You are on page 1of 110

A B C D E F G H I J K L L' M

169-BP2 168-BP2 167-BP2 166-BP2 27-BP2


8
29-BP2 28-BP2 20-BP1 19-BP1 12-BP1 11-BP1 02-BP1 01-BP1
21-BP1 13-BP1 03-BP1
23-BP1 22-BP1 15-BP1 14-BP1 10-BP2 09-BP2 05-BP1 04-BP1
7''
24-BP1 16-BP1 06-BP1
26-BP1 25-BP1 18-BP1 17-BP1 08-BP1 07-BP1

47-BP2
7'
46-BP2

48-BP1 49-BP1 NAMA PROYEK


32-BP2 34-BP1 35-BP1 36-BP1 40-BP2 43-BP2 50-BP1
51-BP1 52-BP1
7
171-BP2 170-BP2 30-BP2 31-BP2 41-BP2 44-BP2
33-BP2 37-BP1 38-BP1 39-BP1 42-BP2 45-BP2
54-BP1
53-BP1
55-BP1
HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


68-BP2 65-BP2 62-BP2 59-BP2 56-BP2
6 SUMATRA UTARA
173-BP2 172-BP2 71-BP2 70-BP2 66-BP2 63-BP2 60-BP2 57-BP2
69-BP2 67-BP2 64-BP2 61-BP2 58-BP2

AS BUILT DRAWING
JUDUL GAMBAR :

01 TC-BP2 02 TC-BP2
75-BP2 78-BP2 81-BP2 84-BP2
5 DENAH TITIK BORE FILE
175-BP2 174-BP2 72-BP2 73-BP2 74-BP2 76-BP2 79-BP2 82-BP2 85-BP2
77-BP2 80-BP2 83-BP2 86-BP2
04 TC-BP2 03 TC-BP2
BANGUNAN UTAMA

100-BP2 99-BP2

NAMA TIM
96-BP2 93-BP2 90-BP2 87-BP2
97-BP2 94-BP2 91-BP2 88-BP2
4
176-BP2 177-BP2 178-BP2 179-BP2 180-BP2 104-BP2 103-BP2 102-BP2 101-BP2
98-BP2 95-BP2 92-BP2 89-BP2

ANGGOTA TIM

1. KETUA TIM

108-BP2 111-BP2
109-BP2 112-BP2
114-BP1 115-BP1
119-BP2
121-BP1 122-BP1 3 2. ANGGOTA 1
187-BP2 186-BP2 185-BP2 184-BP2 183-BP2 182-BP2 181-BP2 105-BP2 106-BP2 107-BP2
110-BP2 113-BP2 116-BP1 123-BP1

117-BP1 118-BP1 120-BP2 124-BP1 125-BP1


2'
3. ANGGOTA 2

● KETERANGAN

137-BP2 134-BP2 131-BP1 130-BP1 127-BP1 126-BP1 1.


138-BP2 135-BP2
2
139-BP2 136-BP2 133-BP1 132-BP1 129-BP1 128-BP1 2.

188-BP2 189-BP2 190-BP2 191-BP2 192-BP2 3.

4.
140-BP1 141-BP1 144-BP1 145-BP1 148-BP2 151-BP2
149-BP2 152-BP2
1 5.
142-BP1 143-BP1 146-BP1 147-BP1 150-BP2 153-BP2
6.

7,

DENAH TITIK BOREPILE 163-BP2 160-BP2 157-BP2 154-BP2


0 TANGGAL 15 NOVEMBER 2020
BANGUNAN UTAMA 165-BP2
164-BP2
162-BP2
161-BP2 158-BP2
159-BP2
155-BP2
156-BP2 KODE GAMBAR SKALA
Skala 1 : 300 1 : 300 -1
STR 1 : 300

NO. GAMBAR
1 : 300
JUMLAH GAMBAR
23/07/2019

001 110
FFL. ±0.000 (FINISH LT. DASAR) FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR) SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING) ELV. -0.170 (TANAH URUG FINISHING)
PILECAP PILECAP
ELV. -0.400 (TANAH URUG EKSISTING) ELV. -0.400 (TANAH URUG EKSISTING)
SFL. -VAR. (TOP PILECAP) SFL. -VAR. (TOP PILECAP)

PEMBESIAN PEMBESIAN
TOP OF BOREPILE PEDESTAL KOLOM TOP OF BOREPILE PEDESTAL KOLOM
LEBIH TIINGGI 10cm LEBIH TIINGGI 10cm
DARI BOTTOM PILECAP -SFL. -VAR. (BOTTOM PILECAP) DARI BOTTOM PILECAP -SFL. -VAR. (BOTTOM PILECAP)

800
NAMA PROYEK

POT. 01
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI) Skala 1 : 30
HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

600
DETAIL BORE FILE
BANGUNAN UTAMA
POT. 02
Skala 1 : 30
NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2
CONCRETE GRADE CONCRETE GRADE
K-250 Kg/cm² K-250 Kg/cm²
● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 45

NO. GAMBAR JUMLAH GAMBAR


BORE PILE 01 (D800) BORE PILE 02 (D600)
Skala 1 : 45 Skala 1 : 45 002 110
900 900

1800 1800

1475
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

1475
KABUPATEN TOBA SAMOSIR,
900 900
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL AS BOREPILE
BANGUNAN UTAMA

NAMA TIM

ANGGOTA TIM
1558 1558
1. KETUA TIM

900 900 2. ANGGOTA 1


900

3. ANGGOTA 2
500 1000
● KETERANGAN
1.
900

2.
900

900
3.
900

4.

5.
900

900
6.
50
17
900

7,

1500
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 50

NO. GAMBAR JUMLAH GAMBAR

003 110
A B C D E F G H I J K L L' M

PC1 PC1 PC1 PC1 PC2 PC1 PC8 PC8 PC8


8
PC1 PC1
7''
PC1
PC1 7' NAMA PROYEK
PC2 PC6 PC3 PC3
PC2 PC2
7
PC8 HOTEL 8 LANTAI
LOKASI PROYEK

PC2 PC3 PC3 PC3 PC3 KABUPATEN TOBA SAMOSIR,


PC2 PC2
SUMATRA UTARA
6
AS BUILT DRAWING
JUDUL GAMBAR :

PC3 PC3 PC3 PC3


PC2 PC2 PC1 DENAH PILE CAP
5 BANGUNAN UTAMA
PC2
PC-TC

NAMA TIM
PC3 PC3 PC3 PC3
PC2 PC1 PC1 PC1 PC2 PC2
4
ANGGOTA TIM

1. KETUA TIM
PC3 PC3
PC2 PC2 PC2 PC2 PC5 PC5
PC1 PC1 2. ANGGOTA 1
3

2' 3. ANGGOTA 2

● KETERANGAN
PC3 PC3 PC4 PC4 1.

2 2.
PC1 PC1 PC1 PC1 PC1
3.

4.
PC4 PC4 PC3 PC3
5.
1
6.

7,

PC3 PC3 PC3 PC3


TANGGAL 15 NOVEMBER 2020
DENAH PILE CAP 0 KODE GAMBAR SKALA
BANGUNAN UTAMA
STR 1 : 300
Skala 1 : 300 -1
NO. GAMBAR JUMLAH GAMBAR

004 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

TABEL TOP OF CONCRETE


BOREPILE & PILE CAP

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

TABEL TOP OF CONCRETE STR 1 : 40


BOREPILE & PILECAP
Skala 1 : 40 NO. GAMBAR JUMLAH GAMBAR

005 110
4116

500 1558 1558 500

TIE BEAM T4 3D13

500
300x600
4600
500 1800 1800 500

900
3D13

500
D19-200
NAMA PROYEK
KOLOM K1
TIE BEAM T1 D19-200 TIE BEAM T4

900
300x500
KOLOM K1
300x500 TIE BEAM T4
300x500
PEDESTAL TIE BEAM T4
300x500 HOTEL 8 LANTAI
PEDESTAL
2800

1800

4600
D25-100
LOKASI PROYEK
D25-80

900
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
D25-200

D19-200

500
3D13 AS BUILT DRAWING

D19-200

D25-100
900
JUDUL GAMBAR :
TIE BEAM T6
300x600

500
3D13
DETAIL & POTONGAN

5374
K1-PC6 & K1-PC8
TIE BEAM T4
300x600

DETAIL K1 - PC6 DETAIL K1 - PC8


NAMA TIM
Skala 1 : 50 Skala 1 : 50

H.250.250.9.14 H.250.250.9.14
40
60
60
40
60
60
ANGGOTA TIM
40 40

P10
L P10
L
H400.400.13.21 P12
L
P12
L H400.400.13.21 P12
L
P12
L
50

50
1. KETUA TIM
70

70
L
P12 L
P12 42Ø22
70

70
42Ø22
85

85
70

70
880

70

70
50

50
5

5
56

56
P.12
L P.12
L TIE BEAM T4
TIE BEAM T1 BASE PLATE P.30.430.600
L TIE BEAM T4 TIE BEAM T4 BASE PLATE P.30.430.600
L
300x500 GROUTNG t=25
RIB P.12
L
300x500
FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)
300x500
GROUTNG t=25
RIBP.12
L 300x500 FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)
2. ANGGOTA 1
ELV. -0.170 (TANAH URUG FINISHING) ELV. -0.170 (TANAH URUG FINISHING)
KOLOM PEDESTAL 800x600 KOLOM PEDESTAL 800x600
500

500

500

500
PILE CAP ELV. -0.400 (TANAH URUG EKSISTING)
PILE CAP ELV. -0.400 (TANAH URUG EKSISTING)
3. ANGGOTA 2
800

800
ANGKUR 16D25 L=800 ANGKUR 16D25 L=800
50

SFL. -0.550 (TOP PILECAP) 50 SFL. -0.550 (TOP PILECAP)

Bg.D13-150 Bg.D13-150
D19-200 D19-200 D19-200 D19-200
● KETERANGAN
D19-500 D19-500 D19-500 D19-500
100

100
1.
3D13 3D13 3D13 3D13
1450

1450
100

100
24D22 24D22

D25-200 2.
760

760
D25-80 D25-200

3.
DARI ELV. -0.400

DARI ELV. -0.400


50

50
100

100

-SFL. -2.050 (BOTTOM PILECAP) -SFL. -2.050 (BOTTOM PILECAP)


9000

9000
4.
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI)

5.

6.

7,

800 800 800 800 800 800


TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

POTONGAN K1 - PC6 POTONGAN K1 - PC8 STR 1 : 50


Skala 1 : 50 Skala 1 : 50 NO. GAMBAR JUMLAH GAMBAR

006 110
KOLOM K2
TIE BEAM T7
PEDESTAL
KOLOM K2 300x600
PEDESTAL
2800
TIE BEAM T1 TIE BEAM T1
300x500 1D13 300x500 TIE BEAM T1 TIE BEAM T1
8D16

500
300x500 3D13 300x500

500
8D19
NAMA PROYEK

8D16

8D16

D19-150

1000
D19-150
8D16

500
HOTEL 8 LANTAI

500
1D13 16D22
3D13
500 500

1000 500 900 900 500


LOKASI PROYEK
TIE BEAM T8
300x600
KABUPATEN TOBA SAMOSIR,
POTONGAN K2 - PC1 POTONGAN K2 - PC2 SUMATRA UTARA

Skala 1 : 40 Skala 1 : 40 AS BUILT DRAWING


JUDUL GAMBAR :

DETAIL & POTONGAN


K2-PC1 & K2-PC2

TIE BEAM T1
H.300.300.9.14 H.300.300.9.14
300x500
NAMA TIM

760
760

TIE BEAM T1 BASE PLATE LP.30.330.330 BASE PLATE LP.30.330.330


300x500 GROUTING t=25 TIE BEAM T1 GROUTING t=25 TIE BEAM T1 FFL. ±0.000 (FINISH LT. DASAR)
FFL. ±0.000 (FINISH LT. DASAR)
300x500 300x500 SFL. -0.050 (LATNTAI DASAR)
SFL. -0.050 (LATNTAI DASAR)
KOLOM PEDESTAL 500x500 ELV. -0.170 (TANAH URUG FINISHING) KOLOM PEDESTAL 500x500 ELV. -0.170 (TANAH URUG FINISHING)
Bg.D10-150
Bg.D13-150
ANGGOTA TIM

500

500
PILE CAP
500

500

Bg.D13-150 ELV. -0.400 (TANAH URUG EKSISTING)


ANGKUR 2x3D22 L=800 ELV. -0.400 (TANAH URUG EKSISTING) ANGKUR 2x3D22 L=800

800
8D19
800

50
12D19 SFL. -0.550 (TOP PILECAP)
50

SFL. -0.550 (TOP PILECAP)

Bg.D13-150
1. KETUA TIM
D19-150
8D16

100
100
400

1D13 1D13
550

2D13 12D19 2D13


2. ANGGOTA 1

950
PILE CAP

760
100
50

8D16 SFL. -1.150 (BOTTOM PILECAP)


16D22 D19-150

3. ANGGOTA 2

100
50
SFL. -1.550 (BOTTOM PILECAP)

● KETERANGAN

DARI ELV. -0.400


DARI ELV. -0.400

1.

9000
9000

2.
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI)

3.

4.

5.

6.

7,
600 600
600

TANGGAL 15 NOVEMBER 2020


POTONGAN K2 - PC1 POTONGAN K2 - PC2 KODE GAMBAR SKALA

Skala 1 : 40 Skala 1 : 40 STR 1 : 40

NO. GAMBAR JUMLAH GAMBAR

007 110
300
TIE BEAM T6
300x600
2800
500 900 900 500

3D13

500

1000
D19-200
D22-100
KOLOM K3b
PEDESTAL

1560

KOLOM K2a TIE BEAM T4


3950

300x500
PEDESTAL
D19-200

2400
TIE BEAM T4
1D13 300x500
8D16 KOLOM K4

500
PEDESTAL

8D16
8D16
1390

D22-100
8D16

500
1D13
KOLOM K2a
500 500 PEDESTAL
1000

550
500

3D13

DETAIL K2a - PC1 1990

Skala 1 : 40 TIE BEAM T4


300x500

DETAIL K2a - PC5


Skala 1 : 40
H.250.250.9.14
40
60
60
H.250.250.9.14
40

P10
L 40
P12
L 60
P12
L 60

50
40

70
P10
L
P12
L

70
42Ø22 P12
L

85
50
70

70
H.300.300.9.14 TIE BEAM T4 300X500
70

70
50
42Ø22
85

5
70

760
56
BASE PLATE LP.30.500.330 H.300.300.9.14
70

LANTAI t=12cm
50

GROUTING t=25
5
56

760

FFL. ±0.000 (FINISH LT. DASAR)


SFL. -0.050 (LATNTAI DASAR)
PLAT LANTAI t=12cm PLAT LANTAI t=12cm

120
BASE PLATE LP.30.500.330 FFL. ±0.000 (FINISH LT. DASAR)
ELV. -0.170 (TANAH URUG FINISHING) GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
120

50
ELV. -0.400 (TANAH URUG EKSISTING) ELV. -0.170 (TANAH URUG FINISHING)
50

ANGKUR 6D25 L=1200 ELV. -0.400 (TANAH URUG EKSISTING)

1200
KOLOM PEDESTAL 500x500
Bg.D10-150
1200

1530
Bg.D13-150
1650

ANGKUR 6D25 L=1200


1480

Bg.D10-150
12D19

Bg.D13-150
8D16
SFL. -1.700 (TOP PILECAP) KOLOM PEDESTAL 500x500
1D13
9000

SFL. -1.700 (TOP PILECAP)


1D13

600
400
D19-200
DARI ELV. -0.400

PILE CAP

50
SFL. -2.300 (BOTTOM PILECAP)
100

8D16
9000

12D19
ELV. -2.500 (TANAH ASLI)
100
100

DARI ELV. -0.400

3D13 3D13 ELV. -2.500 (TANAH ASLI)


1500
760

D22-100
50

SFL. -3.200 (BOTTOM PILECAP)


100

600

POTONGAN K2a - PC1


Skala 1 : 40

800 800

POTONGAN K2a - PC5 K2a - PC 5


Skala 1 : 40
1.

7,
6.
2.

3.

5.
4.

STR

008
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 40
K2a-PC1 & K2a-PC5
DETAIL & POTONGAN
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
TIE BEAM T6
300x600

1000 1500

500
KOLOM K3
TIE BEAM T4 D19-200
PEDESTAL 300x500 KOLOM K3
PEDESTAL

D16-150
2800 3D1
NAMA PROYEK

D19-200
3

16D22
900
TIE BEAM T1 TIE BEAM T4
TIE BEAM T1 TIE BEAM T1 300x500 300x500

500
300x500 3D13 300x500

HOTEL 8 LANTAI
D16-150
500

8D19
D19-150

1000
D19-150

500
LOKASI PROYEK
500

900
16D22
3D13 16D22
KABUPATEN TOBA SAMOSIR,
D19-200
500 900 900 500 SUMATRA UTARA
TIE BEAM T4
300x600

500
AS BUILT DRAWING
DETAIL K3 - PC2 3D13
JUDUL GAMBAR :
Skala 1 : 40 500 1500 500

300x600
TIE BEAM T6

DETAIL K3 - PC3 DETAIL & POTONGAN


Skala 1 : 40 K3-PC2 & K3-PC3

NAMA TIM
H.400.400.13.21
880

H.400.400.13.21

880
TIE BEAM T1 BASE PLATE LP.30.430.430 TIE BEAM T1
300x500 300x500 BASE PLATE LP.30.430.430
GROUTING t=25 FFL. ±0.000 (FINISH LT. DASAR)
TIE BEAM T1
GROUTING t=25
TIE BEAM T4
FFL. ±0.000 (FINISH LT. DASAR)
ANGGOTA TIM
SFL. -0.050 (LATNTAI DASAR) 300x500 300x500
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING)
KOLOM PEDESTAL 600x600 ELV. -0.170 (TANAH URUG FINISHING) 1. KETUA TIM
500

500

PILE CAP
ELV. -0.400 (TANAH URUG EKSISTING)

500

500
ANGKUR 2x4D32 L=1000 PILE CAP
8D19 ELV. -0.400 (TANAH URUG EKSISTING)
50

SFL. -0.550 (TOP PILECAP) ANGKUR 2x4D32 L=1000


950

D16-150

50
SFL. -0.550 (TOP PILECAP)

950
D19-150
2. ANGGOTA 1
KOLOM PEDESTAL 600x600
Bg.D10-150 D16-150
Bg.D10-150
2D13 Bg.D13-150 2D13
3. ANGGOTA 2
950

Bg.D13-150
760

12D22 2D13 2D13

950
12D22
16D22 D19-150
D19-200 16D22 16D22 D19-200 ● KETERANGAN
100
50

SFL. -1.550 (BOTTOM PILECAP)

100
50

SFL. -1.550 (BOTTOM PILECAP)


1.

2.
DARI ELV. -0.400

DARI ELV. -0.400


9000

3.

9000
ELV. -2.500 (TANAH ASLI)
ELV. -2.500 (TANAH ASLI) 4.

5.

6.

7,

600 600
TANGGAL 15 NOVEMBER 2020
600
KODE GAMBAR SKALA

STR 1 : 40
POTONGAN K3 - PC2 POTONGAN K3 - PC3
NO. GAMBAR JUMLAH GAMBAR
Skala 1 : 40 Skala 1 : 40
009 110
300
TIE BEAM T6
300x600
2800
500 900 900 500

3D13

500
TIE BEAM T4

1000
D19-200
300x500

D22-100
500 1800 500 KOLOM K3b
PEDESTAL

3D13
1560

500
KOLOM K3a
PEDESTAL

16D19
TIE BEAM T5 TIE BEAM T4
3950

900

24D25
300x500 300x500
D19-200

2400
KOLOM K4

300
PEDESTAL
D16-150
1390

D22-100

900
KOLOM K2a

1246
24D25 PEDESTAL

500
550
500

3D13
3D13

1400 1400 1990


2800
TIE BEAM T6 TIE BEAM T4
300x600 300x500

DETAIL K3a - PC4


DETAIL K3b - PC5
Skala 1 : 40
Skala 1 : 40

H.250.250.9.14
40
60
60
40

P10
L
P12
L
H400.400.13.21 P12
L

50
H.250.250.9.14

70
70
40
P12
L 42Ø22

85
60

70
60
40

70
L
P10
P12
L

50

880
P12
L H400.400.13.21

5
50

56
70

TIE BEAM T5 P.12


L TIE BEAM T4
70

42Ø22 L
P12
85

300x500 BASE PLATE P.30.430.600


L 300x500 FFL. ±0.000 (FINISH LT. DASAR)
70

RIB P.12
L
70

GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)


50
880

ELV. -0.170 (TANAH URUG FINISHING) PLAT LANTAI t=12cm PLAT LANTAI t=12cm
P.12
L
PILE CAP ANGKUR 16D25 L=800 BASE PLATE P.30.430.600
L RIB P.12
L FFL. ±0.000 (FINISH LT. DASAR)

500
500
KOLOM PEDESTAL L 800x600 ELV. -0.400 (TANAH URUG EKSISTING) GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
120

16D19

800

50
SFL. -0.550 (TOP PILECAP) ELV. -0.170 (TANAH URUG FINISHING)
50

D16-150 Bg.D10-150 KOLOM PEDESTAL L 600x600 ELV. -0.400 (TANAH URUG EKSISTING)
Bg.D13-150 ANGKUR 8D32 L=1200
24D22
2D13 2D13

950
1200

Bg.D10-150

760
760

24 D25 24 D25
Bg.D13-150
1650

1480

50
SFL. -1.550 (BOTTOM PILECAP)

100
PILE CAP
9000

SFL. -1.700 (TOP PILECAP)

D19-200
DARI ELV. -0.400

9000

ELV. -2.500 (TANAH ASLI) 24D22


DARI ELV. -0.400

3D13 3D13 ELV. -2.500 (TANAH ASLI)


1500
760

D22-100
50

SFL. -3.200 (BOTTOM PILECAP)


100

800 800

POTONGAN K3a - PC4


Skala 1 : 40

800 800

POTONGAN K3b - PC5


Skala 1 : 40
1.

7,
6.
2.

3.

5.
4.

010
STR
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 40
K3a-PC4 & K3b-PC5
DETAIL & POTONGAN
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
300
TIE BEAM T6
300x600
2800
500 900 900 500

3D13

500

1000
D19-200
D22-100
KOLOM K3b
PEDESTAL

1560
KOLOM K5
TIE BEAM T7
PEDESTAL

3950
300x600

D19-200 2800

2400
KOLOM K4 TIE BEAM T1 TIE BEAM T1
300x500 3D13 300x500
PEDESTAL
8D19

500

1390
D22-100
1000

D19-150
D19-150

500
KOLOM K2a 16D22
PEDESTAL 3D13

500 900 900 500

550
500
3D13 TIE BEAM T7
300x600
1990

DETAIL K4 - PC5
TIE BEAM T4 DETAIL K5 - PC2
300x500 Skala 1 : 40
Skala 1 : 40

H.250.250.9.14

760
PLAT LANTAI t=12cm BASE PLATE P.20.280.280
L
RIB P.10
L GROUTING t=25 FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)

120
H.300.300.9.14 H.300.300.9.14
ELV. -0.170 (TANAH URUG FINISHING)

50
TIE BEAM T1
ELV. -0.400 (TANAH URUG EKSISTING)
300x500
640
640

ANGKUR 2x2D22 L=1200 TIE BEAM T1


300x500 BASE PLATE P.30.330.330
L BASE PLATE P.30.330.330
L FFL. ±0.000 (FINISH LT. DASAR)
KOLOM PEDESTAL 450x450
GROUTING t=25 GROUTING t=25

1200
SFL. -0.050 (LATNTAI DASAR)
Bg.D10-150 ELV. -0.170 (TANAH URUG FINISHING)
ANGKUR 2x3D22 L=800 ANGKUR 2x3D22 L=800

1650
Bg.D13-150

1480
500

KOLOM PEDESTAL 500x500 KOLOM PEDESTAL 500x500 ELV. -0.400 (TANAH URUG EKSISTING)
8D19
800

50

D19-150 SFL. -0.550 (TOP PILECAP)

Bg.D10-150 Bg.D10-150
PILE CAP
Bg.D13-150 Bg.D13-150
D19-200
9000

SFL. -1.700 (TOP PILECAP)


2D13 2D13
950

12D16 12D16
760

DARI ELV. -0.400

16D22 D19-150
12D19
50

SFL. -1.550 (BOTTOM PILECAP)


100
100

3D13 3D13 ELV. -2.500 (TANAH ASLI)


1500
760

D22-100
9000

50

SFL. -3.200 (BOTTOM PILECAP) ELV. -2.500 (TANAH ASLI)


100
DARI ELV. -0.400

600 600

600

POTONGAN K4 - PC5 POTONGAN K5 - PC2


Skala 1 : 40 Skala 1 : 40
1.

7,
6.
2.

3.

5.
4.

011
STR
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
K4-PC5 & K5-PC2

SKALA

1 : 40
DETAIL & POTONGAN
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
KOLOM K6 KOLOM K7
TIE BEAM T7 TIE BEAM T7
PEDESTAL PEDESTAL
300x600 300x600

2800
2800

TIE BEAM T1 TIE BEAM T9


250x500 3D13
3D13 300x500 8D19

500
500

8D19

D19-150

1000
D19-150
D19-150

1000
D19-150
NAMA PROYEK

500
500

16D22 16D22

HOTEL 8 LANTAI
3D13 3D13

500 900 900 500


500 900 900 500

TIE BEAM T7
TIE BEAM T7
300x600 300x600 LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


DETAIL K6 - PC2 DETAIL K7 - PC2 SUMATRA UTARA
Skala 1 : 40 Skala 1 : 40
AS BUILT DRAWING
JUDUL GAMBAR :

WF.700.300.13.24 WF.700.300.13.24
DETAIL & POTONGAN
H.300.300.9.14 K6-PC2 & K7-PC2

880
880

TIE BEAM T1
RIB P.12
L 300x500 TIE BEAM T9 RIB P.12
L PLAT LANTAI
PLAT LANTAI
t=12cm BASE PLATE P.30.730.330
L BASE PLATE P.30.330.330
L 250x500 BASE PLATE P.30.730.330
L t=12cm FFL. ±0.000 (FINISH LT. DASAR)
FFL. ±0.000 (FINISH LT. DASAR)
GROUTING t=25 GROUTING t=25 SFL. -0.050 (LATNTAI DASAR) GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
120

ELV. -0.170 (TANAH URUG FINISHING) ELV. -0.170 (TANAH URUG FINISHING)
ANGKUR 6x2D25 L=800 ANGKUR 2x3D22 L=800 NAMA TIM

500
PILE CAP KOLOM PEDESTAL 900x500
50

KOLOM PEDESTAL 900x500 KOLOM PEDESTAL 500x500 ELV. -0.400 (TANAH URUG EKSISTING) ELV. -0.400 (TANAH URUG EKSISTING)
ANGKUR 6x2D25 L=800
330

800
800

8D19 D19-150 Bg.D10-150 8D19

50
SFL. -0.550 (TOP PILECAP) SFL. -0.550 (TOP PILECAP)
Bg.D13-150
Bg.D10-150 D19-150 Bg.D10-150

Bg.D13-150 Bg.D13-150 ANGGOTA TIM


2D13 2D13 2D13 18D22 2D13
1000

950

760
1. KETUA TIM
760

18D22 12D19
16D22 D19-150 16D22 D19-150

100
50
SFL. -1.550 (BOTTOM PILECAP)
100
50

SFL. -1.550 (BOTTOM PILECAP)


2. ANGGOTA 1

3. ANGGOTA 2

DARI ELV. -0.400


DARI ELV. -0.400

9000
9000

● KETERANGAN
ELV. -2.500 (TANAH ASLI) ELV. -2.500 (TANAH ASLI)
1.

2.

3.

4.

5.
600 600 600 600
6.

7,

TANGGAL 15 NOVEMBER 2020

POTONGAN K6 - PC2 POTONGAN K7 - PC2 KODE GAMBAR SKALA

Skala 1 : 40 Skala 1 : 40 STR 1 : 40

NO. GAMBAR JUMLAH GAMBAR

012 110
TIE BEAM T8
3300x600

TIE BEAM T2 TIE BEAM T2


300x500 1D13 300x500
8D16

500
8D16

8D16
FFL. ±0.000 (FINISH LT. DASAR)
8D16 SFL. -0.050 (LATNTAI DASAR)

500
ELV. -0.170 (TANAH URUG FINISHING) NAMA PROYEK
1D13

500 500 ELV. -0.400 (TANAH URUG EKSISTING)


1000
SFL. -0.550 (TOP PILECAP)
HOTEL 8 LANTAI
LOKASI PROYEK

DETAIL K8 - PC1 KOLOM K8a


KABUPATEN TOBA SAMOSIR,
Skala 1 : 40 TIE BEAM SUMATRA UTARA
T9 250x500

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL & POTONGAN K8-PC1 &


TIE BEAM T2
K8a DAN DETAIL ANGKUR
H.200.200.8.12
TIE BEAM T2
300x500
TERHADAP FFL. ±0.000
300x500 BASE PLATE P.20.230.230
L
FFL. ±0.000 (FINISH LT. DASAR)
DETAIL K8a DETAIL SAMBUNGAN PILECAP DENGAN TIE BEAM
GROUTING t=25 SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING)
Skala 1 : 40 Skala 1 : 40
Bg.D13-150
500

500

Bg.D10-150
ANGKUR 2x2D22 L=800 ELV. -0.400 (TANAH URUG EKSISTING) NAMA TIM
800
50

50

KOLOM PEDESTAL 400x400 SFL. -0.550 (TOP PILECAP)

8D16
400

1D13 1D13
550

12D16

PILE CAP
KOLOM PROFIL BAJA
ANGGOTA TIM

BESI PEDESTAL
100
50

8D16 SFL. -1.150 (BOTTOM PILECAP)


500
1. KETUA TIM

40D
25 25
60 50 230 50 60
50

NUT 2xM25 (18.48~19.0mm)


WASHER 2xM25 (T=5.3~6.7mm)
H.200.200.8.12
BASE PLATE P.20.230.230
L BASE PLATE t=30mm 2. ANGGOTA 1
GROUTING t=25mm FFL. ±0.000 (FINISH LT. DASAR)
GROUTING t=25
TIE BEAM FFL. ±0.000 (FINISH LT. DASAR)
SFL. -0.050 (LATNTAI DASAR)
DARI ELV. -0.400

T9 250x500
SFL. -0.050 (LATNTAI DASAR)
KOLOM PEDESTAL ELV. -0.170 (TANAH URUG FINISHING) KOLOM PEDESTAL 3. ANGGOTA 2
9000

400x400 Bg.D10-150
500

Bg.D13-150
ANGKUR 2x2D22 ELV. -0.400 (TANAH URUG EKSISTING)
ELV. -2.500 (TANAH ASLI) 8D19 BEGEL PEDESTAL ● KETERANGAN
50

L=400 SFL. -0.550 (TOP PILECAP)


BEGEL ANGKUR

500
1.
ANGKUR
2.
TULANGAN PEDESTAL

3.

TIE BEAM TIE BEAM 4.


PILECAP PILECAP
POTONGAN K8 5.
600

Skala 1 : 40
6.
DETAIL ANGKUR TERHADAP ±0.000
Skala 1 : 40 7,

POTONGAN K8 - PC1 TANGGAL 15 NOVEMBER 2020


Skala 1 : 40 KODE GAMBAR SKALA

STR 1 : 40

NO. GAMBAR JUMLAH GAMBAR

013 110
L' M
3000
200 2800 200

PC 8
4116x4600x1500
PC 1
1000x1000x600

T4 300x500

200
7"
NAMA PROYEK
500

T4 300x500

T4 300x500
D13-150
D13-150 HOTEL 8 LANTAI

2800
3000
D13-150
D13-150

D13-150
D13-150
500
PC 1
LOKASI PROYEK
1000x1000x600

T4 300x500 KABUPATEN TOBA SAMOSIR,

200
7' SUMATRA UTARA
PC 8
4116x4600x1500
AS BUILT DRAWING
PIT LIFT AS L' - M , AS 7'' - 7' JUDUL GAMBAR :

Skala 1 : 75

DETAIL PIT LIFT AS L'-M,


PELAT LT t=120 PELAT LT t=120 AS 7'-7" & POTONGAN A
LT.KERJA t=50 200 2800 200 LT.KERJA t=50
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING)

ELV. -0.400 (TANAH URUG EKSISTING) NAMA TIM


TANAH URUG DI Water proofing Water proofing
PADATKAN System Integral System Integral
CBR = 6
D13-150 D13-150

1650
TIE BEAM T4 D10-200 D10-200 TIE BEAM T4 ANGGOTA TIM
300x500 300x500
PILECAP 01 PILECAP 08

DARI ELV. -0.400


WATER STOP Water proofing
System Integral
WATER STOP 1. KETUA TIM
BATAS COR BATAS COR
D13-150

9000
8D16
400 100

100
ELV. -1.700 (TOP PILECAP) SFL. -1.700 (TOP PILECAP)
200
2. ANGGOTA 1
500

600
400

1D13
1D13
3. ANGGOTA 2
ELV. -2.300 (BOTTOM PILECAP) 8D16
ELV. -2.500 (TANAH ASLI) ● KETERANGAN
1.
760

2.
SFL. -3.200 (BOTTOM PILECAP)

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


800
KODE GAMBAR SKALA
3000

POTONGAN A (PIT LIFT) STR 1 : 75


L' M Skala 1 : 40 NO. GAMBAR JUMLAH GAMBAR

014 110
PELAT LT t=120 PELAT LT t=120
LT.KERJA t=50 200 2200 200 LT.KERJA t=50
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING)
L M ELV. -0.400 (TANAH URUG EKSISTING)
6000 TIE BEAM 300x500
Water proofing Water proofing
System Integral System Integral
TIE BEAM 300x500
TANAH URUG DI TANAH URUG DI
D13-150 D13-150

1650
PADATKAN PADATKAN
CBR = 6 CBR = 6

T6 300x600

T6 300x600
PC 5 PC 5 D10-200 D10-200
3950x2800x1500 3950x2800x1500
200 5800 200 WATER STOP Water proofing NAMA PROYEK
BATAS COR System Integral
D13-150

100

100
SFL. -1.700 (TOP PILECAP)

HOTEL 8 LANTAI

200
T5 300x500
200

3 500

600

600

DARI ELV. -0.400


500

760

9000
LOKASI PROYEK

D13-150
D13-150
ELV. -2.500 (TANAH ASLI)

500 500 SFL. -2.700 (BOTTOM PILECAP)


2200

KABUPATEN TOBA SAMOSIR,

2450
D13-150
D13-150 SUMATRA UTARA

AS BUILT DRAWING
500
200

2' JUDUL GAMBAR :


T4 300x500

200
350 1100 470 430 1576 422 432 1100 350
200
DETAIL PIT LIFT AS L'-M,
800
2450
800 AS 2'-3 & POTONGAN B & C

2' 3
PIT LIFT AS L - M , AS 2' - 3
NAMA TIM
Skala 1 : 75
POTONGAN C (PIT LIFT)
Skala 1 : 40
ANGGOTA TIM

1. KETUA TIM
PELAT LT t=120 PELAT LT t=120
LT.KERJA t=50 200 5800 200 LT.KERJA t=50
SFL. -0.050 (LATNTAI DASAR)
ELV. -0.170 (TANAH URUG FINISHING) 2. ANGGOTA 1
ELV. -0.400 (TANAH URUG EKSISTING)
Water proofing Water proofing
System Integral System Integral
TIE BEAM 300x500
3. ANGGOTA 2
D13-150 D13-150
1650

TANAH URUG DI TANAH URUG DI PADATKAN


PADATKAN CBR = 6
CBR = 6 D10-200 D10-200 ● KETERANGAN
WATER STOP Water proofing WATER STOP
BATAS COR System Integral BATAS COR 1.
D13-150
100

100
SFL. -1.700 (TOP PILECAP)
2.
200

500 500
600

600
3.
760

760

ELV. -2.500 (TANAH ASLI)


4.
SFL. -2.700 (BOTTOM PILECAP)

5.

DARI ELV. -0.400


9000
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
800 800 800 800 800 800
6000
STR 1 : 75
L POTONGAN B (PIT LIFT) M
NO. GAMBAR JUMLAH GAMBAR
Skala 1 : 40
015 110
8
7''

7' NAMA PROYEK

7 HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
6
AS BUILT DRAWING
JUDUL GAMBAR :

DENAH KOLOM,
5
PEDESTAL & TIE BEAM

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

3 2. ANGGOTA 1

2'
3. ANGGOTA 2

● KETERANGAN
1.
2
2.

3.

4.
1 5.

6.

DENAH KOLOM, PEDESTAL & TIE BEAM 7,


Skala 1 : 300
0
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
-1
STR 1 : 300

NO. GAMBAR JUMLAH GAMBAR

016 110
T1 = 300 x 500 T2 = 300 x 500 T3 = 400 x 600

NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING

T4 = 300 x 500 T5 = 300 x 500 T6 = 300 x 600 JUDUL GAMBAR :

TABEL PEMBESIAN
TIE BEAM

NAMA TIM

ANGGOTA TIM

1. KETUA TIM
T7 = 300 x 600 T8 = 300 x 600 T9 = 250 x 500
2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,
TABEL PEMBESIAN TIE BEAM
Skala 1 : 40
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 40

NO. GAMBAR JUMLAH GAMBAR

017 110
PENT NAMA PROYEK
HOUSE 8 8
ROOF P.12
L

P.12

P.12
8 8
HOTEL 8 LANTAI

L
LOKASI PROYEK
H.300.300.9.14 H.300.300.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14
TOP 12D16 12D16 12D16 12D16 12D16 12D16 12D16 12D16 12D16 12D16
FLOOR KABUPATEN TOBA SAMOSIR,
BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D10-150
SUMATRA UTARA

TOP 8
8
8 AS BUILT DRAWING
FLOOR 8 8 P.12
L 8 P.12
L

P.12

P.12
8 8
JUDUL GAMBAR :

L
LT. 6
H.300.300.9.14 H.300.300.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 TABEL KOMPOSIT
12D19 12D19 12D22 12D16 12D16 12D16 12D16 12D16 12D19 12 D19
BG.D13-150 BG.D13-150 BG.D10-150 BG.D10-150 BG.D10-150 BG.D13-150 BG.D10-150 BG.D10-150 BG.D13-150 BG.D13-150 KOLOM (01)

LT.6
8 8
8 8
P.12
L P.12
L 8 8
P.12
L
P.12

P.12
8 8
NAMA TIM
L

L
LT. 5 H.350.350.12.19 H.350.350.12.19 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.250.250.9.14 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19
ANGGOTA TIM
16D22 16D22 12D19 12D19 12D19 12D19 12D19 12D19 16D22 16D22
BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150
1. KETUA TIM
LT.5 P.12
L P.12
L
8 8
8 8
P.12
L 8 8 2. ANGGOTA 1
P.12

P.12
8 8
L

L
3. ANGGOTA 2

LT. 3 H.350.350.12.19 H.350.350.12.19 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19 H.350.350.12.19
● KETERANGAN
16D22 16D22 12D19 12D19 12D19 12D19 12D22 12D22 16D22 16D22
BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 1.

P.12
L 2.
LT. 3 8 L P.12
L 8 P.12
L
P.12

P.12

8 8
8 8
3.
L

8 8

4.
H.400.400.13.21 H.400.400.13.21 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.300.300.9.14 H.400.400.13.21 H.400.400.13.21 H.400.400.13.21 H.400.400.13.21
5.
GROUND 24D22 24D22 12D19 12D19 12D19 12D19 12D22 12D22 24D22 24D22
FLOOR BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150
6.
KOLOM K 1 KOLOM K 2 KOLOM K 2a KOLOM K 3 KOLOM K 3a K 3b
7,

TABEL KOMPOSIT KOLOM (1)


TANGGAL 15 NOVEMBER 2020
Skala 1 : 45
KODE GAMBAR SKALA

STR 1 : 45

NO. GAMBAR JUMLAH GAMBAR

018 110
PENT
HOUSE
ROOF NAMA PROYEK
P.12
L

HOTEL 8 LANTAI
H.250.250.9.14 H.250.250.9.14
TOP 12D16 12D16
FLOOR LOKASI PROYEK
BG.D10-150 BG.D10-150

KABUPATEN TOBA SAMOSIR,


TOP SUMATRA UTARA
FLOOR P.12
L
AS BUILT DRAWING
JUDUL GAMBAR :
H.250.250.9.14 H.250.250.9.14
LT. 6 12D16 12D16
BG.D10-150 BG.D10-150
TABEL KOMPOSIT
LT.6 KOLOM (02)
P.12
L

NAMA TIM
LT. 5 H.250.250.9.14 H.250.250.9.14
12D19 12D19
BG.D13-150 BG.D13-150
ANGGOTA TIM
LT.5
1. KETUA TIM
P.12
L

2. ANGGOTA 1

LT. 3 H.250.250.9.14 H.250.250.9.14


3. ANGGOTA 2
12D19 12D19
BG.D13-150 BG.D13-150
● KETERANGAN
1.
LT. 3 P.12
L P.12
L
P.12
L P.12
L P.12
L
P.12
L P.12
L P.12
L
P.12
L P.12
L P.12
L P.12
L 2.

3.
H.250.250.9.14 H.250.250.9.14 H.300.300.9.14 H.300.300.9.14 WF.700.300.13.24 & H.300.300.9.14 WF.700.300.13.24 & H.300.300.9.14 WF.700.300.13.24 WF.700.300.13.24 H.200.200.8.12 H.200.200.8.12
GROUND 12D19 12D19 12D16 12D16 18D22 12D19 16D22 12D19 18D22 18D22 12D16 12D16 4.
FLOOR BG.D13-150 BG.D13-150 BG.D10-150 BG.D10-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D13-150 BG.D10-150 BG.D10-150
5.
KOLOM K 4 KOLOM K 5 KOLOM K 6 KOLOM K 7 KOLOM K 8
6.

TABEL KOMPOSIT KOLOM (2) 7,


Skala 1 : 45
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 45

NO. GAMBAR JUMLAH GAMBAR

019 110
A B C D E F G H I J K L L' M

8
7''

7'

NAMA PROYEK
7

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

5
LAYOUT BASE PLAT

NAMA TIM
4

ANGGOTA TIM

1. KETUA TIM

3
2. ANGGOTA 1
2'
3. ANGGOTA 2

● KETERANGAN

2 1.

2.

3.

4.

1 5.

6.
LAYOUT BASE PLATE
7,
BANGUNAN UTAMA
Skala 1 : 300
0 TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA
-1
STR 1 : 300

NO. GAMBAR JUMLAH GAMBAR

020 110
HB400.400.13.21
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K1

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

021 110
HB300.300.10.15
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K2

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

022 110
HB300.300.10.15
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K2a

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

023 110
HB400.400.13.21
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K3

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

600*600
2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

024 110
HB400.400.13.21
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K3a

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

025 110
HB400.400.13.21
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K3b

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

026 110
HB250.250.9.14
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K4

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

027 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,

HB300.300.10.15

HB300.300.10.15
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K5

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

028 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

WF700.300.13.24

HB300.300.10.15
ANCHOR BOLT NO MARK
KOLOM K6

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

029 110
WF700.300.13.24
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K7

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

030 110
HB200.200.8.12
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K8a

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

031 110
NAMA PROYEK

HB200.200.8.12
HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

ANCHOR BOLT NO MARK


KOLOM K8

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10

NO. GAMBAR JUMLAH GAMBAR

032 110
A B C D E F G H I J K L L' M

8
7''

7'
NAMA PROYEK
7

Ø8-200 HOTEL 8 LANTAI


LOKASI PROYEK
Ø8-200

6 KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

Ø8-200

Ø8-200
AS BUILT DRAWING
JUDUL GAMBAR :

5
DENAH PLAT LANTAI
DASAR SFL.
± 0.000

4
NAMA TIM

ANGGOTA TIM
3
1. KETUA TIM
2'
2. ANGGOTA 1

2 3. ANGGOTA 2
Ø8-200
● KETERANGAN
1.
Ø8-200
2.
1

Ø8-200

Ø8-200
3.

4.

5.

0 6.

DENAH PLAT LANTAI DASAR SFL. +0.050 -1 7,

BANGUNAN UTAMA
Skala 1 : 350 TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 350

NO. GAMBAR JUMLAH GAMBAR

033 110
NAMA PROYEK

DETAIL PENULANGAN PLAT LANTAI


HOTEL 8 LANTAI
Skala 1 : 10
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

LANTAI DASAR AS BUILT DRAWING


SFL. ±0.000
JUDUL GAMBAR :

DETAIL PENULANGAN
PLAT LANTAI
DASAR & POTONGAN 1
TANAH URUG DIPADATKAN
CBR = 6
DETAIL A NAMA TIM
7 Skala 1 : 20

ANGGOTA TIM

1. KETUA TIM
SFL. ±0.000 FFL. +0.050 (FINISH LT. DASAR)
(PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR) 2. ANGGOTA 1
ELV. -0.170 (TANAH URUG FINISHING)
FFL. -0.400
(FINISH LANDSCAPE)
ELV. -0.400 (TANAH URUG EKSISTING) 3. ANGGOTA 2
TANAH URUG DIPADATKAN, CBR = 6
SFL. -0.550 (TOP PILECAP)
● KETERANGAN
1.
7 6 2.

3.

4.

5.

6.

7,

POTONGAN 01 PLAT LANTAI DASAR TANGGAL 15 NOVEMBER 2020


Skala 1:30 KODE GAMBAR SKALA

STR 1 : 30

NO. GAMBAR JUMLAH GAMBAR

034 110
NAMA PROYEK

3 DETAIL B HOTEL 8 LANTAI


Skala 1 : 20
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
SFL. ±0.000 SFL. ±0.000 FFL. +0.050 (FINISH LT. DASAR) JUDUL GAMBAR :
(PLAT LANTAI DASAR) (PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR)

ELV. -0.170 (TANAH URUG FINISHING)


POTONGAN 2 PLAT LANTAI
ELV. -0.400 (TANAH URUG EKSISTING)
DASAR & DETAIL B,C
SFL. -0.550 (TOP PILECAP)

TANAH URUG DIPADATKAN, CBR = 6 TANAH URUG DIPADATKAN, CBR = 6

NAMA TIM

SFL. -1.700
(PLAT LANTAI PITLIFT)
ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2
2'
● KETERANGAN

3 1.
2
2.

3.
POTONGAN 02 PLAT LANTAI DASAR
Skala 1:30 4.

5.

6.

7,
3
DETAIL C
TANGGAL 15 NOVEMBER 2020
Skala 1 : 20
KODE GAMBAR SKALA

STR 1 : 30

NO. GAMBAR JUMLAH GAMBAR

035 110
FFL. +0.050 (FINISH LT. DASAR) SFL. ±0.000
(PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR)

ELV. -0.170 (TANAH URUG FINISHING) SFL. -0.300


(PLAT LANTAI DROP OFF)

ELV. -0.400 (TANAH URUG EKSISTING)


TANAH URUG DIPADATKAN, CBR = 6
SFL. -0.550 (TOP PILECAP)

TANAH URUG DIPADATKAN, CBR = 6


NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK
7
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
POTONGAN 03 PLAT LANTAI DASAR
AS BUILT DRAWING
Skala 1:30
JUDUL GAMBAR :

POTONGAN 3 & DETAIL


PERTEMUAN TIE BEAM

FFL. +0.050 (FINISH LT. DASAR) SFL. ±0.000


(PLAT LANTAI DASAR)
SFL. ±0.000 (LATNTAI DASAR)

ELV. -0.170 (TANAH URUG FINISHING) SFL. -0.300 NAMA TIM


(PLAT DROP OFF)

ELV. -0.400 (TANAH URUG EKSISTING)

SFL. -0.550 (TOP PILECAP)


ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 30
DETAIL PERTEMUAN TIE BEAM BEDA ELEVASI
NO. GAMBAR JUMLAH GAMBAR
Skala 1:30
036 110
A B C D E F G H I J K L L' M

8
7''

7'

Ø8-200

Ø8-200

Ø8-200

Ø8-200
5

2'

Ø8-200
2
NAMA PROYEK
Ø8-200

Ø8-200

Ø8-200
0

-1
HOTEL 8 LANTAI
KEYPLAN
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :
G H I
DENAH PIT ESKALATOR
DETAIL POTONGAN
Skala 1:100 PIT ESKALATOR
DETAIL BEAM
Skala 1 : 20

FFL. +0.050 (FINISH LT. DASAR)


NAMA TIM
SFL. ±0.000 (LATNTAI DASAR)

ELV. -0.170 (TANAH URUG FINISHING)

ELV. -0.400 (TANAH URUG EKSISTING)


ANGGOTA TIM

1. KETUA TIM

SFL. -1.150
(PIT ESKALATOR) 2. ANGGOTA 1
SFL. -1.150 (PIT ESKALATOR)

3. ANGGOTA 2

● KETERANGAN
1.

2.
H
3.

POTONGAN PIT ESKALATOR 4.


Skala 1:30
5.

6.
SFL. -1.150 (PIT ESKALATOR)
7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
TANAH URUG DIPADATKAN
DETAIL
STR 1 : 30
Skala 1 : 20
NO. GAMBAR JUMLAH GAMBAR

037 110
A B C D E F G H I J K L L' M

8
7''

7'

C D E F G H I
6

2'

2 NAMA PROYEK
8 1

0
HOTEL 8 LANTAI
KEYPLAN
-1

LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

7 AS BUILT DRAWING
JUDUL GAMBAR :

DENAH PLAT LANTAI


AREA BALLROOM

6
NAMA TIM

ANGGOTA TIM

1. KETUA TIM

5 2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.
4
3.

4.

5.

6.

7,
3

TANGGAL 15 NOVEMBER 2020


DENAH PLAT LANTAI AREA BALLROOM KODE GAMBAR SKALA
Skala 1:200
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

038 110
SFL. ±0.000 (LANTAI BALLROOM)

NAMA PROYEK

as HOTEL 8 LANTAI
DETAIL DOWEL DETAIL
Skala 1 : 10 Skala 1 : 15 LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

SFL. ±0.000 (LANTAI BALLROOM)


AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL & POTONGAN


TANAH URUG
as PLAT LANTAI
AREA BALLROOM

as
NAMA TIM

POTONGAN 1 PLAT LANTAI AREA BALLROOM


Skala 1:20
SFL. ±0.000 (LANTAI BALLROOM) ANGGOTA TIM

1. KETUA TIM

as 2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
DETAIL 1.
Skala 1 : 15
as PE
TY
AN 2.
RI
VA
3.
as as
4.
5
5.

6.
Y PE
NT
TAMPAK ISOMETRI POT. 2 RIA 7,
VA
200

Skala 1:100
TAMPAK ISOMETRIA PLAT LANTAI BALLROOM TANGGAL 15 NOVEMBER 2020
as Skala 1:100 KODE GAMBAR SKALA
VARIAN TYPE VARIAN TYPE
5
STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

039 110
7'
8

0
8000 8000 8000 8000 8000 8000 8000 8000 8816

2000 3000 3000 3000 3000 2000 2750 2750 2500 2750 2300 2949 2750 2650 2600 2450 2825 2725 3000 2400 2600 4000 4000

2095

1075
M

3000

NAMA PROYEK
6000

3000

HOTEL 8 LANTAI
L
4000

LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


K

SUMATRA UTARA
6000

AS BUILT DRAWING
JUDUL GAMBAR :
J

DENAH KOLOM
6000

LANTAI 1st (+5.460)

DENAH KOLOM LANTAI 1st (SFL. +5.460)


2750 2650 2600
I

NAMA TIM
6000

H'
H

ANGGOTA TIM
800

1. KETUA TIM
6000

BANGUNAN UTAMA
2. ANGGOTA 1
G

3. ANGGOTA 2

Skala 1 : 300
6000

● KETERANGAN
1.
F

2.
6000

3.

4.
E

5.
6000

6.

7,
D

1760

TANGGAL 15 NOVEMBER 2020


6000

3000 3000 3000 3000


KODE GAMBAR SKALA

STR 1 : 300
C

NO. GAMBAR JUMLAH GAMBAR


-

040 110
C 6000
D 6000
E 6000
F 6000
G 6000
H 6000
I 6000
J 6000
K 4000
L 6000
M
800 H'

3000 3000
8
2000

7'
A12 A12
1760 A15
3000

A14
2095
8000

A08 A08
A09 1075
A13

3000
3000

A10 A10
7
A09 A09 A09 A09

3000
3000
8000

A09 A09 A09 A09 A09


3000

A08 A08 A08 A08 A08


2000

6
A06 A06 A06 A06 A06
2750

A22
A06 A06 A06 A06 A06
8000

2750

3000
A07 A07 A07 A07 A07
2500

5
A06 A06 A06 A06 A06
2750

3000
A05 A05 A05 A05 A05 A22
2300
8000

A04 A04 A04 A04 A04


2949

4
A01 A01 A01 A01 A01 A17 A06 A06 A06
2750

A22
A17 A17 A17
8000

2650

A02 A02 A02 A02 A02


Coming
UP

going A18 A18 A18


2600

A03 A03 A03 A03 A03 DN

3
A19 A19 A19
2450

A20 A20 A20


2825
8000

A21 A21 A21


2725

2
A06 A09
2750
3000

A22
A17 A11
8000

2650
2400

A18 A18 A18


2600
2600

1
4000
8000

4000

0
8816

DENAH METALDECK LANTAI 1st (SFL. +5.460)


BANGUNAN UTAMA
Skala 1 : 300
1.

7,
6.
2.

3.

5.
4.

STR

041
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 300
LANTAI 1st (+5.460)
DENAH METALDECK
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
C 6000
D 6000
E 6000
F 6000
G 6000
H 6000
I 6000
J 6000
K 4000
L 6000
M
800 H'

250
400 6000

270

270
5450 530 530 450 8
300 2940
3000 3000
SHAFT 6000

1600
300

250
2000
500x300

805
505
7'

100
300
SHAFT
1575x620

400
1760

1400
3000

1375
2095
8000

5912

1420 1075

2662

3000
3000

SHAFT 625
500x100
SFL. +5.460 4580 7
1075
T=120

3000
3000

SFL. +5.460
8000

T=120
3000

SHAFT SHAFT SHAFT SHAFT


SHAFT 600x300 600x300 600x300 600x300
2000

500x100

32000
Ø10-200 6
2750

1760
8000

2750

Ø10-200

SHAFT SHAFT

3000
SHAFT
2500

600x300 600x200
500x100
32000

5
2750

3000
2300
8000

250 SHAFT SHAFT SHAFT SHAFT


400
24000 600x300 600x300 600x300 600x300
2949

SHAFT
500x300

100
100
4
2925
2750

3053
SFL. +5.460

7900
8000

2650

1669
30

3011
T=120
59

Coming
UP
SHAFT SHAFT SHAFT
500x300 going 600x300 600x300
2600

DN 1075 1300
75

1936
3000
125

250
250

SHAFT
3
24375 11275 SHAFT
600x200 600x200
50
2450

250 300
150
8000
2825
8000

1420 4580
100
SHAFT
SHAFT
1485x500
600x200
2550
2725

75

1300 2
15750
75

SHAFT
176

SHAFT
600x300 325x200
2750

1075
2987
3000

SFL. +5.460

T=120
85
8000

2650
2400

4925

SHAFT SHAFT SHAFT SHAFT


600x300 600x300 600x300 600x300
2600
2600

1000

1
1000

16000 995
300
4000
8000

4000

0
SHAFT SHAFT
800x200 600x200
8816

3800

DENAH PLAT LANTAI 1st (SFL. +5.460)


BANGUNAN UTAMA
Skala 1 : 300
1.

7,
6.
2.

3.

5.
4.

STR

042
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

DENAH PLAT
AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 300
LANTAI 1st (+5.460)
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
PLAT LANTAI t=120 100
SHEAR SHEAR
CONNECTOR CONNECTOR Selimut=20
TULANGAN Ø10-200 PLAT LANTAI t=120
Ø10-200 TULANGAN Ø10-200 Ø10-200 Ø10-200

150
FFL. +5.500 (FINISH 1st FLOOR) Selimut=20 FFL. +5.500 (FINISH 1st FLOOR) 2 LAPIS
SFL. +5.460 (1st FLOOR) SFL. +5.460 (1st FLOOR)

120
120
SFL. +5.330 (TOP BEAM BAJA) SFL. +5.330 (TOP BEAM BAJA)

STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm


TYPE A09 TYPE A09 TYPE A18
LISTPLANK
WF.300.150.6,5.9 FINISHING

530
WF.400.200.8.13
ARSITEK

WF.300.150.6,5.9 1075
KOLOM K1 WF.400.200.8.13 NAMA PROYEK
KOLOM K3
1000

M 1 HOTEL 8 LANTAI
LOKASI PROYEK
POTONGAN 1 POTONGAN 4
Skala 1 : 20 Skala 1 : 20 KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
SHEAR JUDUL GAMBAR :
CONNECTOR
FINISHING LANTAI
Ø10-200 SEALANT t=15mm SHEAR
PLAT LANTAI t=120 SLANG Ø3/4"
CONNECTOR
SHEAR TULANGAN Ø10-200 PLAT 5mm TULANGAN Ø10-200
Ø10-200
CONNECTOR DYNABOLT

FFL. +5.500 (FINISH 1st FLOOR)


TULANGAN Ø10-200 PLAT LANTAI t=120
Ø10-200
FFL. +5.500 (FINISH 1st FLOOR)
Ø8-500 DEATAIL POTONGAN

50
Selimut=20
SFL. +5.460 (1st FLOOR) SFL. +5.460 (1st FLOOR)
1,2,3,4, & 5

120

120
SFL. +5.330 (TOP BEAM BAJA) SFL. +5.330 (TOP BEAM BAJA)

STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm 375 50 375 STEELDECK t=0.75mm
TYPE A06 TYPE A21 TYPE A03 TYPE A03
NAMA TIM
WF.400.200.8.13

WF.300.150.6,5.9 1075 WF.300.150.6,5.9 WF.300.150.6,5.9


KOLOM K3 WF.400.200.8.13
400 400
WF.400.200.8.13
ANGGOTA TIM
KOLOM K5 KOLOM K5
1. KETUA TIM
M H H'
2. ANGGOTA 1
POTONGAN 2 POTONGAN 5
Skala 1 : 20 Skala 1 : 20 3. ANGGOTA 2

● KETERANGAN
1.

SHEAR SHEAR 2.
CONNECTOR CONNECTOR
PLAT LANTAI t=120
Ø10-200 TULANGAN Ø10-200 PLAT LANTAI t=120 Ø10-200
FFL. +5.500 (FINISH 1st FLOOR)
SFL. +5.460 (1st FLOOR)
Selimut=20 3.

120
SFL. +5.330 (TOP BEAM BAJA) 4.
STEELDECK t=0.75mm STEELDECK t=0.75mm
TYPE A20 TYPE A20 WF.200.100.5,5.8 5.

WF.400.200.8.13 6.

WF.300.150.6,5.9 2375 7,
KOLOM K2a

TANGGAL 15 NOVEMBER 2020


M KODE GAMBAR SKALA

POTONGAN 3 STR 1 : 20

Skala 1 : 20 NO. GAMBAR JUMLAH GAMBAR

043 110
PLAT LANTAI t=120 Ø10-200
PLAT LANTAI t=120 Selimut=20 2 LAPIS
SHEAR
CONNECTOR Selimut=20
TULANGAN Ø10-200
Ø10-200 Ø10-200
FFL. +5.500 (FINISH 1st FLOOR) 2 LAPIS
SFL. +5.460 (1st FLOOR)

120
SFL. +5.330 (TOP BEAM BAJA) PLAT LANTAI t=120
Selimut=20
STEELDECK t=0.75mm SFL. +5.460 Ø10-200
TYPE A09 (1st FLOOR) 2 LAPIS
SFL.
+5.460
(1st
FLOOR)

WF.300.150.6,5.9 WF.300.150.6,5.9
KOLOM K3 WF.400.200.8.13 NAMA PROYEK

I BALOK BAJA
HOTEL 8 LANTAI
POTONGAN 6 LOKASI PROYEK
DETAIL TULANGAN KONVENSIONAL
Skala 1 : 20 KABUPATEN TOBA SAMOSIR,
Skala 1 : 20 SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

SHEAR CONNECTOR
Ø10-200
DETAIL POTONGAN
SHEAR
CONNECTOR 6&7
PLAT LANTAI t=120 DUDUKAN
Ø10-200 DINDING SAMBUNGAN
Selimut=20 PRECAST
LAS
TULANGAN Ø10-200 20x200mm
Ø10-200

70
FFL. +5.500 (FINISH 1st FLOOR) 200 2 LAPIS
SFL. +5.460 (1st FLOOR) NAMA TIM
100
20

SFL. +5.330 (TOP BEAM BAJA)

STEELDECK t=0.75mm ¼b ½b ¼b
TYPE A12 b = beam
ANGGOTA TIM

DETAIL SHEAR CONNECTOR 1. KETUA TIM


WF.300.150.6,5.9 Skala 1 : 5
WF.400.200.8.13
KOLOM K1
2. ANGGOTA 1
300
SHEAR CONNECTOR SHEAR CONNECTOR
Ø10-200 Ø10-200 3. ANGGOTA 2
7' TULANGAN PLAT LANTAI TULANGAN PLAT LANTAI
SFL. +5.460 SFL. +5.460
Ø10-200 Ø10-200 ● KETERANGAN
(1st FLOOR)
POTONGAN 7 (1st FLOOR)
1.
Skala 1 : 20
2.

120

120
3.

4.

5.
METAL DECK METAL DECK
t=0.75mm t=0.75mm
6.
BALOK BAJA BALOK BAJA
7,
AS SAMBUNGAN LAS
AS SAMBUNGAN LAS

SHEAR CONNECTOR SHEAR CONNECTOR TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
TAMPAK SAMPING TAMPAK DEPAN
Skala 1 : 5 Skala 1 : 5 STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

044 110
H 6000
I 6000
J 6000
K 4000
L 6000
M
800 H'

250
250

2000
SHAFT
7'

2095 905
500x300
SHAFT

1400
1575x620

8000
1375
NAMA PROYEK
SHAFT
500x100
250

7 HOTEL 8 LANTAI
450

LOKASI PROYEK

8000
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
SHAFT SHAFT SHAFT SHAFT SHAFT
500x100 600x300 600x300 600x300 600x300
AS BUILT DRAWING
250

300
300
300

300

6 INSTALASI PLUMBING
JUDUL GAMBAR :
450 300 300 300 300

SFL. +5.460 TULANGAN PLAT


(1st FLOOR) LANTAI Ø10-200

8000
DIMENSI SHAFT

120
LANTAI 1st (+5.460)
STEELDECK t=0.75mm
SHAFT
500x100 SHAFT SHAFT TYPE A09
600x300 600x200
250

300
5 BALOK BAJA
300

450 300 300


NAMA TIM

8000
DINDING SHAFT
PAS. BATA 10cm ANGGOTA TIM
KOLOM COMPOSIT
SHAFT SHAFT SHAFT SHAFT SHAFT
500x300 600x300 600x300 600x300 600x300 1. KETUA TIM
250

300

300
300

300

4 150 VARIAN 150


DETAIL SHAFT
250 300 300 300 300
2. ANGGOTA 1
as Skala 1 : 20
8000

3. ANGGOTA 2

● KETERANGAN
SHAFT SHAFT SHAFT
500x300 600x300 600x300 300
300

1.
300
250

300

300

SHAFT
3
250 SHAFT
600x200
300 300 300 600x200 2.

3.
8000

4.
100
SHAFT
SHAFT
600x200 300 1485x500 5.
300

75
75

2 6.
300

SHAFT 300 SHAFT


300 600x300 325x200
7,
8000

TANGGAL 15 NOVEMBER 2020


SHAFT SHAFT SHAFT SHAFT KODE GAMBAR SKALA
600x300 600x300 600x300 600x300
300
300

300
300

1 STR 1 : 250
300 300 300 300

DIMENSI SHAFT 1st FLOOR (SFL. +5.460) NO. GAMBAR JUMLAH GAMBAR

Skala 1 : 250 045 110


7'
8

0
8000 8000 8000 8000 8000 8000 8000 8000

2000 3000 3000 2700 2675 2625 2700 2675 2625 2675 2675 2650 2675 2650 2675 2450 2825 2725 2700 2670 2630 2750 2650 2600 3680 4490

2095
M

NAMA PROYEK

HOTEL 8 LANTAI
6000

LOKASI PROYEK
L
4000

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
K

AS BUILT DRAWING
6000

JUDUL GAMBAR :
J

DENAH KOLOM
6000

LANTAI 2nd (+9.460)


I

NAMA TIM
6000

H'
H

ANGGOTA TIM
800

DENAH KOLOM LANTAI 2nd (SFL. +9.460)


1. KETUA TIM
6000

2. ANGGOTA 1
G

3. ANGGOTA 2
6000

● KETERANGAN
F

1.

2.

BANGUNAN UTAMA
6000

3.
E

4.

Skala 1 : 300
6000

5.

6.
D

7,
6000

TANGGAL 15 NOVEMBER 2020


C

KODE GAMBAR SKALA

STR 1 : 300

NO. GAMBAR JUMLAH GAMBAR

046 110
C D E F G H I J K L M
6000 6000 6000 6000 6000 6000 6000 6000 4000 6000

800 H'

B19
8
2000

B04 B04 B04 B04


7'
B15 B15
B17
3000

B02 B02 B02 B02


2095
8000

B18
B14
B16
3000

B03 B03 B03 B03 B13


7
B04 B04 B04 B04 B04 B04 B04 B04
2700

B14

B02 B02 B02 B02 B02 B02 B02 B02


8000

2675

B03 B03 B03 B03 B03 DUMB


B03 B03 B03
2625

WAITER

6
B04 B04 B04 B04 B04 B04 B04 B04 B04
2700

B02 B02 B02 B02 B02 B02 B02 B02 B02


8000

2675

B03 B03 B03 B03 B03 B03 B03 B03 B03


2625

5
B02 B02 B02 B02 B02 B02 B02 B02 B02
2675

B05 B05 B05 B05 B05 B05 B05 B05 B05


8000

2675

B14
B06 B06 B06 B06 B06 B06 B06 B06 B06
2650

4
B02 B02 B02 B02 B02 B02 B02 B02
2675

B06 B06 B06 B06 B06 B06 B06 B06


2650
8000

B05 B05 B05 B05 B05 B05 B05 B05 B05


2675

B20 3
B07 B07 B07 B07 B07
2450

B08 B08 B08 B08


2825
8000

B09 B09 B09 B09


2725

2
B04 B04 B04 B04
2700

B05 B05 B05 B05


8000

2670

B10 B10 B10 B10


2630

1
B11 B11 B11
2750

B06 B06 B06 B06


8000

2650

B12 B12 B12 B12


2600

0
B21 B21 B21 B21
3680
4490

DENAH METALDECK LANTAII 2nd (SFL. +9.460)


BANGUNAN UTAMA
Skala 1 : 300
1.

7,
6.
2.

3.

5.
4.

STR

047
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 300
2nd FLOOR (+9.460)
DENAH METALDECK
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
C D E F G H I J K L M
6000 6000 6000 6000 6000 6000 6000 6000 4000 6000

800 H'
360
2060 30000

SFL. +9.460 SFL. +9.460

1480
1480
T=120 T=120
400 530 530 400 8
5641 5600 2940 5984

1580
120
300
2000

805
505
7'

420
400
SFL. +8.950
3000

T=120
2095
8000

T=120

SFL. +9.460
3000

1675

7
SFL. +9.460
2700

T=120

SFL. +9.460
8000

2675

T=120
2625

6
2700

SFL. +8.950

40000
8000

2675

Ø10-200

T=120
T=120

SFL. +9.460
2625

32230

5
Ø10-200
2675

SFL. +9.460 SFL. +9.460


8000

2675

T=120 T=120
2650

4
SFL. +9.460
2675

T=120

SFL. +8.950

T=120
2650
8000

T=120

SFL. +9.460
700
75
2675

550
SFL. +9.460 SFL. +9.460 3
2060 18000 6006
2450

8000
2825
8000

15
95
2
2725
75

2
700
2700

88 SFL. +9.460 SFL. +9.460


2815 22
R1
8000

2670

T=120 T=120
3321
2630

1
2750

19605

12130
8000

2650

SFL. +9.460
2600

T=120
680

0
0 00
R3 103
3680

47
12

16000 1675
4490

DENAH PLAT LANTAI 2nd FLOOR (SFL. +9.460)


Skala 1 : 250
1.

7,
6.
2.

3.

5.
4.

STR

048
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

DENAH PLAT
AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 300
LANTAI 2nd (+9.460)
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
100
SHEAR PLAT LANTAI t=120
SHEAR CONNECTOR Selimut=20
CONNECTOR TULANGAN Ø10-200 Ø10-200 Ø10-200

150
TULANGAN Ø10-200 PLAT LANTAI t=120
Ø10-200 FFL. +9.500 (FINISH 2nd FLOOR) 2 LAPIS
FFL. +9.500 (FINISH 2nd FLOOR) Selimut=20 SFL. +9.460 (2nd FLOOR)
SFL. +9.460 (2nd FLOOR)

120
LISTPLANK

120
SFL. +9.330 (TOP BEAM BAJA) FINISHING
SFL. +9.330 (TOP BEAM BAJA)
ARSITEK
STEELDECK t=0.75mm
STEELDECK t=0.75mm STEELDECK t=0.75mm TYPE A18
TYPE B03 TYPE B03
WF.300.150.6,5.9
NAMA PROYEK

530
WF.400.200.8.13

WF.300.150.6,5.9 1662
13 WF.400.200.8.13
HOTEL 8 LANTAI
KOLOM K3 1675
KOLOM K3
1000

LOKASI PROYEK
M 1
KABUPATEN TOBA SAMOSIR,
POTONGAN 1 POTONGAN 4 SUMATRA UTARA
Skala 1 : 20 Skala 1 : 20 AS BUILT DRAWING
JUDUL GAMBAR :

SHEAR

SHEAR
CONNECTOR
FINISHING LANTAI
Ø10-200 SEALANT t=15mm SHEAR DETAIL POTONGAN
PLAT LANTAI t=120 SLANG Ø3/4"
CONNECTOR
Ø10-200
TULANGAN Ø10-200 PLAT LANTAI t=120 TULANGAN Ø10-200 PLAT 5mm
DYNABOLT
CONNECTOR
TULANGAN Ø10-200
Ø10-200 1,2,3,4 & 5
Selimut=20
Ø10-200 Ø8-500
600 FFL. +9.500 (FINISH 2nd FLOOR)

50
FFL. +9.500 (FINISH 2nd FLOOR) 2 LAPIS
SFL. +9.460 (2nd FLOOR) SFL. +9.460 (2nd FLOOR)

120
120
SFL. +9.330 (TOP BEAM BAJA) SFL. +9.330 (TOP BEAM BAJA)
NAMA TIM
STEELDECK t=0.75mm STEELDECK t=0.75mm 375 50 375 STEELDECK t=0.75mm
TYPE B05 TYPE A03 TYPE A03
WF.400.200.8.13

ANGGOTA TIM
WF.300.150.6,5.9 1662 WF.300.150.6,5.9 WF.300.150.6,5.9
13 400 400
KOLOM K3 1675 WF.400.200.8.13 WF.400.200.8.13
KOLOM K5 KOLOM K5
1. KETUA TIM

M H H' 2. ANGGOTA 1

POTONGAN 2 POTONGAN 5
3. ANGGOTA 2
Skala 1 : 20 Skala 1 : 20
● KETERANGAN
1.
SHEAR
CONNECTOR 2.
SHEAR Ø10-200
PLAT LANTAI t=120
CONNECTOR Selimut=20
PLAT LANTAI t=120
Ø10-200 TULANGAN Ø10-200 Ø10-200 3.
FFL. +9.500 (FINISH 2nd FLOOR) 2 LAPIS
SFL. +9.460 (2nd FLOOR)
4.

120
SFL. +9.330 (TOP BEAM BAJA)

STEELDECK t=0.75mm STEELDECK t=0.75mm 5.


TYPE B08 TYPE B08

WF.400.200.8.13 6.

WF.300.150.6,5.9 1863 512 7,


KOLOM K2a 2375

TANGGAL 15 NOVEMBER 2020


M
KODE GAMBAR SKALA
POTONGAN 3
STR 1 : 20
Skala 1 : 20
NO. GAMBAR JUMLAH GAMBAR

049 110
PLAT LANTAI t=120 Ø10-200
PLAT LANTAI t=120 Selimut=20 2 LAPIS
SHEAR
CONNECTOR Selimut=20
Ø10-200 Ø10-200
FFL. +9.500 (FINISH 2nd FLOOR) TULANGAN Ø10-200 2 LAPIS
SFL. +9.460 (2nd FLOOR)

120
SFL. +9.330 (TOP BEAM BAJA) PLAT LANTAI t=120
Selimut=20
STEELDECK t=0.75mm SFL. +9.460 Ø10-200
TYPE A09 (2nd FLOOR) 2 LAPIS
SFL. +9.460
(2nd
FLOOR)

WF.300.150.6,5.9 WF.300.150.6,5.9
NAMA PROYEK
KOLOM K3 WF.400.200.8.13

HOTEL 8 LANTAI
I BALOK BAJA
LOKASI PROYEK
POTONGAN 6
DETAIL TULANGAN KONVENSIONAL KABUPATEN TOBA SAMOSIR,
Skala 1 : 20 SUMATRA UTARA
Skala 1 : 20
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
SHEAR CONNECTOR
Ø10-200
6&7
SHEAR
CONNECTOR
PLAT LANTAI t=120 DUDUKAN
Ø10-200 DINDING SAMBUNGAN
Selimut=20 PRECAST
TULANGAN Ø10-200 20x200mm
Ø10-200
LAS NAMA TIM

70
FFL. +9.500 (FINISH 2nd FLOOR) 200 2 LAPIS
SFL. +9.460 (2nd FLOOR)
100
20

SFL. +9.330 (TOP BEAM BAJA)

¼b ½b ¼b
ANGGOTA TIM
STEELDECK t=0.75mm
TYPE A12 b = beam
1. KETUA TIM
DETAIL SHEAR CONNECTOR
WF.300.150.6,5.9 Skala 1 : 5 2. ANGGOTA 1
WF.400.200.8.13
KOLOM K1
300
3. ANGGOTA 2
SHEAR CONNECTOR SHEAR CONNECTOR
Ø10-200 Ø10-200
7' TULANGAN PLAT LANTAI TULANGAN PLAT LANTAI
● KETERANGAN
SFL. +9.460 Ø10-200 SFL. +9.460 Ø10-200 1.
POTONGAN 7 (2nd FLOOR) (2nd FLOOR)

2.
Skala 1 : 20
3.

120

120
4.

5.

6.
METAL DECK METAL DECK
t=0.75mm t=0.75mm
7,
BALOK BAJA BALOK BAJA

AS SAMBUNGAN LAS
AS SAMBUNGAN LAS

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
SHEAR CONNECTOR SHEAR CONNECTOR
TAMPAK SAMPING TAMPAK DEPAN STR 1 : 20
Skala 1 : 5 Skala 1 : 5 NO. GAMBAR JUMLAH GAMBAR

050 110
I 6000
J 6000
K 4000
L 6000
M

8
2000
7'
SHAFT
1575x620

1400
2095 905
8000

1375

SHAFT
600x200

300
7
400
8000

SHAFT SHAFT SHAFT SHAFT


600x300 600x300 600x300 600x300
300
300

300
300

6
300 300 300 300

INSTALASI PLUMBING
8000

SFL. +5.450 TULANGAN PLAT SHAFT SHAFT


(1st FLOOR) LANTAI Ø10-200 400x200 400x300
200

200

120
300 300
STEELDECK t=0.75mm
TYPE A09

BALOK BAJA
8000

SHAFT SHAFT SHAFT SHAFT


600x300 600x300 600x300 600x300
300
300

300
300

DINDING SHAFT 4
PAS. BATA 10cm 300 300 300 300
KOLOM COMPOSIT

150 VARIAN 150


8000

SHAFT
as SHAFT SHAFT SHAFT 150x150
400x200 600x300 600x300 300
225

300

200
300

3
300 300 300
DETAIL SHAFT
Skala 1 : 20
8000

100
SHAFT
SHAFT SHAFT
1485x500
400x200 400x300
75

200

200

2
75

300 300 300


8000

SHAFT SHAFT SHAFT SHAFT


600x300 600x300 600x300 600x300
300
300

300
300

1
300 300 300 300
8000

SHAFT SHAFT
600x200 400x200
200

300

0
300 300

DIMENSI SHAFT 2nd FLOOR (SFL. +9.460)


Skala 1 : 250
1.

7,
6.
2.

3.

5.
4.

051
STR
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
DIMENSI SHAFT

SKALA

1 : 250
LANTAI 2nd (+9.460)
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
L L' M
6000
400
3000 3000

300
NAMA PROYEK

HOTEL 8 LANTAI
7"
LOKASI PROYEK

1443
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

3000
DENAH PLAT LIFT
SERVICE 3rd FLOOR
1557
NAMA TIM

ANGGOTA TIM

6000
1. KETUA TIM

7' 2. ANGGOTA 1

3. ANGGOTA 2

400 ● KETERANGAN
1.

2.

3000
3.

4.

5.

6.

7,

DENAH PLAT LIFT SERVICE 3rd FLOOR


TANGGAL 15 NOVEMBER 2020
BANGUNAN UTAMA
KODE GAMBAR SKALA
Skala

7 STR 1 : 30

NO. GAMBAR JUMLAH GAMBAR

052 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN 1

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

L' DETAIL POTONGAN 1 M 2. ANGGOTA 1


BANGUNAN UTAMA
3. ANGGOTA 2
Skala
● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


DETAIL PERKUATAN BALOK BAJA KODE GAMBAR SKALA
BANGUNAN UTAMA
STR 1 : 15
Skala
NO. GAMBAR JUMLAH GAMBAR

053 110
7''

7'

0
6000 8000 8000 8000 8000 8000 8000 8000

3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

NAMA PROYEK
2100

HOTEL 8 LANTAI
M
3000

LOKASI PROYEK
6000

KABUPATEN TOBA SAMOSIR,


3000

SUMATRA UTARA
L

AS BUILT DRAWING
JUDUL GAMBAR :
4000
K

DENAH KOLOM LANTAI


3rd SFL. + 13.460
6000

NAMA TIM
J

ANGGOTA TIM
6000

1. KETUA TIM

2. ANGGOTA 1
I

3. ANGGOTA 2
6000

● KETERANGAN

DENAH KOLOM LANTAI 3rd (SFL. 13.450)


H'

1.
H

2.
800

3.
6000

4.

5.
G

6.

BANGUNAN UTAMA
7,

Skala 1 : 200
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

054 110
G 6000
H H' 6000
I 6000
J 6000
K 4000
L 6000
M
3000 3000
800
7''
C04 C04

3000
C05

2100
6000

7'
C03
3000

7
C01 C01 C01

4000
4000
8000

C02 C01 C01 C01

4000
4000

6
C01 C01 C01

4000
4000
8000

C01 C01 C01 C01


4000
4000

5
C01 C01 C01 C01
4000
4000
8000

C01 C01 C01 C01 C01


4000
4000

4
C01 C01 C01 C01 C01
4000
4000
8000

C01 C01 C01


4000
4000

2000 4000

1900 3
C06 C06 C06 100 C06
2450
2450

C02 C02 C02


2830
2825
8000

C07 C07 C07 C07


2725

2720

2
C09
C01 C01 C01
4000
4000
8000

C01 C01 C01


4000
4000

C10
1
C01 C01 C01
4000
4000
8000

C01 C01 C01


4000
4000

C10
DENAH METALDECK FLOOR SFL.+13.460 0
1900
BANGUNAN UTAMA
100
Skala 1 : 200 C08 C08 C08
3680

1.

7,
6.
2.

3.

5.
4.

STR

055
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 200
FLOOR SFL. + 13.460
DENAH METALDECK
HOTEL 8 LANTAI

KABUPATEN TOBA SAMOSIR,

15 NOVEMBER 2020

JUMLAH GAMBAR
G H I J K L M 400
6000 H' 6000 6000 6000 4000 6000
530 2940 530 3000 3000
800

805
505 300
400 7''

395
3000

2100

5995
7'
S1
1775
6000

3000
2885

305

305
2000

S1 S1
7

1575
2000
4000
8000

11647
4000

S1 S1

6
S1 S1
815
4000

S2 S2
R7
50
8000

0
S2 S2

4353
27912
4000

°
60
S1
S1
31913

5
S1 S1
4000

2763 96 S2 S2
80
8000

S2 S2
4000

R2
S1
25 S1
0
SFL. +13.460 SFL. +13.460

106°
T=130 T=130 4

148
S1
S1
4000

469 S2

SFL. SFL. +13.400


8000

S1
+13.400 T=130
92 T=130 S2
38 S2
S1
4000

S1
50

6161
3
SFL. +13.460 S1
2450

T=130

S2 SFL. +13.460
T=130
2825

8000
8000

S2
46°
2725

S1
50

2
S1 S1
0 1775 600
00
R15
4000

S2 S2
8000

23913

S2 S2
4000

S1 S1
SFL. +13.460
16000

T=130 1
SFL.
S1+13.460 S1
13744
19630
4000

S2 S2
SFL. +13.400
8000

T=130
S2 S2
4000

S1 S1

DENAH TOP SLAB 3RD FLOOR SFL.+13.460 2000 0


BANGUNAN UTAMA
3680

Skala 1 : 200
6000 6000 4000 6000 1775
1.

7,
6.
2.

3.

5.
4.

STR

056
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 200
FLOOR SFL. + 13.460
HOTEL 8 LANTAI

DENAH TOP SLAB 3rd


KABUPATEN TOBA SAMOSIR,

15 NOVEMBER 2020

JUMLAH GAMBAR
SHEAR CONNECTOR
∅10-200
WIREMESH M8-150 PLAT LANTAI t=130
1 LAPIS Selimut=20

STEELDECK t=0.75mm STEELDECK t=0.75mm

WF.400.200.8.13

NAMA PROYEK
WF.300.150.6,5.9
KOLOM

HOTEL 8 LANTAI
M
LOKASI PROYEK
DETAIL POTONGAN 1 SHEAR CONNECTOR

BANGUNAN UTAMA WIREMESH M8-150


∅10-200
PLAT LANTAI t=130 WIREMESH M8-150 WIREMESH M8-150 KABUPATEN TOBA SAMOSIR,
Skala 1 : 20
1 LAPIS Selimut=20 1 LAPIS 2 LAPIS
SUMATRA UTARA

AS BUILT DRAWING
STEELDECK t=0.75mm STEELDECK t=0.75mm
JUDUL GAMBAR :
WF.400.200.8.13

WF.300.150.6,5.9
KOLOM DETAIL POTONGAN
PLAT LANTAI 3 (1)
M
DETAIL POTONGAN 2 NAMA TIM
BANGUNAN UTAMA
Skala 1 : 20
ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2
M
● KETERANGAN

DETAIL POTONGAN 3 1.
BANGUNAN UTAMA 2.
Skala 1 : 20
3.

4.

5.

6.

7,

L TANGGAL 15 NOVEMBER 2020

DETAIL POTONGAN 4 KODE GAMBAR SKALA


BANGUNAN UTAMA
STR 1 : 20
Skala 1 : 20
NO. GAMBAR JUMLAH GAMBAR

057 110
NAMA PROYEK

HOTEL 8 LANTAI
6 LOKASI PROYEK

DETAIL POTONGAN 5 KABUPATEN TOBA SAMOSIR,


BANGUNAN UTAMA SUMATRA UTARA
Skala 1 : 20
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 3 (2)

6 NAMA TIM

DETAIL POTONGAN 6
BANGUNAN UTAMA
SHEAR CONNECTOR ANGGOTA TIM
∅10-200
WIREMESH M8-150 PLAT LANTAI t=130 Skala 1 : 20
1 LAPIS Selimut=20
1. KETUA TIM

STEELDECK t=0.75mm STEELDECK t=0.75mm 2. ANGGOTA 1

WF.350.175.8.13
WF.300.150.6,5.9 3. ANGGOTA 2

KOLOM
● KETERANGAN
1.
5 2.
SHEAR CONNECTOR
DETAIL POTONGAN 7 ∅10-200
WIREMESH M8-150 PLAT LANTAI t=130 3.
BANGUNAN UTAMA 1 LAPIS Selimut=20

Skala 1 : 20 4.

STEELDECK t=0.75mm STEELDECK t=0.75mm 5.


WF.300.150.8.13
6.

7,
WF.300.150.6,5.9
KOLOM

TANGGAL 15 NOVEMBER 2020


7"
DETAIL POTONGAN 8 KODE GAMBAR SKALA
BANGUNAN UTAMA
STR 1 : 20
Skala 1 : 20
NO. GAMBAR JUMLAH GAMBAR

058 110
SHEAR CONNECTOR
SHEAR CONNECTOR
∅10-200
∅10-200 WIREMESH M8-150 PLAT LANTAI t=130
PLAT LANTAI t=130 WIREMESH M8-150
1 LAPIS Selimut=20
Selimut=20 1 LAPIS

STEELDECK t=0.75mm STEELDECK t=0.75mm


STEELDECK t=0.75mm
WF.200.100.8.13 NAMA PROYEK
WF.400.200.8.13
WF.250.125.8.13

WF.350.175.6,5.9
HOTEL 8 LANTAI
KOLOM
KOLOM WF.300.150.6,5.9

LOKASI PROYEK

7" DETAIL POTONGAN 10 J KABUPATEN TOBA SAMOSIR,


DETAIL POTONGAN 9 BANGUNAN UTAMA SUMATRA UTARA
BANGUNAN UTAMA Skala 1 : 20
Skala 1 : 20 AS BUILT DRAWING
JUDUL GAMBAR :

SHEAR CONNECTOR
∅10-200
PLAT LANTAI t=130
WIREMESH M8-150
1 LAPIS DETAIL POTONGAN
Selimut=20
PLAT LANTAI 3 (3)

STEELDECK t=0.75mm

WF.300.150.8.13
NAMA TIM

ANGGOTA TIM
7
DETAIL POTONGAN 12 1. KETUA TIM
DETAIL POTONGAN 11 BANGUNAN UTAMA
BANGUNAN UTAMA Skala 1 : 20 2. ANGGOTA 1
Skala 1 : 20
3. ANGGOTA 2

● KETERANGAN
SHEAR CONNECTOR
∅10-200 1.
PLAT LANTAI t=130
WIREMESH M8-150 Selimut=20
2 LAPIS
2.

3.
STEELDECK t=0.75mm
TYPE C01
4.
WF.300.150.8.13

WF.450.200.6,5.9 5.

KOLOM
6.

7,
0 DETAIL POTONGAN 13
BANGUNAN UTAMA DETAIL TUNGAN PADA SHAFT
TANGGAL 15 NOVEMBER 2020
Skala 1 : 20 BANGUNAN UTAMA
KODE GAMBAR SKALA
Skala 1 : 40
STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

059 110
SHEAR CONNECTOR
∅10-200
WIREMESH M8-150 PLAT LANTAI t=130
1 LAPIS Selimut=20

STEELDECK t=0.75mm STEELDECK t=0.75mm


TYPE C01 TYPE C01

WF.400.200.8.13

WF.450.200.6,5.9

NAMA PROYEK
KOLOM

DETAIL POTONGAN 14 0 HOTEL 8 LANTAI


BANGUNAN UTAMA
LOKASI PROYEK
Skala 1 : 20
SHEAR CONNECTOR SHEAR CONNECTOR
WIREMESH M8-150 WIREMESH M8-150
∅10-200 ∅10-200
1 LAPIS
PLAT LANTAI t=130
1 LAPIS
KABUPATEN TOBA SAMOSIR,
Selimut=20
SUMATRA UTARA

AS BUILT DRAWING
STEELDECK t=0.75mm STEELDECK t=0.75mm

WF.350.175.8.13
JUDUL GAMBAR :
WF.350.175.8.13

WF.400.200.8.13 WF.400.200.8.13

KOLOM DETAIL POTONGAN


PLAT LANTAI 3 (4)
2 DETAIL POTONGAN 15
SHEAR CONNECTOR SHEAR CONNECTOR
SHEAR CONNECTOR
∅10-200 BANGUNAN UTAMA
∅10-200 ∅10-200 PLAT LANTAI t=130 NAMA TIM
PLAT LANTAI t=130 PLAT LANTAI t=130 Selimut=20
WIREMESH M8-150
Skala 1 : 20
Selimut=20 WIREMESH M8-150 Selimut=20
1 RANGKAP
1 LAPIS STEELDECK t=0.75mm

ANGGOTA TIM
STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm
WF.250.125.8.13
WF.400.200.8.13 WF.400.200.8.13 1. KETUA TIM

2. ANGGOTA 1
WF.350.175.6,5.9 WF.350.175.6,5.9 KOLOM WF.350.175.6,5.9
KOLOM
3. ANGGOTA 2
L M ● KETERANGAN
DETAIL POTONGAN 16 1.
BANGUNAN UTAMA PLAT LANTAI t=130
Selimut=20 SHEAR CONNECTOR
SHEAR CONNECTOR ∅10-200 2.
Skala 1 : 20 ∅10-200 PLAT LANTAI t=130
WIREMESH M8-150 WIREMESH M8-150 Selimut=20
1 LAPIS 1 LAPIS
3.

4.
STEELDECK t=0.75mm STEELDECK t=0.75mm STEELDECK t=0.75mm
WF.200.100.8.13 WF.200.100.8.13
WF.400.200.8.13 WF.400.200.8.13 5.

6.
WF.300.150.6,5.9 WF.300.150.6,5.9 WF.300.150.6,5.9
KOLOM KOLOM
7,

M L TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
DETAIL POTONGAN 17
BANGUNAN UTAMA STR 1 : 20
Skala 1 : 20
NO. GAMBAR JUMLAH GAMBAR

060 110
PLAT LANTAI t=130 PLAT LANTAI t=130
Selimut=20 Selimut=20
WIREMESH M8-150
SHEAR CONNECTOR SHEAR CONNECTOR
1 LAPIS
∅10-200 WIREMESH M8-150 ∅10-200
1 LAPIS

NAMA PROYEK

STEELDECK t=0.75mm
WF.350.175.8.13
WF.300.150.8.13 STEELDECK t=0.75mm HOTEL 8 LANTAI
WF.250.125.6,5.9
LOKASI PROYEK
KOLOM
KABUPATEN TOBA SAMOSIR,
KOLOM
SUMATRA UTARA

AS BUILT DRAWING
3 JUDUL GAMBAR :

DETAIL POTONGAN 18
BANGUNAN UTAMA DETAIL POTONGAN
PLAT LANTAI 3 (5)
Skala 1 : 20

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

D10-200 2. ANGGOTA 1
2D13
3. ANGGOTA 2
2D13
● KETERANGAN
1.

2.

3.

4.

5.
DETAIL POTONGAN 19 DETAIL BP
BANGUNAN UTAMA BANGUNAN UTAMA 6.

Skala 1 : 20 Skala 1 : 5 7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

061 110
7''

7'

0
8000 8000 8000 8000 8000 8000 8000

NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100 HOTEL 8 LANTAI


1775

LOKASI PROYEK
M

KABUPATEN TOBA SAMOSIR,


3000

SUMATRA UTARA
6000

AS BUILT DRAWING
JUDUL GAMBAR :
L

DENAH KOLOM LANTAI


4000

4th (SFL. +16.960)


K

NAMA TIM
6000

ANGGOTA TIM
J

1. KETUA TIM
6000

2. ANGGOTA 1

3. ANGGOTA 2
I

● KETERANGAN

DENAH KOLOM LANTAI 4th (SFL. +16.960)


1.
6000

2.
H'

3.
H
800

4.

5.

6.

BANGUNAN UTAMA
7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
-

STR 1 : 200

Skala
NO. GAMBAR JUMLAH GAMBAR

062 110
7''

7'

0
8000 8000 8000 8000 8000 8000 8000

NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100 HOTEL 8 LANTAI

D06

D07
1775

LOKASI PROYEK
M

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D08
D02
KABUPATEN TOBA SAMOSIR,
3000

SUMATRA UTARA
6000

AS BUILT DRAWING
D04

JUDUL GAMBAR :
L

D02

D07

D08
D05

D01

D01

D01

D01

D01

D01

D01

D01

D06

D01

D01

D01

D01
DENAH METALDECK 4th
4000

FLOOR (SFL. +16.960)


D03
K

NAMA TIM
D04

D08
6000

D01

D01

D01

D06

D02

D07

D01

D01

D01

D01
ANGGOTA TIM
D01
J

D01
D02

D02

D02
1. KETUA TIM

D09
D01
6000

D01

D01
2. ANGGOTA 1

3. ANGGOTA 2
I

DENAH METALDECK 4th FLOOR (SFL. +16.960)


● KETERANGAN
1.
6000

2.
H'

3.
H
800

4.

5.

6.

BANGUNAN UTAMA
7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 200

Skala
NO. GAMBAR JUMLAH GAMBAR

063 110
7''

7'

0
8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

305
HOTEL 8 LANTAI

600
2100
LOKASI PROYEK
1775
M

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
3000

AS BUILT DRAWING
6000

5400
5800
BP BP BP BP BP BP BP BP BP BP BP BP JUDUL GAMBAR :
2088
S1

S1

S1

S1

S1
1875

S1
S1

S1

S1

S1
530

S1

S1
BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP
S1
S1
L

DENAH TOP SLAB 4th


275

BP BP BP BP BP BP BP BP BP BP BP
4000

BP BP BP BP BP BP BP BP BP BP BP BP BP FLOOR (SFL. +16.960)


530

805
K

S2

S2

S2

S2

S2
BP

BP

BP

BP

BP

BP

BP

BP

BP
S1

S1
S1
S1

S1

S1

S1
BP
NAMA TIM

S1
S1
BP BP BP BP BP BP BP BP BP BP
6000

BP BP BP BP

ANGGOTA TIM
J

1. KETUA TIM
905

905

905

905
2873

2873
2930

2930
3596
2025

2025
88

2. ANGGOTA 1
6000

1481 3335 6369 3335 1481

3. ANGGOTA 2

● KETERANGAN
I

DENAH TOP SLAB 4th FLOOR (SFL. +16.960)


1.
6000

2.
H'

3.
H

4.
800

5.

6.

BANGUNAN UTAMA
7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 200

Skala
NO. GAMBAR JUMLAH GAMBAR

064 110
NAMA PROYEK

HOTEL 8 LANTAI
M LOKASI PROYEK

DETAIL POTONGAN 1 KABUPATEN TOBA SAMOSIR,


BANGUNAN UTAMA SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 4th (1)

M
NAMA TIM
DETAIL POTONGAN 2
BANGUNAN UTAMA
Skala
ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
M 1.

DETAIL POTONGAN 3 2.
BANGUNAN UTAMA 3.
Skala
4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
L
DETAIL POTONGAN 4
STR 1 : 20
BANGUNAN UTAMA
Skala NO. GAMBAR JUMLAH GAMBAR

065 110
NAMA PROYEK

HOTEL 8 LANTAI
6
LOKASI PROYEK
DETAIL POTONGAN 5
BANGUNAN UTAMA KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 4th (2)

6 NAMA TIM

DETAIL POTONGAN 6
BANGUNAN UTAMA
ANGGOTA TIM
Skala
1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.
5
2.
DETAIL POTONGAN 7
3.
BANGUNAN UTAMA
Skala 4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
7"
DETAIL POTONGAN 8 STR 1 : 20
BANGUNAN UTAMA
NO. GAMBAR JUMLAH GAMBAR
Skala
066 110
NAMA PROYEK

7" DETAIL POTONGAN 9 DETAIL POTONGAN 10 J HOTEL 8 LANTAI


BANGUNAN UTAMA BANGUNAN UTAMA
LOKASI PROYEK
Skala Skala
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 4th (3)

NAMA TIM

L' M ANGGOTA TIM


DETAIL POTONGAN 11
BANGUNAN UTAMA 1. KETUA TIM
Skala
2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
DETAIL POTONGAN 12 1.
BANGUNAN UTAMA
7 2.
Skala
3.

4.

5.
0
DETAIL POTONGAN 13 6.
BANGUNAN UTAMA
7,
Skala

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
DETAIL TUNGAN PADA SHAFT
STR 1 : 20
BANGUNAN UTAMA
Skala NO. GAMBAR JUMLAH GAMBAR

067 110
NAMA PROYEK

DETAIL POTONGAN 14 0
HOTEL 8 LANTAI
BANGUNAN UTAMA
LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 4th (4)

2 DETAIL POTONGAN 15
BANGUNAN UTAMA NAMA TIM
Skala

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

L M ● KETERANGAN
1.
DETAIL POTONGAN 16
BANGUNAN UTAMA 2.
Skala
3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


M L
KODE GAMBAR SKALA
DETAIL POTONGAN 17
STR 1 : 20
BANGUNAN UTAMA
Skala NO. GAMBAR JUMLAH GAMBAR

068 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

3 AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN 18
BANGUNAN UTAMA DETAIL POTONGAN
Skala PLAT LANTAI 4th) (5

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.
7 7'
3.

4.
DETAIL POTONGAN 19 DETAIL TUL. BP
BANGUNAN UTAMA BANGUNAN UTAMA 5.

Skala Skala 6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

069 110
7''

7'

0
8000 8000 8000 8000 8000 8000 8000

3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680 NAMA PROYEK

2100
HOTEL 8 LANTAI
1775

LOKASI PROYEK
M
3000

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
6000

AS BUILT DRAWING
JUDUL GAMBAR :
L
4000

DENAH KOLOM
LANTAI 5-6th
K
6000

NAMA TIM
J

ANGGOTA TIM

1. KETUA TIM
6000

2. ANGGOTA 1
I

3. ANGGOTA 2

● KETERANGAN
6000

1.
H'

2.
H
800

3.

DENAH KOLOM LANTAI 5-6th


4.

5.

BANGUNAN UTAMA
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

Skala
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

070 110
7''

7'

0
8000 8000 8000 8000 8000 8000 8000

3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680 NAMA PROYEK

2100
HOTEL 8 LANTAI

D06

D07
1775

LOKASI PROYEK
M

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D01

D08
D02
3000

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
6000

D04

AS BUILT DRAWING
JUDUL GAMBAR :
L

D02

D07

D08
D05

D01

D01

D01

D01

D01

D01

D01

D01

D06

D01

D01

D01

D01
4000

DENAH METALDECK
5-6th FLOOR
D03
K

D04

D08
6000

NAMA TIM
D01

D01

D01

D06

D02

D07

D01

D01

D01

D01
D01
J

ANGGOTA TIM

D01
D02

D02

D02
D09
D01
1. KETUA TIM
6000

D01

D01
2. ANGGOTA 1
I

3. ANGGOTA 2

● KETERANGAN
6000

1.
H'

2.

DENAH METALDECK 5-6th FLOOR


H
800

3.

4.

5.

BANGUNAN UTAMA
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

Skala
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

071 110
NAMA PROYEK
7''

7'

0
HOTEL 8 LANTAI
8000 8000 8000 8000 8000 8000 8000

3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680
LOKASI PROYEK
2100
KABUPATEN TOBA SAMOSIR,
1775

SUMATRA UTARA
M

AS BUILT DRAWING
3000

JUDUL GAMBAR :
6000

BP BP BP BP BP BP BP BP BP BP BP BP

DENAH TOP SLAB


S1

S1

S1

S1

S1
S1
S1

S1
S1

S1

S1

S1
S1

S1
BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP

BP
S1
S1
5-6th FLOOR
L

275
BP BP BP BP BP BP BP BP BP BP BP
4000

BP BP BP BP BP BP BP BP BP BP BP BP BP

NAMA TIM
K

S2

S2

S2

S2

S2
BP

BP

BP

BP

BP

BP

BP

BP

BP
S1

S1
S1
S1

S1

S1

S1
BP
S1
S1
BP BP BP BP BP BP BP BP BP BP
6000

ANGGOTA TIM
BP BP BP BP

1. KETUA TIM
J

2. ANGGOTA 1
6000

3. ANGGOTA 2

● KETERANGAN
1.
I

2.
6000

3.

DENAH TOP SLAB 5-6th FLOOR


H'

4.
H

5.
800

BANGUNAN UTAMA
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

Skala
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

072 110
NAMA PROYEK

M HOTEL 8 LANTAI
DETAIL POTONGAN 1 LOKASI PROYEK
BANGUNAN UTAMA
KABUPATEN TOBA SAMOSIR,
Skala
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 5-6th (1)
M
DETAIL POTONGAN 2
BANGUNAN UTAMA NAMA TIM
Skala

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

M ● KETERANGAN
1.
DETAIL POTONGAN 3
BANGUNAN UTAMA 2.

Skala 3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


L KODE GAMBAR SKALA
DETAIL POTONGAN 4
BANGUNAN UTAMA STR 1 : 20
Skala
NO. GAMBAR JUMLAH GAMBAR

073 110
NAMA PROYEK

HOTEL 8 LANTAI
6
LOKASI PROYEK
DETAIL POTONGAN 5
BANGUNAN UTAMA KABUPATEN TOBA SAMOSIR,
Skala SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 5-6th (2)

6 NAMA TIM

DETAIL POTONGAN 6
BANGUNAN UTAMA
ANGGOTA TIM
Skala
1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

5 2.

DETAIL POTONGAN 7 3.
BANGUNAN UTAMA
4.
Skala
5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

7" STR 1 : 20
DETAIL POTONGAN 8
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR

Skala 074 110


NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK
7" DETAIL POTONGAN 9 DETAIL POTONGAN 10
J KABUPATEN TOBA SAMOSIR,
BANGUNAN UTAMA BANGUNAN UTAMA
SUMATRA UTARA
Skala Skala
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 5-6th (3)

NAMA TIM

ANGGOTA TIM

1. KETUA TIM
L' M
DETAIL POTONGAN 11 2. ANGGOTA 1
BANGUNAN UTAMA
3. ANGGOTA 2
Skala
● KETERANGAN
1.

2.

3.

4.
7 5.

DETAIL POTONGAN 12 6.

BANGUNAN UTAMA 7,
Skala
TANGGAL 15 NOVEMBER 2020

DETAIL POTONGAN 13 KODE GAMBAR SKALA


BANGUNAN UTAMA 0
STR 1 : 20
Skala
NO. GAMBAR JUMLAH GAMBAR

075 110
NAMA PROYEK

DETAIL POTONGAN 14 0 HOTEL 8 LANTAI


BANGUNAN UTAMA
LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 5-6th (4)

2 DETAIL POTONGAN 15
BANGUNAN UTAMA NAMA TIM
Skala

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
L M
DETAIL POTONGAN 16 1.
BANGUNAN UTAMA 2.
Skala
3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


M L KODE GAMBAR SKALA

DETAIL POTONGAN 17 STR 1 : 20


BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
Skala
076 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING

3 JUDUL GAMBAR :

DETAIL POTONGAN 18 DETAIL POTONGAN


BANGUNAN UTAMA PLAT LANTAI 5-6th (5)

Skala

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.
DETAIL POTONGAN 19 DETAIL TUL. BP
6.
BANGUNAN UTAMA BANGUNAN UTAMA
7,
Skala Skala

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

077 110
7''

7'

0
6000 8000 8000 8000 8000 8000 8000 8000

NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100 HOTEL 8 LANTAI


LOKASI PROYEK
M

KABUPATEN TOBA SAMOSIR,


3000

SUMATRA UTARA
6000

275

AS BUILT DRAWING
JUDUL GAMBAR :
L

275

DENAH KOLOM 7-8th


4000
K

NAMA TIM
6000

ANGGOTA TIM
J

1. KETUA TIM
6000

2. ANGGOTA 1

3. ANGGOTA 2
I

● KETERANGAN
6000

1.

2.
H

3.

DENAH KOLOM LANTAI 7-8th


4.

5.

BANGUNAN UTAMA
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE- GAMBAR SKALA

Skala
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

078 110
7''

7'

0
6000 8000 8000 8000 8000 8000 8000 8000

NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100 HOTEL 8 LANTAI

E08

E10
LOKASI PROYEK
M

E01

E01

E01

E01

E01

E01

E01

E01

E09

E01

E01

E01

E01

E07
KABUPATEN TOBA SAMOSIR,
3000

SUMATRA UTARA
6000

275

AS BUILT DRAWING
E02

JUDUL GAMBAR :

E09
L

E07
275

E10
E08
E04

E01

E01

E01

E01

E01

E01

E01

E01

E01

E01

E01

E01
DENAH METALDECK
4000

7-8th FLOOR
K

E02

E03

E07
NAMA TIM
6000

E01

E01

E01

E01

E01

E01

E01

E01

E08

E09

E10

E01

E01

E01

E01
ANGGOTA TIM
J

E05

E05
E06
E01

1. KETUA TIM

E01
6000

E01

E01
E01

2. ANGGOTA 1

3. ANGGOTA 2
I

● KETERANGAN
6000

1.

2.

DENAH METALDECK 7-8th FLOOR


H

3.

4.

5.

BANGUNAN UTAMA
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

Skala
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

079 110
7''

7'

0
6000 8000 8000 8000 8000 8000 8000 8000

NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100 HOTEL 8 LANTAI


400

1775

LOKASI PROYEK
M

KABUPATEN TOBA SAMOSIR,


3000

SUMATRA UTARA
6000

275

BP BP BP BP BP BP BP BP BP BP BP BP BP BP AS BUILT DRAWING
JUDUL GAMBAR :
530

S1

S1
S1

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1
L

275

BP BP BP BP BP BP BP BP BP BP BP BP BP BP
4000

506
DENAH TOP SLAB
300
805
BP
530

7-8th FLOOR
K

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1

S1
S1

BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP
NAMA TIM
6000
402

ANGGOTA TIM
J

300 1. KETUA TIM


6000

2. ANGGOTA 1

3. ANGGOTA 2
I

● KETERANGAN
6000

1.

2.

DENAH TOB SLAB 7-8th FLOOR


H

3.

4.

5.

BANGUNAN UTAMA
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

Skala
STR 1 : 200

NO. GAMBAR JUMLAH GAMBAR

080 110
NAMA PROYEK

HOTEL 8 LANTAI
M
LOKASI PROYEK
DETAIL POTONGAN 1
KABUPATEN TOBA SAMOSIR,
BANGUNAN UTAMA
SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 7-8th (1)

M
DETAIL POTONGAN 2 NAMA TIM
BANGUNAN UTAMA
Skala
ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
M
1.

DETAIL POTONGAN 3 2.
BANGUNAN UTAMA
3.
Skala
4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


L KODE GAMBAR SKALA

DETAIL POTONGAN 4 STR 1 : 20


BANGUNAN UTAMA
NO. GAMBAR JUMLAH GAMBAR
Skala
081 110
NAMA PROYEK

HOTEL 8 LANTAI
6 LOKASI PROYEK
DETAIL POTONGAN 5
KABUPATEN TOBA SAMOSIR,
BANGUNAN UTAMA SUMATRA UTARA
Skala
AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 7-8th (2)

NAMA TIM
6
DETAIL POTONGAN 6
BANGUNAN UTAMA ANGGOTA TIM
Skala
1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

5 2.

DETAIL POTONGAN 7 3.
BANGUNAN UTAMA
4.
Skala
5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

7" STR 1 : 20
DETAIL POTONGAN 8
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
Skala
082 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


7" SUMATRA UTARA
J
DETAIL POTONGAN 9 DETAIL POTONGAN 10 AS BUILT DRAWING
BANGUNAN UTAMA BANGUNAN UTAMA
JUDUL GAMBAR :
Skala Skala

DETAIL POTONGAN
PLAT LANTAI 7-8th (3)

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

L' M
DETAIL POTONGAN 11 3. ANGGOTA 2
BANGUNAN UTAMA
● KETERANGAN
Skala
1.

2.

3.

4.

5.

6.

7,

7
TANGGAL 15 NOVEMBER 2020
0
DETAIL POTONGAN 12 DETAIL POTONGAN 13 KODE GAMBAR SKALA
BANGUNAN UTAMA BANGUNAN UTAMA STR 1 : 20
Skala Skala
NO. GAMBAR JUMLAH GAMBAR

083 110
NAMA PROYEK

HOTEL 8 LANTAI
DETAIL POTONGAN 14 0
LOKASI PROYEK
BANGUNAN UTAMA
Skala KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT LANTAI 7-8th (4)

2 DETAIL POTONGAN 15
NAMA TIM
BANGUNAN UTAMA
Skala

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
L M 1.
DETAIL POTONGAN 16
BANGUNAN UTAMA 2.
Skala 3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


M L KODE GAMBAR SKALA

STR 1 : 20
DETAIL POTONGAN 17
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
Skala
084 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
3 JUDUL GAMBAR :

DETAIL POTONGAN 18 DETAIL POTONGAN


BANGUNAN UTAMA PLAT LANTAI 7-8th (5)
Skala

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

DETAIL POTONGAN 19 DETAIL TUL. BP 5.


BANGUNAN UTAMA BANGUNAN UTAMA
6.
Skala Skala
7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

085 110
H I J K L M
6000 6000 6000 4000 6000
3000

7''

3000

2100
7'
6000

3000

7
4000
8000

4000

6
DET. TUL. KOLOM K8b
BANGUNAN UTAMA
4000

Skala
8000

4000

3713 4000 3712

5
4000

8000
8000
8000

4000

3713 4000 3712

4
4000

8000
8000

DET. TUL. KOLOM K8c


363
4000

BANGUNAN UTAMA 3350 4000 2996 3004

Skala 3
2450

2825

8000
2825
8000

363
3350 4000 3000 3000
2725
2725

2
4000

8000
8000

4000

3350 2000 2000 3000


DET. TUL. KOLOM K8d
1
BANGUNAN UTAMA
Skala
4000

8000
8000

4000

3350 2000 2000 3000

DENAH KOLOM ROOF FLOOR (SFL.+34.460)


3680

BANGUNAN UTAMA
Skala
1775
1.

7,
6.
2.

3.

5.
4.

STR

086
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 200
ROOF (SFL.+34.460)
HOTEL 8 LANTAI

DENAH KOLOM LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
7''

7'

0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100
HOTEL 8 LANTAI

F01

F01

F08

F10
LOKASI PROYEK

1775
F01

F01
M

F01

F01

F01

F01

F01

F01

F09

F01

F01

F07
KABUPATEN TOBA SAMOSIR,
3000

SUMATRA UTARA
6000

AS BUILT DRAWING
F02

JUDUL GAMBAR :
L

F01

F01

F01

F01

F01

F01

F09

F01

F01

F07
DENAH METALDECK
F04

F01

F01

F08
4000

ROOF FLOOR

F01

F01
F10
(SFL.+34.460)
K

NAMA TIM

F01
F02

F03

F01

F01

F01

F01

F01

F01

F01

F01

F08

F09

F10

F01

F01

F01

F07
6000

ANGGOTA TIM
J

F05

F05
F06
1. KETUA TIM
F01

F01
6000

2. ANGGOTA 1
F01

F01

F01 3. ANGGOTA 2
I

DENAH TOP OF SLAB ROOF FLOOR (SFL.+34.460)


● KETERANGAN
1.
6000

2.

3.
H

4.

5.

6.

7,

BANGUNAN UTAMA
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 200

Skala
NO. GAMBAR JUMLAH GAMBAR

087 110
7''

7'

0
6000 8000 8000 8000 8000 8000 8000 8000
NAMA PROYEK
3000 3000 4000 4000 4000 4000 4000 4000 4000 4000 2450 2825 2725 4000 4000 4000 4000 3680

2100
HOTEL 8 LANTAI
LOKASI PROYEK

1775
M

BP BP

KABUPATEN TOBA SAMOSIR,


3000

SUMATRA UTARA
6000

BP BP BP

BP
AS BUILT DRAWING

BP
BP
JUDUL GAMBAR :

BP
S1

BP
L

BP
BP BP

BP
DENAH TOP SLAB
4000

BP
BP BP BP
ROOF FLOOR
(SFL.+34.460)
K

NAMA TIM
6000

ANGGOTA TIM
J

1. KETUA TIM
6000

2. ANGGOTA 1

3. ANGGOTA 2
I

● KETERANGAN

DENAH TOP SLAB ROOF FLOOR (SFL.+34.460)


1.
6000

2.

3.
H

4.

5.

6.

7,

BANGUNAN UTAMA
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 200

Skala
NO. GAMBAR JUMLAH GAMBAR

088 110
DETAIL POTONGAN 1 NAMA PROYEK
BANGUNAN UTAMA
Skala M HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL PERTEMUAN
BANGUNAN UTAMA
DETAIL POTONGAN
Skala
PLAT ROOF FLOOR (1)
DETAIL POTONGAN 2
BANGUNAN UTAMA
Skala
M NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.
M L
DETAIL POTONGAN 3 2.
BANGUNAN UTAMA
3.
Skala
4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
L M
DETAIL POTONGAN 4 STR 1 : 20
BANGUNAN UTAMA NO. GAMBAR JUMLAH GAMBAR
Skala
089 110
NAMA PROYEK

DETAIL POTONGAN 5 2 HOTEL 8 LANTAI


BANGUNAN UTAMA
LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT ROOF FLOOR (2)
3
DETAIL POTONGAN 6
BANGUNAN UTAMA NAMA TIM
Skala

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.
7 7'
DETAIL POTONGAN 7 2.
BANGUNAN UTAMA
3.
Skala
4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 20
L' M
DETAIL POTONGAN 8 NO. GAMBAR JUMLAH GAMBAR
BANGUNAN UTAMA
Skala 090 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

7 KABUPATEN TOBA SAMOSIR,


7" SUMATRA UTARA
DETAIL POTONGAN 10
DETAIL POTONGAN 9 BANGUNAN UTAMA AS BUILT DRAWING
BANGUNAN UTAMA
Skala JUDUL GAMBAR :
Skala

DETAIL POTONGAN
PLAT ROOF FLOOR (3)

NAMA TIM

ANGGOTA TIM

0 1. KETUA TIM
7" DETAIL POTONGAN 12
BANGUNAN UTAMA 2. ANGGOTA 1
Skala
3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

0 1
DETAIL POTONGAN 13 TANGGAL 15 NOVEMBER 2020
BANGUNAN UTAMA KODE GAMBAR SKALA
Skala
STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

091 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

DETAIL POTONGAN 14 KABUPATEN TOBA SAMOSIR,


BANGUNAN UTAMA SUMATRA UTARA
L
Skala AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PLAT ROOF FLOOR (4)

NAMA TIM

ANGGOTA TIM

1. KETUA TIM
DETAIL POTONGAN 15
BANGUNAN UTAMA
L 2. ANGGOTA 1
Skala
3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

J DETAIL TUL. BP
DETAIL POTONGAN 16 DETAIL DINDING ROOF GARDEN BANGUNAN UTAMA TANGGAL 15 NOVEMBER 2020
BANGUNAN UTAMA BANGUNAN UTAMA KODE GAMBAR SKALA
Skala
Skala Skala
STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

092 110
I J K L M
6000 6000 4000 6000
3000
1000 300
8

300
2000

300
7''

3000
3000

2100
8000
G02 G04

6000
7'

3000
3000
7

1000
1000
1000 4000 6000
300
4000
8000

4000

6
4000
8000

1036 3713 2000 2000 3712 1038


4000

1600
1600

G07
5
4000

G01 G02 G01

8000
8000
8000

4000

4
G01 G02 G01
2877
2877
3575

517 1183 2000 817 1033


4000

250
1250
7700
8000

4000
4000
4350

G01 G02 G03 G03


4000

3000 3000
250
2123
300
75

1123
1123

750

3350 2000
3
2000

G06
2450

2800

G01 G02
600

G04
8000
8000
2825
8000

6000
2800

S1
G01 G02
G05
2725

2000

1500 1000 550 2750


75

3250
3350 1950
2000 2000 5099 3000 2951
3000
2
1020
225

1500 250
720
4000

8000
8000

4000

3350 2000 2000 3000 1


4000

8000
8000

DENAH KOLOM TOP ROOF (SFL. +37.950)


4000

BANGUNAN UTAMA
Skala 0
3350 2000 2000 3000

3350 4000 3000


1.

7,
6.
2.

3.

5.
4.

STR

093
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 200
DENAH KOLOM TOP
ROOF (SFL. +37.950)
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
I J K L M
6000 6000 4000 6000
3000
1000 300
8

300
2000

300
7''

3000
3000

2100
8000
G02 G04

6000
7'

3000
3000
7

1000
1000
1000 4000 6000

4000
300
8000

4000

6
4000
8000

1036 3713 2000 2000 3712 1038


4000

1600
1600

G07
5
4000

G01 G02 G01

8000
8000
8000

4000

4
G01 G02 G01
2877
2877
3575

517 1183 2000 817 1033


4000

250
1250
7700
8000

4000
4000
4350

G01 G02 G03 G03


4000

3000 3000
250
2123
300
75

1123
1123

750

3350 2000
3
2000

G06
2450

2800

G01 G02
600

G04
8000
8000
2825
8000

6000
2800

S1
G01 G02
G05
2725

2000

1500 1000 550 2750


75

3250
3350 1950
2000 2000 5099 3000 2951
3000
2
1020
225

1500 250
720
4000

8000
8000

4000

3350 2000 2000 3000 1


4000

8000
8000

DENAH STEELDECK ROOF TOP (SFL. +37.950)


4000

BANGUNAN UTAMA
Skala 0
3350 2000 2000 3000

3350 4000 3000


1.

7,
6.
2.

3.

5.
4.

STR

094
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 200
ROOF (SFL. +37.950)
HOTEL 8 LANTAI

DENAH METALDECK TOP

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
I J K L M
6000 6000 4000 6000
3000
1000 300
8

300
2000

300
7''

3000
3000

2100
8000
G02 G04

6000
7'

3000
3000
7

1000
1000
1000 4000 6000

4000
300
8000

4000

6
4000
8000

1036 3713 2000 2000 3712 1038


4000

1600
1600

G07
5
4000

G01 G02 G01

8000
8000
8000

4000

4
G01 G02 G01
2877
2877
3575

517 1183 2000 817 1033


4000

250
1250
7700
8000

4000
4000
4350

G01 G02 G03 G03


4000

3000 3000
250
2123
300
75

1123
1123

750

3350 2000
3
2000

G06
2450

2800

G01 G02
600

G04
8000
8000
2825
8000

6000
2800

S1
G01 G02
G05
2725

2000

1500 1000 550 2750


75

3250
3350 1950
2000 2000 5099 3000 2951
3000
2
1020
225

1500 250
720
4000

8000
8000

4000

3350 2000 2000 3000 1


4000

8000
8000

DENAH TOP SLAB ROOF TOP SFL. +37.960


4000

BANGUNAN UTAMA
Skala 3350 2000 2000 3000
0
3350 4000 3000
1.

7,
6.
2.

3.

5.
4.

STR

095
TANGGAL
JUDUL GAMBAR :

● KETERANGAN

NO. GAMBAR
KODE GAMBAR
NAMA TIM

1. KETUA TIM
ANGGOTA TIM

2. ANGGOTA 1
NAMA PROYEK

3. ANGGOTA 2
LOKASI PROYEK

AS BUILT DRAWING
SUMATRA UTARA

110
SKALA

1 : 200
ROOF (SFL. +37.950)
DENAH TOP SLAB TOP
HOTEL 8 LANTAI

15 NOVEMBER 2020
KABUPATEN TOBA SAMOSIR,

JUMLAH GAMBAR
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :
DETAIL POTONGAN 1 L
BANGUNAN UTAMA
Skala DETAIL POTONGAN
PLAT ROOF TOP (1)

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

M L 4.

5.
DETAIL POTONGAN 2
6.
BANGUNAN UTAMA
Skala 7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 20

NO. GAMBAR JUMLAH GAMBAR

096 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
M L
JUDUL GAMBAR :

DETAIL POTONGAN 3 DETAIL POTONGAN


BANGUNAN UTAMA PLAT ROOF TOP (2)
Skala

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


DETAIL POTONGAN 4 L M KODE GAMBAR SKALA
BANGUNAN UTAMA
STR 1 : 20
Skala
NO. GAMBAR JUMLAH GAMBAR

097 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN 5
BANGUNAN UTAMA
3 2' 2 DETAIL POTONGAN
Skala
PLAT ROOF TOP (3)

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2
DETAIL POTONGAN 6
BANGUNAN UTAMA 7" ● KETERANGAN
Skala 1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
J' J' DETAIL POTONGAN 8 K
DETAIL POTONGAN 7 BANGUNAN UTAMA STR 1 : 20
BANGUNAN UTAMA Skala NO. GAMBAR JUMLAH GAMBAR
Skala
098 110
300
700
NAMA PROYEK

300
HOTEL 8 LANTAI
DETAIL POTONGAN A

700
BANGUNAN UTAMA LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,

300
SUMATRA UTARA

AS BUILT DRAWING

700
JUDUL GAMBAR :

300
DETAIL POTONGAN
2800 600 2800 PONDASI MESIN ROOF (1)

DETAIL POTONGAN B
DENAH PONDASI ROOF TANK BANGUNAN UTAMA
BANGUNAN UTAMA NAMA TIM
Skala
Skala

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

4000
3. ANGGOTA 2

● KETERANGAN
1.

2.
DETAIL POTONGAN C
1500

BANGUNAN UTAMA 3.
Skala 4.

5.

6.

7,
DENAH PONDASI POMPA BOSTER
BANGUNAN UTAMA TANGGAL 15 NOVEMBER 2020
DETAIL POTONGAN D
Skala KODE GAMBAR SKALA
BANGUNAN UTAMA
Skala STR 1 : 30

NO. GAMBAR JUMLAH GAMBAR

099 110
NAMA PROYEK
4000

DETAIL POTONGAN E HOTEL 8 LANTAI


BANGUNAN UTAMA
LOKASI PROYEK
Skala
KABUPATEN TOBA SAMOSIR,
1700

SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

DETAIL POTONGAN
PONDASI MESIN ROOF (2)
DENAH PONDASI PRESSURE TANK DETAIL POTONGAN F
BANGUNAN UTAMA BANGUNAN UTAMA
Skala Skala
NAMA TIM

ANGGOTA TIM

1. KETUA TIM

4000 2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
DETAIL POTONGAN G
1.
BANGUNAN UTAMA
1850

Skala 2.

3.

4.

5.

6.

7,
DENAH PONDASI PIMPA RETURN & HEATPUMP DETAIL POTONGAN H
BANGUNAN UTAMA BANGUNAN UTAMA
TANGGAL 15 NOVEMBER 2020
Skala Skala
KODE GAMBAR SKALA

STR 1 : 30

NO. GAMBAR JUMLAH GAMBAR

100 110
L M L M
6000 6000
250 250 250 250
6000 6000

250

250
3 3 NAMA PROYEK

HOTEL 8 LANTAI

2450

2450
G04
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING

2825

2825
JUDUL GAMBAR :
G04

8000

8000
DENAH PLAT ATAP
LIFT PASSANGER &
TANGGA (SFL. +42.450)

2725

2725
NAMA TIM
G04 250

250
ANGGOTA TIM
2 2 1. KETUA TIM

2. ANGGOTA 1
DENAH STEELDECK ATAP LIFT DENAH TOP SLAB ATAP LIFT
GEDUNG UTAMA GEDUNG UTAMA
3. ANGGOTA 2
Skala 1:75 Skala 1:75
● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


DETAIL POTONGAN 1 KODE GAMBAR SKALA
GEDUNG UTAMA
Skala 1:75 STR 1 : 30
8 NO. GAMBAR JUMLAH GAMBAR

101 110
C D E F G H
6000 6000 6000 6000 6000

800 H'

B19
8
B04 B04 B04 B04 NAMA PROYEK
7'
HOTEL 8 LANTAI

8000
B02 B02 B02 B02
LOKASI PROYEK
B03 B03 B03 B03
KABUPATEN TOBA SAMOSIR,
7 SUMATRA UTARA

B04 B04 B04 B04 AS BUILT DRAWING


B14
JUDUL GAMBAR :

8000
B02 B02 B02 B02
DENAH METALDECK
BALLROOM
B03 B03 B03 B03 GEDUNG UTAMA
6
B04 B04 B04 B04 NAMA TIM

8000
B02 B02 B02 B02 ANGGOTA TIM

1. KETUA TIM
B03 B03 B03 B03
2. ANGGOTA 1
5
B02 B02 B02 B02 3. ANGGOTA 2

● KETERANGAN

8000
B05 B05 B05 B05 1.
B14
2.
B06 B06 B06 B06 3.
4 4.
B02 B02 B02 B02
5.

6.
B06 B06 B06 B06 8000
7,

B05 B05 B05 B05 TANGGAL 15 NOVEMBER 2020

B20 3 KODE GAMBAR SKALA

STR 1 : 200
DENAH METALDECK BALLROOM NO. GAMBAR JUMLAH GAMBAR
GEDUNG UTAMA
8000

102 110
Skala 1:200
C D E F G H
6000 6000 6000 6000 6000

800 H'
2060 30000

1480
SFL. +9.460 SFL. +9.460
T=130 T=130
8
NAMA PROYEK
7'

SFL. +9.460
T=130
HOTEL 8 LANTAI

8000
SFL. +8.945 SFL. +9.065 SFL. +8.945

T=130 T=130 T=130


LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


7 SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

8000
DENAH TOP SLAB
BALLROOM
GEDUNG UTAMA
6
NAMA TIM
SFL. +9.460

SFL. +8.945 SFL. +9.065 SFL. +8.945

8000
40000

T=130

ANGGOTA TIM
T=130 T=130 T=130
7689 1. KETUA TIM
1129
700

226 226 226 226


1200

2. ANGGOTA 1
500

6000 5
3. ANGGOTA 2

● KETERANGAN

8000
10400
8000

8000

9000

1.

2.

3.
4
500
1200

4.
450 450
6000
5.
850 850
SFL. +9.460

SFL. +8.945 SFL. +9.065 SFL. +8.945 6.


T=130

T=130 T=130 T=130 8000


7,

TANGGAL 15 NOVEMBER 2020


550

SFL. +9.460 SFL. +9.460 3 KODE GAMBAR SKALA


2060 18000 6006
STR 1 : 200
DENAH TOP SLAB BALLROOM
GEDUNG UTAMA NO. GAMBAR JUMLAH GAMBAR
8000

Skala 1:200 103 110


DETAIL A DETAIL B DETAIL C DETAIL D DETAIL E

WF 300.150.9.14 WF 250.125.9.14 WF 250.125.9.14 WF 250.125.9.14 WF 250.125.9.14 WF 250.125.9.14

WF 250.125.9.14 WF 250.125.9.14 WF 250.125.9.14 WF 250.125.9.14


WF 300.150.9.14 WF 300.150.9.14 WF 300.150.9.14 WF 300.150.9.14
HCB 1600.300.14.26 HCB 1600.300.14.26 HCB 1600.300.14.26 HCB 1600.300.14.26 HCB 1600.300.14.26
KOLOM KOLOM KOLOM KOLOM KOLOM
6000 6000 6000 6000

D E F G H
NAMA PROYEK
DETAIL POTONGAN 1
GEDUNG UTAMA HOTEL 8 LANTAI
Skala 1:100
2379 LOKASI PROYEK
100

KABUPATEN TOBA SAMOSIR,


WF 300.150.9.14 WF 250.125.9.14 WF 250.125.9.14 WF 250.125.9.14
120

200
SUMATRA UTARA
130
200 130
450

AS BUILT DRAWING

515
300

220 JUDUL GAMBAR :

DETAIL POTONGAN
PLAT BALLROOM (1)

HCB 1600.300.14.26 HCB 1600.300.14.26 HCB 1600.300.14.26


DETAIL A KOLOM DETAIL B KOLOM DETAIL C KOLOM NAMA TIM
GEDUNG UTAMA GEDUNG UTAMA GEDUNG UTAMA
Skala 1:40 Skala 1:40 Skala 1:40
ANGGOTA TIM

1. KETUA TIM
D E F
2. ANGGOTA 1

WIREMESH M8-150 SHEAR CONNECTOR


1 LAPIS ∅10-200 3. ANGGOTA 2
PLAT LANTAI t=130
WF 250.125.9.14 WF 250.125.9.14 Selimut=20 ● KETERANGAN
1.

2.

3.

4.

5.

HCB 1600.300.14.26
HCB 1600.300.14.26 6.
D13-250
KOLOM KOLOM STEELDECK t=0.75mm 7,
LAS
LAS
DETAIL PERTEMUAN D13-250 TANGGAL 15 NOVEMBER 2020

BANGUNAN UTAMA KODE GAMBAR SKALA


DETAIL D DETAIL E
Skala 1 : 8 STR 1 : 100
G GEDUNG UTAMA GEDUNG UTAMA H
Skala 1:40 Skala 1:40 NO. GAMBAR JUMLAH GAMBAR

104 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
DETAIL POTONGAN 2 8 DETAIL POTONGAN 3
GEDUNG UTAMA GEDUNG UTAMA 8 AS BUILT DRAWING
Skala 1:30 JUDUL GAMBAR :
Skala 1:30

DETAIL POTONGAN
PLAT BALLROOM (2)

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.
DETAIL POTONGAN 4
2.
GEDUNG UTAMA
Skala 1:30 3.

4.
H
5.
DET. POT. A
GEDUNG UTAMA 6.
Skala 1:10
7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
DETAIL PEDESTAL RUMAH GORGA
GEDUNG UTAMA STR 1 : 30
Skala 1:10 NO. GAMBAR JUMLAH GAMBAR

105 110
NAMA PROYEK

HOTEL 8 LANTAI

7'
8

6
1800 2000 6000 8000 LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
200
AS BUILT DRAWING
320

SFL. +9.450
JUDUL GAMBAR :
100
I

1050

200
950

750
DENAH KOLAM LANTAI 2nd
200

NAMA TIM

SFL. +9.450
5000
5400
SFL. +9.460

SFL. +9.030

SFL. +8.800
6000

T=130

T=200

T=200
4450
4050

ANGGOTA TIM
500

1. KETUA TIM

200.130.100
BOX LAMP
1

2. ANGGOTA 1

200
200

3. ANGGOTA 2
500

500
● KETERANGAN
H

SFL. +9.450
1.

DENAH KOLOM LANTAI 2nd


100 200 200 10000 200 3000 200

1950 1750 13200 2.

3.
2
4

GEDUNG UTAMA
4.

5.

1:70
6.

7,

Skala
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 70

NO. GAMBAR JUMLAH GAMBAR

106 110
200 3000 200 10000 200

500 2000 500 1000 2000 2000 2000 2000 1000 1750
SFL.+10.000

50
200 1950 100

300

540
550

600

130
KID POOL

120
SFL.+9.580
450

130
SFL.+9.450 200 SFL.+9.460

920
1200
120

450
SWIMMING POOL

900

430

200
SFL.+9.030

600

730
230 200
230
320
200

450

1480
NAMA PROYEK
500

2000 6000 4000 2000 2000 HOTEL 8 LANTAI


8000 6000

LOKASI PROYEK

6 7 7' 8 KABUPATEN TOBA SAMOSIR,


DETAIL POTONGAN 1 SUMATRA UTARA
GEDUNG UTAMA
AS BUILT DRAWING
500 300 Skala 1:60
200 5000 200 JUDUL GAMBAR :
500 2000 2000 500 100
SFL.+10.000 500 200 4050 200 1050 320 100
SFL.+9.900
DETAIL POTONGAN
300

SFL.+9.460

120
200
550
130

130
450

450
200 SFL.+9.450 KOLAM LANTAI 2nd

430
1200

630
SFL.+9.030

120
900

200
320

400
350
SFL.+8.800
H I NAMA TIM
400 DETAIL POTONGAN 3
GEDUNG UTAMA
Skala 1:50
ANGGOTA TIM
A 1. KETUA TIM
6000

800 5200
2. ANGGOTA 1

800 5200
320 100
3. ANGGOTA 2
SFL.+9.460

120
H I

200
130
450
● KETERANGAN

130
1.
DETAIL POTONGAN 2 320

GEDUNG UTAMA 800 5200 2.


6000
Skala 1:50 3.
H I 4.
DETAIL POTONGAN 4
GEDUNG UTAMA 5.
Skala 1:50
6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
DETAIL POTONGAN A
GEDUNG UTAMA STR 1 : 70
Skala 1:30
NO. GAMBAR JUMLAH GAMBAR

107 110
DN FR
1ST FL
UP TO
1ST FL
3

NAMA PROYEK

2557 3000 3000 2443


HOTEL 8 LANTAI
443 557
LOKASI PROYEK

DROP OFF KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA

AS BUILT DRAWING
2
JUDUL GAMBAR :

DENAH RAMP DROP


OFF LOBBY BALLROOM

NAMA TIM

1 ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

D E F G H 3. ANGGOTA 2

● KETERANGAN
1.
DENAH RAMP DROP OFF LOBBY BALLROOM
BANGUNAN UTAMA 2.
Skala
3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA
G STR 1 : 70
DETAIL POTONGAN RAMP 1
NO. GAMBAR JUMLAH GAMBAR
BANGUNAN UTAMA
Skala 108 110
7''

6
7

DENAH BALOK & PLAT TOILET 2nd FLOOR


J

NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

BANGUNAN UTAMA
KABUPATEN TOBA SAMOSIR,
SUMATRA UTARA

AS BUILT DRAWING
JUDUL GAMBAR :

Skala
DENAH STRUKTUR
TOILET KOLAM
LANTAI 2nd

NAMA TIM
7''

6
7
ANGGOTA TIM

1. KETUA TIM

DENAH KOLOM, SLOOF TOILET 2nd FLOOR


2. ANGGOTA 1
J

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

BANGUNAN UTAMA
4.

5.

6.

7,

Skala
TANGGAL 15 NOVEMBER 2020
KODE GAMBAR SKALA

STR 1 : 50

NO. GAMBAR JUMLAH GAMBAR

109 110
NAMA PROYEK

HOTEL 8 LANTAI
LOKASI PROYEK

KABUPATEN TOBA SAMOSIR,


SUMATRA UTARA
DETAIL KOLOM KP1 DETAIL BALOK BP1 DETAIL SLOOF, BALOK BP2
BANGUNAN UTAMA BANGUNAN UTAMA BANGUNAN UTAMA AS BUILT DRAWING
JUDUL GAMBAR :
Skala Skala Skala

DETAIL POTONGAN
TOILET KOLAM
LANTAI 2nd

NAMA TIM

ANGGOTA TIM

1. KETUA TIM

2. ANGGOTA 1

3. ANGGOTA 2

● KETERANGAN
1.

2.

3.

4.

5.

6.

7,

TANGGAL 15 NOVEMBER 2020


KODE GAMBAR SKALA

STR 1 : 10
DETAIL POTONGAN 1
NO. GAMBAR JUMLAH GAMBAR
BANGUNAN UTAMA
110 110
Skala