Professional Documents
Culture Documents
ACKNOWLEDGEMENT .......................................................................................................................... 4
1. INTRODUCTION .................................................................................................................................. 5
3.1.2. Topography.............................................................................................................................. 22
Elevation ............................................................................................................................................ 22
4.1.1. Vision....................................................................................................................................... 50
5. IMPLEMENTATION ........................................................................................................................... 74
6.1. Conclusion...................................................................................................................................... 79
References ............................................................................................................................................. 80
ACKNOWLEDGEMENT
First of all, we would like to express our heartfelt gratitude (thanks) to our instructor Samuel A. for his
endless effort in equipping the required knowledge and skill in the course Urban Design Project
(Condominium Development) in giving a project which helps us exercise the theoretical knowledge we
grasp in the class to practical and in consult to complete our project as intended with the required quality
on time. Secondly, we would like to offer our heartfelt appreciation to our group members for the
endless effort accomplishes the project on time by working day and night. Our great thanks also extend
to different officials and institutions: Bole sub city woreda 10 administrative offices, residents within
our Project area and also around it.
Condominium is a multipleunit dwelling in which there is separate and distinct ownership of individual
units and joint ownership ofcommon areas. For example, in an apartment house, the individual owners
would each own their own apartments while all theowners of the separate apartments would together ow
n the parts of the building common to all of them, such as the entrances,laundry rooms, elevators, and ha
llways. The building is managed by the condominium association, either directly or through aprofession
al manager. The owners of the individual units are jointly responsible for the costs of maintaining the bu
ilding and commonareas, but they are individually responsible for the maintenance expenses of their part
icular units.
In Singapore and Malaysia, "Condo" or "Condominium" are terms used for housing buildings with some
special luxury features like security guards, swimming pools or tennis courts. Most housings without
such features are built by the governmental Housing Development Board (HDB), and such HDB units
can be possessed for rent or individually bought from the government. Condominiums and HDB flats
make up the overwhelming majority of available residential housing in the country.
of the program.
In this approach the community facilities are an integral part of the condominium and are a part of the
common estate. Unlike the series condominium the condominium unit owners have an undivided
interest in all of the facilities contained in the common estate together with the separate fee of the unit
When condominiums are developed in series with an off-site corporation holding title to the community
facilities
The Instructions Require the off-site facilities to be conveyed unencumbered and free and clear of all
liens to a nonprofit corporation if the facilities are to be constructed as an inducement to purchasers
to buy.
Alternate Plan. HUD-FHA offices have the discretion to use the following alternate plan if there is
doubt that a sufficient number of units can be sold to support a recreational area of the size shown in
the plan and if the facilities cannot be phased In proportion to the phasing of the separate
condominiums:
(1) Title to the land on which the community facilities will be constructed will be conveyed to a
nonprofit off-site corporation (with an owners title policy insuring title, free and clear of all
liens) will be used to create the condominium regimes. Consideration should be given to the
location of the community facility land with respect to the first condominium phase.
(2) The Grantor/Developer will enter into a binding contract with the nonprofit corporation to
construct the facilities at a fixed price. This price shall not exceed the agregate sum of the values
attributable to, and supportable by, the individual condominium estates to be served by such
facilities. The contract shall have a termination date satisfactory to the HUD-FHA Director.
(3) The project commitment will require that at the time each sale is consummated an amount
equal to the value of the community facilities attributable to each condominium estate will be set
The community will be developed entirely as a community of condominium estates and will be
phased in accordance with a total development plan.
Each phase will have an incorporated condominium association which will ultimately be merged
with the others so as to land up with one corporation that governs the use and maintenance of certain
designated community facilities and areas.
The common areas within each condominium phase will not be merged with other areas in other
phases; therefore; the original ratio of ownership in each phase will remain unaffected by the merger
of the corporations.
Reciprocal easements of enjoinment (cross easements) will be used to tie the community areas
together and form the basis of assessment.
3.1.2. Topography
The site’s fundamental landform components includes: elevation, slope & aspect (direction of slope).
Each of these attributes can have a substantial influence on land use planning & urban design decisions.
Elevation
The elevation affects drainage patterns, visibility on a site & the surrounding landscape which in turn
determines the size and spatial configuration of local view sheds. Hence, the elevation of the given
project site is ranging from 2275m to 2423.6m.
Slope Analysis.
Analyzing the slope of the given site will help us to detect which area will fit the required building
arrangement, circulation system, drainage, storm water management and allocating public facilities and
others. In the table below shows the slope analysis.
Our action area as we mentioned earlier most of the area has gentle slope which is in between 2-7 %
(33.02ha and 41.47% of total area). Then we can conclude that the area is suitable for condominium
development rather than the slope is beyond 20% of the action area.
1. The slope class of 0-2% covers about 13.63 ha and estimated to be 17.12% 0f the total area. The area
is flat and it has characteristics of high retaining capacity of water and it becomes muddy during
rainy season. It requires high cost to construct drainage channel.
2. The slope class 2-4% covers about 16.73ha of the site which is 21.01 % of the total area. The area is
favorable for different urban setting and does not require much cost to undertake development
program.
3. The slope class 4-7% covers about 16.29ha of the site which is 20.46% of the total area. This is the
dominant class, favorable for different urban setting does not require much cost to undertake
development program.
4. The slope class 7-10% covers about area 3.63ha of the site which is 4.56% of the total area. This is
very favorable for heavy industries but favorable many other different urban development’s
programs and does not require much cost to undertake development program. Therefore we can
conclude generally this area is suitable for setting urban development programs without any
difficulties and much costs.
5. Slope of 10-15% covers about area 3.79ha of the site which is 4.76% of the total area. It is also
acceptable for urban system. But it requires drainage and retaining wall to realize the urban project.
So, it is necessary to expect high cost of construction
6. The slope class >15% covers about area 25.55ha of the site which is 32.09% of the total area. It is
less acceptable for urban system /setting but suitable urban agriculture, green belt, Urban a
forestation and greenery. It requires retaining wall and high construction cost for urban development.
This map shows areas which are too sloping and too flat. Too flat and too slope topography is
constraint to urban development activities. The flat area is Subjected to:-
- Flood inundation, required high investment for realization of drainage system, requires flood diversion
channels. It may become swampy during rainy season. In case of too steep slope, it is very difficult to
urban setting.
From the above map we can summarize about 58.53 of our project site is suitable for various
development activities.
On contrary, nearly 41.47% of the project area is taken as constraints or challenges for
construction but it does not mean impossible to practice different development interventions,
rather in needs high amount of construction cost. For this case, we can solve this slope constraint
problem by land escaping the steep area and use it for greenery purpose.
Aspect analysis
Aspect map shows direction that land faces so as to help natural drainage and the proposal of drainage
lines.
Prepared By: UP 4-1 Group 1 (Feb/2016) Page 25
Urban Design Project (Condominium Development)
Soil Analysis
Analyzing the existing soil type is useful for identifying the carrying capacity and percolation potential
of the site.In our action area the soil is black cotton. This type of soil has the characteristics of cracking
during dry season and shirinks during rainy season. So it difficult to urban development (it needs high
cost) It enables to determine deep foundation for building construction.
In summer and in autumn seasons of the year the wind blows from Northeast to Southwest dominantly
at speed of 3-6m/s but it has the maximum 11m/s and minimum 0.51ms respectively. Glasses of
openings in higher stories of high rise buildings should be thick enough to resist pressure due to such
wind speed. And different types of trees should be planted to break wind speed.
Wind direction
According to the data we obtained from the Ethiopian Meteorology service agency the prevailing wind
direction of the site in months is: .
September to April from North east to South west direction(prevailing wind direction)
In May it flows West to East wards
June to August blows towards South east direction
From this data in order to get all houses equal ventilation the longest side of the block shall be from North
East towards South West or parallel to the prevailing direction. Because the prevailing wind direction is
from North East to South West. And the road network shouldn’t be designed the same direction to
prevailing wind direction (from north east to south west).
Temperature
The monthly mean minimum and maximum temperature is analyzed in the four main seasons. The
monthly min T and Max T
Rain fall
According to data collection from national Metrological service agency A.A the maximum rainfall was
observed in the area from Jun to September, the monthly average rainfall was 208.8mm.
Generally
Sun Orientation
The sun direction is commonly fallows from East to South and to West direction with small deviation
and relative to the whole Addis Ababa, the same sun orientation is observed. This can also be used to
determine the building arrangement and its openings. And the recreational areas and sport fields should
consider sun orientation.
Sun Angle
According to data obtained from national meteorology, Addis Ababa is located at 10º N during the time
of June solstice. The sun is over head at 231/2N. At this latitude the noon sun angle is 90º.
• Environmental aspect analysis is also useful for insuring sustainable development, and to
improve issues like noise pollution, air pollution, soil pollution and water pollution. These
pollutions can affect human health. But our action area since it is located at the periphery of the
city that makes it better for living except the liquid disposal site.
Vegetation
In our project site we observed that both indigenous and exogenous species of trees which are serving
for different purposes.
The important function of vegetation is
soil stabilization and enrichment
play role in flood control
To balance ecological system.
Makes the area aesthetically attractive
For shading purpose
Some tree species in the site are:
gravillia Robusta which is found on the main road
Acacia Seligina
Eucalyptus tree
These trees have their own roll for better air quality of the area, esthetical value, social benefit (shade),
ecological balance, wind break and etc. However, the coverage and the types of the existing trees are not
enough for our study area. So that, we will incorporate various trees which used for wind break, soil
stability, recreational purposes.
Liquid Waste
• Almost all of the residents in our site dispose their liquid wastes by using well organized
sewerage system which is connected to the buildings and transported to the liquid waste disposal
site. But the other waste disposal site which is located to the east direction has an air pollution
problem. Therefore, the existing liquid disposal site should be well sealed to avoid bad smell, air
pollution and to improve aesthetical value of the site.
3.1.5. Hydrology
Hydrology is the scientific study of the movement, distribution, and quality of water on Earth, including
the hydrologic cycle, water resources and environmental watershed sustainability. Hydrology is
subdivided into surface water hydrology, groundwater hydrology (hydrogeology), and marine
hydrology. There is a river at the eastern part of our site and it doesn’t cause any problem since it is
located at the down side. T he main thing is how to use these resource on the site.
Sub-Arterial Street
This road is used for fast and heavy traffic movement and it connects from Megenagna, up to Cheffe
Condominium inside the boundaries of our site. Generally, this road which is found in the site has best
connectivity with others.
Collector Street
The collector Roads in our site Used for Medium traffic Collection to Sub Arterial road.
Local Street
These roads have been serving to access Condominium units, heavy vehicles are restricted, even through
traffic of these serving access condominium road is prohibited, only dwelling unit private cars access to
these roads.
Generally, the hierarchy of the roads and their connectivity with each other (local roads to collector,
collector to sub Arterial Road) can full fill the standard except some local streets connected to sub
Prepared By: UP 4-1 Group 1 (Feb/2016) Page 33
Urban Design Project (Condominium Development)
Arterial Street. But, the coverage of the road is 11.67% from the total land use. This shows that the
coverage of the roads is below standard. For this case, we will propose additional roads within the study
area.
Regarding the existing road, there is no serious problem. Surface treatment of the roads within the site
covered by asphalt and cobble stone. They have better quality and comfortable for circulation in the
neighborhood area. But access roads within blocks are earthen, and these roads are not comfortable for
dwellers, specially, for disabled persons. In addition to the above surface materials, there is also
Pedestrian walk ways along the sub-arterial are paved with Terrazzo. Furniture, streets lights, zebra
cross, all are present in our site along the sub arterial road but not along the collector and local streets.
From the observation conducted by our group member, we have seen the following main land use
3.1.8. Utilities
Water supply
Water is essential for our life and for any purpose. All residents of our project area have better water line
connection. But the water supply is not fully gives service to the community during all 24 hours.
Electricity
All residents of our project area use electricity as a source of light and majority of the households use
electricity for food preparation. But except the main road, other roads haven’t street light, which is
important for security of the area.
Drainage
Drainage system which controls the quantity of run-off from a development improves the quality of the
run-off and enhances the nature conservation, landscape and amenity value of a site and its
surroundings.
Almost in the sub arterial, local, and collector roads closed ditch facility is provided. Some of these
drainage facilities are not well handled and they have maintenance problem. The ditches which are
found within the blocks are open.
Morphology it is the study of the form of human settlements and the process of their formation and
transformation i.e. the solid and void part of the action area. Building Morphology shows the built up
area and the space free from buildings.
The Solid is the Built up area of the site. And the Void is the inbuilt up area of the site. Building
morphology also indicates that the Solid and Void have some specific calculation.
The subdivision of settlement in to specific block type has an impact on the movement of circulation
system within the settlement. As the block length decrease the number of through connections increases
for pedestrian movement, however it implies more roads to be constructed. The scale down of large
blocks could be beneficiaries in creating sense of belongingness especially for children and aged people.
(Planning manual, 2006.pp,72). In our site the block arrangement is not well organized and there are
large buildings. We have to propose well organized block arrangements and minimize block size to
increase access to circulation and physical & visual permeability.
Building Height
Standardized building heights play important role in aesthetical appearance with the street hierarchy.
Because it becomes focal point for visualization, this has to be weighed against to the negative impact
on the micro climate, environmental performance of nearby buildings and amount of activity frontage.
According to our project area the existing building height is G + 4, G+1 and G+0. Based on this data, the
area accommodate below the capacity. The project area is 79.7ha, but the population resides on this area
is only 15060 residents.
Population density is midyear population divided by land area in square kilometers. Population is based
on the de facto definition of population, which counts all residents regardless of legal status or
citizenship--except for refugees not permanently settled in the country of asylum, who are generally
considered part of the population of their country of origin. The existing density of the action area is as
follows.
The permeability map shows the number of alternative ways we can go from one place to another, with
shortest distance.
Legibility
Legibility (Where am I? How do I get there?): A well known and legible place has a clear image and is
easy to understand.
In our study area there is no legible land mark. Even the height of buildings and their colors are similar
that makes difficult to identify one block from other block. Different shapes and heights of building, and
known land mark ( like big hotel, monument, round about…) should be built to avoid legibility problem
of the area.
Accessibility:
Accessibility refers to the design of products, devices, services, or environments for people with
disabilities. The concept of accessible design ensures both "direct access" (i.e. unassisted) and "indirect
access" meaning compatibility with a person's assistive technology. Based on these, our study area has
no that much problem of accessibility for shopping, services, open space but the facilities are not as
safer as for disabled persons.
Variety:
It is about the presence of different activities, forms and people. Varity /mixed use can be appropriate at
different scales from national to local environments; city to town or to village; neighborhoods or street;
or in single structures. According to this principle, our study area has variety problems that most the
residential buildings have the same design; it is dominated by residential area and it is highly dominated
by middle income people.
A well- designed built environment makes the residents comfortable and feelings of safety and security.
Unsafe environment can literally imprison peoples in their own homes, especially during the hours of
darkness. Good lighting and good layout are further important factors. But in our site specially, the
inner collector and local roads have not street light. This exposes the residents for security and safe
problems.
Robustness:
A quality of a place to be used for many different purposes by different peoples at a time and to be
changed and adapted for different use at different periods. Robustness is important for both outdoors and
indoors spaces. Based on this principle, our study area has different robustness problems according to
the above mentioned definitions.
Health
Before any urban design program implementation, it is vital to assess the existing community health
facility provisions in terms of catchment of population, location, and space requirement. In our project
area there is no a private and public health facilities. From this reason, the residents spend more cost to
get these facilities from the surrounding. Proposing health center in the project area is necessary.
Recreational facilities
Recreational facilities are integral part of city planning because of the impact that it generates and
eventually perpetuates through the city fabric and city life. Proper planning of recreational facilities
therefore demands greater attention and care for ensuring vibrant city life for urban dwellers.
Recreational facilities include open space, play field, playground, play lot etc.
Based from this idea, our study area has limited number of recreational facilities, and also the
management problems of the existing facilities are there. Proposing additional recreational facilities is
necessary.
Worshiping places
Worshiping places are areas for religious practices. They include worshiping buildings and open spaces
for religious festivity. In our project area there are no Worshiping places, but orthodox churches and
protestant churches in nearby neighborhood integrate our project area in all direction, thus no need of
additional worship places within the study area.
Administration facilities
Administration is a crucial for keeping the well being of the community and for the efficient and proper
management of resources. Proper administration is a tool for urban development. Unfortunately, there
are two administration facilities in the area (Police station and Post office). There is no other type of
administration facilities on the study area. Additional administration facilities like district offices, needs
to be proposed.
Parking
There are no specific parking places along the main road but inside the blocks there are enough parking
areas for the neighborhood dwellers. However the management and maintenance of these parking areas
is very poor. No basement and off street parking in the study area and should be considered in proposal.
Public space
Private space
Semi-private space
3.2.4. Integration
Integration means the interaction and interconnection of one neighborhood with the other to
getting services and functions. Based project area get services from surrounding area are the
followings.
Social service(education, health, administrative )
Religious service (Churches and mosques)
Market
Recreation and public transport
Strength
Most of the topography of the site is suitable for construction of buildings, roads and drainage
urban development.
The existences of sub arterial road which may attract different activities and due to the presence
of this road the dwellers have the advantage to use public transport like city bus.
Availability of pedestrian walk ways along the sides of the sub-arterial street.
Weakness
There is no street lights along interior roads, except the main road
Opportunities
Since the area found near to the current rail road, the residents can use this public transport easily
with a minimum cost.
The site has the chance to expand outwards because it is adjacent to rural areas.
Threats
4. PROJECT PROPOSAL
4.1.2 Goal
To create economically active, environment friendly, structurally pleasant, socially acceptable,
safe and livable urban area based on the concept of new urbanism.
Modifying the width and surface treatment of the existing and potential roads.
Greeneries and buffer will be developed along the sides of the river.
Residential and different services will be planned in the site in appropriate way.
Conceptual framework
The conceptual frame work of the project is to guiding or directing the urban transformation and
integrates the existing urban fabric with the structure plan. So our conceptual framework includes:
Facilitating public spaces that are: attractive, enjoyable, comfortable, & livable.
Concept one
This alternative needs to make the center of the area commercially active and modifying the current
land use functions with a little modification of street network.
Advantages
• To attract investment
• Create permeability
Disadvantages
Concept two
This alternative is needs to preserve accessible services, by keeping the continuity of street, greenery,
and building.
Advantages
Disadvantages
Topographic condition
Provision of roundabout
The greenery and urban aforestation will be preserved for recreational purpose and also
keeps the ecological balance of the site and forage production.
Commercial area that use for hotel.
The public services and administration will be provided with accessible in the site. It
includes education (Kg and from first cycle up to Preparatory), health center, police,
post office, community office, Tele, electric and water offices.
Open spaces will be created to serve for residents. Like play ground, play lot, and social
and cultural interaction.
Manufacturing (such as flour factory and dairy) will be established in the site to create
job opportunity
Mixed use that is dominated by residential use and it includes, super markets, bars and
restaurants, beauty salons, shops, pharmacies
Collector and local roads will be additionally designed within the site.
Collector and local roads will be additionally designed within the site.
General Land Use Existing Land Use Proposed Land Existing Land Use Proposed Land
Use Use
Area(ha) Area (%) Area(ha) Area (%)
Administration 0.18 0.23 0.89 1.1
Commerce & 0.10 0.13 0.78 0.97
Business
Manufacturing 1.99 2.50 1.55 1.93
Mixed Residence 4.63 5.81 25.79 32.15
Open Space 36.53 45.81 4.52 5.64
Recreation 3.65 4.58
River 0.38 0.47 0.38 0.47
River Buffer 4.29 5.35 4.29 5.35
Residence 4.74 5.95 - -
Service 2.11 2.64 3.34 4.16
Road and Transport 9.31 11.68 15.51 19.34
Urban Afforestation 16.48 20.67 - -
Urban Afforestation - - 23.16 28.88
& Recreation
Total 79.7 100 80.2 100
In the construction of utility lines, minimum spacing between utility and their respective
depth should be expected and properly executed.
Storm water should be located opposite side of the street from the water line.
Areas that are proposed with a good void solid relation are more legible and attractive to urban
community and developers.
Thus the study area is proposed as to have a definite morphological appearance through:-
The BAR is the ground floor area of a building is divided by the area of the plot.
The FAR is the total floor area of the building divided by the plot area in multi-story buildings.
Our proposal is based on the standard of BAR and FAR ratio and percent to full and free circulation
within the building.
Economy
The economic height study was about identifying the minimum height or developable area (FA) that is
economically feasible for an investor. Rather than a feasible height, the economic study group has come
up with a feasible developable area (Floor Area) for each location in the urban structure.
Infrastructure
This study was about identifying the maximum development capacity of an area on the basis of the
bearing capacity of infrastructure mainly the road network. While the economic floor area study
indicated the minimum economically feasible developable area or building height, the infrastructure
height on the other hand indicated the maximum that should be allowed. In combination, these two
studies determine the minimum and the maximum development density for an area.
Climatic
Wind and sun are strong determinants of building height. What time we want to shade an area, a
pedestrian street or ventilate a building is partly a matter of the height of buildings in respect to such
areas and other buildings.
Enclosure:
It is the relationship between the horizontal distance between two buildings and the vertical height.
Scale:
The building’s dimension and all its parts relative to the dimensions of a human being (i.e. human scale)
and, its dimensions relative to those of its setting (i.e. generic scale).
The basis for determining the building height in this action area is the Structural Plan regulation and
other building parameters are also taken into consideration.
Building facing to sub arterial streets the building height is minimum G+8 maximum G + 11
All buildings should respect a setback of 2 meter depending upon the street hierarchy
Basement Parking
We propose basement parking for mixed use buildings; the site allows such a facility of parking to meet the
parking requirement.
This parking plan proposed in each blocks used for residents and customers.
4.9. Landscaping
Properly designed and constructed soft and hard landscape elements cover the ground by creating
interesting and dynamic public spaces within the urban environment.
5. IMPLEMENTATION
Addis Ababa City Administration Land- Bank and Urban Renewal Project Office
- Discussing issue with key responsible body and community to create awareness and encourage
community participation up to the highest level of participation.
- Formation of committee (community representative, fund raising advice and consultancy)
- Mobilizing all available resources
- Preparation of temporary relocation shelters and compensation according to rule and regulation.
- Analyzing the overall existing conditions of the site
- Site preparation
Period : one year is required to accomplish these activities.
- Street widening and new street construction which encourages high raise buildings.
- Promoting mixed and commercial use overall the site and reserving and upgrading some existing
social service and buildings.
• Lease revenue
• Tax revenue
The following table shows the road length and the amount of cost.
Total 8.6mill
Solutions
6.1. Conclusion
This project considered the basic facts from the literature, analysis parts and according to the
building permits and height regulations for the site; we proposed new buildings, streets, open
spaces and other land uses. In relation to land value, attention is given for the maximum
utilization of urban land and utilities. Because of this, low-rise buildings in the project area are
not allowed in the existing situation.
Our design was to give solution in case of:
Mixed land use
Providing pleasant open spaces
Compact building design
Workable neighborhood
Transportation choices and congestion measures
With minimum impact on the environment
6.2. Recommendations
Government and key stakeholders should take their clear role for the implementation of the
project and participate actively in the project.
Environmental sensitivity and other prone areas should be protected by the community and the
environmental protection agency from human encroachment and pollution.
All stakeholders should give special attention for vulnerable groups (e.g. old age, disabled,
women, low income groups, children etc) from the inception of the project to implementation.
Community participation should take the major share to mobilize resources (human, material,
knowledge finance etc) for realization of the project.
Government should plan to cover the construction cost and the residents are expected to cover
the total cost of construction in the future and pay the dawn payment.
Strong coordination between different sectors like telecommunication, Ethiopian electric and
power corporation authority, Addis Ababa water supply and sanitation and Addis Ababa Road
Authority have a great contribution for the management of waste materials and construction of
infrastructure for the sake of common development and benefits of resources.
References
Structural plan Manual: Addis Ababa
Previous urban planning graduate student documents.
World Urbanization Prospects: 2014
Condominium Housing in Ethiopia: The Integrated Housing Development, 2011
Housing and Land Use Regulatory Board of Philippines, 2009
Types of Condominium Projects: (www.lesaoline.org/samples)
Sustainable Urban Housing: Design Standards for New Apartments, (www.environ.ie)
Condominium: Wikipedia, the free encyclopedia.