You are on page 1of 128

APPENDIX: A-01

PROJECT LAYOUT
350660.00E

350685.00E

350710.00E

350735.00E

350760.00E

350785.00E

350810.00E

350835.00E

350860.00E

350885.00E

350910.00E

350935.00E

350960.00E

350985.00E

351010.00E
A
2530480.00N
BH- 2
E:350849.90 BH- 3
N:2530454.57 E:350896.37
Elev: 12.50m N:2530470.15
Elev: 12.50m
2530455.00N
2530430.00N
BH- 8 BH-10
E:350854.18 BH- 9 BH- 7 E:350942.74
N:2530413.65 E:350893.00 E:350895.25 N:2530425.19
Elev: 12.51m N:2530411.13 N:2530411.53 Elev: 11.65m BH-11
Elev: 12.10m Elev: 12.50m E:350974.18
N:2530412.30 2530405.00N
BH-12 Elev: 12.51m
E:350907.63
N:2530393.52
Elev: 12.00m
2530380.00N
BH-14
E:350858.12 BH-15
N:2530373.79 E:350901.24
Elev: 12.51m N:2530368.90
Elev: 12.51m
2530355.00N
BH-18
BH-19 E:350913.17
E:350888.91 N:2530345.75
N:2530341.60 Elev: 12.56m
Elev: 12.50m 2530330.00N
BH-21 BH-20 BH- 4
E:350892.47 E:350862.13 E:351002.35
BH-22 N:2530325.16
N:2530313.95 N:2530324.29 E:350916.86 Elev: 12.53m
Elev: 12.50m Elev: 12.23m N:2530314.94
Elev: 12.35m
2530305.00N
BH-23
E:350838.56
N:2530302.82 BH- 5 BH- 6
Elev: 12.50m E:350910.96 E:350956.99
N:2530290.16 N:2530290.10
Elev: 12.51m Elev: 12.50m
2530280.00N
BH-33 BH-16
BH-13
E:350736.08 E:350869.39 BH-31
E:350673.86
N:2530252.74 N:25302687.07 N:2530265.72 E:350911.17
Elev: 12.50m Elev: 12.72m Elev: 12.45m N:2530258.77
Elev: 12.60m

A
2530255.00N
Project: Drawing Title: Client: Location: Engineer: Drg. No. Sub Consultant:
Drawn by: Emran Uddin DCL/BHEL/ D e ve lo p m e n t C o n structions Ltd.
BSRM Factory. (Unit-02) Borhole Layout. BSRM Jowrargong, Mirsarai, Chittagong. House 11, Road 19/A, Uttara, Dhaka 1230
Checked by: Engr. Priodeep Layout/ Sheet-1
Phone +880-2-58957231, Fax +880-2-58957283
Approved by: Engr. Roknuz zaman Date:20-10-16 Email: dcl@dcl-fcl.com, Web: http://www.dcl-fcl.com
APPENDIX: B-01

BOREHOLE LOGS
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.

Moisture
Unit

Specific
Borehole:

Layer Symbol
Content
E:350849.90m

GravitY
Grain Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-02 N:2530454.57m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:18m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/qu GWD(m): Start: 08.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.55m End: 08.09.16
0 10 20 30 40 50
12.0
1.0
11.0
04 05 06 11 D1 380 2.0
10.0
3.0 SM- Silty sand. Medium.
00 87 13 N P 06 07 07 14 D2 330 9.0 Brownish.
4.0
8.0
08 09 11 20 D3 320 5.0
7.0
6.0
400 CL- Lean Clay with
04 05 04 09 D4 6.0
Sand. Stiff. Brownish.
00 21 79 41 16 25.7720.3916.21 2.67 UDS-1 275 7.0
00 22 78 37 10 20.0620.2816.89 2.66 UC 177.5 UDS-2 260 5.0
04 05 07 12 D5 380 8.0
4.0
ML- Silt With Sand. Stiff
9.0 to Very stiff. Brownish.
06 08 09 17 D6 350 3.0
10.0
2.0
00 33 67 N P 22.51 2.66 03 06 08 14 D7 370 11.0

1.0
12.0
09 12 13 25 D8 360 0.0
13.0
-1.0
DS 27.7 30.2 07 14 15 29 D9 330 14.0

-2.0 ML- Sandy Silt. Stiff to


Hard. Brownish Grey .
15.0
13 16 19 35 D10 310 -3.0
16.0
-4.0
15 22 29 51 Frist 50 blows /400mm D11 290 17.0

-5.0
18.0
19 25 28 53 Frist 50 blows /370mm D12 320 -6.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350896.37m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-03 N:2530470.15m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 09.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.30m End: 09.09.16
0 10 20 30 40 50
12.0
1.0
11.0
02 03 05 08 D1 380 2.0
10.0
3.0
04 05 07 12 D2 370 9.0
4.0
8.0
00 86 14 N P 22.29 05 07 07 14 D3 330 5.0
7.0
6.0
06 08 09 17 D4 360 6.0 SM- Silty sand. Loose
7.0 to Medium. Brownish.
5.0
04 06 07 13 D5 350 8.0
4.0
9.0
08 07 05 12 D6 380 3.0
10.0
2.0
04 05 07 12 D7 380 11.0

1.0
12.0
07 09 07 16 D8 320 0.0
13.0
-1.0
00 33 67 N P 20.54 2.67 06 07 11 18 D9 400 14.0

-2.0 ML- Sandy Silt. Very


Stiff. Brownish.
15.0
08 09 14 23 D10 370 -3.0
16.0
-4.0
11 13 16 29 D11 330 17.0

-5.0
18.0
DS 26.7 30.0 09 12 12 24 D12 390 -6.0
19.0
-7.0
14 15 18 33 D13 350 20.0

-8.0
21.0 SM- Silty sand. Medium
00 69 31 N P 21.56 2.66 07 11 23 34 D14 320 to Dense. Grey.
-9.0
22.0
-10.0
10 14 18 32 D15 360 23.0

-11.0
24.0
08 12 15 27 D16 370 -12.0
25.0
-13.0
05 09 12 21 D17 380 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:351002.35m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-04 N:2530325.16m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:22m Elev: 12.53m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 01.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.20m End: 02.09.16
0 10 20 30 40 50
12.0
1.0
11.0
00 33 67 33 09 27.80 2.66 370 ML- Sandy Silt. Soft.
01 01 03 04 D1 2.0
Grey.
10.0
3.0
01 02 04 06 D2 400 9.0
4.0
8.0 SM- Silty sand. Loose.
00 59 41 N P 2.66 02 04 04 08 D3 430 5.0
Brownish.

7.0
6.0
01 02 03 05 D4 420 6.0
7.0
5.0
00 41 59 52 21 34.77 2.66 04 06 09 15 D5 390 8.0

4.0
9.0
00 01 02 03 D6 450 3.0
10.0
2.0 MH- Sandy Elastic Silt.
03 03 04 07 D7 400 11.0 Soft to Stiff. Brownish.

1.0
12.0
02 05 07 12 D8 380 0.0
13.0
-1.0
04 06 08 14 D9 420 14.0

-2.0
15.0
06 08 10 18 D10 390 -3.0
16.0

-4.0
07 07 09 16 D11 370 17.0 CL- Lean clay with
sand. Very Stiff.
00 21 79 50 23 15.68 21.1818.31 2.67 UC 209.1 UDS-1 340 -5.0 Brownish.
UDS-2 300 18.0
07 11 12 23 D12 420 -6.0
19.0

-7.0
05 08 17 25 D13 380 20.0

-8.0
21.0 SM- Silty sand. Medium
00 69 31 N P 2.66 DS 26.7 30.0 22 51 27 78 Frist 50 blows /250mm D14 330 to Very dense. Grey.
-9.0
22.0

-10.0
18 23 30 53 Frist 50 blows /380mm D15 400 23.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350910.96m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-05 N:2530290.16m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.51m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 29.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.40m End: 30.08.16
0 10 20 30 40 50
12.0
1.0
11.0
00 00 00 00 D1 320 2.0

10.0
3.0
02 02 04 06 D2 410 9.0
4.0
8.0
SM- Silty sand. Very
00 59 41 N P 24.88 2.66 430 Loose to Medium.
01 02 02 04 D3 5.0
Brownish.
7.0
6.0
04 07 11 18 D4 440 6.0
7.0
5.0
05 07 07 14 D5 420 8.0

4.0
UDS-1 9.0
05 11 18 29 D6 400 3.0
10.0
2.0
DS 22.8 30.5 07 09 14 23 D7 440 11.0

1.0
12.0
ML- Sandy Silt. Very
06 12 13 25 D8 390 0.0 Stiff. Brownish.
13.0
-1.0
00 30 70 N P 2.67 08 10 11 21 D9 420 14.0

-2.0
15.0
06 09 12 21 D10 400 -3.0
16.0

-4.0
05 08 10 18 D11 380 17.0

-5.0 ML- Silt With Sand.


00 26 74 37 12 26.5219.24 15.21 2.67 UC 176.2 UDS-2 280 18.0 Very stiff. Grey.
09 11 13 24 D12 420 -6.0
19.0

-7.0
04 05 07 12 D13 420 20.0

-8.0
21.0
06 06 09 15 D14 400 -9.0
22.0
00 26 74 43 17 34.0119.06 14.22 2.67 UDS-3 315 -10.0
CL- Lean clay with
03 07 12 19 D15 450 23.0
sand. Stiff to Very Stiff.
-11.0 Grey.
24.0
08 11 18 29 D16 400 -12.0
25.0

-13.0
09 13 14 27 D17 420 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350956.99m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-06 N:2530290.10m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 31.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.30m End: 01.09.16
0 10 20 30 40 50
12.0
1.0
11.0
01 04 04 08 D1 340 2.0
10.0
3.0
03 06 09 15 D2 360 9.0
4.0 CL- Lean clay with
UDS-1 305 8.0 sand. Stiff to Very Stiff.
06 10 16 26 D3 390 5.0 Brownish Grey .

7.0
6.0
04 06 10 16 D4 420 6.0
7.0
5.0
00 30 70 31 12 2.66 05 07 12 19 D5 410 8.0
4.0
9.0
07 08 13 21 D6 400 3.0
10.0
2.0
12 14 10 24 D7 280 11.0

1.0
12.0
00 32 68 N P 2.66 06 08 12 20 D8 400 0.0
13.0
-1.0
07 09 13 22 D9 420 14.0

-2.0
15.0
08 10 12 22 D10 410 -3.0
16.0
00 32 68 46 18 29.27 20.3815.76 2.67 1.12 0.07 0.02 UC 260.7 UDS-2 300 -4.0
10 18 20 38 D11 420 17.0

-5.0
18.0 ML- Sandy Silt. Stiff to
06 07 11 18 D12 400 Hard. Grey.
-6.0
19.0
-7.0
04 06 07 13 D13 440 20.0

-8.0
UDS-3 21.0
04 05 09 14 D14 400 -9.0
22.0
-10.0
06 06 10 16 D15 410 23.0

-11.0
24.0
07 09 12 21 D16 390 -12.0
25.0
-13.0
07 10 13 23 D17 420 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350956.99m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-07 N:2530290.10m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 06.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.30m End: 19.10.16
0 10 20 30 40 50
12.0
1.0
11.0
05 06 07 13 D1 340 2.0
10.0
3.0
07 09 11 20 D2 360 9.0
4.0
8.0
00 21 79 N P 2.67 08 10 12 22 D3 370 5.0
7.0
6.0
05 06 04 10 D4 400 6.0
32 11 17.9419.9616.92 0.63 0.07 0.02 UDS-1 300 7.0
UDS-2 5.0
03 06 07 13 D5 020 8.0
4.0
ML- Silt With Sand.
9.0 Soft to Very stiff.
04 05 08 13 D6 390 3.0 Brownish.
10.0
2.0
00 01 02 03 D7 360 11.0

1.0
12.0
03 04 04 08 D8 380 0.0
13.0
-1.0
00 30 70 N P 31.44 2.66 02 04 03 07 D9 350 14.0

-2.0
15.0
04 05 06 11 D10 380 -3.0
16.0
-4.0
08 10 12 22 D11 370 17.0

-5.0
18.0
11 14 16 30 D12 340 -6.0
19.0
-7.0
13 15 18 33 D13 320 20.0

-8.0
21.0
10 14 09 23 D14 350 -9.0
22.0
-10.0 ML- Sandy Silt. Medium
00 31 69 43 15 2.66 02 03 03 06 D15 420 23.0 to Hard. Grey.
UDS-3 -11.0
24.0
08 10 13 23 D16 380 -12.0
25.0
-13.0
11 15 19 39 D17 350 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350854.62m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-08 N:2530413.65m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.51m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 08.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.20m End: 09.09.16
0 10 20 30 40 50
12.0
1.0
11.0
00 00 01 01 D1 330 2.0
10.0 CL- Lean clay with
sand. Very Soft to
3.0
Soft. Brownish grey .
00 22 78 50 23 27.25 2.67 00 00 03 03 D2 340 9.0
4.0
8.0
00 24 76 N P 2.67 02 03 05 08 D3 390 5.0
7.0
6.0
01 03 04 07 D4 370 6.0 ML- Silt With Sand.
7.0 Medium to Stiff.
Brownish grey .
5.0
00 21 79 N P 2.66 04 05 05 10 D5 400 8.0
4.0
9.0
03 05 07 12 D6 380 3.0
10.0
2.0
00 25 75 52 23 22.68 2.66 04 09 10 19 D7 370 11.0
UDS-1 320 1.0
UDS-2 12.0 MH- Elastic Silt With
08 09 12 21 D8 410 0.0 Sand. Stiff to Very stiff.
Brownish.
13.0
-1.0
07 08 09 17 D9 390 14.0

-2.0
15.0
08 12 16 28 D10 420 -3.0
16.0
-4.0
10 12 14 26 D11 390 17.0

-5.0
18.0
05 09 15 24 D12 370 -6.0
19.0
-7.0
00 27 73 N P 2.66 07 11 17 28 D13 380 20.0 ML- Silt With Sand.
-8.0 Very stiff to Hard.
Brownish grey .
21.0
10 14 19 33 D14 360 -9.0
22.0
-10.0
12 16 20 36 D15 390 23.0

-11.0
24.0
00 27 73 N P 2.66 14 15 17 32 D16 370 -12.0
25.0
-13.0
08 12 15 27 D17 400 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350893.00m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-09 N:2530411.13m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:18m Elev: 12.10m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 07.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.35m End: 08.09.16
0 10 20 30 40 50 12.0

1.0 11.0

00 00 01 01 D1 410 2.0 10.0

3.0 9.0
00 33 67 48 22 27.74 2.66 02 02 03 05 D2 400
CL- Sandy Lean Clay.
4.0 8.0 Very soft to Stiff.
Brownish.
04 05 08 13 D3 360 5.0 7.0

6.0 6.0
03 04 06 10 D4 390

7.0 5.0

05 07 08 15 D5 350 8.0 4.0

9.0 3.0 SM- Silty sand. Medium.


00 66 34 N P 2.66 08 10 13 23 D6 360 Brownish.
10.0 2.0

08 12 15 27 D7 370 11.0
1.0

12.0 0.0
03 05 06 11 D8 400 CL- Sandy Lean Clay.
00 31 69 28 09 19.41 20.9017.51 2.66 260 13.0 Stiff. Brownish.
UC 146.3 UDS-1
-1.0
23.2320.4516.60 UC 110.9 UDS-2 180
06 07 10 17 D9 360 14.0
-2.0

15.0 -3.0
00 54 46 N P 2.66 09 12 14 26 D10 380
SM- Silty sand. Medium
16.0 -4.0 to Very Dense.
Brownish.
13 27 24 51 Frist 50 blows /410mm D11 310 17.0
-5.0

18.0 -6.0
16 25 26 51 Frist 50 blows /360mm D12 290

END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350942.74m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-10 N:2530425.19m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 11.65m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 05.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.05m End: 06.09.16
0 10 20 30 40 50

11.0
1.0

10.0
00 02 02 04 D1 400 2.0

9.0
SC - Clayey Sand.
3.0
Loose. Brownish.
02 03 04 07 D2 420
8.0
4.0

7.0
00 54 46 39 16 20.28 2.66 02 03 02 05 D3 390 5.0

6.0
6.0
04 05 07 12 D4 380
5.0
7.0

4.0 SM- Silty sand. Medium.


00 65 35 N P 18.49 2.66 03 05 06 11 D5 400 8.0 Brownish.

3.0
9.0
06 07 07 14 D6 380
2.0
10.0

1.0
04 04 05 09 D7 400 11.0

0.0
12.0
05 06 07 13 D8 420 CL- Lean clay with
-1.0 sand. Medium to Stiff.
13.0 Brownish.
-2.0
00 25 75 31 11 24.72 2.67 04 06 08 14 D9 410 14.0

-3.0
15.0
08 11 13 24 D10 370
-4.0
16.0

-5.0
10 14 15 29 D11 330 17.0

-6.0
18.0
00 91 09 N P 13 16 18 34 D12 320
-7.0
19.0

-8.0
09 15 20 35 D13 350 20.0
SP- SM - Silty sand.
Medium to Dense.
-9.0
21.0 Grey.
DS 27.0 30.4 08 12 16 28 D14 300
-10.0
22.0

-11.0
11 14 20 34 D15 320 23.0

-12.0
24.0
13 16 22 38 D16 350
-13.0
25.0

-13.0
07 15 18 33 D17 310 26.0

END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350974.18m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-11 N:2530412.30m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.51m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 09.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.15m End: 10.09.16
0 10 20 30 40 50
12.0
1.0
11.0
SM- Silty sand. Loose.
00 52 48 N P 2.66 03 04 03 07 D1 390 2.0 Brownish.
10.0
3.0
CL- Sandy Lean Clay.
01 02 02 04 D2 430 9.0 Soft. Brownish.
00 43 57 47 22 30.0219.98 15.36 2.66 UC 53.36 UDS-1 250 4.0
00 41 59 N P 30.1420.0015.37 2.66 UDS-2 275 8.0
02 03 02 05 D3 400 5.0 ML- Sandy Silt.
7.0 Medium. Brownish.
6.0
03 05 05 10 D4 370 6.0
7.0
5.0
00 62 38 N P 23.61 2.66 03 06 09 15 D5 350 8.0
4.0
9.0
05 08 12 20 D6 360 3.0
10.0
2.0
06 09 14 23 D7 360 11.0

1.0
12.0
05 08 10 18 D8 340 0.0
13.0
-1.0
00 58 42 N P 2.66 07 11 13 24 D9 14.0
-2.0 SM- Silty sand. Medium
15.0 to Dense. Brownish.
05 07 11 18 D10 -3.0
16.0
-4.0
06 10 13 23 D11 17.0
-5.0
18.0
09 11 16 27 D12 -6.0
19.0
-7.0
DS 32.9 30.0 12 13 15 28 D13 20.0
-8.0
21.0
08 11 14 25 D14 -9.0
22.0
-10.0
11 12 16 28 D15 23.0
-11.0
24.0
12 14 19 33 D16 -12.0
25.0
-13.0
13 18 20 38 D17 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350907.63m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-12 N:2530393.52m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.00m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 09.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.50m End: 10.09.16
0 10 20 30 40 50 12.0

1.0 11.0

00 00 00 00 D1 270 2.0 10.0

3.0 9.0
00 40 60 N P 51.44 2.66 00 00 01 01 D2 260

4.0 8.0

00 00 00 00 D3 5.0 7.0

6.0 6.0 ML- Sandy Silt. Very


02 05 07 12 D4 360 Soft to Very Stiff.
Grey.
7.0 5.0

00 43 57 N P 2.66 04 04 06 10 D5 390 8.0 4.0

9.0 3.0
04 05 06 11 D6 370

10.0 2.0

05 07 11 18 D7 400 11.0 1.0

12.0 0.0
07 08 13 21 D8 420

13.0 -1.0

00 82 18 N P 2.66 15 17 19 36 D9 390 14.0 -2.0

15.0 -3.0 SM- Silty sand. Dense.


DS 28.6 30.6 12 14 20 34 430 Brown.
D10

16.0 -4.0

10 12 18 30 D11 420 17.0 -5.0

18.0 -6.0
05 07 09 16 D12 400 CL- Lean clay with
sand. Very stiff. Grey.
00 20 80 35 16 30.2519.85 15.24 2.67 UC 70.80 UDS-1 380 19.0 -7.0
00 22 78 34 09 29.2019.13 14.81 2.67 UDS-2 390
03 06 08 14 D13 380 20.0 -8.0

21.0 -9.0
06 07 10 17 D14 400

22.0 -10.0 ML- Silt With Sand.


Stiff to Very stiff. Grey.
08 10 12 22 D15 370 23.0 -11.0

24.0 -12.0
06 11 14 25 D16 380

25.0 -13.0

09 12 18 30 D17 370 26.0 -14.0


END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350673.86m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-13 N:2530252.74m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 06.09.16
Ø/%
(%) (%) (%) (%) (kPa) 2.40m End: 07.09.16
0 10 20 30 40 50
12.0
1.0
11.0
01 01 02 03 D1 360 2.0
10.0
3.0
03 04 06 10 D2 380 9.0
4.0
8.0 ML- Sandy Silt. Soft to
00 37 63 N P 2.66 04 04 05 09 D3 400 5.0 Stiff. Brown.
7.0
6.0
03 05 07 12 D4 370 6.0
7.0
5.0
05 06 10 16 D5 400 8.0
4.0
9.0
04 07 11 18 D6 320 3.0
10.0
2.0 CL- Lean clay with
05 05 06 11 D7 370 11.0 sand. Stiff to Very stiff.
Brown.
1.0
12.0
07 08 10 18 D8 340 0.0
00 23 77 35 16 22.8720.4816.67 2.67 UC 163.4 UDS-1 340 13.0
00 24 76 N P 30.27 2.67 UDS-2 -1.0
08 10 11 21 D9 390 14.0

-2.0
15.0
10 11 14 25 D10 420 -3.0
16.0 ML- Silt With Sand.
Very stiff. Brown.
-4.0
07 10 13 23 D11 430 17.0

-5.0
18.0
09 11 15 26 D12 390 -6.0
19.0
-7.0
00 42 58 N P 2.66 06 08 12 20 D13 410 20.0

-8.0
21.0
07 12 14 26 D14 400 -9.0
22.0
ML- Sandy Silt. Very
-10.0 Stiff to Hard. Brownish
05 06 12 18 D15 370 23.0 Grey.
00 46 54 34 09 27.0620.0215.76 2.66 UC 264.9 UDS-3 390 -11.0
UDS-4 24.0
00 45 55 N P 2.66 12 14 21 35 D16 390 -12.0
25.0
-13.0
10 14 18 33 D17 360 26.0

END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350858.12m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-14 N:2530373.79m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.51m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 07.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.10m End: 08.09.16
0 10 20 30 40 50
12.0
1.0
11.0
00 00 01 01 D1 360 2.0
10.0
3.0
00 00 02 02 D2 380 9.0
4.0
8.0 ML- Sandy Silt. Very
00 40 60 N P 2.66 01 03 05 08 D3 360 5.0 Soft to Very Stiff.
7.0
Brown.

6.0
02 04 06 10 D4 390 6.0
7.0
5.0
04 05 08 13 D5 420 8.0
4.0
9.0
04 06 10 16 D6 380 3.0
10.0
2.0
05 08 09 17 D7 390 11.0

1.0
12.0
05 07 12 19 D8 400 0.0
13.0
ML- Silt With Sand. Stiff
-1.0 to Very stiff. Brownish
07 07 14 21 D9 370 14.0 Grey.
00 29 71 40 14 25.6820.5716.37 2.66 UDS-1 330 -2.0
UDS-2 15.0
04 08 10 18 D10 420 -3.0
16.0
-4.0
06 09 11 20 D11 380 17.0

-5.0
ML- Sandy Silt. Very
18.0 Stiff. Brown.
00 34 66 N P 2.66 09 10 13 23 D12 400 -6.0
19.0
-7.0
06 11 15 26 D13 420 20.0 CL- Sandy Lean clay.
Very stiff. Brown.
00 30 70 49 22 23.6920.0116.17 2.66 0.77 0.07 0.02 UC 100.1 UDS-3 380 -8.0
00 34 66 N P 19.2618.73 15.71 2.66 UC 235.7 UDS-4 360 21.0
07 09 12 21 D14 360 -9.0
22.0
-10.0
08 09 10 19 D15 400 23.0 ML- Sandy Silt. Very
-11.0 Stiff. Brown.
24.0
10 13 15 28 D16 390 -12.0
25.0
-13.0
07 11 14 25 D17 340 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350901.24m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-15 N:2530368.90m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.51m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 04.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.50m End: 05.09.16
0 10 20 30 40 50
12.0
1.0
11.0
02 02 02 04 D1 380 2.0
10.0
SM- Silty sand. Loose.
3.0
Grey.
02 03 04 07 D2 410 9.0
4.0
8.0
00 81 19 N P 03 02 03 05 D3 420 5.0
7.0
6.0
00 24 76 32 14 2.66 05 05 06 11 D4 400 6.0
7.0
5.0 CL- Lean clay with
05 06 07 13 D5 410 8.0 sand. Stiff to Very stiff.
Brown.
4.0
9.0
07 08 08 16 D6 420 3.0
10.0
2.0
06 09 08 17 D7 350 11.0

1.0
12.0
08 12 10 22 D8 320 0.0
13.0
-1.0
00 26 74 N P 2.66 07 09 13 22 D9 400 14.0

-2.0
15.0
08 10 16 26 D10 390 -3.0
16.0
-4.0
09 12 13 25 D11 420 17.0
ML- Silt With Sand. Stiff
-5.0 to Hard. Brownish
18.0 grey.
03 04 05 09 D12 430 -6.0
00 27 73 45 17 32.5120.0115.10 2.66 0.88 0.07 0.02 UC 127.8 UDS-1 245 19.0
23.02 UDS-2 220 -7.0
04 05 05 10 D13 410 20.0

-8.0
21.0
03 03 05 08 D14 420 -9.0
22.0
-10.0
08 09 07 16 D15 400 23.0

-11.0
24.0
10 15 17 32 D16 340 -12.0
25.0
-13.0
DS 22.9 30.7 13 18 20 38 D17 360 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350869.39m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-16 N:2530265.72m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.45m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 05.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.20m End: 06.09.16
0 10 20 30 40 50
12.0

1.0
11.0
01 01 02 03 D1 420 2.0
10.0

3.0
02 04 05 09 D2 430 9.0

4.0
8.0
ML- Sandy Silt. Soft to
Very Stiff. Brownish
00 41 59 N P 26.37 2.66 03 05 05 10 D3 390 5.0 grey.
7.0

6.0
04 07 09 16 D4 410 6.0

7.0
5.0
06 08 09 17 D5 380 8.0
4.0

9.0
05 11 13 24 D6 370 3.0

10.0
2.0
07 10 12 22 D7 360 11.0
1.0 CL- Sandy Lean clay.
12.0
Very stiff. Brown.
08 12 14 26 D8 390 0.0

13.0
-1.0
06 08 10 18 D9 410 14.0
00 34 66 39 16 23.0220.9917.07 2.67 UC 202.1 UDS-1 365 -2.0
00 35 65 44 17 28.2420.1515.72 2.66 UC 129.2 UDS-2 360 15.0
07 10 11 21 D10 410 -3.0

16.0
-4.0
06 08 09 17 D11 390 17.0
-5.0

18.0
08 08 11 21 D12 370 -6.0

19.0
-7.0
ML- Sandy Silt. Very
06 07 09 16 D13 380 20.0
Stiff to Hard. Brownish
-8.0 grey.
21.0
08 11 12 23 D14 420 -9.0

22.0
-10.0
00 42 58 N P 2.66 07 09 10 19 D15 400 23.0
-11.0

24.0
11 13 15 28 D16 390 -12.0

25.0
-13.0
08 16 17 33 D17 380 26.0

END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350913.17m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-18 N:2530345.75m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.56m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 28.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.60m End: 29.08.16
0 10 20 30 40 50

12.0
1.0

11.0
00 00 01 01 D1 350 2.0

10.0
3.0
00 00 00 00 D2
9.0
4.0

8.0
00 00 00 00 D3 5.0

7.0
6.0
00 01 03 04 D4 370
6.0
7.0

5.0 ML- Silt With Sand.


00 19 81 N P 2.67 01 03 04 07 D5 400 8.0 Very Soft to Very Stiff.
Brown.
4.0
9.0
00 22 78 N P 2.66 DS 22.9 30.7 04 07 14 21 D6 430
3.0
10.0

2.0
06 09 10 19 D7 410 11.0

1.0
12.0
06 08 12 20 D8 440
0.0
13.0
00 27 73 22 03 22.4120.8217.01 2.66 UC 79.25 UDS-1 320 -1.0
05 10 16 26 D9 420 14.0

-2.0
15.0
08 11 13 23 D10 400
-3.0
16.0

-4.0
07 15 18 33 D11 420 17.0

-5.0
18.0
13 18 23 41 D12 390
-6.0
19.0

-7.0
07 09 16 25 D13 420 20.0

-8.0
320 21.0
ML- Silt With Sand. Stiff
UDS-2
to Hard. Grey.
05 06 08 14 D14 430
-9.0
22.0

-10.0
07 09 12 21 D15 400 23.0

-11.0
24.0
00 28 72 46 17 2.66 10 14 21 35 D16 420
-12.0
25.0

-13.0
12 16 16 32 D17 390 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350888.91m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-19 N:2530341.60m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 26.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.30m End: 27.08.16
0 10 20 30 40 50
12.0
1.0
11.0
00 00 00 00 D1 380 2.0
10.0
3.0
00 01 02 03 D2 410 9.0
4.0 CL- Sandy Lean Clay.
8.0 Very Soft to Stiff.
00 00 01 01 D3 390 5.0
Brown.

7.0
6.0
00 46 54 42 19 2.67 01 03 04 07 D4 420 6.0
7.0
UDS-1 410 5.0
02 04 06 10 D5 400 8.0
4.0
9.0
10 11 13 24 D6 430 3.0
10.0
2.0 SC-SM - Silty. Clayey
00 72 28 23 05 2.66 06 11 15 26 D7 420 11.0 Sand. Very Stiff.
Brown.
1.0
12.0
08 10 11 21 D8 440 0.0
13.0
-1.0
08 09 13 22 D9 420 14.0

-2.0
00 32 68 48 21 19.4219.2516.12 2.67 UDS-2 340 15.0 CL- Sandy Lean Clay.
10 17 22 39 D10 450 -3.0
Hard. Brown.

16.0
-4.0
07 15 17 32 D11 390 17.0

-5.0
18.0
09 13 15 28 D12 410 -6.0
19.0
-7.0
08 08 11 19 D13 430 20.0

-8.0
00 19 81 42 18 32.2319.5714.80 2.67 UC 62.36 UDS-3 21.0
07 08 10 18 D14 420 -9.0
22.0 CL- Lean Clay with
-10.0
Sand. Very stiff to Hard.
Grey.
09 10 12 22 D15 420 23.0

-11.0
24.0
08 12 19 31 D16 440 -12.0
25.0
-13.0
07 08 15 23 D17 390 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350862.13m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-20 N:2530324.29m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.23m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 03.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.40m End: 04.09.16
0 10 20 30 40 50
12.0

1.0
11.0

00 00 01 01 D1 390 2.0
10.0

3.0
9.0
03 03 03 06 D2 370
SM- Silty sand. Very
4.0 Loose to Medium.
8.0 Brown.
00 50 50 N P 2.66 03 04 05 09 D3 420 5.0
7.0

6.0
6.0
03 05 08 13 D4 410

7.0
5.0

00 24 76 N P 19.96 2.67 04 06 08 14 D5 410 8.0


4.0

9.0
3.0 ML- Silt With Sand.
DS 25.0 30.2 17 22 16 38 D6 400
Stiff to Very stiff. Grey.
10.0
2.0

10 12 18 30 D7 390 11.0
1.0

12.0
0.0
04 07 13 20 D8 420

13.0
-1.0
SM- Silty sand. Medium.
00 56 44 N P 2.66 06 08 10 18 D9 400 14.0 Brown.
-2.0

15.0
-3.0
07 09 12 21 D10 420

16.0
-4.0

08 12 15 27 D11 17.0 CL- Lean Clay. Very


-5.0 stiff. Grey.

18.0
-6.0
08 10 12 22 D12

00 11 89 36 12 24.6020.0416.08 2.67 UC 95.32 UDS-1 320 19.0


-7.0
00 12 88 38 11 25.1820.1916.13 2.67 UDS-2 400
08 09 12 21 D13 20.0
-8.0
ML- Silt. Very stiff.
21.0 Grey.
-9.0
07 10 13 23 D14

22.0
-10.0

09 12 12 24 D15 400 23.0


-11.0

24.0 SM- Silty sand. Medium.


-12.0
00 56 44 N P 2.66 08 11 15 26 D16 Grey.
25.0
-13.0

07 09 12 21 D17 26.0
-13.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350842.47m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-21 N:2530313.95m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 04.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.50m End: 05.09.16
0 10 20 30 40 50
12.0

1.0
11.0

00 43 57 33 07 21.32 2.66 00 00 01 01 D1 360 2.0 ML- Sandy Silt. Very


10.0
Soft. Grey.
3.0
9.0
00 02 02 04 D2 400

4.0
8.0 CL- Sandy Lean Clay.
Soft. Brownish grey .
00 36 64 49 23 37.95 2.66 00 01 01 02 D3 360 5.0
7.0

6.0
6.0
00 00 00 00 D4

7.0
5.0

00 39 61 N P 51.37 2.66 02 03 04 07 D5 410 ML- Sandy Silt. Very


8.0
4.0 Soft to Medium. Grey.

9.0
3.0
04 05 05 10 D6 380

10.0
2.0

06 07 09 16 D7 390 11.0
1.0

12.0
0.0
09 11 13 24 D8 420

13.0
-1.0

00 74 26 N P 2.66 07 09 12 21 D9 410 14.0


-2.0

15.0
-3.0
10 15 18 33 D10 450

16.0
-4.0
SM- Silty sand. Loose
07 08 10 18 D11 430 17.0 Dense. Brown.
-5.0

18.0
-6.0
05 06 08 14 D12 390
UDS-1 19.0
-7.0

07 09 11 20 D13 360 20.0


-8.0

21.0
-9.0
06 07 10 17 D14 390
22.0
-10.0

08 09 14 23 D15 420 23.0


-11.0

24.0
-12.0
13 20 22 42 D16 400

25.0
-13.0

10 18 20 38 D17 370 26.0


END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350916.86m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-22 N:2530314.94m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 24.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.30m End: 25.08.16
0 10 20 30 40 50
12.0
1.0
11.0
00 00 01 01 D1 360 2.0
10.0
3.0
00 00 01 01 D2 390 9.0
4.0
8.0
Silty Clay. Very Soft.
03 05 07 12 D3 420 5.0
7.0
6.0
04 04 06 10 D4 400 6.0
7.0
5.0
04 06 08 14 D5 430 8.0
4.0
UC 43.72 UDS-1 9.0
09 10 12 22 D6 440 3.0
10.0
2.0
07 09 11 20 D7 420 11.0

1.0
12.0
05 08 10 18 D8 400 0.0
13.0
-1.0
00 34 66 31 12 2.67 03 06 09 15 D9 440 14.0 CL- Sandy Lean Clay.
-2.0 Very Stiff. Brown.
15.0
08 10 12 22 D10 410 -3.0
16.0
-4.0
10 12 14 26 D11 390 17.0

-5.0
18.0
05 08 09 17 D12 440 -6.0
19.0
00 18 82 46 18 25.3719.3515.43 2.67 UDS-2 380 -7.0
06 06 08 14 D13 400 20.0

-8.0
ML- Silt With Sand.
21.0
Stiff to Very stiff. Grey.
04 05 10 15 D14 450 -9.0
22.0
-10.0
08 09 12 21 D15 390 23.0

-11.0
24.0
07 10 19 29 D16 420 -12.0
25.0
CL- Lean clay with
-13.0
sand. Very stiff. Grey.
00 28 72 37 13 2.67 10 12 14 26 D17 430 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350838.56m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-23 N:2530302.82m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.50m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 01.09.16
Ø/%
(%) (%) (%) (%) (kPa) 1.35m End: 04.09.16
0 10 20 30 40 50
12.0
1.0
11.0
02 03 03 06 D1 350 2.0
10.0
3.0
01 01 01 02 D2 400 9.0
4.0
8.0
00 40 60 N P 2.66 04 04 04 08 D3 390 5.0
7.0
6.0
03 05 07 12 D4 410 6.0
7.0
5.0
05 05 06 11 D5 400 8.0 ML- Sandy Silt. Soft to
4.0 Very stiff. Brown.
9.0
04 05 08 13 D6 420 3.0
10.0
2.0
07 09 09 18 D7 390 11.0

1.0
12.0
07 08 10 18 D8 380 0.0
13.0
-1.0
00 31 69 N P 2.67 06 07 11 18 D9 390 14.0

-2.0
15.0
05 08 12 20 D10 400 -3.0
16.0
-4.0
08 10 17 27 D11 380 17.0

-5.0
18.0
04 05 07 12 D12 420 -6.0
00 24 76 41 15 21.6519.8316.30 2.67 UC 47.04 UDS-1 240 19.0
00 23 77 44 17 30.4119.6115.04 2.67 UDS-2 285 -7.0
07 08 10 18 D13 420 20.0

-8.0
21.0
06 07 09 16 D14 400 ML- Silt With Sand.
-9.0
Stiff to Very stiff. Grey.
22.0
-10.0
08 08 12 20 D15 410 23.0

-11.0
24.0
07 08 13 21 D16 410 -12.0
25.0
-13.0
09 11 15 26 D17 420 26.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350911.17m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-31 N:2530258.77m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:30m Elev: 12.60m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 20.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.60m End: 22.08.16
0 10 20 30 40 50

12.0
1.0

11.0
00 00 01 01 D1 440 2.0

10.0
3.0
01 02 02 04 D2 380
9.0
4.0 CL- Lean clay with
00 26 74 45 22 25.8418.5114.71 2.67 UDS-1 270 sand. Very Soft to Very
8.0
400 stiff. Brown.
04 07 10 17 D3 5.0

7.0
6.0
02 04 07 11 D4 420
6.0
7.0

5.0
04 06 09 15 D5 450 8.0

4.0
9.0
03 03 04 07 D6 440
3.0
10.0
00 30 70 35 07 21.6220.1816.59 2.67 UC 53.04 UDS-2 380 2.0
05 06 08 14 D7 470 11.0

1.0
12.0
07 11 16 27 D8 450
0.0 ML- Sandy Silt. Very
13.0 stiff to Hard. Brown.
-1.0
08 10 15 25 D9 430 14.0

-2.0
15.0
00 35 65 31 08 2.67 06 10 11 21 D10 460
-3.0
16.0

-4.0
10 13 18 31 D11 470 17.0

-5.0
18.0
05 07 07 14 D12 440
-6.0
19.0

-7.0
00 02 98 46 20 2.67 03 05 06 11 D13 420 20.0

-8.0
21.0
04 06 10 16 D14 450
-9.0
22.0

-10.0
06 08 15 23 D15 420 23.0

-11.0 CL- Lean Clay. Stiff to


24.0 Hard. Grey.
08 12 20 32 D16 470
-12.0
25.0

-13.0
04 06 08 14 D17 440 26.0

-14.0
27.0
09 11 15 26 D18 430
-15.0
28.0

-16.0
07 11 14 25 D19 460 29.0

-17.0
30.0
10 19 29 48 D20 420
L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
DEVELOPMENT CONSTRUCTIONS LIMITED . Project: BSRM Factory. (Unit-02)
Geotechnical Engineering Laboratory. Dhaka. Client: BSRM.
House 11. Road 19A. Sector 4. Uttara. Dhaka 1230. Bangladesh.
Phone: +880-2-58957231. Fax: 880-2-8957283. Email: fcl@dcl-fcl.com. Web: http://www.dcl-fcl.com Location: Jowrargong, Mirsarai, Chittagong.
Unit

Moisture

Specific
Borehole:

Layer Symbol
Content
Grain E:350736.08m

GravitY
Atterberg Shear Dia/Depth of Casing:- 125mm/3m

Sample No.
Consolidation

Rec. (mm)
Weight

Depth (m)
BH-33 N:2530268.07m

Elev (m)
Sample
Size Limits (kN/m³) Strength Standard Penetration Test
Dep:25m Elev: 12.72m

N -Value
Gravel Sand Fines w

150mm

150mm

150mm
Type
L.L. P.I. Yt Yd Gs eo Cc Cr Cu/ qu GWD(m): Start: 23.08.16
Ø/%
(%) (%) (%) (%) (kPa) 1.80m End: 24.08.16
0 10 20 30 40 50

12.0
1.0

11.0
00 01 01 02 D1 400 2.0

10.0
3.0
00 00 01 01 D2 430
9.0
4.0

8.0
02 04 05 09 D3 390 5.0

7.0
UDS-1 6.0
03 03 05 08 D4 440
6.0
7.0

5.0
02 04 06 10 D5 430 8.0
ML- Sandy Silt.Very
4.0 stiff to Stiff. Brown.
1.12 0.07 0.02 UDS-2 9.0
05 07 08 15 D6 390
3.0
10.0

2.0
00 38 62 33 07 2.67 DS 24.7 30.2 13 09 11 20 D7 420 11.0

1.0
12.0
09 12 12 24 D8 400
0.0
13.0

-1.0
00 44 56 N P 2.67 12 18 21 39 D9 430 14.0

-2.0
15.0
07 13 15 28 D10 390
-3.0
16.0

-4.0
05 07 12 19 D11 420 17.0

-5.0
00 10 90 29 07 23.7419.3615.64 2.67 UDS-3 360 18.0
08 09 12 21 D12 400
-6.0
19.0

-7.0
08 12 13 25 D13 410 20.0 CL- ML - Silty Clay.
Very. Brown.
-8.0
21.0
03 07 08 15 D14 420
-9.0
22.0

-10.0
05 07 13 20 D15 390 23.0

-11.0
24.0
09 12 15 27 D16 430
-12.0
END OF BORING

L.L. = Liquid Limit Yt = Bulk Unit Weight eo= Initial Void Ratio % = Strain at Failure Clay Drawn BY: Md. Emran Uddin
Legend

P.I. = Plasticity Index Yd = Dry Unit Weight Cu= Cohesion D = Disturbed Sample Silt Checked BY: Priodeep Chowdury
w = Moisture Content Cc = Compression Index qu= Unconfined Compression Strength UD = Undisturbed Sample Sand Approved BY: Eng. Roknuz zaman
Gs= Specific Gravity Cr = Re-compression Index Ø = Friction Angle G.W.D = Ground Water Depth Gravel Date : 19.10.16
APPENDIX: B-02

SOIL PROFILE
N: 2530258.77m

N: 2530345.17m
N: 2530290.16m

N: 2530314.94m

N: 2530368.24m

N: 2530290.10m

N: 2530470.15m
E: 350911.17m

E: 350913.75m
E: 350290.96m

E: 350916.86m

E: 350901.24m

E: 350956.99m

E: 350896.37m
N: 2530393.52m
E: 350907.63m
EL: 12.60m

EL: 12.56m
EL: 12.51m

EL: 12.50m

EL: 12.51m

EL: 12.50m

EL: 12.50m
EL: 12.00m
BH- 18
BH- 22

BH- 15
BH-31

BH- 5

BH- 7

BH- 3
BH- 12
12.0
11.0 01
10.0 00 01 01 04 13 08
SM- Silty 00
9.0 04 sand. Loose.
CL- Lean clay with 06 SM- Silty sand. 01 00 07 20 12
8.0 sand. Very Soft to Very Loose to Silty Clay. Very ML- Silt With Grey. 01
17
Very stiff. Brown. 04 Medium. 12 Soft. 00 Sand. Very Soft to 05 22 14
7.0 00 ML- Silt With SM- Silty sand.
Brownish. Very Stiff. Brown. ML- Sandy Silt.
6.0 11 Sand. Soft to Very Loose to Medium.
18 10 04 11 CL- Lean clay Very Soft to 10 17
5.0 12 stiff. Brownish. Brownish.
15 with sand. Stiff to Very Stiff. Grey.
4.0 14 14 07 13 Very stiff. Brown. 13 13
10
3.0 07
29 22 21 16 13 12
2.0 11
14
1.0 23 20 19 17 03 12
ML- Sandy Silt. 18
0.0 27
ML- Sandy Silt. 25 Very Stiff. 18 20 22 08 16
-1.0 Brownish. 21
25 Very stiff to CL- Sandy Lean SM- Silty sand.
Hard. Brown. 21 15 Clay. Very Stiff. 26 22 07 ML- Sandy 18
ELEVATION (m)

-2.0 36 Dense. Brown.


21 Brown. Silt. Very Stiff.
-3.0 21 22 23 26 11 Brownish. 23
-4.0 34
31 ML- Silt With
-5.0 18 26 33 25 22 29
Sand. Very ML- Silt With 30 CL- Lean clay
-6.0 14 stiff. Grey.
24 17 41 09 Sand. Stiff to with sand. Very 30 24
-7.0 Hard. Brownish 16 stiff. Grey.
11
12 14 ML- Silt With 25 ML- Silt With 10 grey. 33 SM- Silty sand. 33
-8.0 14
16 Sand. Stiff to Sand. Stiff to Medium to
-9.0 15 15 14 Hard. Grey. 08 23 Dense. Grey. 34
CL- Lean clay Very stiff. Grey.
-10.0 17 ML- Sandy Silt.
23 with sand. Stiff to ML- Silt With
-11.0 19 21 21 16 06 Medium to 32
CL- Lean Clay. Very Stiff. Grey. 22 Sand. Stiff to
32 Hard. Grey.
-12.0 Stiff to Hard. Very stiff. Grey.
29 29 CL- Lean clay 35 32 23 27
-13.0 Grey. 25
14 with sand. Very
-14.0 27 26 stiff. Grey. 32 38 39 21
30
-15.0 26
-16.0 25
-17.0
-18.0 18
-19.0
-20.0
0 5 10 15 20 25 30 35 40 45 50M
PROFILE A-A Legend: Sand Silt Clay
Project Drawing Title: Client: Location Engineer Drg. No. Sub Consultant
Drawn by: Emran Uddin DCL/BHEL/ Deve lo p m e n t Co n str u ctions Ltd.
Sectional Soil Profile. BSRM Jowrargong, Mirsarai, Chittagong.
BSRM Factory. (Unit-02) Checked by: Engr. Prodeep Chowdhoury Section/ Sheet-1 House 11, Road 19/A, Uttara, Dhaka 1230
Phone +880-2-58957231, Fax +880-2-58957283
Approved by: Engr. Roknuz zaman Date:20-10-16 Email: dcl@dcl-fcl.com, Web: http://www.dcl-fcl.com
APPENDIX: C

LABORATORY TEST RESULTS


Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
10 13
11
12
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
10 BH-31 UDS-01 4.00-4.50 0 26 74 6.9 0.6 0.04 0.01 0.01 0.20 45 22 [CL] Lean Clay with Sand. Test Date
11 BH-31 UDS-02 10.00-10.50 0 30 70 8.1 0.5 0.04 0.01 0.01 0.14 35 7 [ML] Sandy Silt. 6-Sep-16
12 BH-31 D-10 15.00-15.45 0 35 65 14.3 0.5 0.06 0.01 0.00 0.18 31 8 21 [ML] Sandy Silt. Very Stiff. Performed By:
13 BH-31 D-13 19.50-19.95 0 2 98 3.5 0.9 0.02 0.01 0.01 0.01 46 20 11 [CL] Lean Clay. Stiff. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
71 74
72
73
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
71 BH-23 D-03 4.50-4.95 0 40 60 9.1 0.3 0.07 0.01 0.01 0.26 N P 8 [ML] Sandy Silt. Medium. Test Date
72 BH-23 D-09 13.5-13.95 0 31 69 12.1 0.5 0.05 0.01 0.00 0.18 N P 18 [ML] Sandy Silt. Very Stiff. 4-Oct-16
73 BH-23 UDS-01 18.5-18.95 0 24 76 8.0 0.5 0.04 0.01 0.00 0.14 41 15 [ML] Silt with Sand. Performed By:
74 BH-23 UDS-02 19.0-19.45 0 23 77 6.5 0.6 0.03 0.01 0.00 0.13 44 17 [ML] Silt with Sand. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
5
6
7
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
5 BH-22 D-09 13.50-13.95 0 34 66 12.8 0.6 0.05 0.01 0.00 0.20 31 12 15 [CL] Sandy Lean Clay. Stiff. Test Date
6 BH-22 D-17 25.50-25.95 0 28 72 13.9 0.5 0.03 0.01 0.00 0.15 37 13 26 [CL] Lean Clay with Sand. Very Stiff. 6-Sep-16
7 BH-22 UDS-02 19.00-19.50 0 18 82 8.1 0.8 0.02 0.01 0.00 0.18 46 18 [ML] Silt with Sand. Performed By:
Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
76 79
77
78
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
76 BH-21 D-01 1.5-1.95 0 43 57 7.4 0.4 0.08 0.02 0.01 0.27 33 7 1 [ML] Sandy Silt. Very Soft. Test Date
77 BH-21 D-03 4.50-4.95 0 36 64 7.1 0.4 0.07 0.02 0.01 0.21 49 23 2 [CL] Sandy Lean Clay. Soft. 4-Oct-16
78 BH-21 D-05 07.5-07.95 0 39 61 9.3 0.4 0.07 0.01 0.01 0.24 N P 7 [ML] Sandy Silt. Medium. Performed By:
79 BH-21 D-09 13.5-13.95 0 74 26 7.4 1.6 0.19 0.09 0.03 0.60 N P 21 [SM] Silty Sand. Medium. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
34 37
35 38
36 39
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
34 BH-20 D-03 4.5-4.95 0 50 50 12.5 0.4 0.15 0.03 0.01 0.49 N P 9 [SM] Silty Sand. Loose. Test Date
35 BH-20 D-05 07.5-7.95 0 24 76 9.0 0.6 0.04 0.01 0.00 0.15 N P 14 [ML] Silt with Sand. Stiff. 1-Oct-16
36 BH-20 D-09 13.5-13.95 0 56 44 13.9 0.8 0.15 0.04 0.01 0.49 N P 18 [SM] Silty Sand. Medium. Performed By:
37 BH-20 UDS-01 18.5-19.0 0 11 89 5.4 0.8 0.02 0.01 0.00 0.08 36 12 [CL] Lean Clay. Md. Akbar Ali
38 BH-20 UDS-02 19.0-19.50 0 12 88 5.9 0.7 0.02 0.01 0.00 0.09 38 11 [ML] Silt. Checked By:
39 BH-20 D-16 24.0-24.45 0 56 44 13.5 0.8 0.15 0.04 0.01 0.47 N P 26 [SM] Silty Sand. Medium. Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
1 4
2
3
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
1 BH-19 D-04 6.00-6.45 0 46 54 23.6 0.5 0.14 0.02 0.01 0.62 42 19 4 [CL] Sandy Lean Clay. Soft. Test Date
2 BH-19 D-07 10.50-10.95 0 72 28 10.8 1.7 0.20 0.08 0.02 0.70 23 5 26 [SC-SM] Silty, Cleyey Sand. Medium. 6-Sep-16
3 BH-19 UDS-02 14.50-15.00 0 32 68 12.9 0.5 0.05 0.01 0.00 0.27 48 21 [CL] Sandy Lean Clay. Performed By:
4 BH-19 UDS-03 20.50-20.95 0 19 81 5.9 0.9 0.03 0.01 0.01 0.19 42 18 [CL] Lean Clay with Sand. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
110 113
111
112
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
110 BH-18 D-05 07.50-07.95 0 19 81 6.8 0.7 0.02 0.01 0.00 0.12 N P 7 [ML] Silt with Sand. Medium. Test Date
111 BH-18 D-06 9.00-9.45 0 22 78 8.2 0.6 0.03 0.01 0.00 0.13 N P 21 [ML] Silt with Sand. Very Stiff. 3-Oct-16
112 BH-18 UDS-01 13.00-13.50 0 27 73 10.2 0.6 0.05 0.01 0.00 0.13 22 3 [ML] Silt with Sand. Performed By:
113 BH-18 D-16 24.00-24.45 0 28 72 10.7 0.5 0.04 0.01 0.00 0.13 46 17 35 [ML] Silt with Sand. Hard. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
100 103
101
102
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
100 BH-16 D-03 4.50-4.95 0 41 59 8.8 0.3 0.08 0.02 0.01 0.26 N P 10 [ML] Sandy Silt. Stiff. Test Date
101 BH-16 UDS-01 14.00-14.50 0 34 66 12.8 0.4 0.06 0.01 0.00 0.22 39 16 [CL] Sandy Lean Clay. 2-Oct-16
102 BH-16 UDS-02 14.50-15.00 0 35 65 12.2 0.4 0.06 0.01 0.01 0.23 44 17 [ML] Sandy Silt. Performed By:
103 BH-16 D-15 22.50-22.95 0 42 58 7.4 0.4 0.08 0.02 0.01 0.27 N P 19 [ML] Sandy Silt. Very Stiff. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
105 108
106
107
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
105 BH-15 D-03 4.50-4.95 0 81 19 0.20 0.11 0.62 N P 5 [SM] Silty Sand. Loose. Test Date
106 BH-15 D-04 6.00-6.45 0 24 76 8.5 0.6 0.03 0.01 0.00 0.12 32 14 11 [CL] Lean Clay with Sand. Stiff. 2-Oct-16
107 BH-15 D-09 13.50-13.95 0 26 74 9.8 0.6 0.04 0.01 0.00 0.13 N P 22 [ML] Silt with Sand. Very Stiff. Performed By:
108 BH-15 UDS-01 18.50-19.00 0 27 73 10.8 0.5 0.05 0.01 0.00 0.12 45 17 [ML] Silt with Sand. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
94 97
95 98
96
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
94 BH-14 D-03 4.50-4.95 0 40 60 8.3 0.4 0.07 0.02 0.01 0.28 N P 8 [ML] Sandy Silt. Medium. Test Date
95 BH-14 UDS-01 14.00-14.50 0 29 71 7.6 0.5 0.05 0.01 0.01 0.22 40 14 [ML] Silt with Sand. 28-Sep-16
96 BH-14 D-12 18.00-18.45 0 34 66 9.1 0.4 0.06 0.01 0.01 0.22 N P 23 [ML] Sandy Silt. Very Stiff. Performed By:
97 BH-14 UDS-03 20.00-20.50 0 30 70 7.1 0.5 0.05 0.01 0.01 0.22 49 22 [CL] Sandy Lean Clay. Md. Akbar Ali
98 BH-14 UDS-04 20.50-21.00 0 34 66 8.6 0.4 0.06 0.01 0.01 0.22 N P [ML] Sandy Silt. Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
87 90
88 91
89 92
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
87 BH-13 DS-03 4.50-4.95 0 37 63 11.4 0.4 0.07 0.01 0.01 0.26 N P 9 [ML] Sandy Silt. Stiff. Test Date
88 BH-13 UDS-01 12.50-13.00 0 23 77 8.7 0.6 0.04 0.01 0.00 0.13 35 16 [CL] Lean Clay with Sand. 28-Sep-16
89 BH-13 UDS-02 13.00-13.50 0 24 76 8.9 0.6 0.04 0.01 0.00 0.13 N P [ML] Silt with Sand. Performed By:
90 BH-13 DS-13 19.50-19.95 0 42 58 10.1 0.4 0.08 0.02 0.01 0.28 N P 20 [ML] Sandy Silt. Very Stiff. Md. Akbar Ali
91 BH-13 DS-16 24.00-24.45 0 45 55 6.9 0.3 0.09 0.02 0.01 0.32 N P 35 [ML] Sandy Silt. Hard. Checked By:
92 BH-13 UDS-03 23.00-23.50 0 46 54 9.2 0.5 0.10 0.02 0.01 0.31 34 9 [ML] Sandy Silt. Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
81 84
82 85
83
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
81 BH-12 D-02 3.0-3.45 0 40 60 9.3 0.4 0.07 0.02 0.01 0.24 N P 1 [ML] Sandy Silt. Very Soft. Test Date
82 BH-12 D-05 07.5-07.95 0 43 57 10.2 0.4 0.09 0.02 0.01 0.28 N P 10 [ML] Sandy Silt. Stiff. 4-Oct-16
83 BH-12 D-09 13.5-13.95 0 82 18 0.12 0.09 0.20 N P 36 [SM] Silty Sand. Dense. Performed By:
84 BH-12 UDS-01 18.5-19.00 0 20 80 7.1 0.7 0.03 0.01 0.00 0.14 35 16 [CL] Lean Clay with Sand. Md. Akbar Ali
85 BH-12 UDS-02 19.5-20.0 0 22 78 8.1 0.6 0.03 0.01 0.00 0.14 34 9 [ML] Silt with Sand. Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
28 31
29 32
30
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
28 BH-11 D-01 1.5-1.95 0 52 48 13.4 0.5 0.15 0.03 0.01 0.49 N P 7 [SM] Silty Sand. Loose. Test Date
29 BH-11 UDS-01 3.5-4.0 0 43 57 10.4 0.4 0.09 0.02 0.01 0.38 47 22 [CL] Sandy Lean Clay. 26-Sep-16
30 BH-11 UDS-02 4.0-4.50 0 41 59 10.6 0.4 0.08 0.02 0.01 0.35 N P [ML] Sandy Silt. Performed By:
31 BH-11 D-05 07.50-7.95 0 62 38 12.2 1.1 0.16 0.05 0.01 0.52 N P 15 [SM] Silty Sand. Medium. Md. Akbar Ali
32 BH-11 D-09 13.5-13.95 0 58 42 12.9 0.9 0.16 0.04 0.01 0.52 N P 24 [SM] Silty Sand. Medium. Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
23 26
24
25
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
23 BH-10 D-03 4.50-4.95 0 54 46 12.1 0.6 0.16 0.03 0.01 0.50 39 16 5 [SC] Cleyey Sand. Loose. Test Date
24 BH-10 D-05 07.50-07.95 0 65 35 12.4 1.4 0.18 0.06 0.01 0.57 N P 11 [SM] Silty Sand. Medium. 30-Sep-16
25 BH-10 D-09 13.5-13.95 0 25 75 9.3 0.6 0.04 0.01 0.00 0.18 31 11 14 [CL] Lean Clay with Sand. Stiff. Performed By:
26 BH-10 D-12 18.0-18.45 0 91 9 4.0 1.3 0.32 0.18 0.08 1.20 N P 34 [SP-SM] Poorly graded Sand with Silt. Dense. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
18 21
19
20
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
18 BH-09 D-02 3.0-3.45 0 33 67 10.3 0.5 0.06 0.01 0.01 0.15 48 22 5 [CL] Sandy Lean Clay. Medium. Test Date
19 BH-09 D-06 9.0-9.45 0 66 34 13.4 1.4 0.19 0.06 0.01 0.60 N P 23 [SM] Silty Sand. Medium. 30-Sep-16
20 BH-09 UDS-01 12.5-13.00 0 31 69 9.1 0.5 0.05 0.01 0.01 0.14 28 9 [CL] Sandy Lean Clay. Performed By:
21 BH-09 D-10 15.0-15.45 0 54 46 10.8 0.7 0.13 0.03 0.01 0.40 N P 26 [SM] Silty Sand. Medium. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
64 67
65 68
66 69
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
64 BH-08 D-02 3.0-3.45 0 22 78 7.6 0.7 0.03 0.01 0.00 0.12 50 23 3 [CL] Lean Clay with Sand. Soft. Test Date
65 BH-08 D-03 4.5-4.95 0 24 76 9.3 0.6 0.04 0.01 0.00 0.14 N P 8 [ML] Silt with Sand. Medium. 4-Oct-16
66 BH-08 D-05 7.5-7.95 0 21 79 8.0 0.6 0.03 0.01 0.00 0.12 N P 10 [ML] Silt with Sand. Stiff. Performed By:
67 BH-08 D-07 10.5-10.95 0 25 75 8.7 0.6 0.04 0.01 0.00 0.14 52 23 19 [MH] Elastic Silt with Sand. Very Stiff. Md. Akbar Ali
68 BH-08 D-13 19.5-19.95 0 27 73 11.0 0.5 0.04 0.01 0.00 0.14 N P 28 [ML] Silt with Sand. Very Stiff. Checked By:
69 BH-08 D-15 22.5-22.95 0 27 73 10.8 0.5 0.04 0.01 0.00 0.14 N P 36 [ML] Silt with Sand. Hard. Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
60
61
62
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
60 BH-07 D-03 4.5-4.95 0 21 79 7.1 0.7 0.03 0.01 0.00 0.12 N P 22 [ML] Silt with Sand. Very Stiff. Test Date
61 BH-07 D-09 13.5-13.95 0 30 70 10.8 0.6 0.05 0.01 0.00 0.13 N P 7 [ML] Silt with Sand. Medium. 24-Sep-16
62 BH-07 D-15 22.5-22.95 0 31 69 11.3 0.5 0.05 0.01 0.00 0.13 43 15 6 [ML] Sandy Silt. Medium. Performed By:
Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
56
57
58
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
56 BH-06 D-05 7.5-7.95 0 30 70 10.9 0.6 0.05 0.01 0.00 0.13 30 12 19 [CL] Lean Clay with Sand. Very Stiff. Test Date
57 BH-06 D-08 12.0-12.45 0 32 68 12.2 0.5 0.05 0.01 0.00 0.16 N P 20 [ML] Sandy Silt. Very Stiff. 24-Sep-16
58 BH-06 UDS-2 16.0-16.50 0 32 68 10.5 0.5 0.06 0.01 0.01 0.13 46 18 [ML] Sandy Silt. Performed By:
Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
115 118
116
117
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
115 BH-05 D-03 4.5-4.95 0 59 41 13.4 0.9 0.18 0.05 0.01 0.57 N P 4 [SM] Silty Sand. Loose. Test Date
116 BH-05 D-09 13.5-13.95 0 30 70 11.4 0.5 0.05 0.01 0.00 0.15 N P 21 [ML] Sandy Silt. Very Stiff. 4-Oct-16
117 BH-05 UDS-02 17.5-18.00 0 26 74 9.9 0.6 0.04 0.01 0.00 0.15 37 12 [ML] Silt with Sand. Performed By:
118 BH-05 UDS-03 22.0-22.50 0 26 74 9.9 0.6 0.03 0.01 0.00 0.15 43 17 [CL] Lean Clay with Sand. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
50 53
51 54
52
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
50 BH-04 D-01 1.5-1.95 0 33 67 9.7 0.5 0.06 0.01 0.01 0.20 33 9 4 [ML] Sandy Silt. Soft. Test Date
51 BH-04 D-03 4.5-4.95 0 59 41 8.2 0.8 0.17 0.05 0.02 0.55 N P 8 [SM] Silty Sand. Loose. 22-Sep-16
52 BH-04 D-05 7.5-7.95 0 41 59 8.3 0.5 0.08 0.02 0.01 0.37 52 21 15 [MH] Sandy Elastic Silt. Stiff. Performed By:
53 BH-04 UDS-1 17.0-17.45 0 21 79 7.6 0.7 0.03 0.01 0.00 0.13 50 23 [CL] Lean Clay with Sand. Md. Akbar Ali
54 BH-04 D-14 21.0-21.45 0 69 31 8.5 1.5 0.17 0.07 0.02 0.51 N P 78 [SM] Silty Sand. Very Dense. Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
46
47
48
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
46 BH-03 D-03 4.5-4.95 0 86 14 0.22 0.12 0.78 N P 8 [SM] Silty Sand. Loose. Test Date
47 BH-03 D-09 13.5-13.95 0 33 67 11.1 0.5 0.06 0.01 0.01 0.15 N P 14 [ML] Sandy Silt. Stiff. 26-Sep-16
48 BH-03 D-14 21.0-21.45 0 69 31 14.5 0.7 0.32 0.07 0.02 1.06 N P 27 [SM] Silty Sand. Medium. Performed By:
Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
41 44
42
43
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
41 BH-02 D-02 3.0-3.45 0 87 13 0.22 0.12 0.79 N P 14 [SM] Silty Sand. Medium. Test Date
42 BH-02 UDS-01 06.5-7.0 0 21 79 8.2 0.6 0.03 0.01 0.00 0.13 41 16 [CL] Lean Clay with Sand. 1-Oct-16
43 BH-02 UDS-02 7.0-7.50 0 22 78 7.8 0.6 0.03 0.01 0.00 0.13 37 10 [ML] Silt with Sand. Performed By:
44 BH-02 D-07 10.5-10.95 0 33 67 13.6 0.5 0.06 0.01 0.00 0.22 N P 14 [ML] Sandy Silt. Stiff. Md. Akbar Ali
Checked By:
Priodeep
Project: BSRM FACTORY UNIT-02

PARTICLE SIZE Client: BSRM

Owner: BSRM
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DISTRIBUTION
Location: SONARPAR, MIRSARAI, CHITTAGONG
DHAKA
100.0 100.0
14
15
16
90.0 90.0

80.0 80.0

70.0 70.0

60.0 60.0
Percent Passing

Percent Passing
50.0 50.0

40.0 40.0

30.0 30.0

20.0 20.0

10.0 10.0

0.0 0.0
100.000 10.000 1.000 0.100 0.010 0.001 0.000 100.000 10.000 1.000 0.100 0.010 0.001 0.000
Particle Size (mm) Particle Size (mm)

Plot Bore Sample Depth Gravel Sand Fines LL PI SPT Test


CU CC D60 D30 D10 FM Description
ID No. No (m) (%) (%) (%) (%) (%) N Information
14 BH-33 D-07 10.50-10.95 0 38 62 16.2 0.5 0.07 0.01 0.00 0.19 33 7 20 [ML] Sandy Silt. Very Stiff. Test Date
15 BH-33 D-09 13.50-13.95 0 44 56 18.0 0.4 0.09 0.01 0.00 0.29 N P 39 [ML] Sandy Silt. Hard. 6-Sep-16
16 BH-33 UDS-03 17.50-18.00 0 10 90 4.2 0.8 0.01 0.01 0.00 0.09 29 7 [CL-ML] Silty Clay. Performed By:
Md. Akbar Ali
Checked By:
Priodeep
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


48.00% 37.00%

47.50% 36.00%
Moisture Content %

Moisture Content %
47.00% 35.00%

46.50% 34.00%

46.00% 33.00%

45.50% 32.00%

45.00% 31.00%

44.50% 30.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-31 Depth (m): 04.00-4.50 Sample: UDS-01 Borehole: BH-31 Depth (m): 15.00-15.45 Sample: D-10
LL: 45 PL: 23 PI: 22 LL: 31 PL: 23 PI: 8

Flow Curve Flow Curve


60.00% 52.00%

50.00% 51.00%

Moisture Content %
Moisture Content %

50.00%
40.00%
49.00%
30.00%
48.00%
20.00%
47.00%
10.00% 46.00%

0.00% 45.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-31 Depth (m): 10.00-10.50 Sample: UDS-02 Borehole: BH-31 Depth (m): 19.50-19.95 Sample: D-13
LL: 35 PL: 28 PI: 7 LL: 46 PL: 26 PI: 20

TEST DATE TEST PERFORMED BY CHECKED BY


3-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


48.00% 120.00%
47.00%
100.00%

Moisture Content %
Moisture Content %

46.00%
80.00%
45.00%
44.00% 60.00%
43.00%
40.00%
42.00%
20.00%
41.00%
40.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-23 Depth (m): 18.50-19.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 41 PL: 26 PI: 15 LL: PL: PI:
Flow Curve Flow Curve
48.50% 120.00%
48.00%
100.00%

Moisture Content %
Moisture Content %

47.50%
47.00% 80.00%
46.50%
60.00%
46.00%
45.50% 40.00%
45.00%
20.00%
44.50%
44.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-23 Depth (m): 19.00-19.50 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 44 PL: 27 PI: 17 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


4-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


37.00% 43.00%

36.00% 42.00%
Moisture Content %

Moisture Content %
35.00% 41.00%

34.00% 40.00%

33.00% 39.00%

32.00% 38.00%

31.00% 37.00%

30.00% 36.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-22 Depth (m): 13.50-14.00 Sample: D-09 Borehole: BH-22 Depth (m): 25.50-26.00 Sample: D-17
LL: 31 PL: 19 PI: 12 LL: 37 PL: 24 PI: 13

Flow Curve Flow Curve


49.50% 100.00%
49.00% 90.00%

Moisture Content %
80.00%
Moisture Content %

48.50%
70.00%
48.00%
60.00%
47.50%
50.00%
47.00%
40.00%
46.50% 30.00%
46.00% 20.00%
45.50% 10.00%
45.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-22 Depth (m): 19.00-19.50 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 46 PL: 28 PI: 18 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


3-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


37.50% 35.00%
37.00%
30.00%

Moisture Content %
Moisture Content %

36.50%
36.00% 25.00%
35.50% 20.00%
35.00%
34.50% 15.00%
34.00% 10.00%
33.50%
5.00%
33.00%
32.50% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-21 Depth (m): 1.50-1.95 Sample: DS-01 Borehole: BH-21 Depth (m): 07.50-7.95 Sample: DS-05
LL: 33 PL: 26 PI: 7 LL: 24 PL: 19 PI: 5

Flow Curve Flow Curve


55.00% 120.00%

54.00% 100.00%

Moisture Content %
Moisture Content %

53.00%
80.00%
52.00%
60.00%
51.00%
40.00%
50.00%

49.00% 20.00%

48.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-21 Depth (m): 4.50-4.95 Sample: DS-03 Borehole: Depth (m): Sample:
LL: 49 PL: 26 PI: 23 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


3-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


40.00% 100.00%
39.50% 90.00%

Moisture Content %
Moisture Content %

39.00% 80.00%
70.00%
38.50%
60.00%
38.00%
50.00%
37.50%
40.00%
37.00% 30.00%
36.50% 20.00%
36.00% 10.00%
35.50% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-20 Depth (m): 18.50-19.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 36 PL: 24 PI: 12 LL: PL: PI:
Flow Curve Flow Curve
42.00% 100.00%
41.50% 90.00%

Moisture Content %
41.00% 80.00%
Moisture Content %

40.50% 70.00%
40.00% 60.00%
39.50% 50.00%
39.00% 40.00%
38.50% 30.00%
38.00% 20.00%
37.50% 10.00%
37.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-20 Depth (m): 19.00-19.50 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 38 PL: 27 PI: 11 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


1-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


47.00% 51.50%
51.00%
46.00%
Moisture Content %

Moisture Content %
50.50%
45.00%
50.00%
44.00% 49.50%
49.00%
43.00%
48.50%
42.00%
48.00%
41.00% 47.50%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-19 Depth (m): 06.00-6.45 Sample: D-04 Borehole: BH-19 Depth (m): 14.50-15.00 Sample: UDS-02
LL: 42 PL: 23 PI: 19 LL: 48 PL: 27 PI: 21

Flow Curve Flow Curve


26.50% 51.00%
50.00%
26.00%

Moisture Content %
49.00%
Moisture Content %

25.50% 48.00%
25.00% 47.00%
46.00%
24.50% 45.00%
24.00% 44.00%
43.00%
23.50%
42.00%
23.00% 41.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-19 Depth (m): 10.50-10.95 Sample: D-07 Borehole: BH-19 Depth (m): 20.50-21.00 Sample: UDS-03
LL: 23 PL: 18 PI: 5 LL: 42 PL: 24 PI: 18

TEST DATE TEST PERFORMED BY CHECKED BY


3-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


35.00% 120.00%

30.00% 100.00%

Moisture Content %
Moisture Content %

25.00%
80.00%
20.00%
60.00%
15.00%
40.00%
10.00%

5.00% 20.00%

0.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-18 Depth (m): 13.00-13.50 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 22 PL: 19 PI: 3 LL: PL: PI:
Flow Curve Flow Curve
50.50% 120.00%
50.00%
49.50% 100.00%

Moisture Content %
Moisture Content %

49.00%
80.00%
48.50%
48.00%
60.00%
47.50%
47.00% 40.00%
46.50%
46.00% 20.00%
45.50%
45.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-18 Depth (m): 24.00-24.45 Sample: D-16 Borehole: Depth (m): Sample:
LL: 46 PL: 29 PI: 17 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


28-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


43.00% 120.00%
42.50%
100.00%

Moisture Content %
Moisture Content %

42.00%
80.00%
41.50%
41.00% 60.00%
40.50%
40.00%
40.00%
20.00%
39.50%
39.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-16 Depth (m): 14.00-14.50 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 39 PL: 23 PI: 16 LL: PL: PI:
Flow Curve Flow Curve
48.50% 120.00%
48.00%
47.50% 100.00%

Moisture Content %
Moisture Content %

47.00%
80.00%
46.50%
46.00%
60.00%
45.50%
45.00% 40.00%
44.50%
44.00% 20.00%
43.50%
43.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-16 Depth (m): 14.50-15.00 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 44 PL: 27 PI: 17 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


3-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


39.00% 120.00%
38.00%
100.00%

Moisture Content %
Moisture Content %

37.00%
80.00%
36.00%
35.00% 60.00%
34.00%
40.00%
33.00%
20.00%
32.00%
31.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-15 Depth (m): 06.00-6.45 Sample: D-04 Borehole: Depth (m): Sample:
LL: 32 PL: 18 PI: 14 LL: PL: PI:
Flow Curve Flow Curve
52.00% 120.00%
51.00%
100.00%

Moisture Content %
Moisture Content %

50.00%
80.00%
49.00%
48.00% 60.00%
47.00%
40.00%
46.00%
20.00%
45.00%
44.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-15 Depth (m): 18.50-19.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 45 PL: 28 PI: 17 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


28-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


42.00% 120.00%

100.00%

Moisture Content %
Moisture Content %

41.50%
80.00%
41.00%
60.00%
40.50%
40.00%

40.00% 20.00%

39.50% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-14 Depth (m): 14.00-14.50 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 40 PL: 26 PI: 14 LL: PL: PI:
Flow Curve Flow Curve
52.00% 120.00%
51.50%
100.00%

Moisture Content %
Moisture Content %

51.00%
80.00%
50.50%
50.00% 60.00%
49.50%
40.00%
49.00%
20.00%
48.50%
48.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-14 Depth (m): 20.00-20.50 Sample: UDS-03 Borehole: Depth (m): Sample:
LL: 49 PL: 27 PI: 22 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


2-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


41.00% 120.00%

40.00% 100.00%

Moisture Content %
Moisture Content %

39.00%
80.00%
38.00%
60.00%
37.00%
40.00%
36.00%

35.00% 20.00%

34.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-13 Depth (m): 12.50-13.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 35 PL: 19 PI: 16 LL: PL: PI:
Flow Curve Flow Curve
80.00% 120.00%
70.00%
100.00%

Moisture Content %
Moisture Content %

60.00%
50.00% 80.00%
40.00%
60.00%
30.00%
20.00% 40.00%
10.00%
20.00%
0.00%
-10.00% 1 10 100 0.00%
1 10 100
Number of Blows Number of Blows

Borehole: BH-13 Depth (m): 23.00-23.50 Sample: UDS-03 Borehole: Depth (m): Sample:
LL: 34 PL: 25 PI: 9 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


2-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


43.50% 120.00%
43.00%
100.00%

Moisture Content %
Moisture Content %

42.50%
80.00%
42.00%
41.50% 60.00%
41.00%
40.00%
40.50%
20.00%
40.00%
39.50% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-12 Depth (m): 18.50-19.00 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 40 PL: 26 PI: 14 LL: PL: PI:
Flow Curve Flow Curve
48.50% 120.00%
48.00%
100.00%

Moisture Content %
Moisture Content %

47.50%
47.00% 80.00%
46.50%
60.00%
46.00%
45.50% 40.00%
45.00%
20.00%
44.50%
44.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-12 Depth (m): 19.00-19.50 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 45 PL: 27 PI: 18 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


2-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


52.00% 100.00%
90.00%
51.00%

Moisture Content %
Moisture Content %

80.00%
50.00% 70.00%
49.00% 60.00%
50.00%
48.00% 40.00%
47.00% 30.00%
20.00%
46.00%
10.00%
45.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-11 Depth (m): 3.50-4.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 47 PL: 25 PI: 22 LL: PL: PI:
Flow Curve Flow Curve
100.00% 100.00%
90.00% 90.00%

Moisture Content %
80.00% 80.00%
Moisture Content %

70.00% 70.00%
60.00% 60.00%
50.00% 50.00%
40.00% 40.00%
30.00% 30.00%
20.00% 20.00%
10.00% 10.00%
0.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: Depth (m): Sample: Borehole: Depth (m): Sample:


LL: PL: PI: LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


1-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


41.50% 100.00%
90.00%
41.00%

Moisture Content %
Moisture Content %

80.00%
70.00%
40.50%
60.00%
40.00% 50.00%
40.00%
39.50% 30.00%
20.00%
39.00%
10.00%
38.50% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-10 Depth (m): 04.50-4.95 Sample: D-03 Borehole: Depth (m): Sample:
LL: 39 PL: 23 PI: 16 LL: PL: PI:
Flow Curve Flow Curve
36.00% 100.00%
90.00%
35.00%

Moisture Content %
80.00%
Moisture Content %

70.00%
34.00%
60.00%
33.00% 50.00%
40.00%
32.00% 30.00%
20.00%
31.00%
10.00%
30.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-10 Depth (m): 13.50-13.95 Sample: D-09 Borehole: Depth (m): Sample:
LL: 31 PL: 20 PI: 11 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


30-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


54.00% 100.00%
90.00%
53.00%

Moisture Content %
Moisture Content %

80.00%
52.00% 70.00%
51.00% 60.00%
50.00%
50.00% 40.00%
49.00% 30.00%
20.00%
48.00%
10.00%
47.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-09 Depth (m): 03.00-3.45 Sample: D-02 Borehole: Depth (m): Sample:
LL: 48 PL: 26 PI: 22 LL: PL: PI:
Flow Curve Flow Curve
34.00% 100.00%
90.00%
33.00%

Moisture Content %
80.00%
Moisture Content %

32.00% 70.00%
31.00% 60.00%
50.00%
30.00% 40.00%
29.00% 30.00%
20.00%
28.00%
10.00%
27.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-09 Depth (m): 12.50-13.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 28 PL: 19 PI: 9 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


30-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


55.00% 100.00%
90.00%
54.00%

Moisture Content %
Moisture Content %

80.00%
70.00%
53.00%
60.00%
52.00% 50.00%
40.00%
51.00% 30.00%
20.00%
50.00%
10.00%
49.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-08 Depth (m): 3.00-3.45 Sample: D-02 Borehole: Depth (m): Sample:
LL: 50 PL: 27 PI: 23 LL: PL: PI:
Flow Curve Flow Curve
57.00% 100.00%
90.00%
56.00%

Moisture Content %
80.00%
Moisture Content %

70.00%
55.00%
60.00%
54.00% 50.00%
40.00%
53.00% 30.00%
20.00%
52.00%
10.00%
51.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-08 Depth (m): 10.50-10.95 Sample: D-07 Borehole: Depth (m): Sample:
LL: 52 PL: 29 PI: 23 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


25-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


37.00% 120.00%

36.00% 100.00%

Moisture Content %
Moisture Content %

35.00% 80.00%

34.00% 60.00%

33.00% 40.00%

32.00% 20.00%

31.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-07 Depth (m): 06.50-7.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 32 PL: 21 PI: 11 LL: PL: PI:
Flow Curve Flow Curve
48.00% 120.00%

47.00% 100.00%

Moisture Content %
Moisture Content %

46.00% 80.00%

45.00% 60.00%

44.00% 40.00%

43.00% 20.00%

42.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-07 Depth (m): 22.50-22.95 Sample: D-15 Borehole: Depth (m): Sample:
LL: 43 PL: 28 PI: 15 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


25-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


55.00% 100.00%
54.00% 90.00%
53.00%

Moisture Content %
Moisture Content %

80.00%
52.00% 70.00%
51.00%
60.00%
50.00%
50.00%
49.00%
40.00%
48.00%
47.00% 30.00%
46.00% 20.00%
45.00% 10.00%
44.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-06 Depth (m): 16.00-16.50 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 46 PL: 28 PI: 18 LL: PL: PI:
Flow Curve Flow Curve
34.00% 100.00%
33.50% 90.00%

Moisture Content %
33.00% 80.00%
Moisture Content %

32.50% 70.00%
32.00% 60.00%
31.50% 50.00%
31.00% 40.00%
30.50% 30.00%
30.00% 20.00%
29.50% 10.00%
29.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-06 Depth (m): 07.50-7.95 Sample: D-05 Borehole: Depth (m): Sample:
LL: 30 PL: 18 PI: 12 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


3-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


44.00% 120.00%
43.00%
100.00%

Moisture Content %
Moisture Content %

42.00%
80.00%
41.00%
40.00% 60.00%
39.00%
40.00%
38.00%
20.00%
37.00%
36.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-05 Depth (m): 17.50-18.00 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 37 PL: 25 PI: 12 LL: PL: PI:
Flow Curve Flow Curve
48.00% 120.00%
47.50%
47.00% 100.00%

Moisture Content %
Moisture Content %

46.50%
80.00%
46.00%
45.50%
60.00%
45.00%
44.50% 40.00%
44.00%
43.50% 20.00%
43.00%
42.50% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-05 Depth (m): 22.00-22.50 Sample: UDS-03 Borehole: Depth (m): Sample:
LL: 43 PL: 26 PI: 17 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


2-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


39.00% 56.00%
38.00% 55.00%

Moisture Content %
Moisture Content %

37.00%
54.00%
36.00%
53.00%
35.00%
52.00%
34.00%
51.00%
33.00%
32.00% 50.00%

31.00% 49.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-04 Depth (m): 1.50-1.95 Sample: D-01 Borehole: BH-04 Depth (m): 17.00-17.50 Sample: UDS-01
LL: 33 PL: 24 PI: 9 LL: 50 PL: 27 PI: 23

Flow Curve Flow Curve


58.00% 100.00%
57.00% 90.00%

Moisture Content %
80.00%
Moisture Content %

56.00%
70.00%
55.00%
60.00%
54.00%
50.00%
53.00%
40.00%
52.00% 30.00%
51.00% 20.00%
50.00% 10.00%
49.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-04 Depth (m): 7.50-7.95 Sample: D-05 Borehole: Depth (m): Sample:
LL: 52 PL: 31 PI: 21 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


24-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


49.00% 100.00%
48.00% 90.00%

Moisture Content %
Moisture Content %

47.00% 80.00%
46.00% 70.00%
45.00% 60.00%
44.00% 50.00%
43.00% 40.00%
42.00% 30.00%
41.00% 20.00%
40.00% 10.00%
39.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-02 Depth (m): 06.50-7.00 Sample: UDS-01 Borehole: Depth (m): Sample:
LL: 41 PL: 25 PI: 16 LL: PL: PI:
Flow Curve Flow Curve
42.00% 100.00%
90.00%
41.00%

Moisture Content %
80.00%
Moisture Content %

40.00% 70.00%
39.00% 60.00%
50.00%
38.00% 40.00%
37.00% 30.00%
20.00%
36.00%
10.00%
35.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-02 Depth (m): 07.00-07.50 Sample: UDS-02 Borehole: Depth (m): Sample:
LL: 37 PL: 27 PI: 10 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


1-Oct-16 Md. Shahidullah PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
ATTERBERG LIMIT TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Flow Curve Flow Curve


38.00% 100.00%
90.00%
37.00%
Moisture Content %

Moisture Content %
80.00%
70.00%
36.00%
60.00%
35.00% 50.00%
40.00%
34.00% 30.00%
20.00%
33.00%
10.00%
32.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-33 Depth (m): 13.50-13.95 Sample: D-09 Borehole: Depth (m): Sample:
LL: 33 PL: 26 PI: 7 LL: PL: PI:
Flow Curve Flow Curve
70.00% 100.00%
90.00%
60.00%

Moisture Content %
80.00%
Moisture Content %

50.00% 70.00%
40.00% 60.00%
50.00%
30.00% 40.00%
20.00% 30.00%
20.00%
10.00%
10.00%
0.00% 0.00%
1 10 100 1 10 100
Number of Blows Number of Blows

Borehole: BH-33 Depth (m): 17.50-18.00 Sample: UDS-03 Borehole: Depth (m): Sample:
LL: 29 PL: 22 PI: 7 LL: PL: PI:

TEST DATE TEST PERFORMED BY CHECKED BY


3-Sep-16 Md. Shahidullah PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS
LTD. Project BSRM Factory. (Unit-02) Client BSRM Location Jowrargong, Mirsarai, Chittagong.
Geotechnical Engineering Laboratory
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Average Shelby
Diameter of Top Average Bottom Length of Volume of Volume of Total Soil Bulk Bulk Unit Dry
BOREHOLE SAMPLE Length of Bottom Tube Moisture
DEPTH (m) Shelby Gap Top Gap Gap Sample Sample Sample Weight Weight Density Weight Density(
NO. Shelby Gap Weight Content
Tube (mm) (mm) (mm) (mm) (mm) (mm 3 ) (m 3 ) (g) (g) (kg/m 3 ) (kN/m 3 ) γd)
Tube (mm) (mm) (g)

227 13
227 13
BH-9 UDS-1 12.50-13.00 490 72
227
227
13
13 250 1017876 1.02E-03 3523 1354 2169 2131 20.90 19.41 17.51
227 13
305 25
305 25
BH-9 UDS-2 13.00-13.50 510 72
305
305
25
25 180 732871 7.33E-04 2898 1370 1528 2085 20.45 19.59 17.10
305 25
243 16
243 16
BH-11 UDS-1 3.50-4.00 503 72
243
243
16
16 244 993447 9.93E-04 3395 1372 2023 2036 19.98 30.02 15.36
243 16
214 15
214 15
BH-11 UDS-2 4.00-4.50 500 72
214
214
15
15 271 1103378 1.10E-03 3606 1356 2250 2039 20.00 30.14 15.37
214 15
145 35
145 35
BH-20 UDS-1 18.50-19.00 496 72
145
145
35
35 316 1286595 1.29E-03 4026 1398 2628 2043 20.04 24.6 16.08
145 35
75 33
75 33
BH-20 UDS-2 19.00-19.50 500 72
75
75
33
33 392 1596030 1.60E-03 4676 1391 3285 2058 20.19 25.18 16.13
75 33

Test Performed By: Md.Shahidullah


Checked By : Priodeep
DEVELOPMENT CONSTRUCTIONS LTD.
Geotechnical Engineering Laboratory Project BSRM Factory. (Unit-02) Client BSRM Location Jowrargong, Mirsarai, Chittagong.
Dhaka
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Diameter Average Length Volume Shelby Bulk
Average Bottom Volume of Total Soil Bulk Dry
BOREHOLE SAMPLE Length of of Shelby Top Gap Bottom of of Tube Unit Moisture
DEPTH (m) Top Gap Gap Sample Weight Weight Density Density(
NO. Shelby Tube (mm) Gap Sample Sample 3 Weight Weight Content
(mm) (mm) (m ) (g) (g) (kg/m 3 ) γd)
Tube (mm) (mm) (mm) (mm) (mm 3 ) (g) (kN/m 3 )
102 21
102 21
BH-22 UDS-2 19.00-19.50 500 72
102
102
21
21 377 1534957 1.53E-03 4452 1425 3027 1972 19.35 25.37 15.43
102 21
240 20
240 20
BH-23 UDS-1 18.50-19.00 500 72
240
240
20
20 240 977161 9.77E-04 3338 1363 1975 2021 19.83 21.65 16.30
240 20
205 25
205 25
BH-23 UDS-2 19.00-19.50 500 72
205
205
25
25 270 1099306 1.10E-03 3553 1355 2198 1999 19.61 30.41 15.04
205 25
207 16
207 16
BH-31 UDS-1 4.00-4.50 500 72
207
207
16
16 277 1127807 1.13E-03 3537 1409 2128 1887 18.51 25.84 14.71
207 16
107 18
107 18
BH-31 UDS-2 10.00-10.50 500 72
107
107
18
18 375 1526814 1.53E-03 4522 1381 3141 2057 20.18 21.62 16.59
107 18
103 37
103 37
BH-33 UDS-3 17.50-18.00 496 72
103
103
37
37 356 1449455 1.45E-03 4239 1379 2860 1973 19.36 23.74 15.64
103 37

Test Performed By Md.Shahidullah


Check ed By Priodeep Chowdhury
DEVELOPMENT CONSTRUCTIONS LTD.
Geotechnical Engineering Laboratory Project BSRM Factory. (Unit-02) Client BSRM Location Jowrargong, Mirsarai, Chittagong.
Dhaka
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Diameter Average Length Volume Shelby Bulk
Average Bottom Volume of Total Soil Bulk Dry
BOREHOLE SAMPLE Length of of Shelby Top Gap Bottom of of Tube Unit Moisture
DEPTH (m) Top Gap Gap Sample Weight Weight Density Density(
NO. Shelby Tube (mm) Gap Sample Sample 3 Weight Weight Content
(mm) (mm) (m ) (g) (g) (kg/m 3 ) γd)
Tube (mm) (mm) (mm) (mm) (mm 3 ) (g) (kN/m 3 )
125 17
125 17
BH-16 UDS-1 14.00-14.50 505 72
125
125
17
17 363 1477956 1.48E-03 4511 1348 3163 2140 20.99 23.02 17.07
125 17
120 15
120 15
BH-16 UDS-2 14.50-15.00 505 72
120
120
15
15 370 1506457 1.51E-03 4443 1348 3095 2054 20.15 28.24 15.72
120 15
152 30
152 30
BH-18 UDS-1 13.00-13.50 504 72
152
152
30
30 322 1311024 1.31E-03 4138 1355 2783 2123 20.82 22.41 17.01
152 30
128 29
128 29
BH-19 UDS-2 14.50-15.00 503 72
128
128
29
29 346 1408740 1.41E-03 4136 1371 2765 1963 19.25 19.42 16.12
128 29
88 39
88 39
BH-19 UDS-3 20.50-21.00 498 72
88
88
39
39 371 1510528 1.51E-03 4358 1345 3013 1995 19.57 32.23 14.80
88 39
145 35
145 35
BH-20 UDS-1 18.50-19.00 496 72
145
145
35
35 316 1286595 1.29E-03 4026 1398 2628 2043 20.04 24.6 16.08
145 35
75 33
75 33
BH-20 UDS-2 19.00-19.50 500 72
75
75
33
33 392 1596030 1.60E-03 4676 1391 3285 2058 20.19 25.18 16.13
75 33

Test Performed By Md.Shahidullah


Check ed By Priodeep Chowdhury
DEVELOPMENT CONSTRUCTIONS LTD.
Geotechnical Engineering Laboratory Project BSRM Factory. (Unit-02) Client BSRM Location Jowrargong, Mirsarai, Chittagong.
Dhaka
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Diameter Average Length Volume Shelby Bulk
Average Bottom Volume of Total Soil Bulk Dry
BOREHOLE SAMPLE Length of of Shelby Top Gap Bottom of of Tube Unit Moisture
DEPTH (m) Top Gap Gap Sample Weight Weight Density Density(
NO. Shelby Tube (mm) Gap Sample Sample 3 Weight Weight Content
(mm) (mm) (m ) (g) (g) (kg/m 3 ) γd)
Tube (mm) (mm) (mm) (mm) (mm 3 ) (g) (kN/m 3 )
95 60
95 60
BH-13 UDS-1 12.50-13.00 500 72
95
95
60
60 345 1404669 1.40E-03 4282 1350 2932 2087 20.48 22.87 16.67
95 60
90 22
90 22
BH-13 UDS-3 23.50-24.00 498 72
90
90
22
22 386 1571601 1.57E-03 4676 1468 3208 2041 20.02 27.06 15.76
90 22
107 48
107 48
BH-14 UDS-1 14.00-14.50 498 72
107
107
48
48 343 1396526 1.40E-03 4256 1328 2928 2097 20.57 25.68 16.37
107 48
100 17
100 17
BH-14 UDS-3 20.00-20.50 500 72
100
100
17
17 383 1559386 1.56E-03 4568 1388 3180 2039 20.01 23.69 16.17
100 17
120 15
120 15
BH-14 UDS-4 20.50-21.00 500 72
120
120
15
15 365 1486099 1.49E-03 4228 1390 2838 1910 18.73 19.26 15.71
120 15
255 20
255 20
BH-15 UDS-1 18.50-19.00 497 72
255
255
20
20 222 903874 9.04E-04 3204 1360 1844 2040 20.01 32.51 15.10
255 20

Test Performed By Md.Shahidullah


Check ed By Priodeep Chowdhury
DEVELOPMENT CONSTRUCTIONS LTD.
Geotechnical Engineering Laboratory Project BSRM Factory. (Unit-02) Client BSRM Location Jowrargong, Mirsarai, Chittagong.
Dhaka
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Diameter Average Length Volume Shelby Bulk
Average Bottom Volume of Total Soil Bulk Dry
BOREHOLE SAMPLE Length of of Shelby Top Gap Bottom of of Tube Unit Moisture
DEPTH (m) Top Gap Gap Sample Weight Weight Density Density(
NO. Shelby Tube (mm) Gap Sample Sample 3 Weight Weight Content
(mm) (mm) (m ) (g) (g) (kg/m 3 ) γd)
Tube (mm) (mm) (mm) (mm) (mm 3 ) (g) (kN/m 3 )
227 13
227 13
BH-9 UDS-1 12.50-13.00 490 72
227
227
13
13 250 1017876 1.02E-03 3523 1354 2169 2131 20.90 19.41 17.51
227 13
305 25
305 25
BH-9 UDS-2 13.00-13.50 510 72
305
305
25
25 180 732871 7.33E-04 2898 1370 1528 2085 20.45 23.23 16.60
305 25
243 16
243 16
BH-11 UDS-1 3.50-4.00 503 72
243
243
16
16 244 993447 9.93E-04 3395 1372 2023 2036 19.98 30.02 15.36
243 16
214 15
214 15
BH-11 UDS-2 4.00-4.50 500 72
214
214
15
15 271 1103378 1.10E-03 3606 1356 2250 2039 20.00 30.14 15.37
214 15
104 21
104 21
BH-12 UDS-1 18.50-19.00 495 72
104
104
21
21 370 1506457 1.51E-03 4416 1367 3049 2024 19.85 30.25 15.24
104 21
85 15
85 15
BH-12 UDS-2 19.00-19.50 497 72
85
85
15
15 397 1616387 1.62E-03 4510 1358 3152 1950 19.13 29.2 14.81
85 15

Test Performed By Md.Shahidullah


Check ed By Priodeep Chowdhury
DEVELOPMENT CONSTRUCTIONS LTD.
Geotechnical Engineering Laboratory Project BSRM Factory. (Unit-02) Client BSRM Location Jowrargong, Mirsarai, Chittagong.
Dhaka
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Diameter Average Length Volume Shelby Bulk
Average Bottom Volume of Total Soil Bulk Dry
BOREHOLE SAMPLE Length of of Shelby Top Gap Bottom of of Tube Unit Moisture
DEPTH (m) Top Gap Gap Sample Weight Weight Density Density(
NO. Shelby Tube (mm) Gap Sample Sample 3 Weight Weight Content
(mm) (mm) (m ) (g) (g) (kg/m 3 ) γd)
Tube (mm) (mm) (mm) (mm) (mm 3 ) (g) (kN/m 3 )
213 15
213 15
BH-2 UDS-1 6.50-7.00 498 72
213
213
15
15 270 1099306 1.10E-03 3615 1330 2285 2079 20.39 25.77 16.21
213 15
225 17
225 17
BH-2 UDS-2 7.00-7.50 500 72
225
225
17
17 258 1050448 1.05E-03 3615 1443 2172 2068 20.28 20.06 16.89
225 17
120 35
120 35
BH-4 UDS-1 17.00-17.50 500 72
120
120
35
35 345 1404669 1.40E-03 4378 1345 3033 2159 21.18 15.68 18.31
120 35
200 20
200 20
BH-5 UDS-2 17.50-18.00 500 72
200
200
20
20 280 1140021 1.14E-03 3660 1424 2236 1961 19.24 26.52 15.21
200 20
165 27
165 27
BH-5 UDS-3 22.00-22.50 515 72
165
165
27
27 323 1315096 1.32E-03 3978 1423 2555 1943 19.06 34.01 14.22
165 27
168 30
168 30
BH-6 UDS-2 16.00-16.50 500 72
168
168
30
30 302 1229594 1.23E-03 3912 1358 2554 2077 20.38 29.27 15.76
168 30
190 17
190 17
BH-7 UDS-1 6.50-7.00 500 72
190
190
17
17 293 1192951 1.19E-03 3837 1410 2427 2034 19.96 17.94 16.92
190 17

Test Performed By Md.Shahidullah


Check ed By Priodeep Chowdhury
DEVELOPMENT CONSTRUCTIONS LTD.
Geotechnical Engineering Laboratory Project BSRM Factory. (Unit-02) Client BHEL Location Jowrargong, Mirsarai, Chittagong.
Dhaka
DETERMINATION OF BULK DENSITY OF UNDISTURBED SAMPLES/SHELBY TUBE
Total Shelby
Diameter of Top Average Bottom Average Length of Volume of Volume of Total Soil Bulk Bulk Unit Dry
BOREHOLE SAMPLE Length of Tube Moisture
DEPTH (m) Shelby Gap Top Gap Gap Bottom Sample Sample Sample Weight Weight Density Weight Density(
NO. Shelby Weight Content
Tube (mm) (mm) (mm) (mm) Gap (mm) (mm) (mm 3 ) (m 3 ) (g) (g) (kg/m 3 ) (kN/m 3 ) γd)
Tube (mm) (g)

128 29
128 29
BH-19 UDS-2 14.50-15.00 503 72
128
128
29
29 346 1408740 1.41E-03 4136 1371 2765 1963 19.25 19.42 16.12
128 29
88 39
88 39
BH-19 UDS-3 20.50-21.00 498 72
88
88
39
39 371 1510528 1.51E-03 4358 1345 3013 1995 19.57 32.23 14.80
88 39
102 21
102 21
BH-22 UDS-2 19.00-19.50 500 72
102
102
21
21 377 1534957 1.53E-03 4452 1425 3027 1972 19.35 25.37 15.43
102 21
207 16
207 16
BH-31 UDS-1 4.00-4.50 500 72
207
207
16
16 277 1127807 1.13E-03 3537 1409 2128 1887 18.51 25.84 14.71
207 16
107 18
107 18
BH-31 UDS-2 10.00-10.50 500 72
107
107
18
18 375 1526814 1.53E-03 4522 1381 3141 2057 20.18 21.62 16.59
107 18
103 37
103 37
BH-33 UDS-3 17.50-18.00 496 72
103
103
37
37 356 1449455 1.45E-03 4239 1379 2860 1973 19.36 23.74 15.64
103 37

Test Performed By: Md.Shahidullah


Checked By : Md.Rafiqul Islam
PROLECT NAME: BSRM Factory. (Unit-02)
CLIENT: BSRM
LOCATION: Jowrargong, Mirsarai, Chittagong
Test No. 1 2 3 4 5 6 7 8 9

Borehole No.: BH-23 BH-23 BH-23 BH-31 BH-31 BH-33

Sample No.: UDS-1 UDS-2 D3 UDS-1 UDS-2 UDS-3

Depth (m): 18.50-19.00 19.00-19.50 4.50-5.00 4.00-4.50 10.00-10.50 17.50-18.00

Container No:

Mass of Container (g) (m1): 23.74 21.41 22.32 25.28 28.76 28.61

Mass of Wet Soil + Container (g) (m2): 139.26 157.31 173.69 146.55 156.94 150.2

Mass of Dry Soil + Container (g) (m3): 118.7 125.62 147.4 121.65 134.15 126.87

Mass of Moisture (m2-m3): 20.6 31.7 26.3 24.9 22.8 23.3

Mass of Dry Soil (m3-m1): 94.96 104.21 125.08 96.37 105.39 98.26

Moisture Content (%) (w): 21.65 30.41 21.02 25.84 21.62 23.74

TEST PERFORMED ON: 13/10/2016 m 2  m3


TEST PERFORMED BY: MD.SHAHIDULLAH w%   100
CHECKED BY: PRIODEEP CHOWDHURY
m3  m1
PROLECT NAME: BSRM Factory. (Unit-02)
CLIENT: BSRM
LOCATION: Jowrargong, Mirsarai, Chittagong
Test No. 1 2 3 4 5 6 7 8 9 10

Borehole No.: BH-18 BH-19 BH-19 BH-20 BH-20 BH-20 BH- 21 BH- 21 BH- 21 BH-22

Sample No.: UDS-1 UDS-2 UDS-3 UDS-1 UDS-2 D5 D1 D3 D5 UDS-2

Depth (m): 13.00-13.50 14.50-15.00 20.00-21.00 18.50-19.00 19.00-19.50 7.50-8.00 1.50-2.00 4.50-5.00 7.50-8.00 19.50-20.00

Container No:

Mass of Container (g) (m1): 26.16 22.93 28.1 18.12 17.36 28.13 30.95 27.57 25.57 23.01

Mass of Wet Soil + Container (g) (m2): 185.98 144 168.07 145.03 147.78 139.32 158.53 134.15 168.66 155.14

Mass of Dry Soil + Container (g) (m3): 156.72 124.31 133.95 119.97 121.55 120.82 136.11 104.83 120.1 128.4

Mass of Moisture (m2-m3): 29.3 19.7 34.1 25.1 26.2 18.5 22.4 29.3 48.6 26.7

Mass of Dry Soil (m3-m1): 130.56 101.38 105.85 101.85 104.19 92.69 105.16 77.26 94.53 105.39

Moisture Content (%) (w): 22.41 19.42 32.23 24.60 25.18 19.96 21.32 37.95 51.37 25.37

TEST PERFORMED ON: 13/10/2016 m 2  m3


TEST PERFORMED BY: MD.SHAHIDULLAH w%   100
CHECKED BY: PRIODEEP CHOWDHURY
m3  m1
PROLECT NAME: BSRM Factory. (Unit-02)
CLIENT: BSRM
LOCATION: Jowrargong, Mirsarai, Chittagong
Test No. 1 2 3 4 5 6 7 8 9 10

Borehole No.: BH-13 BH-13 BH-13 BH- 14 BH- 14 BH- 14 BH-15 BH-16 BH-16 BH-16

Sample No.: UDS-1 UDS-2 UDS-3 UDS-1 UDS-3 UDS-4 UDS-1 UDS-1 UDS-2 D3

Depth (m): 12.50-13.00 19.00-19.50 23.00-23.50 14.00-14.50 20.00-20.50 20.50-21.00 18.50-19.00 14.00-14.50 14.50-15.00 4.50-5.00

Container No:

Mass of Container (g) (m1): 29.12 21.41 29.35 24.31 27.17 26.42 28.6 29.84 24.79 25.88

Mass of Wet Soil + Container (g) (m2): 150.69 157.31 155.62 141.61 147.04 152.3 160.74 156.35 147.71 151.83

Mass of Dry Soil + Container (g) (m3): 128.06 125.73 128.73 117.64 124.08 131.97 128.32 132.68 120.64 125.55

Mass of Moisture (m2-m3): 22.6 31.6 26.9 24.0 23.0 20.3 32.4 23.7 27.1 26.3

Mass of Dry Soil (m3-m1): 98.94 104.32 99.38 93.33 96.91 105.55 99.72 102.84 95.85 99.67

Moisture Content (%) (w): 22.87 30.27 27.06 25.68 23.69 19.26 32.51 23.02 28.24 26.37

TEST PERFORMED ON: 13/10/2016 m 2  m3


TEST PERFORMED BY: MD.SHAHIDULLAH w%   100
CHECKED BY: PRIODEEP CHOWDHURY
m3  m1
PROLECT NAME: BSRM Factory. (Unit-02)
CLIENT: BSRM
LOCATION: Jowrargong, Mirsarai, Chittagong
Test No. 1 2 3 4 5 6 7 8 9 10

Borehole No.: BH- 9 BH- 10 BH- 10 BH- 10 BH-11 BH-11 BH-11 BH-12 BH-12 BH-12

Sample No.: D2 D3 D5 D9 UDS-1 UDS-2 D5 UDS-1 UDS-2 D2

Depth (m): 3.50-4.00 4.50-5.00 7.50-8.00 13.50-14.00 3.50-4.00 4.00-4.50 7.50-8.00 18.50-19.00 19.00-19.50 3.50-4.00

Container No:

Mass of Container (g) (m1): 29.86 28.63 24.55 27.31 24.13 26.43 26.43 25.83 28.06 26.13

Mass of Wet Soil + Container (g) (m2): 136.82 147.14 156.26 152.59 165.96 182.3 161.84 148.21 146.33 162.96

Mass of Dry Soil + Container (g) (m3): 113.59 127.16 135.71 127.76 133.21 146.2 135.98 119.79 119.6 116.48

Mass of Moisture (m2-m3): 23.2 20.0 20.6 24.8 32.8 36.1 25.9 28.4 26.7 46.5

Mass of Dry Soil (m3-m1): 83.73 98.53 111.16 100.45 109.08 119.77 109.55 93.96 91.54 90.35

Moisture Content (%) (w): 27.74 20.28 18.49 24.72 30.02 30.14 23.61 30.25 29.20 51.44

TEST PERFORMED ON: 13/10/2016 m 2  m3


TEST PERFORMED BY: MD.SHAHIDULLAH w%   100
CHECKED BY: PRIODEEP CHOWDHURY
m3  m1
PROLECT NAME: BSRM Factory. (Unit-02)
CLIENT: BSRM
LOCATION: Jowrargong, Mirsarai, Chittagong
Test No. 1 2 3 4 5 6 7 8 9 10

Borehole No.: BH- 5 BH- 5 BH- 5 BH- 6 BH- 7 BH- 7 BH- 8 BH- 8 BH-9 BH-9

Sample No.: UDS-2 UDS-3 D3 UDS-2 UDS-1 D9 D2 D7 UDS-1 UDS-2

Depth (m): 17.50-18.00 22.00-22.50 4.50-4.95 16.00-16.50 6.50-7.00 13.50-13.95 3.00-3.45 10.50-10.95 12.50-13.00 13.00-13.50

Container No:

Mass of Container (g) (m1): 24.62 23.84 24.62 24.62 31.61 24.47 25.74 24.36 22.48 25.47

Mass of Wet Soil + Container (g) (m2): 156.53 160.2 180.82 162.73 150.82 126.32 102.98 139.72 178.22 173.58

Mass of Dry Soil + Container (g) (m3): 128.88 125.59 149.7 131.46 132.69 101.96 86.44 118.39 152.91 145.66

Mass of Moisture (m2-m3): 27.7 34.6 31.1 31.3 18.1 24.4 16.5 21.3 25.3 27.9

Mass of Dry Soil (m3-m1): 104.26 101.75 125.08 106.84 101.08 77.49 60.7 94.03 130.43 120.19

Moisture Content (%) (w): 26.52 34.01 24.88 29.27 17.94 31.44 27.25 22.68 19.41 23.23

TEST PERFORMED ON: 13/10/2016 m 2  m3


TEST PERFORMED BY: MD.SHAHIDULLAH w%   100
CHECKED BY: PRIODEEP CHOWDHURY
m3  m1
PROLECT NAME: BSRM Factory. (Unit-02)
CLIENT: BSRM
LOCATION: Jowrargong, Mirsarai, Chittagong
Test No. 1 2 3 4 5 6 7 8 9

Borehole No.: BH- 2 BH- 2 BH- 2 BH- 3 BH- 3 BH- 3 BH- 4 BH- 4 BH- 4

Sample No.: UDS-1 UDS-2 D7 D3 D9 D14 UDS-1 D1 D5

Depth (m): 6.50-7.00 7.50-8.00 10.50-10.95 4.50-4.95 13.50-13.95 21.00-21.45 17.00-17.50 1.50-1.95 7.50-7.95

Container No:

Mass of Container (g) (m1): 23.75 23.43 28.04 22.42 24.27 25.02 22.92 29.09 25.28

Mass of Wet Soil + Container (g) (m2): 146.4 148.38 149.47 145.32 127.66 161.41 164.33 126.37 164.38

Mass of Dry Soil + Container (g) (m3): 121.27 127.5 127.16 122.92 110.04 137.22 145.16 105.21 128.49

Mass of Moisture (m2-m3): 25.1 20.9 22.3 22.4 17.6 24.2 19.2 21.2 35.9

Mass of Dry Soil (m3-m1): 97.52 104.07 99.12 100.5 85.77 112.2 122.24 76.12 103.21

Moisture Content (%) (w): 25.77 20.06 22.51 22.29 20.54 21.56 15.68 27.80 34.77

TEST PERFORMED ON: 13/10/2016 m 2  m3


TEST PERFORMED BY: MD.SHAHIDULLAH w%   100
CHECKED BY: PRIODEEP CHOWDHURY
m3  m1
DEVELOPMENT CONSTRUCTIONS LTD. PROJECT NAME: BSRM Factory. (Unit-02)
GEOTECHNICAL ENGINEERING LABORATORY CLIENT: BSRM
OWNER: BSRM
HOUSE# 11, ROAD# 19/A, SECTOR# 04, UTTARA MODEL TOWN, DHAKA-1230
LOCATION: Jowrargong, Mirsarai, Chittagong.
PHONE: 8957236,8957243; FAX: +880-2-8957243; WEB: www. dcl-fcl.com DATE:

MOISTURE CONTENT TEST


Test No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Borehole No.: BH-9 BH-9 BH-11 BH-11 BH-20 BH-20
Sample No.: UDS-1 UDS-2 UDS-1 UDS-2 UDS-1 UDS-2
Depth (m): 12.50-13.00 13.00-13.50 3.50-4.00 4.00-4.50 18.50-19.00 19.00-19.50
Mass of Container (g) (m 1 ): 22.48 22.46 24.13 26.43 18.12 17.36
Mass of Wet Soil + Container (g) (m 2 ): 178.22 177.5 165.96 182.3 145.03 147.78

Mass of Dry Soil + Container (g) (m 3 ): 152.91 152.1 133.21 146.2 119.97 121.55

Mass of Moisture (m 2 -m 3 ): 25.3 25.4 32.8 36.1 25.1 26.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Mass of Dry Soil (m 3 -m 1 ): 130.43 129.64 109.08 119.77 101.85 104.19 0 0 0 0 0 0 0 0 0 0
Moisture Content (%) (w): 19.41 19.59 30.02 30.14 24.60 25.18 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

m2  m3 TESTED BY MD. SHAHIDULLAH


w%  100 PREPARED & CHECKED BY PRIODEEP CHOWDHURY
m3  m1
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


MIRSARAI,
BSRM BSRM CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No.
(m) No. (kPa) (kPa) Initial Failure
2
(%) (%) Area (mm ) 2537.14

1 200.00 138.24 375.00 Volume (mm3) 59895.4


9.00-
BH-20 D-06 2 300.00 207.03 375.00 17.82 16.5% 17.3% Rate (mm/min) 0.5
9.45
3 375.00 239.08 375.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.2
Cohesion (kPa)
25.0
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

25-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No.
(m) No. (kPa) (kPa) Initial Failure
(%) (%) Area (mm2) 2537.14
3
1 200.00 138.57 375.00 Volume (mm ) 59895.4
09.0-
BH-18 D-06 2 300.00 208.03 375.00 15.13 19.2% 19.9% Rate (mm/min) 0.5
9.45
3 375.00 241.42 375.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.7
Cohesion (kPa)
22.9
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

29-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)
Sample Normal Shear

(kN/m )
Dry Unit
Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No. No. Initial Failure
(m) (kPa) (kPa)
(%) (%) Area (mm2) 2537.14
3
1 200.00 138.57 375.00 Volume (mm ) 59895.4
25.50-
BH-15 D-17 2 300.00 208.03 375.00 15.24 18.5% 19.0% Rate (mm/min) 0.5
25.95
3 375.00 241.42 375.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.7
Cohesion (kPa)
22.9
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

27-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacement
Moisture Content Dimension

(0.01mm)
at Failure

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No. No. Initial Failure
(m) (kPa) (kPa)
(%) (%) Area (mm2) 2537.1357

1 200.00 143.25 425.00 Volume (mm3) 59895.4


15.0-
BH-12 D-10 2 300.00 213.71 425.00 15.40 17.6% 17.8% Rate (mm/min) 0.5
15.45
3 375.00 245.43 450.00 Test Type Unsub
500
Test Points Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.6
Cohesion (kPa)
28.6
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)

300

250
Shear Stress (kPa)

200

150

100
ID1
50 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450 500
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

3-Oct-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)
Sample Normal Shear

(kN/m )
Dry Unit
Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No. No. Initial Failure
(m) (kPa) (kPa)
(%) (%) Area (mm2) 2537.14
3
1 200.00 144.92 425.00 Volume (mm ) 59895.4
19.50-
BH-11 D-13 2 300.00 214.04 425.00 15.36 18.2% 18.1% Rate (mm/min) 0.5
19.95
3 375.00 244.76 425.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.0
Cohesion (kPa)
32.9
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450 500
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

27-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)
Sample Normal Shear

(kN/m )
Dry Unit
Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No. No. Initial Failure
(m) (kPa) (kPa)
(%) (%) Area (mm2) 2537.14
3
1 200.00 141.58 425.00 Volume (mm ) 59895.4
BH-10 D14 21.0-21.45 2 300.00 210.37 425.00 15.38 16.6% 17.9% Rate (mm/min) 0.5
3 375.00 243.42 425.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.4
Cohesion (kPa)
27.0
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450 500
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

27-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacement
Moisture Content Dimension

(0.01mm)
at Failure

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No. No. Initial Failure
(m) (kPa) (kPa)
(%) (%) Area (mm2) 2537.1357

1 200.00 137.24 375.00 Volume (mm3) 59895.4


10.50-
BH-05 D-07 2 300.00 206.69 375.00 15.42 16.8% 17.6% Rate (mm/min) 0.5
10.95
3 375.00 239.08 375.00 Test Type Unsub
500
Test Points Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.5
Cohesion (kPa)
22.8
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)

300

250
Shear Stress (kPa)

200

150

100
ID1
50 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

3-Oct-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY MIRSARAI,
BSRM BSRM CHITTAGONG
(UNIT 02)

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No.
(m) No. (kPa) (kPa) Initial Failure
2
(%) (%) Area (mm ) 2537.14

1 200.00 139.24 400.00 Volume (mm3) 59895.4


21.0-
BH-04 D-14 2 300.00 207.36 400.00 16.68 19.1% 20.0% Rate (mm/min) 0.5
21.45
3 375.00 239.42 400.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.0
Cohesion (kPa)
26.7
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

25-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No.
(m) No. (kPa) (kPa) Initial Failure
2
(%) (%) Area (mm ) 2537.14

1 200.00 139.24 375.00 Volume (mm3) 59895.4


18.0-
BH-03 D-12 2 300.00 207.70 375.00 14.74 21.8% 23.1% Rate (mm/min) 0.5
18.45
3 375.00 239.42 375.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.0
Cohesion (kPa)
26.7
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

25-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY (UNIT MIRSARAI,
02)
BSRM BSRM CHITTAGONG

Displacement
Moisture Content Dimension

(0.01mm)
at Failure

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No. No. Initial Failure
(m) (kPa) (kPa)
(%) (%) Area (mm2) 2537.1357

1 200.00 140.91 400.00 Volume (mm3) 59895.4


13.50-
BH-02 D-09 2 300.00 210.03 425.00 15.08 19.0% 20.3% Rate (mm/min) 0.5
13.95
3 375.00 241.75 425.00 Test Type Unsub
500
Test Points Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.2
Cohesion (kPa)
27.7
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)

300

250
Shear Stress (kPa)

200

150

100
ID1
50 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450 500
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

3-Oct-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
DIRECT SHEAR TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY MIRSARAI,
BSRM BSRM
(UNIT 02) CHITTAGONG

Displacemen
Moisture Content Dimension

t at Failure
(0.01mm)

(kN/m )
Dry Unit
Sample Normal Shear

Weight
3
Boring Sample ID
Depth Pressure Strength Height (mm) 20.0
No. No.
(m) No. (kPa) (kPa) Initial Failure
2
(%) (%) Area (mm ) 2537.14

1 200.00 137.91 375.00 Volume (mm3) 59895.4


10.50-
BH-33 D-07 2 300.00 207.36 375.00 17.93 17.0% 17.5% Rate (mm/min) 0.5
10.95
3 375.00 238.75 375.00 Test Type Unsub
500
Test Points
Mohr-Coulomb Envelop

400
Shear Stress (kPa)

300 Friction Angle (Deg)


30.2
Cohesion (kPa)
24.7
200

100

0
0 100 200 300 400 500
Normal Stress (kPa)
300

250

200
Shear Stress (kPa)

150

100

50 ID1 ID2
ID3
0
0 50 100 150 200 250 300 350 400 450
Displacement (0.01mm)
TEST DATE PERFORMED BY CHECKED BY

26-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY


FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-20 UDS-01 18.5-19.00 95.32 7.03 20.55 16.42 25.12%
2
3

STRESS-STRAIN DIAGRAM
120.00
ID 1
ID 2
ID 3
100.00
(KP a )

80.00

60.00
S tres s

40.00

20.00

0.00
0 1 2 3 4 5 6 7 8 9
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-16 UDS-02 14.5-15.00 129.20 9.84 21.09 16.72 26.15%
2
3

STRESS-STRAIN DIAGRAM ID 1
140.00
ID 2
ID 3
120.00

100.00
(KP a )

80.00
S tres s

60.00

40.00

20.00

0.00
0 2 4 6 8 10 12
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-16 UDS-01 14.0-14.50 202.19 11.95 21.58 17.57 22.85%
2
3

STRESS-STRAIN DIAGRAM ID 1
250.00
ID 2
ID 3

200.00
(KP a )

150.00
S tres s

100.00

50.00

0.00
0 2 4 6 8 10 12 14
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-15 UDS-01 18.5-19.00 127.80 7.73 21.47 17.98 19.41%
2
3

STRESS-STRAIN DIAGRAM ID 1
140.00
ID 2
ID 3
120.00

100.00
(KP a )

80.00
S tres s

60.00

40.00

20.00

0.00
0 1 2 3 4 5 6 7 8 9
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-14 UDS-03 20.00-20.50 100.16 6.68 21.41 17.34 23.52%
2 BH-18 UDS-01 13.00-13.50 79.25 4.92 20.82 16.76 24.24%
3

STRESS-STRAIN DIAGRAM
120.00
ID 1
ID 2
ID 3
100.00
(KP a )

80.00

60.00
S tres s

40.00

20.00

0.00
0 1 2 3 4 5 6 7 8 9
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


01.10.16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-14 UDS-04 20.5-21.00 235.70 5.27 21.14 17.55 20.47%
2
3

STRESS-STRAIN DIAGRAM
250.00

ID 1
200.00 ID 2
ID 3
(KP a )

150.00
S tres s

100.00

50.00

0.00
0 1 2 3 4 5 6
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-13 UDS-03 23.0-23.50 264.98 7.73 20.57 16.64 23.60%
2
3

STRESS-STRAIN DIAGRAM ID 1
300.00
ID 2
ID 3

250.00
(KP a )

200.00

150.00
S tres s

100.00

50.00

0.00
0 1 2 3 4 5 6 7 8 9
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-13 UDS-01 12.5-13.00 163.43 6.33 21.28 17.56 21.21%
2
3

STRESS-STRAIN DIAGRAM
180.00
ID 1
ID 2
160.00
ID 3

140.00
(KP a )

120.00

100.00
S tres s

80.00

60.00

40.00

20.00

0.00
0 1 2 3 4 5 6 7 8
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-12 UDS-01 18.5-19.00 70.80 7.03 20.02 15.26 31.24%
2
3

STRESS-STRAIN DIAGRAM ID 1
80.00
ID 2
ID 3
70.00

60.00
(KP a )

50.00

40.00
S tres s

30.00

20.00

10.00

0.00
0 1 2 3 4 5 6 7 8 9
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-11 UDS-01 4.0-4.50 53.36 6.33 20.06 15.87 26.42%
2
3

STRESS-STRAIN DIAGRAM
60.00
ID 1
ID 2
ID 3
50.00
(KP a )

40.00

30.00
S tres s

20.00

10.00

0.00
0 1 2 3 4 5 6 7 8
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-09 UDS-02 13.0-13.50 110.93 7.03 21.57 17.51 23.23%
2
3

STRESS-STRAIN DIAGRAM
120.00
ID 1
ID 2
ID 3
100.00
(KP a )

80.00

60.00
S tres s

40.00

20.00

0.00
0 1 2 3 4 5 6 7 8 9
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-09 UDS-01 12.5-13.00 146.33 11.25 22.69 19.00 19.41%
2
3

STRESS-STRAIN DIAGRAM
160.00
ID 1
ID 2
140.00 ID 3

120.00
(KP a )

100.00

80.00
S tres s

60.00

40.00

20.00

0.00
0 2 4 6 8 10 12 14
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-4 UDS-01 17.0-17.50 209.13 5.98 21.55 18.13 18.86%
2
3

STRESS-STRAIN DIAGRAM
250.00
ID 1
ID 2
ID 3
200.00
(KP a )

150.00
S tres s

100.00

50.00

0.00
0 1 2 3 4 5 6 7 8
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-31 UDS-02 10.00-10.50 53.04 2.81 21.17 16.92 25.15%
2 BH-19 UDS-03 12.00-12.45 62.36 2.81 20.80 15.90 30.82%
3 BH-22 UDS-01 09.00-9.50 43.72 2.81 20.64 16.10 28.21%
STRESS-STRAIN DIAGRAM
100.00
ID 1
90.00
ID 2
ID 3
80.00

70.00
( K Pa)

60.00

50.00
Stress

40.00

30.00

20.00

10.00

0.00
0 1 2 3 4 5
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


05.09.16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-02 UDS-02 7.00-7.50 177.57 5.98 21.62 18.12 19.32%
2 BH-05 UDS-02 17.50-18.00 176.24 6.68 20.56 16.02 28.38%
3 BH-06 UDS-02 16.0-16.50 260.75 8.44 20.12 15.56 29.27%
STRESS-STRAIN DIAGRAM
300.00
ID 1
ID 2
ID 3
250.00
(KP a )

200.00

150.00
S tres s

100.00

50.00

0.00
0 2 4 6 8 10 12
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


01.10.16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONFINED COMPRESSION STRENGTH TEST
PROJECT CLIENT OWNER LOCATION

BSRM FACTORY (UNIT-02) BSRM BSRM MIRSARAI, CHITTAGONG

Unconfined Unit Weight (kN/m3)


Sample Moisture
ID Boring No. Sample No. Comp. Strength Strain at Failure (%)
Depth (m) Wet Dry Content
(kPa)
1 BH-23 UDS-01 18.5-19.00 47.04 9.84 20.17 15.44 30.63%
2
3

STRESS-STRAIN DIAGRAM
50.00
ID 1
45.00
ID 2
ID 3
40.00

35.00
(KP a )

30.00

25.00
S tres s

20.00

15.00

10.00

5.00

0.00
0 2 4 6 8 10 12
S t r a i n ( % )

TEST DATE TEST PERFORMED BY CHECKED BY


5-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY UNIT MIRSARAI,
BSRM BSRM
02 CHITTAGONG
Max
Sample Cell Failure Dry Unit Moisture Strain Dimension
Boring Sample ID Deviator Mass
Depth Pressure Strain Weight Content Rate Height
No. No. No. Stress Diam
(m) (mm)
(kPa) (kPa) (%) (kN/m3) (%) (%/min) (g) (mm) (mm)
1 200 461.34 4.17 18.95 27.9% 1.0% 181.07 72.00 36.00
BH-14 UDS-03 20.0-20.50 2 400 979.16 4.17 19.42 25.4% 181.85 72.00 36.00
3
600
ID1 ID2 ID3 Mohr-Coulomb

500
Shear Stress (kPa)

400 Friction Angle (Deg)


0
Cohesion (kPa)
300 360.1

200
Remarks
100 Only 2 Nos. Samples
Could be Prepared
0
0 500 1000 1500
Total Stress (kPa)

1200 500
ID1 ID2 ID3 450 ID1 ID2 ID3 Kf
1000 400
Deviator Stress (kPa)

800 350
300
q (kPa)

600 250
200
400
150
200 100
50
0
0
0 2 4 6 8
0 100 200 300 400 500
Strain (%) p (kPa)

TEST DATE PERFORMED BY CHECKED BY


26-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY UNIT MIRSARAI,
BSRM BSRM
02 CHITTAGONG
Max
Cell Failure Dry Unit Moisture Strain Dimension
Sample Deviator Mass
Boring Sample ID Pressure Strain Weight Content Rate Height
Depth Stress Diam
No. No. No. (mm)
(m) 3
(kPa) (kPa) (%) (kN/m ) (%) (%/min) (g) (mm) (mm)
1 130 391.13 5.21 19.61 24.1% 1.0% 181.82 72.00 36.00
BH-1 UD-1 4.05-4.50 2 260 488.15 6.25 19.80 22.9% 181.85 72.00 36.00
3
300
ID1 ID2 ID3 Mohr-Coulomb

250
Shear Stress (kPa)

200 Friction Angle (Deg)


0
Cohesion (kPa)
150 219.8

100
Remarks
50 Only 2 Nos. Samples
Could be Prepared
0
0 200 400 600 800
Total Stress (kPa)

600 500
ID1 ID2 ID3 450 ID1 ID2 ID3 Kf
500 400
Deviator Stress (kPa)

400 350
300
q (kPa)

300 250
200
200
150
100 100
50
0
0
0 2 4 6 8 10 12
0 100 200 300 400 500
Strain (%) p (kPa)

TEST DATE PERFORMED BY CHECKED BY


27-Sep-16 MD. AKBAR ALI Priodeep Chowdhury
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY UNIT MIRSARAI,
BSRM BSRM
02 CHITTAGONG

Max Dimension
Sample Cell Failure Dry Unit Moisture Strain
Boring Sample ID Deviator Mass
Depth Pressure Strain Weight Content Rate
No. No. No. Stress Height Diam
(m)
(kPa) (kPa) (%) (kN/m3) (%) (%/min) (g) (mm) (mm)
1 150 522.33 8.33 17.23 41.2% 1.0% 181.72 72.00 36.00
14.00-
BH-16 UDS-01 2 300 1059.19 6.25 17.32 40.5% 181.69 72.00 36.00
14.50
3
600
ID1 ID2 ID3 Mohr-Coulomb

500
Shear Stress (kPa)

400 Friction Angle (Deg)


0
Cohesion (kPa)
300 395.4

200
Remarks
100 Only 2 Nos. Samples
Could be Prepared
0
0 500 1000 1500
Total Stress (kPa)
1400 500
ID1 ID2 ID3
1200 450 ID1 ID2 ID3 Kf
Deviator Stress (kPa)

400
1000
350
800 300
q (kPa)

250
600
200
400 150
200 100
50
0
0 5 10 15 20 0
0 100 200 300 400 500
Strain (%) p (kPa)

TEST DATE PERFORMED BY CHECKED BY


25-Sep-16 MD. AKBAR ALI PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram


1.00

0.90

0.80
Vo i d R a t i o ( e )

0.70

0.60

0.50

0.40

0.42 e0

σc'
0.30
10.00 σz
100.00 1000.00 10000.00
Pressure (kPa)

Borehole: BH-15 Init Void Ratio (e0): 0.88 Pre. Con. Press. (σ'c), kPa: 200 Initial MC (%): 32.51%
3
Depth (m): 18.5-19.00 Comp Index, Cc: 0.07 OC Margin (kPa): 33 Bulk Unit Wt (kN/m ): 18.58
Sample: UDS-01 Recomp Index, Cr: 0.02 OC Ratio: 1.2 Dry Unit Wt (kN/m3): 14.02

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


2-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram


1.00

0.90

0.80
Vo i d R a t i o ( e )

0.70

0.60

0.50

0.40

0.42 e0
σc'
0.30
10.00 σz
100.00 1000.00 10000.00
Pressure (kPa)

Borehole: BH-14 Init Void Ratio (e0): 0.77 Pre. Con. Press. (σ'c), kPa: 300 Initial MC (%): 23.69%
3
Depth (m):20.00-20.50 Comp Index, Cc: 0.00 OC Margin (kPa): 124 Bulk Unit Wt (kN/m ): 18.38
Sample: UDS-03 Recomp Index, Cr: 0.08 OC Ratio: 1.7 Dry Unit Wt (kN/m3): 14.86

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


2-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram

1.45

1.35

1.25

1.15
Vo i d R a t i o ( e )

1.05

0.95

0.85

0.75

0.65

0.55

σc'
0.42 e0
0.45
10.00 σ
100.00
z 1000.00 10000.00
Pressure (kPa)
Borehole: BH-09 Init Void Ratio (e0): 1.12 Pre. Con. Press. (σ'c), kPa: 400 Initial MC (%): 43.60%
3
Depth (m): 12.50-13.0 Comp Index, Cc: 0.07 OC Margin (kPa): 296 Bulk Unit Wt (kN/m ): 17.84
Sample: UDS-01 Recomp Index, Cr: 0.02 OC Ratio: 3.8 Dry Unit Wt (kN/m3): 12.42

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


26-Sep-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram

0.60

0.50
Vo i d R a t i o ( e )

0.40

0.30

0.42 e0

σ c'
0.20
10.00 σ
100.00
z 1000.00 10000.00
Pressure (kPa)
Borehole: BH-07 Init Void Ratio (e0): 0.63 Pre. Con. Press. (σ'c), kPa: 100 Initial MC (%): 20.56%
3
Depth (m): 6.50-7.00 Comp Index, Cc: 0.07 OC Margin (kPa): 33 Bulk Unit Wt (kN/m ): 19.40
Sample: UDS-01 Recomp Index, Cr: 0.02 OC Ratio: 1.5 Dry Unit Wt (kN/m3): 16.09

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


26-Sep-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION

BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram

1.45

1.35

1.25

1.15
Void Ratio (e)

1.05

0.95

0.85

0.75

0.65

0.55

σc' 0.42 e0
0.45
10.00 100.00 1000.00 10000.00
σz Pressure (kPa)

Borehole: BH-06 Init Void Ratio (e0): 1.12 Pre. Con. Press. (σ'c), kPa: 300 Initial MC (%): 29.27%
3
Depth (m): 16.0-16.50 Comp Index, Cc: 0.11 OC Margin (kPa): 197 Bulk Unit Wt (kN/m ): 16.05
Sample: UDS-02 Recomp Index, Cr: 0.02 OC Ratio: 2.9 Dry Unit Wt (kN/m3): 12.42

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


26-Sep-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram


0.95

0.85

0.75

0.65
Vo i d R a t i o ( e )

0.55

0.45

0.35

0.25

σc' 0.42 e0
0.15
10.00 σ
100.00
z 1000.00 10000.00
Pressure (kPa)
Borehole: BH-05 Init Void Ratio (e0): 0.87 Pre. Con. Press. (σ'c), kPa: 900 Initial MC (%): 26.33%
Depth (m): 17.5-18.00 Comp Index, Cc: 0.10 OC Margin (kPa): 758 Bulk Unit Wt (kN/m3): 17.72
Sample: UDS-02 Recomp Index, Cr: 0.02 OC Ratio: 6.3 Dry Unit Wt (kN/m3): 14.03

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


26-Sep-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST
PROJECT CLIENT OWNER LOCATION
BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram


0.65

0.55

0.45
Vo i d R a t i o ( e )

0.35

0.25

0.42 e0

σc'
0.15
10.00 σ
100.00
z 1000.00 10000.00
Pressure (kPa)
Borehole: BH-04 Init Void Ratio (e0): 0.53 Pre. Con. Press. (σ'c), kPa: 600 Initial MC (%): 15.68%
Depth (m): 17.00-17.50 Comp Index, Cc: 0.08 OC Margin (kPa): 424 Bulk Unit Wt (kN/m3): 19.87
3
Sample: UDS-01 Recomp Index, Cr: 0.02 OC Ratio: 3.4 Dry Unit Wt (kN/m ): 17.17

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


26-Sep-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram

1.45

1.35

1.25

1.15
Vo i d R a t i o ( e )

1.05

0.95

0.85

0.75

0.65

0.55

σc' 0.42 e0
0.45
10.00 σ z'
100.00 1000.00 10000.00
Pressure (kPa)
Borehole: BH-13 Init Void Ratio (e0): 1.12 Pre. Con. Press. (σ'c), kPa: 500 Initial MC (%): 43.60%
Depth (m): 12.5-13.00 Comp Index, Cc: 0.07 OC Margin (kPa): 396 Bulk Unit Wt (kN/m3): 17.84
Sample: UDS-01 Recomp Index, Cr: 0.02 OC Ratio: 4.8 Dry Unit Wt (kN/m3): 12.42

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


6-Oct-16 Md. Akbar Ali PRIODEEP CHOWDHURY
DEVELOPMENT CONSTRUCTIONS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
CONSOLIDATION TEST

PROJECT CLIENT OWNER LOCATION


BSRM FACTORY(UNIT 02) BSRM BSRM BSRM

Consolidation Graph: Pressure Vs Void Ratio Diagram

1.45

1.35

1.25

1.15
Vo i d R a t i o ( e )

1.05

0.95

0.85

0.75

0.65

0.55 σc'

0.42 e0
0.45
10.00 σ
100.00
z 1000.00 10000.00
Pressure (kPa)
Borehole: BH-33 Init Void Ratio (e0): 1.12 Pre. Con. Press. (σ'c), kPa: 500 Initial MC (%): 43.60%
3
Depth (m):17.50-18.00 Comp Index, Cc: 0.07 OC Margin (kPa): 357 Bulk Unit Wt (kN/m ): 17.84
Sample: UDS-02 Recomp Index, Cr: 0.02 OC Ratio: 3.5 Dry Unit Wt (kN/m3): 12.42

TEST DATE TEST PERFORMED BY PLOTTED & CHECKED BY


26-Sep-16 Md. Akbar Ali PRIODEEP CHOWDHURY
FOUNDATION CONSULTANTS LTD.
GEOTECHNICAL ENGINEERING LABORATORY
SWELL INDEX TEST (REF.: IS 2720)
PROJECT BSRM FACTORY (UNIT 02) OWNER BSRM
CLIENT BSRM LOCATION MIRSARAI, CHITTAGONG

BOREHOLE NO BH-16 BH-11 BH-09 BH-20 BH-20 BH-14 BH-13 BH-16 BH-23 BH-12
SAMPLE ID UDS-01 UDS-02 UDS-01 UDS-02 UDS-01 UDS-01 UDS-03 UDS-02 UDS-01 UDS-01
DEPTH(m) 14.00-14.50 04.00-4.50 12.50-13.00 19.00-19.50 18.50-19.00 14.00-14.50 23.00-23.50 14.50-15.00 18.50-19.00 18.50-19.00
FINAL VOLUME (10 gm Sample+40cc Water),Vd 44.7 44.5 44.7 44.5 44.6 44.7 44.5 44 44.2 44
FINAL VOLUME (10 gm Sample+40 cc Kerosene),Vk 43 43 43 43 43 43 43 43 43 43
Vd-Vk 1.7 1.5 1.7 1.5 1.6 1.7 1.5 1 1.2 1
FREE SWELL INDEX, [(Vd-Vk)/Vk] X 100% 3.95% 3.49% 3.95% 3.49% 3.72% 3.95% 3.49% 2.33% 2.79% 2.33%

TEST DATE TEST PERFORMED BY CHECKED BY


10/4/2016 MD. AKBAR ALI PRIODEEP CHOWDHURY

You might also like