANK DETAIL POTONGAN F
BANGUNAN UTAMA BANGUNAN UTAMA
Skala Skala
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
4000 2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
DETAIL POTONGAN G
1.
BANGUNAN UTAMA
1850
Skala 2.
3.
4.
5.
6.
7,
DENAH PONDASI PIMPA RETURN & HEATPUMP DETAIL POTONGAN H
BANGUNAN UTAMA BANGUNAN UTAMA
TANGGAL 15 NOVEMBER 2020
Skala Skala
KODE GAMBAR SKALA
STR 1 : 30
100 110
L M L M
6000 6000
250 250 250 250
6000 6000
250
250
3 3 NAMA PROYEK
HOTEL 8 LANTAI
2450
2450
G04
LOKASI PROYEK
AS BUILT DRAWING
2825
2825
JUDUL GAMBAR :
G04
8000
8000
DENAH PLAT ATAP
LIFT PASSANGER &
TANGGA (SFL. +42.450)
2725
2725
NAMA TIM
G04 250
250
ANGGOTA TIM
2 2 1. KETUA TIM
2. ANGGOTA 1
DENAH STEELDECK ATAP LIFT DENAH TOP SLAB ATAP LIFT
GEDUNG UTAMA GEDUNG UTAMA
3. ANGGOTA 2
Skala 1:75 Skala 1:75
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
101 110
C D E F G H
6000 6000 6000 6000 6000
800 H'
B19
8
B04 B04 B04 B04 NAMA PROYEK
7'
HOTEL 8 LANTAI
8000
B02 B02 B02 B02
LOKASI PROYEK
B03 B03 B03 B03
KABUPATEN TOBA SAMOSIR,
7 SUMATRA UTARA
8000
B02 B02 B02 B02
DENAH METALDECK
BALLROOM
B03 B03 B03 B03 GEDUNG UTAMA
6
B04 B04 B04 B04 NAMA TIM
8000
B02 B02 B02 B02 ANGGOTA TIM
1. KETUA TIM
B03 B03 B03 B03
2. ANGGOTA 1
5
B02 B02 B02 B02 3. ANGGOTA 2
● KETERANGAN
8000
B05 B05 B05 B05 1.
B14
2.
B06 B06 B06 B06 3.
4 4.
B02 B02 B02 B02
5.
6.
B06 B06 B06 B06 8000
7,
STR 1 : 200
DENAH METALDECK BALLROOM NO. GAMBAR JUMLAH GAMBAR
GEDUNG UTAMA
8000
102 110
Skala 1:200
C D E F G H
6000 6000 6000 6000 6000
800 H'
2060 30000
1480
SFL. +9.460 SFL. +9.460
T=130 T=130
8
NAMA PROYEK
7'
SFL. +9.460
T=130
HOTEL 8 LANTAI
8000
SFL. +8.945 SFL. +9.065 SFL. +8.945
AS BUILT DRAWING
JUDUL GAMBAR :
8000
DENAH TOP SLAB
BALLROOM
GEDUNG UTAMA
6
NAMA TIM
SFL. +9.460
8000
40000
T=130
ANGGOTA TIM
T=130 T=130 T=130
7689 1. KETUA TIM
1129
700
2. ANGGOTA 1
500
6000 5
3. ANGGOTA 2
● KETERANGAN
8000
10400
8000
8000
9000
1.
2.
3.
4
500
1200
4.
450 450
6000
5.
850 850
SFL. +9.460
D E F G H
NAMA PROYEK
DETAIL POTONGAN 1
GEDUNG UTAMA HOTEL 8 LANTAI
Skala 1:100
2379 LOKASI PROYEK
100
200
SUMATRA UTARA
130
200 130
450
AS BUILT DRAWING
515
300
DETAIL POTONGAN
PLAT BALLROOM (1)
1. KETUA TIM
D E F
2. ANGGOTA 1
2.
3.
4.
5.
HCB 1600.300.14.26
HCB 1600.300.14.26 6.
D13-250
KOLOM KOLOM STEELDECK t=0.75mm 7,
LAS
LAS
DETAIL PERTEMUAN D13-250 TANGGAL 15 NOVEMBER 2020
104 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
DETAIL POTONGAN
PLAT BALLROOM (2)
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
DETAIL POTONGAN 4
2.
GEDUNG UTAMA
Skala 1:30 3.
4.
H
5.
DET. POT. A
GEDUNG UTAMA 6.
Skala 1:10
7,
105 110
NAMA PROYEK
HOTEL 8 LANTAI
7'
8
6
1800 2000 6000 8000 LOKASI PROYEK
SFL. +9.450
JUDUL GAMBAR :
100
I
1050
200
950
750
DENAH KOLAM LANTAI 2nd
200
NAMA TIM
SFL. +9.450
5000
5400
SFL. +9.460
SFL. +9.030
SFL. +8.800
6000
T=130
T=200
T=200
4450
4050
ANGGOTA TIM
500
1. KETUA TIM
200.130.100
BOX LAMP
1
2. ANGGOTA 1
200
200
3. ANGGOTA 2
500
500
● KETERANGAN
H
SFL. +9.450
1.
3.
2
4
GEDUNG UTAMA
4.
5.
1:70
6.
7,
Skala
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 70
106 110
200 3000 200 10000 200
500 2000 500 1000 2000 2000 2000 2000 1000 1750
SFL.+10.000
50
200 1950 100
300
540
550
600
130
KID POOL
120
SFL.+9.580
450
130
SFL.+9.450 200 SFL.+9.460
920
1200
120
450
SWIMMING POOL
900
430
200
SFL.+9.030
600
730
230 200
230
320
200
450
1480
NAMA PROYEK
500
LOKASI PROYEK
SFL.+9.460
120
200
550
130
130
450
450
200 SFL.+9.450 KOLAM LANTAI 2nd
430
1200
630
SFL.+9.030
120
900
200
320
400
350
SFL.+8.800
H I NAMA TIM
400 DETAIL POTONGAN 3
GEDUNG UTAMA
Skala 1:50
ANGGOTA TIM
A 1. KETUA TIM
6000
800 5200
2. ANGGOTA 1
800 5200
320 100
3. ANGGOTA 2
SFL.+9.460
120
H I
200
130
450
● KETERANGAN
130
1.
DETAIL POTONGAN 2 320
7,
107 110
DN FR
1ST FL
UP TO
1ST FL
3
NAMA PROYEK
AS BUILT DRAWING
2
JUDUL GAMBAR :
NAMA TIM
1 ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
D E F G H 3. ANGGOTA 2
● KETERANGAN
1.
DENAH RAMP DROP OFF LOBBY BALLROOM
BANGUNAN UTAMA 2.
Skala
3.
4.
5.
6.
7,
6
7
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
BANGUNAN UTAMA
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
AS BUILT DRAWING
JUDUL GAMBAR :
Skala
DENAH STRUKTUR
TOILET KOLAM
LANTAI 2nd
NAMA TIM
7''
6
7
ANGGOTA TIM
1. KETUA TIM
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
BANGUNAN UTAMA
4.
5.
6.
7,
Skala
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
STR 1 : 50
109 110
NAMA PROYEK
HOTEL 8 LANTAI
LOKASI PROYEK
DETAIL POTONGAN
TOILET KOLAM
LANTAI 2nd
NAMA TIM
ANGGOTA TIM
1. KETUA TIM
2. ANGGOTA 1
3. ANGGOTA 2
● KETERANGAN
1.
2.
3.
4.
5.
6.
7,
STR 1 : 10
DETAIL POTONGAN 1
NO. GAMBAR JUMLAH GAMBAR
BANGUNAN UTAMA
110 110
Skala